MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] Category:Meeting Summary
MONTHYEARML24292A1832024-10-30030 October 2024 Summary of Meeting with Tennessee Valley Authority, October 16, 2024, to Discuss Proposed License Amendment Regarding Implementation of an Online Monitoring Methodology ML24269A0062024-10-0303 October 2024 Correction to Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the TVA Nuclear Quality Assurance Plan ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24228A2652024-08-20020 August 2024 Summary of Public Pre-Submittal Meeting with Tennessee Valley Authority Regarding a Future Sequoyah Nuclear Plant and Watts Bar Nuclear Plant LAR Related to TS 3.5.2. ECCS - Operating ML24221A0132024-08-19019 August 2024 July 10, 2024, Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24173A2122024-06-27027 June 2024 Summary of Public Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request Regarding Adoption of TSTF-276-A, Revision 2 to Clarify Requirements for Diesel Generator Testing ML24158A3002024-06-11011 June 2024 Summary of May 6, 2024, Public Meeting with Tennessee Valley Authority to Discuss the Potential for a License Amendment Request Regarding the Control Room Envelope and Selective Use of an Alternative Source Term ML24089A0712024-04-0101 April 2024 3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML24057A0582024-02-27027 February 2024 Summary of February 15, 2024, Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23265A1512023-09-28028 September 2023 Summary of September 12, 2023, Partially Closed Meeting with Tennessee Valley Authority to Discuss Proposed License Amendment Request ML23198A3102023-07-20020 July 2023 July 10, 2023, Summary of Public Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23068A1532023-03-16016 March 2023 Summary of February 22, 2023, Meeting with Tennessee Valley Authority Regarding Proposed License Amendment Request to Increase Allowable Number of Tritium Producing Burnable Absorber Rods at Watts Bar Nuclear Plant, Units 1 and 2 ML23055A4562023-03-0909 March 2023 Summary of February 15, 2023, Public Meeting with Tennessee Valley Authority Regarding Proposed Expedited License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML22329A1382022-12-0505 December 2022 Summary of Meeting with Tennessee Valley Authority Related to Planned Alternative Request WBN-2-ISI-01 for Watts Bar Nuclear Plant, Unit 2 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22104A2252022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Exemption Request for Watts Bar Nuclear Plant, Unit 2 ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22042B3262022-02-14014 February 2022 Summary of February 8, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed License Amendment Request to Revise the Allowable Value for Trip of Turbine-Driven Main Feedwater Pump at Watts Bar Nuclear Plant, Unit 1 ML22025A3112022-02-0909 February 2022 Summary of January 19, 2022, Meeting with Tennessee Valley Authority Regarding a Proposed Schedule for Development of a License Amendment Request for Increased Tritium Production ML21349A3642022-01-0404 January 2022 Summary of December 14, 2021, Teleconference with Tennessee Valley Authority Regarding a Proposed Change to the Capsule Withdrawal Schedule for Watts Bar Nuclear Plant, Unit 2 ML21279A0902021-11-0303 November 2021 Summary of Conference Calls Regarding the Fall 2021, Mid-Cycle Steam Generator Tube Inspections ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21253A0872021-09-15015 September 2021 Summary of August 19, 2021, Partially Closed Meeting with Tennessee Valley Authority to Discuss Mid-Cycle Outage Contingencies for Watts Bar Nuclear Plant, Unit 2 ML21245A4252021-09-15015 September 2021 Summary of August 19, 2021, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to the Watts Bar Nuclear Plant, Units 1 and 2 ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21120A2192021-05-0404 May 2021 April 28,2021, Summary of Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, to Remove from Technical Specifications Redundant Units of Measurement for Control ML21099A2072021-04-13013 April 2021 Summary of April 7, 2021, Meeting with Tennessee Valley Authority Related to a Planned Relief Request from ASME Code Testing Requirements ML21060B0532021-03-0303 March 2021 Summary of February 11, 2021, Meeting with Tennessee Valley Authority Related to a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2, to Apply a Temperature Adjusted Steam Generator Tube Flaw Growth Rate Methodology ML21033A5952021-02-23023 February 