IR 05000382/2018007

From kanterella
(Redirected from ML18253A135)
Jump to navigation Jump to search
NRC Triennial Fire Protection Inspection Report 05000382/2018007 and Confirmatory Order (EA-15-100) Follow-Up Inspection Report
ML18253A135
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/07/2018
From: Greg Werner
NRC/RGN-IV/DRS/EB-2
To: Dinelli J
Entergy Operations
Werner G
References
EA-15-100 IR 2018007
Download: ML18253A135 (17)


Text

September 7, 2018

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000382/2018007 and CONFIRMATORY ORDER (EA-15-100) FOLLOW-UP INSPECTION REPORT

Dear Mr. Dinelli:

On August 16, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the triennial fire protection program at your Waterford Steam Electric Station, Unit 3 and discussed the results of this inspection with Mr. S. Vazquez, General Manager Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

This inspection also assessed activities related to the implementation of the commitments described in Confirmatory Order NRC Inspection Report 05000382/2016007 and NRC Investigation Report 4-2014-017, dated April 6, 2016 (ADAMS Accession Number ML16096A474). The inspectors reviewed the action items associated with the subject commitments to determine the status of those commitments and the enclosed inspection report describes the results of those reviews. This report documents the NRCs conclusion that the requirements of the Confirmatory Order have been met.

No findings or violations of NRC requirements of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Gregory E. Werner, Chief Engineering Branch 2 Division of Reactor Safety

Docket No. 50-382 License No. NPF-38

Enclosure:

Inspection Report 05000382/2018007 w/Attachment: Documents Reviewed

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2018007

Enterprise Identifier: I-2018-007-0003

Licensee:

Entergy Operations, Inc.

Facility:

Waterford Steam Electric Station, Unit 3

Location:

Killona, Louisiana

Inspection Dates:

July 30, 2018, to August 16, 2018

Inspectors:

J. Mateychick, Senior Reactor Inspector (Team Lead)

S. Alferink, Reactor Inspector

B. Correll, Reactor Inspector

S. Makor, Reactor Inspector

N. Okonkwo, Reactor Inspector

Approved By:

G. Werner, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting a triennial fire protection inspection and a confirmatory order follow-up inspection at Waterford Steam Electric Station, Unit 3 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below. No licensee-identified non-cited violations are documented in the report.

List of Findings and Violations

No findings or violations of more than minor significance were identified during the inspection.

Additional Tracking Items

Type Issue number Title Report Section Status CO Confirmatory Order EA-15-100 Waterford Steam Electric Station - Confirmatory Order NRC Inspection Report 05000382/2016007 and NRC Investigation Report 4-2014-017

Reviewed

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.05XT - Fire Protection - NFPA 805 (Triennial)

The inspectors evaluated the following from July 30, 2018, to August 16, 2018.

Fire Protection Inspection Requirements===

The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:

Fire Area Description RAB 7 Relay Rooms (+35' Elevation)

RAB 8 Switchgear Rooms RAB 15 Diesel Generator B Room

B.5.b Inspection Activities (2 Samples)

The inspectors evaluated feasibility of the following B.5.b mitigating strategies contained in Procedure S-SAMG-01, Supplemental SAMG Loss of Large Areas of the Plant Due to Fire/Explosion, Revision 020:

(1) Section 9.0, Reactor Coolant System (RCS) Heat Removal Via Steam Generators
(2) Section 10.0, Containment Flooding and RCS Injection

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 92702 - Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders

The inspectors reviewed the licensee response to Confirmatory Order EA-15-100 by specifically reviewing the actions taken in association with Section V of the Order.

