Responds to 10CFR50,App E Re Emergency Response Data Sys. Util Currently Investigating Use of Plant Prime Computer to Serve as Interface W/Nrc Sys.Emergency Response Data Sys Expected to Be Operable by 930213
ML17286B120
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/25/1991
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-91-195, NUDOCS 9111050067
Download: ML17286B120 (4)


Text

)ACCELERATED DISTRIBUTION DEMONSTPWTION SYSTEM REGULATORY XNFORMATXON DISTRIBUTION SYSTEM (RIDS)

ACCESSXON NBR: 9111050067 DOC. DATE: 91/10/25 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R

SUBJECT:

Responds to 10CFR50,App E re emergency response data sys.

Util currently investigating use of plant prime computer to serve as interface w/NRC sys.Emergency response data sys D expected to be operable by 930213.

DISTRIBUTION CODE: A045D TITLE: OR COPIES RECEIVED:LTR Submittal: Emergency Preparedness J

Plans, ENCL + SIZE:

Implement'g Procedures, C NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR E CL ID CODE/NAME LTTR ENCL D PD5 PD 1 ENG, P. L.

D XNTERNAL: AEOD/DOA/IRB RR/DRE - PEPB9D NUDOCS-ABSTRACT REG 01 EXTERNAL: NRC PDR NSXC D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL

r WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 October 25, 1991 9il1p5pp67 yij.p25 G02-91-195 F'DR ADOCK pSppp397 F PDR Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 RESPONSE TO THE EMERGENCY RESPONSE DATA SYSTEM (ERDS)

RULE, 10CFR50, APPENDIX E

References:

l. Letter, G02-89-224, GC Sorensen (SS) to NRC, "Response to Generic Letter 89-15, Emergency Response Data System", dated December 14, 1989
2. Letter, JR Jolicoeur (NRC) to AG Hosier (SS),

dated January 30, 1990

3. Letter, G02-90-090, AG Hosier (SS) to JR Jolicoeur (NRC),

"Response to Emergency Response Data System (ERDS) Survey",

dated May 4, 1990 Letter, G02-91-002, AG Hosier (SS) to JR Jolicoeur (NRC),

"Response to Emergency Response Data System (EROS) Survey",

dated January 2, 1991

5. Letter, G02-91-111, AG Hosier (SS) to JR Jolicoeur (NRC),

"Response to Emergency Response Data System (ERDS) Survey",

dated June 3, 1991

6. Letter, G02-91-122, AG Hosier (SS) to JR Jolicoeur (NRC),

"Emergency Response Data System (ERDS) Data Point Library",

dated June 13, 1991

7. Letter, EI-NRC-91-020, TP LaRosa (NUS) to AG Hosier (SS),

dated March 5, 1991

8. Letter, EI-NRC-91-033, TP LaRosa (NUS) to AG Hosier (SS),

dated April 10, 1991 Appendix E to Part 50, Section VL.4a requires that each licensee shall develop and submit an Emergency Response Data System (ERDS) implementation program plan to the NRC by October 28, 1991. Section VL.4c states that licensees that have submitted the required information under the voluntary ERDS implementation program will not be required to resubmit this information.

~Q' 'age Two RESPONSE TO THE EMERGENCY RESPONSE DATA SYSTEM (ERDS)

-BOULE, 10CFR50 By Reference 1 the Supply System volunteered to participate in the ERDS program.

In Reference 2 the NRC acknowledged the Supply System's voluntary action and provided a survey designed to provide the hardware, communication, data point and administrative information necessary for the NRC's contractor to design the ERDS system interface and data base for WNP-2.

The required information was transmitted to the NRC via References 3 through 6 and acknowledged by the NRC's contractor via References 7 and 8.

As the NRC is aware, the Supply System has experienced difficulties in completing the performance testing of its system with the NRC Operations Center. It appears at this time that new software and hardware may be required to achieve a reliable system. We are currently investigating using the plant Prime computer to serve as the interface with the NRC system. it If this option is selected and becomes necessary to change any of the responses to the Survey of Reference 2 we will so notify the NRC. It is the Supply Systems plan to have an operable ERDS by the February 13, 1993 date of Section VL.4d to 10CFR50 Appendix E.

Very truly yours, G. C Sorensen, Manager Regulatory Programs AGH/bk cc: JB Hartin - NRC RV NS Reynolds - Winston 5 Strawn PL Eng - NRC DL Williams - BPA/399 NRC Site Inspector - 901A