MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated IR 05000244/19990081999-10-14014 October 1999 Forwards Insp Rept 50-244/99-08 on 990809-0919.Severity Level IV Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs IR 05000244/19992011999-09-24024 September 1999 Forwards Insp Rept 50-244/99-201 (Operational Safeguards Response Evaluation) on 990621-24.No Violations Noted. Primary Purpose of Osre to Assess Licensee Ability to Respond to External Threat.Insp Rept Withheld ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date ML17265A5111999-01-11011 January 1999 Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME Bp&V Code for ISI Program.Relief Requests 37,38 & 39 Encl ML17265A5101999-01-11011 January 1999 Requests Relief Per to 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME B&PV Code for ISI Program.Relief Request 40 Encl 1999-09-30
[Table view] Category:RESEARCH INSTITUTION/LABORATORY TO NRC
MONTHYEARML17261A8541989-01-13013 January 1989 Discusses 890110-11 Meetings Re Nozzle Sizing Study.Most Accurate Sizing Obtained by Collecting Data of Edge Diffracted Waves from Geometric Extremities of Flaw ML20212N6571986-08-19019 August 1986 Forwards EGG-PHY-7350, Technical Evaluation Rept for Proposed Change to Operation of Ginna Fuel Pool Charcoal Filter Sys, Per FIN D-6023, Review of Plant-Specific Licensing Actions for Operating Reactor Issues, Task 4-5 ML17251A7281986-06-0404 June 1986 Forwards Inel EGG-NTA-7266, Assessment of Removal of Raised Floor & Mod to Fire Detection Zones for Plant Process Computer Sys (PPCS) Computer Room at Ginna Plant, Final Informal Rept Per Task 4-1, Review of Plant-Specific.... ML19306A0151984-02-10010 February 1984 Summarizes 840206-07 Visit to Nevada Test Site Hydrogen Burn Facility to Inspect Condition of Equipment & Cable/Splice Samples After Series of Hydrogen Burn Tests Conducted by Epri.No Indication of External Damage to Equipment Noted ML17256B1011982-06-21021 June 1982 Comments on NUREG-0821, Integrated Plant Safety Assessment, SEP Re Ginna Nuclear Power Plant. Document Is Comprehensive W/Respect to Arguments Leading to Resolution of Various SEP Topics ML20063C5531982-06-14014 June 1982 Compares Format & Positions of Facilities for Integrity Plant Safety Assessments Per SEP Objectives.Wind & Tornado Loadings Need Improvement.Pipe Break Outside Containment Requires Clarification ML20065A7311982-03-23023 March 1982 Informs That Info Submitted by Licensee in Response to NUREG-0737,Item III.D.3.4, Control Room Habitability Acceptable ML17258A5181981-10-30030 October 1981 Forwards Progress Rept Re Open Items for Unit.Remaining Item Is Primary Coolant Pump Casing ML17258A1941981-09-30030 September 1981 Forwards Rept Addressing Resolution of Open Items in Mechanical Electrical Equipment SEP Re Seismic Integrity,Per 810909 Meeting ML17258A5201981-09-11011 September 1981 Forwards Info Re Seismic Capacity of Reactor Coolant Pump. Action Proposed to Close Item ML19345D6991980-11-24024 November 1980 Submits Monthly Mgt Ltr 8 for Oct 1980 Re Containment Analysis Support for Sep. ML17250A7611980-06-16016 June 1980 Discusses Completed mini-review of Util Safe Shutdown Analysis.Impossible to Confirm Safe Shutdown During or After Fire.Suggests NRC Require Installation of More Conservative Shutdown Sys ML17261A1701980-01-31031 January 1980 Forwards Input to Fire Protection Design Review & Supplemental Items.Items 3.1.24,24 & 43 Remain Open Due to Lack of Info from Licensee ML17249A8831980-01-23023 January 1980 Recommends That Licensee Proposal on Fire Protection Review Item 3.2.6 Re Backflow Protection Be Accepted Subj to Review of Four Listed Documents.Also Recommends That Fire Brigade Size Be Increased to Five Men ML17261A1691980-01-23023 January 1980 Discusses Util Fire Protection Review Items 3.2.6 & 3.2.9. Recommends Accepting Backflow Protection Proposal Pending Submittal of Prints of Drain Sys & Problem Drain Location. Five-man Fire Brigade Size Acceptable ML17249A2391979-10-30030 October 1979 Informs of Util 790525 Agreement to Increase 3-man Fire Brigade to Five Men as Recommended in J Townley 780710 Rept & Justified in 790214 Safety Evaluation.Item Now Deemed Acceptable & Closed ML17244A3171978-12-19019 December 1978 Proposed Fire Protection as Presented in SER Adequately Assures Health & Safety of Public.Exception Re Valve Supervision & Cable Protection Must Be Evaluated by Nrc.Fire Protection Milestones & Documents Are Discussed 1989-01-13
[Table view] |
Text
Lawrence Livermore National Laboratory September ll, 1981 SM 81-247 Docket 850-244 FIN A0415 Mr. William T. Russell, Branch Chief Systematic Evaluation Program Branch Division of Licensing Office of Nuclear Reactor Reg.
Washington, D.C. 20555
Dear Bill:
I have enclosed information regarding the seismic capacity of a reactor coolant pump at the Ginna plant. While this open item has not been completely resolved, a rather simple action is proposed which should close this item.