INSPECTION RESULTS

Confirmatory Order EA 15-100 Waterford Steam Electric Station - Confirmatory Order NRC Inspection Report 05000382/2016007 and NRC Investigation Report 4-2014-017 92702

Description:

To ensure the effectiveness and completeness of the implementation of the Confirmatory Order commitments, the inspectors reviewed the root cause analysis; Condition Report CR-WF2-2014-063, and the associated corrective actions; reviewed documents and records produced to meet the specific items in the Confirmatory Order; performed follow-up interviews of some security and fire watch personnel who have been assigned with the fire watch responsibilities following the implementation of Confirmatory Order; and reviewed the licensees effectiveness reviews of actions taken to address the Confirmatory Order commitments.

The inspectors concluded that the individual Confirmatory Order Section V items and the associated action plans were adequately completed and were effective in achieving the associated performance improvement objectives of the Order.

Corrective Action Reference(s): The licensee still had a small number of open corrective actions associated with the Order, including Condition Reports CR-WF3-2018-04337, CR-WF3-2018-04338, and CR-WF3-2018-04335.

EXIT MEETINGS AND DEBRIEFS

On August 2, 2018, the inspectors presented the Confirmatory Order follow-up inspection results to Mr. J. Dinelli, Site Vice President, and other members of the licensee staff.

On August 16, 2018, the inspectors presented the triennial fire protection inspection results to Mr. S. Vazquez, General Manager Plant Operations, and other members of the licensee staff.

The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71111.05XT - Fire Protection - NFPA 805 (Triennial)

Cable Routing Data Components

ACC-139A

BAM-113A

CVC-101

CVC-103

CVC-109

ACC-139B

BAM-113B

Calculations

Number

Title

Revision

ECE91-056

Relay Settings and Coordination Curves for 6.9kV,

4.16kV, and 480V Buses

ECE94-005

Low Voltage Coordination Study

EE5-32-2

Appendix R - Associated Circuit Analysis - Coordination

Study

EC-F00-009

Hydraulic Calculation of Suppression System FPM-25B

EC-F00-013

Hydraulic Calculation of Suppression System FPM-29

EC-F00-014

Hydraulic Calculation of Suppression System FPM-30A

EC-F09-005

NFPA-805 Transition, Non-Power Operating Mode

(NPO)

EC-F10-021

WF3 NFPA 805 Fire Risk Evaluation - Fire Area RAB-15 1

EC-F13-001

WF3 Post-Fire NSCA (NFPA-805)

EC-F13-002

WF3 NFPA 805 Fire Risk Evaluation - Fire Area RAB-7

EC-F13-003

WF3 NFPA 805 Fire Risk Evaluation - Fire Area RAB-8

EC-F99-002

Supply System Hydraulic Calculation Data File

EC-F99-009

Hydraulic Calculation of Suppression System FPM-4B

EC 1617

B.5.b Phase 2 and 3 Mitigation Strategy Portable Pump

and Line Loss Evaluation

ECF13-001

Post-Fire NSCA (NFPA-805)

ECF14-006

WF3 Fire Safety Analysis - Fire Area RAB 1

ECF14-008

WF3 Fire Safety Analysis - Fire Area RAB 2

ECF14-013

WF3 Fire Safety Analysis - Fire Area RAB 7

ECF14-014

WF3 Fire Safety Analysis - Fire Area RAB 8

ECF14-019

WF3 Fire Safety Analysis - Fire Area RAB 15

Calculations

Number

Title

Revision

ECF14-039

WF3 Fire Safety Analysis - Fire Area RAB 35

ECF14-041

WF3 Fire Safety Analysis - Fire Area RAB 37

ECF14-043

WF3 Fire Safety Analysis - Fire Area RAB 39

MMNQ3-5

Flooding Analysis Outside Containment

PRA-W3-05-005

Waterford 3 Fire PRA Multi-Compartment Analysis and

Hot Gas Layer Impact Evaluation

PRA-W3-05-006F Waterford 3 Fixed Ignition Source Zone of Influence

Methods

PRA-W3-05-007

Waterford 3 Fire PRA Summary Report

PRA-W3-05-100

Waterford 3 Fire Risk Evaluation Quantification and

Analysis Report

Condition Reports (CR-WF3-xxxx-xxxxx)