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar Nuclear Plant, Unit 2 Steam Generator Replacement ML20351A4212021-01-19019 January 2021 Summary of Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Requests Related to the Watts Bar, Unit 2, Steam Generator Replacement ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20351A2192021-01-11011 January 2021 Summary of Conference Calls Regarding the Fall 2020 Steam Generator Tube Inspections ML20337A0402020-12-15015 December 2020 Summary of November 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification 5.9.9, Steam Generator Tube Inspection Report ML20323A0662020-11-27027 November 2020 Summary of October 28, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request for Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML20244A1892020-09-11011 September 2020 Summary of Teleconference Call with Tennessee Valley Authority Regarding a Proposed Change to the Containment Leakage Rate Testing Program ML20233A8352020-08-25025 August 2020 Summary of August 11, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20213C7112020-08-25025 August 2020 Summary of July 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned Alternative Request for Watts Bar Nuclear Plant, Unit 1 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20211L8222020-08-10010 August 2020 Summary of Teleconference Call with the Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20150A4162020-06-24024 June 2020 Summary of May 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 1 ML20153A3622020-06-22022 June 2020 Summary of May 27, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20135H2702020-05-28028 May 2020 Summary of May 5, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 ML20143A1692020-05-28028 May 2020 Summary of May 14, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Unit 2 ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20034F5232020-02-12012 February 2020 Summary of Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2 2024-09-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 15, 2018 Joseph W. Shea, Vice President Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A Chattanooga, TN 37402-2801
SUBJECT:
PUBLIC MEETING
SUMMARY
- WATTS BAR NUCLEAR PLANT -
DOCKET NOS. 50-390 AND 50-391
Dear Mr. Shea:
This refers to the meeting conducted, at your request, at the NRC Region II office, Atlanta GA, on February 9, 2018, at 1:00 p.m. EDT. The meeting's purpose was to hold a discussion regarding the need for a clarification or modification request to be submitted by Tennessee Valley Authority (TVA) for the 2017 Confirmatory Order (ML17208A647).
Specifically, TVA has identified areas where it seeks clarification of previously issued Confirmatory Orders in order to ensure compliance with the Orders and TVA intends to formally request modification to the Confirmatory Orders EA-17-022 and EA 09-009, 203.
Enclosed are a list of attendees and the presentation handout.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding.
Please contact me at (404) 997-4465 with any questions you may have regarding this letter.
Sincerely,
/RA/
Anthony D. Masters, Chief Reactor Projects Branch 5
Enclosures:
- 1. List of Attendees
- 2. Handout - NRC Public Meeting Regarding Confirmatory Order Modification cc Distribution via ListServ
ML18046A730 OFFICE RII/DRP RII/DRP RII/DRP NAME SNinh BBishop AMasters DATE 2/15/2018 2/15/2018 2/15/2018 ATIENDANCE LIST DATE: February 9, 2018 MEETING TITLE/PURPOSE: Tennessee Valley Authority (TVA) Requesting Public Meeting for Clarification O( Possible Modification of the 2017 Confirmatory Order Requirements LOCATION: Region II Office Name Organization (j Of; _S,J..J -r vii-E:n f/e"Jer,>Ot1 71/A Steve 6+\c..-.J Tvt\
T
' Ml,,c., I \-L.J" e. '1 " l/A-
-JO 1Z. L,.f 7VA-fH1l1r4'tk"-- ti!la J.J.-t.f* 1 1\Jd,
- .. /-). J}vG.rc t:,u s-,:;1 7t/4 I
_j. ./'iv'( -
A7c-i11/iJ1<*{ ;../(2.C
?,
- fv\v.
CL re-'-._ l'\<-L- t0 Q.c_
.Joel ctil.u,,1 I n..J.<<.I AIR'-
I f4cwe,<f A.Jt2C Ja.m; ., s 4.,-f Jll<.C Enclosure 1
TVA Presentation NRC Public Meeting regarding Confirmatory Order Modification February 9, 2018
Purpose
- TVA has identified areas where it seeks clarification of previously issued Confirmatory Orders in order to ensure compliance with the Orders
- TVA intends to formally request modifications to Confirmatory Orders EA-17-022 and EA 09-009, 203.
Shea NRC Public Meeting related to Confirmatory Orders 2/9/18 l 2
EA-17-022 Current Status
- In June 2017, TVA utilized ADR to address apparent violations documented in the Watts Bar PI&R Report (March 2017).
