Provides Revised Completion Date for Installation of Adjustable Speed Drives (ASD) in Rrs.Current Plans Are to Installed ASDs During R-11 Annual Maint & Refueling Outage (Currently Scheduled for Spring 1996)
ML17290A385
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/21/1993
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-116, NUDOCS 9306070190
Download: ML17290A385 (5)


Text

ACCEI.ERA KD DOCUIVIENT DIST UTION SYSTEM REGUL RY INFORMATION DISTRIBUT . SYSTEM (RIDS)

ACCESSION. NBR:9306070190 DOC.DATE: 93/05/21 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides revised completion date for installation of adjustable speed drives (ASD) in RRS.Current plans are to installed ASDs during R-11 annual maint a refueling outage D (currently scheduled for Spring 1996).

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR L ENCL 0 SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV LA PDV PD D CLIFFORD,J INTERNAL: ACRS NRR/DE/EELB NRR/DORS/OTSB NRR/DRCH/HICB NRR/DSSA/SPLB NRR/DSSA/SRXB NUDOCS-ABSTRACT OC +~B OGC/HDS1 EG FILL 01 EXTERNAL: NRC PDR NSIC D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL

V

/~

V

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Boyc96'8 ~ 3000 George Wasbtngton Way e Rtcbland, Wasbtngton 993529t58 ~ (509) 372-5000 May 21, 1993 G02-93-116 Docket No. 50-397 U,S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C. 20555 Gentlemen:

Subject:

WNP-2, OPERATING LICENSE NO. NPF-21 MEGAWATTIMPROVEMENT PROGRAM REACTOR RECIRCULATION SYSTEM (RRC) ADJUSTABLE SPEED DRIVE (ASD) INSTALLATIONSCHEDULE

References:

1) Letter, dated May 8, 1992, WM Dean (NRC) to Washington Public Power Supply System, "WNP-2 Megawatt Improvement Pxogram - Public Meeting Held on April 16, 1992"
2) Letter, dated June 15, 1992, WM Dean (NRC) to GC Sorensen (SS)

"Summary of Meeting with Washington Public Power Supply System (WNP-2) on May 28, 1992 Regarding Adjustable Speed Drives"

3) Letter G02-92-218, dated September 14, 1992; JW Baker (SS) to NRC, "Licensee Event Report (LER)92-037, "Manual Reactor Scram due to Core Instability"
4) Letter GO2-92-247, dated October 30, 1992, GC Sorensen (SS) to JB Martin (NRC), "Response to Augmented Inspection Team Report"
5) Letter GO2-93-008, dated January 11, 1993, JV Parrish (SS) to NRC, "Response to Notice of Violations and Notice of Deviation - Power Oscillation Event" The purpose of this letter is to provide a revised completion date for installation of the Adjustable Speed Drives (ASDs) in the Reactor Recirculation (RRC) System. As stated in previous correspondence, this modification is a segment of the ongoing Megawatt Improvement Program and involves removal of the RRC System flow control valves and installation of ASDs

.ttte,system pump motors.

03 Pgg r', 930b070i90 93052i PDR ADOCK 05000397 P '

. PDR

Page Two MEGAWATT IMPROV&<EENT PROGRAM REACTOR RECIRCULATION SYSTEM (RRC) ADJUSTABLE SPEED DRIVE (ASD) INSTALLATIONSCHEDULE In the referenced correspondence, completion schedule information was provided pertaining to installation of the ASDs, with the most recent being a completion date of June 30, 1994, as reflected in Reference 5. However, due to higher priority requirements, current plans are to install the ASDs during the R-11 annual maintenance and refueling outage (currently scheduled for Spring 1996). Accordingly, the appropriate licensing documentation will now be submitted to the NRC by December 31, 1994, to support the revised completion schedule.

In addition, a supplement to LER 92-037 will be submitted to reflect a revised ASD completion date. The supplemental LER will be submitted to the NRC by June 18, 1993.

If you have any questions, please contact Mr. John Arbuckle, Senior Licensing Engineer, at (509) 377-4601.

Sincerely, J. V. Parrish (Mail Drop 1023)

Assistant Managing Director, Operations JDA/b1<