2015-00540

2015-03501

2018-00573

2016-07759

2018-04276

2018-04286

2018-04287

2018-02055

2018-02112

2018-04289

2016-07759

2018-04360*

2018-04362*

2018-04354*

2018-04362*

2018-04357*

2018-04412*

2018-04664*

2018-04359*

2018-00617

2015-03502

2018-00573

2018-04497*

2018-04601*

2018-04453*

2017-08611

2017-08737

2018-00053

2006-04460

2006-04054

2018-04276

2018-04296

2018-04356*

2015-00859

2018-04336*

2018-04497*

2017-00134

2018-02089

2018-04628*

HQN-2018-01769

  • Issued as a result of inspection activities.

Drawings Number Title

Revision

B424 Sheet 2388

4.16kV Bus 3B3-S Undervoltage Relays Sheet 2

B424 Sheet 2390

480V Bus 3B31-S Undervoltage Relays Sheet 2

B424 Sheet 2391

Sequencer B Sheet 1

B424 Sheet 2939

Isolation Switch Dev - Aux Pnl 2B

B424 Sheet 2937

Isolation Switch Dev - Aux Pnl 1B

B424 Sheet 2942

Transfer Switch Development Aux Panel - 2

B289 Sheet 15A

4.16kV Switchgear 3A3-S Protective Relay Settings

B289 Sheet 15-1

4.16kV Swgr 3A3-S One-Line Diagram

B289 Sheet 15

Power Distribution and Motor Data 4.16kV Swgr 3A3-S

One-Line Diagram

B424 Sheet 2335

4.16kV Bus 3AB3-S Tie to Bus 3A3-S

Drawings Number Title

Revision

B424 Sheet 2334

4.16kV Bus 3A3-S Tie to Bus 3AB3-S

B424 Sheet 2527

480V Bus 3AB31-S Tie to Bus 3A31-S

B424 Sheet 2477

480V Bus 3A31-S Tie to Bus 3AB31-S

B424 Sheet 300

Letdown Stop Valve 1CH-FI516 A/B

B424 Sheet 301

Letdown Containment Isolation Valve 1CH-F2501 A/B

B424 Sheet 302

Letdown Containment Isolation Valve 2CH-F1518 A/B

B424 Sheet 709

Component Cooling Water Pump B

B424 Sheet 848

Shutdown Heat Exchanger Outlet Valve 3CC-F131B

B424 Sheet 292

Pressurizer Proportional Heater Bank - 2

B424 Sheet 2978

Diverse Emergency Feedwater Actuation System

(DEFAS) - Sheet 1

B424 Sheet 2979

Diverse Emergency Feedwater Actuation System

(DEFAS) - Sheet 2

B424 Sheet 2980

Diverse Emergency Feedwater Actuation System

(DEFAS) - Sheet 3

B424 Sheet 2976

Control Wiring Diagram Diverse Reactor Trip System

B424 Sheet 1565

Steam Generator No. 2 Blowdown Containment

Isolation Valve 2BD-F605 and 2BD-F606

G153, Sheet 4

Flow Diagram Feedwater, Condensate and Air

Evacuation Systems

G161, Sheet 1

Flow Diagram Fire, Make-Up and Domestic Water

Systems

G161, Sheet 3

Flow Diagram Fire, Make-Up and Domestic Water

Systems

G161, Sheet 5

Flow Diagram Fire, Make-Up and Domestic Water

Systems

G168, Sheet 2

Flow Diagram Chemical and Volume Control System

Engineering

Reports Number

Title

Revision

WF3-FP-15-00002 NFPA 805 Monitoring Program Phase 1: Scoping

WF3-FP-15-00003 NFPA 805 Monitoring Program Phase 2/3: Quantitative

Screening and Risk Target Values

Engineering

Reports Number

Title

Revision

WF3-FP-15-00004 NFPA 805 Monitoring Program Phase 2: Qualitative

Screening Results

WF3-FP-15-00006 NFPA 805 Monitoring Program: Expert Panel

Documentation

WF3-FP-11-00001 NFPA 805 Table G-1 and Section 4.4 of the Transition

Report on Radioactive Release

Fire Impairments17-094

17-127P

17-158

17-287

18-058P

18-065P

18-113P

18-135P

Miscellaneous

Documents

Number

Title

Revision

or Date

Audit Report

QA-9-2018-W3-1

Fire Protection

February 26,

2018

EN-DC-330

Fire Protection Program

EN-SA-G-001

Identification and Documentation of Time Critical Actions 1

FAQ 07-0030

Establishing Recovery Actions

Lesson Plan

WGATT-AOR-

17HITFFR04

Fire Field Refresher Training

Lesson Plan WLP-

AOR-17HITIFB01

Fire Brigade Site Specific Training and Biennial

