ML062770224
ML062770224 | |
Person / Time | |
---|---|
Site: | Beaver Valley, Millstone, Calvert Cliffs, Davis Besse, Peach Bottom, Salem, Oconee, Mcguire, Nine Mile Point, Indian Point, Wolf Creek, Saint Lucie, Arkansas Nuclear, Columbia, Seabrook, Turkey Point, Crystal River, Farley, Robinson, Clinton, Fort Calhoun, McGuire, LaSalle |
Issue date: | 09/27/2006 |
From: | Mcbride M LeBoeuf, Lamb, Greene, & MacRae, LLP, Tyco Valves & Controls, LP |
To: | Document Control Desk, NRC/FSME |
References | |
Event #42844 | |
Download: ML062770224 (7) | |
Text
0912712006 U.S. NuclearRegulatory Commission Operations CenterEvent Report Paze I General Information or Other (PAR) Event# 42844 Rep Org: TYCO VALVES AND CONTROLS LP Notification Date I Time: 09/15/2006 19:38 (EDT)
Supplier: TYCO VALVES AND CONTROLS LP Event Date / Time: 09115/2006 (EDT)
Last Modification: 09/15/2006 Region: 1 Docket #:
City: WRENTHAM Agreement State: Yes County: License #:
State: MA NRC Notified by: DAVID THIBAULT Notifications: EUGENE COBEY R1 HQ Ops Officer: BILL GOTT BINOY DESAI R2 Emergency Class: NON EMERGENCY PATRICK LOUDEN R3 10 CFR Section: CLAUDE JOHNSON R4 21.21 UNSPECIFIED PARAGRAPH VERN HODGE (email)
IMPROPER VALVE SPRINGS IN PRESSURE RELIEF VALVES LeBoeuf, Lamb, Green and MacRae LLP provided the following information on behalf of the licensee via facsimile:
Tyco Valves & Controls LP (TVC) manufactures, sells, and services Pressure Relief Valves (PRVs) to NRC licensees for use in NRC licensed facilities. There is a potential problem with one series of those PRVs, but TVC's analysis to date leads TVC to believe that there is not an imminent safety problem with the PRVs that would require the immediate shutdown of licensed nuclear facilities. Rather, TVC believes that there is adequate assurance that the public health and safety can and will be adequately protected until such time as it is possible to replace the spring(s) at issue. The background of this matter is as follows:
"The National Board of Boiler and Pressure Vessel Inspectors performed certification testing on PRVs manufactured by the TVC plant located in India (Tyco Sanmar Ltd). The valves tested by the National Board (NB) were the Crosby series JLT pressure relief valves. These valves are spring-loaded PRVs which are used to provide over-pressure protection for liquid applications. The Series JLT are certified to be in compliance with ASME Boiler and Pressure Vessel Code Sections III and VIII. The certification testing performed by the National Board indicated that these JLT valves did not meet ASME standards and so notified TVC. Thereafter, TVC performed its own testing on the JLT valves and confirmed the NB findings.
"TVC performed a root-cause analysis and determined that the Spring Selection Tables were inaccurate in that the Tables specified a spring with a spring rate which was too high for the adjusted set pressure. It was further determined that, in most cases, the Spring Selection Table specified the correct spring for the higher portion of the tabulated set pressure range; however, the Table specified a spring too strong for the lower portion of the range.
"The corrective action which has been taken by TVC is as follows:
0912712006 U.S. Nuclear Regulatory Commission OperationsCenter Event Report Pa-ee General Information or Other (PAR) Event# 42844
- 1. The Spring Selection Tables are being revised and will take effect by 9/23/2006;
- 2. All of the safety-related PRVs which were affected by the Spring Selection Table have been identified;
- 3. A list of all nuclear facilities has been compiled;
- 4. A Product Safety Advisory is being drafted and will be forwarded to all nuclear facilities as identified in Exhibit A; and
- 5. The Product Safety Advisory recommends replacement of the spring.
"[TVC] believes that, while not in compliance with ASME, these PRVs do not pose a safety hazard inasmuch as there are many levels of conservatism built into the design of pressurized equipment and selection of PRVs such as:
- 1. These valves will open at the specified set pressure and will flow some capacity at the ASME specified overpressure of 10%. Further, based on our testing, these valves will flow the ASME certified capacity at an overpressure of not more than 20%. Most equipment will have been designed with a safety factor above the set pressure of at least 200%.
- 2. In sizing a PRV for an application, the 'required capacity' is determined by the user and the next largest PRV is selected to assure that the ASME certified capacity of the ARV is always greater than the 'required capacity' adding additional conservatism.
- 3. These valves have been supplied to the industry using these same spring selections for over 21 years without incident.
