ML17289A882

From kanterella
Jump to navigation Jump to search
Forwards LER 90-019-01,identified in Response to Insp Rept 50-397/90-20 W/Expected Submittal Date of 910114.Rev Delayed Due to Higher Priority Work.Ler Became Part of LER Suppl Backlog
ML17289A882
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/24/1992
From: John Baker
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17289A883 List:
References
GO2-92-223, NUDOCS 9210020042
Download: ML17289A882 (2)


Text

~cczr.za~~zD orsrmaurrox ozMQXSva~nox SvsrzM REGULATO INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9210020042 DOC.DATE: 92/09/24 NOTARIZED: NO DOCKET ¹ FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION BAKERPJ.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT Forwards LER 90-019-01,identified in response to Insp Rept 50-397/90-20 w/expected submittal date of 910114.Rev delayed due to higher priority work.LER became part of LER suppl backlog.

DISTRIBUTION CODE: 'IE22T COPIES RECEIVED:LTR Q ENCL / SIZE: /+S TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 DEANPW. 1 1 INTERNAL: ACNW 2 2, ACRS 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DET/EMEB 7E 1 1 NRR/DLPQ/LHFB10 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 NRR/DREP/PRPB11 2 2 NRR/DST/SELB 8D 1 1 . NRR/DST/SICB8H3 1 1 N SPLB8D1 1 1 NRR/DST/SRXB 8E 1 1

.1 RES/DSIR/EIB 1 -1 RE FILE 02 1 RGN5 E 01 1 1 EXTERNAL EGGG BRYCE P

~ J ~ H 2 2 L ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MURPHY,G.A 1 1 NSIC POORE,W. 1 1 NUDOCS FULL TXT 1 1 1

I FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 31

ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 + 3000 George Washington Way ~ Richland, Washington 99352 September 24, 1992 G02-92-223 Docket No. 50-397 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555

SUBJECT:

NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21 LICENSEE EVENT REPORT NO. 90-019-01 Transmitted herewith is Licensee Event Report No. 90-019-01 for the WNP-2 Plant. This revision was identified in our response to Inspection Report 90-20 with an expected submittal date of January 14, 1991. This revision was initially awaiting the completion of a root cause analysis. Although the root cause was completed shortly after issuance of the original LER, the revision was delayed due to higher priority work. Eventually, it became part of an LER supplement "backlog". A supplemental LER has been committed, or needs to be evaluated, for approximately ten other issues. Management recognizes this supplemental "backlog" is inappropriate and is taking co'rrective action to resolve these items. This- report is submitted in response to the report requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.

Sincerely, J.. Baker WNP-2 Plant Manager (Mail Drop 927M)

JWB/CLF/lr Enclosure cc: Mr. J. B. Martin, NRC - Region V Mr. W. Ang, NRC Resident Inspector (Mail Drop 901A, 2 Copies)

INPO Records Center - Atlanta, GA Mr. D. L. Williams, BPA (Mail Drop 399)

~c'~J(i i Q ~:.

9210020042 '920924 PDR ADOCK 05000397 WEaz 5 PDR //]