Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage
ML22116A244
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/26/2022
From: Justin Poole
Plant Licensing Branch 1
To: Jarrett J, Levander M
NextEra Energy Seabrook
Poole J, NRR/DORL/LPLI, 415-2048
References
EPID L-2021-LLR-0098
Download: ML22116A244 (2)


Text

From:

Poole, Justin To:

Levander, Matthew; Mack, Jarrett Cc:

Danna, James

Subject:

SEABROOK STATION, UNIT NO. 1 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: RELIEF REQUEST 3IR-18 AND 3IR-19 FOR END OF THIRD 10-YEAR ISI INTERVAL FOR EXAMINATIONS WITH LIMITED COVERAGE (L-2021-LLR-0098)

Date:

Tuesday, April 26, 2022 3:54:00 PM

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: RELIEF REQUEST 3IR-18 AND 3IR-19 FOR END OF THIRD 10-YEAR ISI INTERVAL FOR EXAMINATIONS WITH LIMITED COVERAGE (L-2021-LLR-0098)

By [[letter::SBK-L-21083, NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage|letter dated August 18, 2021]], NextEra Energy Seabrook, LLC, submitted relief requests for Seabrook Station, Unit No. 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of these relief requests. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(g)(5)(iii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the impracticality is based on the demonstrated limitations experienced when attempting to comply with the Code requirements during the inservice inspection interval for which the request is being submitted.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br /> to complete. The NRC staff expects to complete this review by November 30, 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Justin C. Poole Project Manager NRR/DORL/LPL I U.S. Nuclear Regulatory Commission (301)415-2048