MONTHYEARML24213A3222024-07-30030 July 2024 NRR E-mail Capture - Fermi 2 Audit Questions from the Audit Team Supporting Review of the LAR to Adopt TSTF-505 ML24102A2462024-04-11011 April 2024 NRR E-mail Capture - Fermi 2 Acceptance of Requested Licensing Action Re Amendment to Adopt TSTF-505, TSTF-439, and TSTF-591 ML24080A3912024-03-20020 March 2024 NRR E-mail Capture - Fermi 2 - Request for Additional Information for License Amendment Request Regarding Risk-Informed ECCS Strainer Performance Evaluation (Final) (L-2023-LLA-0092) ML24080A3902024-03-19019 March 2024 NRR E-mail Capture - (External_Sender) Fermi 2 - Request for Additional Information for License Amendment Request Regarding Risk-Informed ECCS Strainer Performance Evaluation (DRAFT)(L-2023-LLA-0092) ML23340A1322023-12-0606 December 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Audit Clarifications - EPID L-2023-LLA-0092 ML24044A1492023-12-0404 December 2023 NRR E-mail Capture - Follow Up of Our Phone Call - Fermi 2 Exemption Request ML24011A2072023-11-17017 November 2023 Approval to Conduct NRC Appendix C Inspection Procedure 93100 at Fermi-2 ML23277A1332023-10-0303 October 2023 NRR E-mail Capture - ECCS Strainer Risk Informed Licensing Amendment - Audit Questions ML23276A0052023-10-0202 October 2023 NRR E-mail Capture - (External_Sender) Fermi EDG Crankcase Trip LAR RAI Response ML23250A2732023-09-0707 September 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.12 ML23244A0022023-08-30030 August 2023 NRR E-mail Capture - Fermi 2 - Acceptance of Relief Request RR-A25 for Extended License Period ML23241B0162023-08-24024 August 2023 Exigent License Amendment Request for Additional Information RAI-12 (EPID L-2023-LLA-0112) (Email) ML23235A1822023-08-23023 August 2023 Exigent LAR Request for Additional Information NRC-23-0055, NRR E-mail Capture - (External Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-00552023-08-16016 August 2023 NRR E-mail Capture - (External_Sender) Fermi 2 Power Plant, Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 - Updated Clean Sheet for NRC-23-0055 NRC-23-0028, NRR E-mail Capture - (External Sender) Fermi Relief Request RR-A25 (NRC-23-0028)2023-08-0707 August 2023 NRR E-mail Capture - (External_Sender) Fermi Relief Request RR-A25 (NRC-23-0028) ML23199A2472023-07-14014 July 2023 Acceptance Review License Amendment Pertaining to ECCS Strainer Performance Evaluation ML23163A1742023-06-12012 June 2023 NRR E-mail Capture - Fermi 2 - Acceptance of Requested Licensing Action Regarding Amendment to Revise SR 3.8.1.2 in TS 3.8.1, AC Sources - Operating NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi ML23146A0622023-05-25025 May 2023 Acceptance of Requested Licensing Action Regarding Amendment to Correct Non-Conservative TS 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage ML23131A1912023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Fermi 2 LAR (EDG Crankcase Trip) - 6-Month Review ML23115A1452023-04-25025 April 2023 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Changes to TS 3.8.1, AC Sources - Operating ML23076A0222023-03-14014 March 2023 Email SUNSI Action Related to Fermi Unit 1 Safety Hazards Summary Report (ML23066A135) ML23010A0962023-01-10010 January 2023 NRR E-mail Capture - Fermi 2 - Acceptance Review of the Requested Licensing Action Re License Amendment Request to Revise TS 3.8.1 ML22241A0622022-08-29029 August 2022 NRR E-mail Capture - Fermi 2: Acceptance Review of LAR Regarding Adoption of TSTF-582 ML22027A3612022-01-26026 January 2022 U1: CY2022 Inspection Plan, Docket No. 05000016, License No. DPR-9 ML21350A0482021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21266A4342021-09-20020 September 2021 Acceptance of DTE Request for Exemption from 10 CFR 72.44(d)(3) for Fermi 2 ML21214A1492021-08-0202 August 2021 License Amendment Request: Request for Additional Information ML21209A0132021-07-27027 July 2021 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 - Follow-Up to July 12, 2021 Email ML21194A0282021-07-12012 July 2021 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 - Continuance on Fall 2020 Emails ML21126A0532021-05-0404 May 2021 NRR E-mail Capture - Fermi 2 - Request for Additional Information for Revised Relief Request RR A-39 ML21116A2572021-04-21021 April 2021 NRR E-mail Capture - Fermi 2 - Acceptance Review Licensing Amendment Request to Revise Technical Specifications ML21089A3962021-03-30030 March 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21084A1322021-03-19019 March 2021 NRR E-mail Capture - (External_Sender) Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi Nuclear Power Plant, Unit 2 ML21026A1372021-01-25025 January 2021 NRR E-mail Capture - Acceptance Review: Fermi 2 Revised Relief Request RR-A39 ML20329A3802020-11-23023 November 2020 NRR E-mail Capture - Fermi 2 (COVID-19) Part 73 Exemption Request ML20275A2962020-09-30030 September 2020 NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendment to Technical Specifications for Fermi 2 Nuclear Power Plant ML20289A1032020-09-29029 September 2020 NRR E-mail Capture - Petition Review Board Initial Assessment of 2.206 Petition Regarding Fermi Unit 2 ML20289A1052020-09-24024 September 2020 NRR E-mail Capture - Status Update on 2.206 Petition Regarding Fermi Unit 2 ML20261H9282020-08-14014 August 2020 NRR E-mail Capture - (External_Sender) Action - Request for Comments on the Proposed Issuance of Amendments to Technical Specifications for Fermi 2 Nuclear Power Plant ML20239A9682020-08-12012 August 2020 NRR E-mail Capture - Fermi 2 LAR: RAI for Revision to Technical Specifications to Change the Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20195A2762020-07-0909 July 2020 NRR E-mail Capture - Your Request for Extension of Part 26 Exemption Date - Documentation of Our Discussion on July 8, 2020 ML20181A4102020-06-29029 June 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Licensing Amendment Request to Adopt TSTF-563 ML20239A7962020-06-26026 June 2020 NRR E-mail Capture - Screening Result of 2.206 Petition Regarding Fermi Unit 2 ML20149K4242020-05-19019 May 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Relief Request RR-A42 ML20073E4222020-03-12012 March 2020 NRR E-mail Capture - Fermi 2: Relief Request VRR-004, Minor Clarifications to Ensure Consistency with the Specific Language in the ASME Code ML20029F0232020-01-29029 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 Relief Requests (Proposed Alternatives), VRR-010 and VRR-011 for the Fourth 10-year IST Program ML20017A1782020-01-17017 January 2020 Relief Request #1 for Four RHR Valves (E1150F006A/B/C/D) ML20015A3012020-01-14014 January 2020 E-mail Fermi 1: CY2020 Master Inspection Plan ML20008D5752020-01-0808 January 2020 NRR E-mail Capture - Acceptance Review: Fermi 2 - LAR to Revise Technical Specification for Secondary Containment Surveillance Requirements 2024-07-30
[Table view] |
Text
NRR-DMPSPEm Resource From: Goetz, Sujata Sent: Monday, January 29, 2018 3:05 PM To: Jason R Haas
Subject:
Fermi 2 LAR to Revise TS to Eliminate MSLRM Reactor Trip and PCIS Group 1 Isolation Functions (SRXB)
Attachments: SRXB RAI SG jan29 clean.docx
Dear Mr. Hass:
By letter dated August 24, 2017, as supplemented by letter dated October 18, 2017 (Agencywide Documents Access and Management System Accession Number ML17237A176 and ML17298A185), DTE Electric Company (DTE), the licensee, submitted a license amendment request to revise the Fermi 2 technical specifications (TS). Specifically, DTE requested to:
- Add two new TS limiting conditions for operation 3.3.7.2 and 3.3.7.3 for the mechanical vacuum pump and gland seal exhauster trip instrumentation.
The Nuclear Regulatory Commission (NRC) staff is reviewing the submittal and has determined that additional information is needed to complete its review. Attached, please find the request for additional information (RAI).
The NRC staff considers that timely responses to RAIs help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. Please contact me at (301) 415-8004 if you would like to schedule a clarification call. The response to this RAI is due to the NRC by March 2, 2018.