TVC has notified the affected NRC licensees: Arkansas Nuclear One, Beaver Valley, Calvert Cliffs, Clinton Nuclear Station, Columbia Generating Station, Davis-Besse, Fort Calhoun, Millstone Nuclear Power Station, Nine Mile Point, Oconee Nuclear Station, Peach Bottom, Salem Station, Seabrook Station, Wolf Creek Generating Station.
- UPDATE ON 9/27/06 1150 ET VIA FAX FROM MICHAEL MCBRIDE TO MACKINNON **
- TVC has notified the additional NRC licensees: Crystal River, Farley, Indian Point, La Salle, McGuire, Robinson, St. Lucie and Turkey Point.
R1DO (Chris Hott), R2DO (David Ayers), R3DO (Sonia Burgess), R4DO (Zach Dunham) notified and e-mailed to
.NRR Vern Hodge.
ý0296641017. leboeuf, lamb, greene & 11:56:59a.m. 27ý-2006 1 15 4 1-.
LEBOEUF, LAMB, GREENE & MACRAE LLP 1875 CONNECTICUT AVE:., N.W.
SUITE 1200 WASHINGTON, D.C. 20009-5728 (202) 0845-8000 FACSIMILE: (202) 86e-8 102 FAX TRANSMISSION FROM: Michael F. McBride ID#: 0553 DATE: September 27,2006 TEL: (202) 986-8050 PAGES: 1 of " CLIENTIMATTER NO.: 09398-00011 Comments/Message:
Please see the enclosed letter.
THIS FACSIMILE TRANSMISSION CONTAINS CONFIDENTIAL AND/OR LEGALLY PRIVILEGED INFORMATION INTENDED ONLY FOR THE USE OF THE INDMIDUAL(S) NAMED ON THE TRANSMISSION SHEET. IF YOU ARE NOT THE INTENDED RECIPIENT. YOU ARE HEREBY NOTIFIED THAT ANY DISCLOSURE. COPYING. DISTRIBUTION OR THE TAKING OF ANY ACTION IN RELIANCE ON THE CONTENTS OF THIS FACSIMILE TRANSMISSION IS STRICTLY PROHIBITED. IF YOU HAVE RECEIVED THIS COMMUNICATION IN ERROR, PLEASE CALL US COLLECT IMMEDIATELY SO THAT M CAN ARRANGE FOR RETURN OF THE DOCUMENTS TO US AT NO COST TO YOU. THANK YOU.
09/27/2006 WED 11:44 [TX/RX NO 51281 D 001
'2029066I 0~2 leboeuf, lamb, greene & 11:57:08 a.m. 09-27-2006 2/5 LEBOEUF, LAMB, GREENE & MACRAE LLP NEW YORK 1875 CONNECTICUT AVE., N.W. LONDON A 4ULMTINATIONAL WASHINGTON. D.C. PARTN C*RSHIP ALBANY SUITE 1200 PARIS BOSTON WASHINGTON, D.C. 2"0009-5728 BRUSSELS CHICAGO (202) 00-80000 JOHANNESBURG HARTFORD IPTY) LTD.
FACSIMILE: (202) 9B058 102 HOUSTON MOSCOW JACKSONVILLE RIYADH LOS ANGELES AVrlLIATID OFFICZ PITTSBURGH E-MAIL ADDRESS: MICHAEL.MCBRIDE@LLGM.COM ALMATY SAN FRANCISCO BEIJING WRITER*S DIRECT DIAL: (2OZ) 986-8050 September 27, 2006 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Re: Tyco Valves & Controls LP To Whom It May Concern:
Enclosed please find a revised "Exhibit A" to the 10 C.F.R. § 21.5 filing made by Tyco Valves & Controls LP ("TVC") on Friday, September 15, 2006, to reflect additional NRC licensees whose facilities apparently have TVC-furnished valves in use.
Very truly yours, Michael F. McBride Attorney for Tyco Valves & Controls LP Enclosure 09/27/2006 IVED 11:44 [TX/RX NO 5128] RI002
I~.
C, EXHIBIT A 0 10 CFR Part 21 Contacts - Revision I ~1.
-I
,~~~~~~~~~2 reCo. :"C'A;2
~T .