Refresher

Lesson Plan WLP-

AOR-166SAMG

Severe Accident Management Guidelines

Lesson Plan WLP-

AOR-184FBL02

Fire Brigade Leader Incident Commander

Lesson Plan WLP-

EP-SAM00

Severe Accident Management Guidelines

Lesson Plan WLP-

FPFB-IFB01

Fire Brigade Site Specific Training and Biennial

Refresher

Lesson Plan WLP-

LOR-166SAM00

Severe Accident Management Guidelines

Lesson Plan WLP-

OPS-FP00

Fire Protection System

Letter W3F1-

2006-0064

Response Providing Information Regarding

Implementation Details for the Phase 2 and Phase 3

Mitigation Strategies

January 11,

2007

Miscellaneous

Documents

Number

Title

Revision

or Date

Letter W3F1-

2007-0016

Supplemental Response Regarding Implementation

Details for the Phase 2 and Phase 3 Mitigation

Strategies

April 26, 2007

LO-WLO-2017-

00073

Pre-NRC Triennial Fire Protection Inspection Focused

Self-Assessment

May 6, 2018

OE-NOE-2016-

00008 CA-19

RIS 2015-017 Review and Submission of Updates to

Final Safety Analysis Reports, Emergency

Preparedness Documents, and Fire Protection

Documents

OE-NOE-2016-

00124 CA-17

OE-2016-00194

OE-NOE-2016-

00345 CA-18

PSSB 20161010A - Use of Non-Phosphate Ester EHC

Fluid in GE Steam Turbines

OE-NOE-2017-

00016 CA-14

OE-2016-00077 - Plant Personnel Do Not Plan,

Schedule, and Coordinate Work Effectively at Times

OE-NOE-2017-

00049 CA-15

CR-ANO-C-2016-03405

OE-NOE-2017-

00389 CA-11

CR-ANO-S-2017-4836 - Control of Flammable Materials 0

PSA-W3-03-01

Waterford 3 Methodology for Addressing VFDRs in the

Fire PRA and NFPA-805

Permit ID 18-124

Transient Combustible Permit

Permit ID 18-126

Transient Combustible Permit

Permit ID 18-127

Transient Combustible Permit

Permit ID 18-128

Transient Combustible Permit

Permit ID 18-129

Transient Combustible Permit

Pre-Fire Strategy

RAB 7-001

Elevation +35.00 RAB Relay Room

Pre-Fire Strategy

RAB 08A-001

Switchgear Room A

Pre-Fire Strategy

RAB 08B-001

Switchgear Room B

Pre-Fire Strategy

RAB 08C-001

Switchgear Room A/B

Miscellaneous

Documents

Number

Title

Revision

or Date

Pre-Fire Strategy

RAB 15-001

Emergency Diesel Generator 3B

TRM 3/4.3.3.8

Fire Detection Instrumentation

138

TRM 3/4.7.10

Fire Suppression Water Systems

138

TRM 3/4.7.10.2

Spray and/or Sprinkler Systems

146

TRM 3/4.7.10.4

Fire Hose Stations

138

TRM 3/4.7.10.5

Yard Fire Hydrants and Hydrant Hose Houses

138

TRM 3/4.7.10.11

Fire-Rated Assemblies

138

TRM 3/4.3.3.8

Fire Detection Instrumentation

138

W3-DBD-018

CFR 50.48 (a) and (c)/NFPA 805/Fire Protection

Upper Level DBD

WF3-FP-08

One hour rated 3-M Interam E-54A Support and Heat

Transfer Items - Deviation to thermocouple placement

requirements Generic Letter 86019, Supplement 1, as

tested in Fire Test CTP 1199 and Supplementary Item in

2019

WF3-FP-10-00006 WF3 Code Compliance Report for NFPA 72D Standard

for the Installation, Maintenance and Use of Proprietary

Signaling Systems for Watchmen, Fire Alarm and

Supervisory Service, 1975 Edition

WF3-FP-10-00007 WF3 Code Compliance Report for NFPA 72E

Automatic Fire Detectors, 1974 Edition

WF3-FP-10-00013 WF3 Code Compliance Report for NFPA 13, Standard

for Installation of Sprinkler Systems,

1976 Edition

WF3-FP-10-00015 WF3 Code Compliance Report for NFPA 20 Centrifugal

Fire Pumps, 1972 Edition

WF3-FP-10-00019 NFPA 805 Chapter 3: Fundamental Fire Protection

Program and Design Elements Review (Table B-1)

WF3-FP-11-00017 W3 NFPA 805 Fire Area Transition Evaluation

(Table B-3)