Sujata Goetz Project Manager, Fermi, Unit 2 Nuclear Regulatory Commission 11555 Rockville Pike Office of the Nuclear Reactor Regulation NRC/NRR/DORL/LPL3 Office O8F2 Mailroom O8-B1A Rockville, MD 20852-2738 Washington, DC 20555-0001 (o) 301.415.8004 (f) 301.415.3313 1
Hearing Identifier: NRR_DMPS Email Number: 156 Mail Envelope Properties (Sujata.Goetz@nrc.gov20180129150400)
Subject:
Fermi 2 LAR to Revise TS to Eliminate MSLRM Reactor Trip and PCIS Group 1 Isolation Functions (SRXB)
Sent Date: 1/29/2018 3:04:56 PM Received Date: 1/29/2018 3:04:00 PM From: Goetz, Sujata Created By: Sujata.Goetz@nrc.gov Recipients:
"Jason R Haas" <haasj@dteenergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1941 1/29/2018 3:04:00 PM SRXB RAI SG jan29 clean.docx 24578 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION APPLICATION TO REVISE TECHNICAL SPECIFICATION TO ELIMINATE MAIN STEAM LINE RADIATION MONITOR REACTOR TRIP AND PRIMARY CONTAINMENT ISOLATION SYSTEM GROUP 1 ISOLATION FUNCTIONS DTE ELECTRIC COMPANY FERMI 2 By application dated August 24, 2017, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17237A176), DTE Energy Company (DTE or licensee) requested to revise Fermi 2 technical specifications (TS) to eliminate the main steam line radiation monitor (MSLRM) reactor trip and Primary Containment Isolation System (PCIS)
Group 1 Isolation Functions. The NRC staff has reviewed the information provided by the licensee in support of the proposed license amendment and the staff requests additional information.
SRXB-RAI-1 The August 24, 2017, application requests elimination of MSLRM functions for initiating: 1) a reactor protection system (RPS) automatic reactor trip and 2) the associated (Group 1) primary containment isolation system (PCIS) automatic closure of the main steam isolation valves (MSIVs) and main steam line (MSL) drain valves. The licensees justifications for eliminating the MSLRM trip and isolation functions are based on the approach documented in the Boiling Water Reactor Owners Group (BWROG) General Electric (GE) Licensing Topical Report NEDO-31400A.
- a. In addition to the control rod drop accident (CRDA) analysis, are there other MSLRM trip function credited for other accident or transient analyses at Fermi 2? If so, discuss the events, including any plan to eliminate the trip function and resulting impacts on the outcome for those events.
- b. The proposed TS changes requirements for the MSLRM trip function from the Fermi TS Table 3.3.1.1-1, Reactor Protection System Instrumentation. The proposed changes also remove requirements for PCIS Group 1 isolation from TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. However, the MSLRM isolation function in TS Table 3.3.6.1-1 is relocated and retained for the current existing PCIS Group 2 isolation of the reactor water sample line. NRC staff concludes that this change will defeat portions of MSLRM high radiation trip function logic circuitry in the reactor protection RPS and PCIS. Will there be any impact on the operation of the RPS or PCIS with respect to other intended safety functions? If so, discuss.
SRXB-RAI-2 Operating data presented in GE topical report NED0-31400A indicates that the MSLRMs have initiated eight reactor shutdowns from 1980 through October 1992, but none of the shutdowns were the result of fuel degradation. The shutdowns were the result of instrument failures, chemistry excursions, radiation monitor maintenance errors, and other causes.
For Fermi 2 specifically, state how many plant shutdowns have been caused by the MSLRM trip function. For each shutdown discuss the cause for those MSLRM trip function initiations, including whether any of the shutdowns were the result of actual fuel degradation, and whether the shutdown was unnecessary.
SRXB-RAI-3 The August 24, 2017, application on page 7 of Enclosure 1 states that Above 10% rated thermal power, control rod reactivity worth is reduced such that the effects of postulated rod drop are not sufficient to cause significant fuel damage. In order for the NRC staff to evaluate the impact of the proposed license amendment on the CRDA analytical results, provide the following information, as it relates to the current CRDA analysis of record, and how the proposed changes would impact the degree of fuel damage:
- c. Other than to eliminate the MSLRM trip and the related isolation functions proposed for the CRDA in the licensee's application, will there be any other changes of parameters and assumptions that are made for a CRDA analysis at Fermi 2? If so, discuss the changes and its impact on the CRDA analysis results.
- d. In the Fermi 2 CRDA analysis which trip function of the RPS is credited to scram the reactor, and does this change as a result of eliminating the MSLRM high radiation trip function? If so, discuss the impact of the change.
- e. Other than radiological consequences, discuss whether there is any impact from eliminating the MSLRM high radiation trip function on the degree of fuel damage during a CRDA or any other adverse impact on the core or the plant.
- f. Has the number of fuel rods predicted to fail and melt changed for a CRDA as a result of eliminating the MSLRM high radiation trip function? If so, discuss.