J~t~:~i ~ ~ di2i________ jf ARKANSAS NUCLEAR Manager, Operating Energy Operations PO Box 31995 Jackson, MS 39286- 9' ONE Experience M-ECH-595 1995 0I BEAVR VALEYManager, Site Regulatory M BEAVER VALLEY Manae Beaver Valley Power Station P0 Box 4 Shippingport, PA 15077 *C CD BRUNSWICK Site Vice President wi cc: Site CD NUCLEAR POWER Supv. - Lic/Reg Prog Brunswick Nuclear Plant NC Hwy 87 Box 10429 Southport, NC 28461 STATION CALVERT CLIFFS Buyer Calvert Clifss Nuclear Power Plant 1650 Calvert Cliffs Lusby, Maryland 20637 Parkway CLINTON NUCLEAR Plant Engineering Manager Amergen Energy, An Exelon RR #3,Route 54 East 6 Miles East of Clinton Clinton, IL61727 STATION Co.
COLUMBIA (WPPS) Michael Woodruff, Buyer Energy Northwest- Snake River Warehouse North Power Plant Richland, WA 99352 0
N Columbia (WPPS) Complex Loop N
0 CRYSTAL RIVER Site Vice President Crystal River 3 Nuclear 15760 W.Power Line 0 Cc: Site Supv ! LicIReg Prog. Progress Energy Plant Street C) Crystal River, FL 34428 I-. DAVIS-BESSE Plant Engineering Manager Davis-Besse Mall Stop 1056 FENOC 5501 N.State, Route 2 Oak Harbor, OH 43449 FORT CALHOUN Manager - Nuclear Ucensing Fort Calhoun Nuclear Station P0 Box 550 Mail Stop FC.2 Fort Calhoun, NE N ADMIN 68026-0050 z0 Southern Nuclear FARLEY Plant Supply Chain Operating Co. Plant Cal Su perintendent Farley Nuclear P0 Drawer 470 Ashford, AL 36212 C-.
0 0 Page 1 of 3
0.
10 CFR Part 21 Contacts - Revision 1. Cl S. ,~. .:A
,...........~
INDIAN POINT Vice President Entergy cI~
Nuclear Indian Point Energy Center Buchanan, NY 10511. 0' 29S Broadway Suite 1 0249 0
'S.
LASALLE Mark Geyer I Procurement Exelon Generation LaSalle County 0'
Company 2601N. 21" Road Marseilles, IL61341 Co c~.
MCGUIRE OEA Manager, Nuclear Duke Energ Caronas LLC Mall Code EC 05P PO o 1006 Assessment Division Charlotte, NC 2820i.
1006 MILLSTONE NUCLEAR Director, Nuclear Licensing and Domiinion Resources, Inc. Innsbrook Technical 5000 Dominion Glen Allen, VA 23060 PWR STATION Operation Support Center Boulevard MILLSTONE UNIT #3 Director, OperationNuclear SupportUcensing and Dominion Resorces Inc Innsbrook Center Technical 5000 Dominion Boulevard Glen Allen, VA 23060 0 NINE MILE POINT Procurement Technology Nine Mile Point Nuclear PO Box 63 Co
-'S Power Station L.LC. Lycoming, NY 13093
-Li
-'S Co OCONEE NUCLEAR OEA Manager, Nuclear Duke Energy Corp. Mil Code EC 05P 0
STATION P0 Box 1006 Charlotte, NC 28201-
- 0) Assessment Division 1006 Cl'
~.1 I-.
I-..
PEACH BOTTOM Manager - Licensing Section Kennett Square, PA Correspondence Control Desk Exelon Nuclear Company P0 Box 160 Cli 19348 ROBINSON Site Vice President Progress Energy SC Hwy 151 &23 Cc: Site SupvJLic/Reg Prog. Robinson Nuclear Plant Box 790 Harsville, SC 29550 0 Co M
-.1 R.A. Symes JNAIJB 0 ST. LUCIE Supervisor Performance Florida Power &Light Co. 700 Universe Blvd. 0 PO Box 14000 Juno Beach, FL 33408 0 Assessment Page 2 of 3
- n
ýQl UR ?laft 1ý WW&ks -?kýd% ý ALMSAONOperating SAraM SxpeIencNDAB Experience Group, PSEG Nuclear, LLC Mail Stop N21 PO Box 236 Hancocks 08038 Bridge. NJ 0
Site Vice President Manager - Nuclear Engineering SEABROOK STATION Procurement Engineering FPL Energy, Seabrook, LLC Supervisor P0 Box 300 SeabrooR, NH 03874 (FPLE Seabrook)
Record Management
_____Supervisor R.A. Symes JNAIJB TURKEY POINT Supervisor Performance Florida Power &Light Co. 700 Universe Blvd. PO Box 14000 Juno Beach, FL 33408 Assessment WOLFCREEK WCNOC Manager Document Wolf Creek 1550 Oxen Lane, NE PO Box 411 Burlinglto, KS 66839 GENERATING STATION 0
CO N
N 0
0 0
CA' I.-.
I-.. (AI Page 3 of 3