- TVA committed to actions in the following areas:
- Communications
- Training
- Work Processes
- Independent Oversight
- Assessing and Monitoring Nuclear Safety Culture and Safety Conscious Work Environment
- Of the 31 individual actions, the NRC recently inspected 23 actions.
Bethay NRC Public Meeting related to Confirmatory Orders 2/9/18 l 3
Order EA-17-022; V.1.c.5
- Current Confirmatory Order Requirement:
Within six months following issuance of the CO, TVA shall revise Nuclear Safety Culture Monitoring guidance to incorporate a requirement for the Senior Leadership Team to conduct a review of Adverse Employment Actions to identify potential trends that could impact an organizations nuclear safety culture.
- Proposed Confirmatory Order Requirement:
Within six months following issuance of the CO, TVA shall revise Nuclear Safety Culture Monitoring guidance to incorporate a requirement for the Senior Leadership Team to conduct a review of Adverse Employment Actions described in V.1.c.1) to identify potential trends that could impact an organizations nuclear safety culture.
Polickoski NRC Public Meeting related to Confirmatory Orders 2/9/18 l 4
Basis for Modification
- TVA proposes the modification because:
- The modified requirements ensure consistency with Section V.1.c.1 of EA-17-022 where adverse actions that require an executive review board are defined.
- This change is consistent with TVAs perspective of the required intent during ADR.
Polickoski NRC Public Meeting related to Confirmatory Orders 2/9/18 l 5
Order EA-17-022; V.1.d.1
- Current Confirmatory Order Requirement:
The audit shall include reviewing all adverse employment actions periodically attending ERBs, reviewing chilling effect mitigation plans, and providing recommendations as appropriate.
- Proposed Confirmatory Order Requirement:
The audit shall include reviewing all adverse employment actions described in V.1.c.1, periodically attending ERBs, reviewing chilling effect mitigation plans, and providing recommendations as appropriate.
NRC Public Meeting related to Confirmatory Orders 2/9/18 l 6
Basis for Modification
- TVA proposes the modification because:
- The modified requirements ensure consistency with Section V.1.c.1 of EA-17-022 where adverse actions that require an executive review board are defined.
- This change is consistent with TVAs perspective of the required intent during ADR.
Polickoski NRC Public Meeting related to Confirmatory Orders 2/9/18 l 7
Order EA-09-009, 203; V.1
- Current Confirmatory Order Requirement:
By no later than ninety (90) calendar days after the issuance of this Confirmatory Order, TVA shall implement a process to review proposed licensee adverse employment actions at TVAs nuclear plant sites before actions are taken to determine whether the proposed action comports with employee protection regulations, and whether the proposed actions could negatively impact the SCWE. Such a process should consider actions to mitigate a potential chilling effect if the employment action, despite its legitimacy, could be perceived as retaliatory by the workforce.
Calle NRC Public Meeting related to Confirmatory Orders 2/9/18 l 8
Order EA-09-009, 203; V.1
- Proposed Confirmatory Order Requirement:
By no later than ninety (90) calendar days after the issuance of this Confirmatory Order, TVA shall implement a process to review proposed licensee adverse employment actions to include suspensions (one or more days off without pay), terminations for cause, involuntary reduction in force, and no-fault terminations of employment at TVAs nuclear plant sites before actions are taken to determine whether the proposed action comports with employee protection regulations, and whether the proposed actions could negatively impact the SCWE. Such a process should consider actions to mitigate a potential chilling effect if the employment action, despite its legitimacy, could be perceived as retaliatory by the workforce.
Calle NRC Public Meeting related to Confirmatory Orders 2/9/18 l 9
Order EA-09-009, 203; V.1
- Current Confirmatory Order Requirement:
By no later than one hundred twenty (120) calendar days after the issuance of the confirmatory order, TVA shall implement a process to review proposed significant adverse employment actions by contractors performing services at TVAs nuclear plant sites before the actions are taken to determine whether the proposed action comports with employee protection regulations, and whether the proposed action could negatively impact the SCWE. Such a process will likewise consider actions to mitigate a potential chilling effect if the employment action, despite its legitimacy, could be perceived as retaliatory by the workforce.
