ML17250A729

From kanterella
Jump to navigation Jump to search
Proposed Change to Tech Specs Figure 6.2-1,revising Mgt Organization Chart
ML17250A729
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/04/1980
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17250A724 List:
References
NUDOCS 8011060449
Download: ML17250A729 (6)


Text

Att.achment. A

1. Replace Technical Specification Figure 6.2-1 with the attached I

figure.

. ~ 4~

h II

R.E. GINNA NUCLEAR POWER PLANT MANAGEMENT ORGANIZATION CHART:

CHAIRMAN Of THE EOARD SLtCPVISION AND ADNIHISTRATION OTHER fUNCTIDNAL PCIATIONSNIPS

~ RtstOHS ISLE FDR f it t PROTtCTIOM PROCRAN PRESIDENT EXECUTIVE VICC tRtslDtHT I SR, V.'9, SR, V.t ~

flNANCC I RAtES CtNtRAL StRVICCS y,t, ELECTRIC V. P CLtCTRFC I CHltt VICt PRtslDEMT VICE tRESIDtMT 1 RANI HI 5 S I ON DISTRIRVtlON I SYSTEM tiAMMINC ENCINtCR ELECTRIC I STCAM NSARR RATES AND OPEPATIOM ~ 'IODVCII ON ~ .

VTILIIATIOM SVPT RIMTKMDEMT CKNtRAL NANACCR DIV, SUPT ~ DIV. SUPT CLECT PURCHAS INC I ELECT TRANS ~ ~ SYSTtN PIANMINC I NVCLKAR I

9 RODVCI ON PUSLIC AFFAIRS 01st. I~ UTIL Ot CRATI OM ASSISTANT CHIEF ENCINttR ASST CNltt SUPCA'INTENDtNT HANACKR Of PV RCH As I NC SUtT r ELECTRIC ACCNT NETL'R I LAD ENCINEtRINC I tNQINCCR 0l NNA STATION SCCVRITT CONSTRVCTI 0'N I

L SCttRINTEMDCNT FWVACCR SUPERVISOR NAMACtts ASSISTAVT Cty PAL 0CAL'ITt MLCLEAR DtslCM I CO<<STR HA IMTENAVCE ASSURANCC SUPCRIMTEMDtlCT SCCUP I .T OCL~ TRAIMIVC I I CCNEFAL OUALITT C'CTPIC Ftttt StAFI'TAFF FIANT OFKFATIIeS DtSICN CONSTR. PKCOPDS ~ OUALITT OUALITT rVCNAS INC 14ttts Ctff?POL, DPAfTIHC <<AIMTEMANCE

~~OL ASSLVANCE OPFA4IIATICH 9 LXR StAfF ADVISO<<S AÃ0 TPAIHINU I

I L L FIGURE 6.2-1

Attachment B The management organization chart has been revised to reflect recent changes. Two positions of Senior Vice President have been created, Senior Vice President General Services and Senior Vice President - Finance and Rates. Reporting to the former is the General Manager Purchasing and Public Affairs. Reporting to the latter is the Vice President Rates. The position of Chief Engineer has been changed to Vice President and Chief Engineer.

These changes do not degrade the offsite management control of Ginna Station.

Attachment C Fee Determination The proposed Technical Specification change is administrative in nature and has no safety or .environmental significance. It therefore falls within Class II as defined in 10 CFR Section 170.22 with.a fee of 91200.00.