WF3-FP-13-00001 IN 92-18 Motor Operated Valve Failure Evaluation

WF3-FP-13-00003 Recovery Action Feasibility and Reliability Review

Miscellaneous

Documents

Number

Title

Revision

or Date

WF3-FP-17-00001 Risk Assessment of WF3 SUPS EC-43927

WF3-FP-18-00001 Evaluation of Fire Damper FD-76 and FD-77

WSES-FSAR-

UNIT-3,

Section 9.5.1

Fire Protection

310

Modification

Number

Title

AR 259964259964Delete PM Requirement for FR Test Switches

Procedures

Number

Title

Revision

EN-DC-115

Engineering Change Process

EN-DC-127

Control of Hot Work and Ignition Sources

EN-DC-128

Fire Protection Impact Reviews

EN-DC-324

Preventive Maintenance Program

EN-DC-161

Control of Combustibles

EN-DC-186

Fuse Control

EN-DC-357

NFPA 805 Monitoring Program

EN-DC-359

Fire Risk Management During Non-Power Operations

for NFPA 805 Plants

EN-OP-123

Time Critical Action/Time Sensitive Action Program

Standard

000

FP-001-014

Duties of a Firewatch

FP-001-015

Fire Protection System Impairments

21

FP-001-019

Fire Brigade Equipment

309

FP-001-020

Fire Emergency/Fire Report

2

FP-001-024

Fire Prevention Inspection

ME-003-002

Fire Detector Supervisory Circuit Functional Test

319

ME-003-004

Fire Dampers

ME-003-006

Fire Barrier Penetration Seals

311

Procedures

Number

Title

Revision

ME-003-009

Fire-Rated Walls, Floors, and Ceilings

307

ME-003-012

Cerberus Pyrotronics ID-60 Series Intelligent Detector

Testing

316

ME-003-017

Cerberus Pyrotronics Thermal Detector Testing

2

ME-003-301

480 VAC Overcurrent Protective Integrated Device

Functional Test

008

ME-004-121

4.16kV Switchgear Maintenance

017

ME-004-463

Paging System

011

OP-006-001

Plant Distribution (7kV, 4kV, and SSD) System

331

OP-009-004

Fire Protection

21

OP-901-502

Evaluation of Control Room and Subsequent Plant

Shutdown

OP-901-502

Evaluation of Control Room and Subsequent Plant

Shutdown

OP-901-502

Evaluation of Control Room and Subsequent Plant

Shutdown

035

OP-901-524

Fire Areas Affecting Safe Shutdown

OP-903-053

Fire Protection System Pump Operability Test

OP-903-054

Fire Protection Valve Lineup Check

OP-903-055

Fire Main Flush and Hydrant Inspection

OP-903-056

Fire Protection Functional Test

309

OP-903-057

Fire Protection System Flow Test

23

PLG-009-014

Conduct of Planned Outages

315

S-SAMG-01

Loss of Large Areas of the Plant Due to Fire/Explosion

20

UNT-005-013

Fire Protection Program

UNT-005-034

Communication Affecting Plant Operation

007

UNT-006-033