Calle NRC Public Meeting related to Confirmatory Orders 2/9/18 l 10
Order EA-09-009, 203; V.1
- Proposed Confirmatory Order Requirement:
By no later than one hundred twenty (120) calendar days after the issuance of the confirmatory order, TVA shall implement a process to review proposed significant adverse employment actions by contractors performing services at TVAs nuclear plant sites to include suspensions (one or more days off without pay) and terminations for cause before the actions are taken to determine whether the proposed action comports with employee protection regulations, and whether the proposed action could negatively impact the SCWE. Such a process will likewise consider actions to mitigate a potential chilling effect if the employment action, despite its legitimacy, could be perceived as retaliatory by the workforce. In the case of a suspension or termination of access authorization that may be associated with an adverse employment action, or where a contractor did not provide notification to TVA of a significant adverse employment action until after it had occurred, process review may occur after the adverse employment action has been taken.
Calle NRC Public Meeting related to Confirmatory Orders 2/9/18 l 11
Order EA-17-022; V.1.c.1
- Current Confirmatory Order Requirement:
By no later than six months after the issuance of the CO, TVA shall maintain a uniform process to ensure independent management review of all proposed adverse actions in accordance with the procedure. This process shall be executed by an ERB chaired by a TVA Vice President or above. The ERB shall, at a minimum, review proposed adverse employment actions to include suspensions (one or more days off without pay),
terminations for cause, involuntary reduction in force, and no-fault terminations of employment.
Calle NRC Public Meeting related to Confirmatory Orders 2/9/18 l 12
Order EA-17-022; V.1.c.1
- Proposed Confirmatory Order Requirement:
By no later than six months after the issuance of the CO, TVA shall maintain a uniform process to ensure independent management review of all proposed adverse actions in accordance with the procedure. This process shall be executed by an ERB chaired by a TVA Vice President or above. The ERB shall, at a minimum, review proposed adverse employment actions to include suspensions (one or more days off without pay), terminations for cause, involuntary reduction in force, and no-fault terminations of employment. In the case of a suspension or termination of access authorization that may be associated with an adverse employment action, or where a contractor did not provide notification to TVA of a significant adverse employment action until after it had occurred, process review may occur after the adverse employment action has been taken.
Calle NRC Public Meeting related to Confirmatory Orders 2/9/18 l 13
Basis for Modifications
- The modified requirement provides consistency between EA-09-009 and EA-17-022.
- The modified requirement provides clarification to ensure that TVA meets both the requirements of the Confirmatory Orders and Access Authorization requirements.
Calle NRC Public Meeting related to Confirmatory Orders 2/9/18 l 14
Order EA-09-009, 203; V.9
- Current Confirmatory Order Requirement in EA-09-009, 203 Section V.9:
By no later than ninety (90) calendar days after the issuance of this Confirmatory Order, TVA shall revise its training program for new supervisors to incorporate a classroom discussion of the NRCs employee protection rule and the Companys policy on SCWE.
Bethay NRC Public Meeting related to Confirmatory Orders 2/9/18 l 15
Order EA-09-009,203; V.9
- Current Confirmatory Order Requirement in EA-17-022:
- 2) The training [as described in V.1.b.1] will be provided within one year and on an annual basis thereafter, to, at a minimum, all working status nuclear business group supervisory employees, contractor supervisory employees involved in nuclear related work activities, human resource staff involved in the adverse employment action process, employee concerns program staff, contract technical stewards for nuclear related work activities, and the personnel in the TVA Office of General Counsel who are engaged in nuclear related work activities.
- 3) New supervisory employees shall complete initial training through in-person or computer based training within three months of their hire or promotion effective date. The training shall require, at a minimum, a discussion of the training material with personnel in the TVA Office of General Counsel who are engaged in nuclear related work activities.
Bethay NRC Public Meeting related to Confirmatory Orders 2/9/18 l 16
Basis for Withdrawal
- TVA proposes the requirement in EA-09-009, 203 be withdrawn because:
- The training requirements for supervisors in EA-17-022 are duplicative with EA-09-009, 203 and more comprehensive.
Bethay NRC Public Meeting related to Confirmatory Orders 2/9/18 l 17
Summary
- TVA has implemented the commitments in EA 022 per the required due dates. TVA has taken numerous corrective actions to ensure that actions are taken as necessary to mitigate the potential impacts an adverse employment action may have on organizational SCWE
- During implementation of the new requirements, TVA identified potential compliance issues requiring clarification to the requirements to ensure compliance. TVA intends to formally request modification to the Confirmatory Orders.