ML19211C856

From kanterella
Jump to navigation Jump to search
Summary of NRC 791004 Discussion in Washington,Dc Re Proposed Use of EPICOR-II at TMI-2 & Solidification of Radwaste
ML19211C856
Person / Time
Issue date: 10/05/1979
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Bickwit L, Gossick L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO), NRC OFFICE OF THE GENERAL COUNSEL (OGC)
Shared Package
ML19211C854 List:
References
REF-10CFR9.7 NUDOCS 8001150112
Download: ML19211C856 (2)


Text

S

( NUCLEAR REGULATORY COMMISSwN-o UNITED STATES

(

~

g e ; 6;

.r WASHIN GTON,0.C. 20555 iV ll o

y C.iV,/

October 5, 1979 OFFICS OF THE SECRETARY MEMORANDUM FOR:

Leonard Bickwit, General Counsel Lee V. Gossick, Executive Director for Opa t ns FROM:

amuel J. Chilk, c etary

SUBJECT:

STAFF REQUIREMENTS - DISCUSSION OF RADI0 ACTIVELY CONTAMINATED WATER AT THREE MILE ISLAND AND RELATED SUBJECTS (EPICOR II)

(SEE SECY-79-561), 9:45 A.M.. THURSDAY, OCTOBER 4,1979, COMMISSIONERS' CONFERENCE ROOM, D. C. OFFICE (OPEN TO PUBLIC ATTENDANCE)

The Comission discussed the proposed use of EPICOR II at Three Mile Island Unit 2, and the solidification of radioactive wastes there.

The Commission requested:

1.

that OGC provide a legal assessment of the various options for Commission action in these matters; (OGC) (SECY Suspense: 10/9/79) 2.

that the staff be prepared to address the points raised in the

~.

substantive letters commenting on the Environmental Assessment CE published on 8/20/79; (NRR) (SECY Suspense: 10/9/79)

Ei%

iG 3.

that the Office of the Secretary schedule two briefings on this subject, '

  • 3 one to discuss with the staff the comments on the Environmental Assessment, and the other to discuss with OGC the legal aspects of EPICOR II use at Three Mile Island.

(Subsequently, the briefings were scheduled for 10/10/79).

Comissioner Ahearne requested:

4.

an analysis of whether each step in the proposed decontamination process can be considered separately in the legal process, or whether the process must be considered all at once.

(OGC) (SECY Suspense: 10/9/79) cc:

Chairman Hendrie Comissioner Gilinsky Comissioner Kennedy

}744 }32 Comissioner Bradford Comissioner Ahearne Cc=ission Staff Offices 8001150ll2%

(

(-

aa a.

a program of inspection of NRC licensees only at a frequency of once each three years; b.

ar FY 83 supplemental request for 11 positions and S100,000, ar.d a corresponding addition to the FY 81 budget.

(.'s.'SS) (SECY Suspense: December,1979) cc:

Chairman Hendrie Cc.mcissioner Gilinsky Cc:n issioner Xennedy Ccnzissioner Bradford Com:issioner Ahearne C~=:ission Staff Offices k

1744 133