Proposed Tech Specs Re one-time Exemption from Requirements of 10CFR50 Re Integrated Leak Rate Testing Intervals for License DPR-70
ML18101A626
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/04/1995
From:
Public Service Enterprise Group
To:
Shared Package
ML18101A625 List:
References
LCR-94-47, LR-N95032, NUDOCS 9504130071
Download: ML18101A626 (2)


Text

e e ATTACHMENT 3 TECHNICAL SPECIFICATION PAGES WITH PEN AND INK CHANGES LICENSE AMENDMENT APPLICATION ILRT ONE-TIME SCHEDULAR EXEMPTION SALEM GENERATING STATION, UNIT NO. 1 FACILITY OPERATING LICENSE DPR-70 LR-N95032 DOCKET NO. 50-272 LCR 94-47 The following Technical Specifications have been revised to reflect the proposed changes:

Technical Specification Page 4.6.1 .* 2.a 3/4 6-2 1

.\

( 9504130071 950404

! PDR ADDCK 05000272 P . PDR

~- ' .

  • CONi~~~:M::NT SYST:'.MS ICONiA!!*:~i::NT LEAKAGE LIMITING CONO!TION FOR o.o~~T..IClN 3.6.1.2 Cor.tainment leak.age rat~s shall be limited to:
a. An overall integrated leak.age rate of!. L , 0.10 percent by we.ight of the containment*air per 24 hourl at design pressure, (47.0 psig).
b. A combined leakage rate of!. 0.60 La for all penetrations and valves subject to Type Band C tests"as identified in Table 3.6-1, when pressurized to Pa.

APPLICABILITY: MODES_l, 2, 3 and 4*

.!.CT!ON:

~~ith either (a) th& rne-asured overall integrat!d containment leak.age rate exceeding 0.75 L , or (b) with the measured combined leakage rate for all penetrationsaand valves subject to Tyr~s B and C tests exceeding 0.60 La' restore the leakage rate(s) to within the limit(s) prior to increasing the Reactor Coolant System temperature above zoo*F.

4.6.1.2 The containment 1eak.age rates shall be d~~onstrated at ~he fo11owing test schedule and shall be detennined in conformance with the criteria specified in Appendix J of 10 CFR SO using the methods and provisions of ANSI N45.4-1972:

a. ihree Type A tes:s (Overall Integrated Contai~ment Leakage Rate) shall be conducted at 40 + 10 month intervals during shutdown at desi3n pressure (47:'°0 psig) dur~ng each 10-year servic~ period.;~The third test of each set shall be conducted during the shutdown for the 10-year plan! inservice ins~ection.
  • 'the second inservice Integrated teak Rate Test shall be *
  • , ~rformed at the fifth C'Sfuelin;; OJtage, OUt no later than May, 1984. .

. * + :tecl \..ec..k. 'Ro..t.c. Tes.:t L--+he. sec.end. 1'ns7r-'l/1c.e..

11"'-1hc
fifth 1ns.erv1ce. :In eqra.: d . -\he. se.c.ond.. 10 -yea..r pla...nt 1n~en/1ce.

~~~efn~~~w1~fX~~?'med du.ring the +h1"rt-eenth refueJi'~

--.r~

    • .*_...t oU:klge, bU;%:: ro ln.-ter +ha.n ~:n.1..ne 1.,g1.

S.:.L~l*~ - Ut\il .1 3/4 6-2 Amendment No. 54