Technical Specifications Surveillance Frequency List

Vendor

Documents

Number

Title

Revision

GEH-1802

Types M26 and M36 for Magne-Blast Air Circuit Breaker

Types AM-4.16 and AM-13.8

X

Tech Pub 24-1

Series 24 Instrument and Control Switches

2/98

GEH-2636

Armor-Clad Indoor Feeder Busway

6-75

Work Orders

2321112

00099542

283342

2700943

2816894

2822026

2748895

2709413

2709412

2709411

2603247

2606298

2610650

2821792

2757271

2757271

2831291

2515208

2735558

2755814

2769009

2587397

2649177

2728394

2803417

00033196

2570142

2600440

2358489

00040986

00047412

2702 - Follow-up on Traditional Enforcement Actions Including Violations, Deviations,

Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution

Confirmatory Orders

Condition Reports (CR-WF3-xxxx-xxxxx)

2013-06073

2014-00631

2014-00695

2014-05660

2014-00631

2015-07022

2015-07707

2016-00201

2016-00202

2018-04337*

2018-04335*

2018-04338*

  • Issued as a result of inspection activities.

Miscellaneous

Documents

Number

Title

Revision

or Date

FFAM-SUPV-

00001

Supervisor Training Program Familiarization Guide

FCBT-SUPV-

CFR-Compliance

CFR 50.5/7/9 Compliance CBT

FCBT-SUPV-

CFR-Compliance

CFR 50.5/7/9 Compliance CBT

QS-2014-W3-010

Quality Assurance Surveillance Report

December 9,

2014

ADI

Fleet-Wide Assessment of Integrity Events

(2011-2016)

December 10,

2016

Talisman Report

Effectiveness Assessment EN-OM-126

September 26,

2016

CR-WF3-2014-

0631

Root Cause Analysis for Failure to Complete Required

Hourly Watch Inspection

March 16, 2014

Procedures

Number

Title

Revision

FP-001-014

Duties of a Firewatch

FP-001-014

Duties of a Firewatch

FP-001-014

Duties of a Firewatch

EN-MA-126

Control of Supplemental Personnel

EN-NS-101-04

Processing Potentially Disqualifying Information

EN-OM-126

Management and Oversight of Supplemental Personnel

EN-MP-106

Contract Management

EN-NS-101

Unescorted Access Authorization Program

EN-OP-139

Fire Watch Program

EN-OP-139

Fire Watch Program

ML18253A135

SUNSI Review: ADAMS:

Non-Publicly Available Non-Sensitive Keyword: NRC-002

By: JMM Yes No

Publicly Available

Sensitive

OFFICE

RI:EB2

RI:EB2

RI:EB2

RI:EB2

SRI:EB2

BC:ACES

BC:DRPD

NAME

BCorrell

SMakor

SAlferink

NOkonkwo

JMateychick

MVasquez

NOKeefe

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

9/4/2018

8/23/2018

9/4/2018

9/4/2018

9/5/2018

9/6/2018

9/7/2018

OFFICE

BC:EB2

NAME

GWerner

SIGNATURE

/RA/

DATE

9/7/2018