Sincerely, Thomas A. Nelson Structural Mechanics Group Nuclear Test Engineering Division TAN/mg 0131m Enclosure sooaoqoo79 saoiis PDR ADOCK 05000244 I PDR An Endleaf ~tnffyEl~ NiVeetyef Caifemia PQ BaX 808 Li mmes Caifemia 94550 ~ TelephOne(415)422-1100 ~ TWX9f0-38&8339 UCLLL LWR
i i 11 IE P.
P
'I
STRUCTURAL IECHAfllCS ASSOC l ATES SMA 12205.20 A Collf. Coro.
5160 Birch Street, Newport Beach, Caiif. S2660 (714) 833-7552 August 27, 1981 Mr. Thomas A. Nelson (L-9Q}
Lawrence Livermore Laboratory Nuclear Test Engine'ering Division P. 0. Box08 Livermore, California 94550 P
Subject:
Resolution of Open Items on Ginna Equipment l
Dear Tom:
!n my June 22 letter, there were still two open items for Ginna equipment which were:
- 1. Control Rod Drives and .Supports
- 2. Primary Coolant Pump This letter is to advise you of the current status of these items..
George Wrobel of Rochester Gas & Electric (RGE} Company arranged for me to talk directly to Robert Kelly of'Westinghouse, who was responsible for providing much of the Ginna equipment seismic documentation. Regarding loading documentation on the CRD assemblies, R. Kelly will send his analysis of CRD housing and seismic support loading for 'a 0.8g static coefficient loading. A quick review of the analysis should resolve all outstanding issues. on the CRD system.
A legible copy of the primary coolant pump report was transmitted to me from RGE. Conclusions from the review of that report are contained in the attachment, Tom Cheng suggested that I be present at an upcoming open items meeting for Ginna in September. In view of the current status of open items for which I have been responsible, I don't feel it necessary for me to attend;the=
meeting. After my conversation with R. Kelly of Westinghouse, I feel that the CRD and primary coolant pump issues will be. resolved very'quickly and can be handled without a meeting. It is. therefore recommended that these not be a topic of the meeting. 'tems r
Yery truly yours, STRUCTURAL MECHANICS ASSOCIATES, INC.
rZW Robert D. Campbell Project Manager RDC:lca cc: T. Cheng {NRC)
~ ~
ATTACHMENT REACTOR COOLANT PUMP SEISMIC DESIGN REVIEM The original stress report submitted for review, was illegible.
A more legib1e copy was submitted to SMA by RGE on August 17, 1981, and the following conclusions can be reached from review of that submittal.
I ~
- 1. The pump was analyzed for a 0.8g horizontal static coef-ficient and a 0.54g.vertical static coefficient. As reported in. NUREG/CR-1821, the 7X damped peak spectral acceleration for both horizontal directions is 0.55 g's resulting in a vector sum Iof 0.78 g's. Thus, the equiva-lent static coefficient used in the original analysis is conservative by a small margin.
- 2. 'll stresses calculated fdr the 0.8g H and 0,54g V coefficients ai e within allowables. designated for the static original design basis.
- 3. Analytical methods used in the design analysis are reason-able except in the ca'se of pump nozzles.
- 4. The pump nozzles analysis is unrealistic and inadequate for the followi.ng reasons:
- a. Only the straight pipe portion of the nozzles were evaluated. Local membrane stresses in the pump casing were not computed.
ATTACHHENT Continued
- b. The derived pump nozzle loads have no resemblance to actual achievable loads. The pump was assumed to be supported by the piping for purposes of deriving nozzle loads. This is probably highly conservative but not necessarily so. Actual piping reactions are available and should be used in an evaluation of the pump case.
A conversation between R. Kelly of Mestinghouse and R. Campbell of SMA revealed that:.
i
- 1. The San Onofre pumps are very similar to the Ginna pumps and that a detailed finite element analysis was conducted for the San Onofre Units for a specified set of nozzle loads.
- 2. A loop analysis of Ginna was conducted by Mestinghouse for seismic loading. Actual pump nozzle loads are obtainable from the analysis.
Reconmended Actions RGE should have Vestingfiouse make a comparison of Ginna vs San Onofre pump casing geometry and pump nozzle loads and scale resulting stresses from the San Onofre pump analysis for Ginna nozzle loading conditions. The load/stress comparison and a comparison of nozzle and casing geometry should be sufficient to demonstrate seismic capability of the Ginna primary coolant pumps.
8 1
~ r- p
~
STRUCTURAL lTIECHAAICS ASSOCIATES SMA 12205.20 A Calif. Corp.
5160 Erch Street, Newport Beach, CaN. 92BBO (714) 833-7552.
June 22, 1981 Mr. Thomas A. Nelson (L-90)
Lawrence Livermore Laboratory Nuclear Test Engineering Division P. 0. Box 808 Livermore, California 94550
Dear Tom:
In the Reference 1 submittal regarding review of open items on Robert E.
Ginna Nuclear Power Plant, there were three (3) open items still remaining.
- 1. Control Rod Drive Mechanism
- 2. Reactor Coolant Pump
- 3. Steam Generator Tube Supports I
Tom Cheng of the USNRC contacted me on June 16, to inquire if use of a, site specific spectra for Ginna, in lieu of the regulatory guide spectrum anchored to 0.2g, would eliminate the oustanding items. ' indicated that for two of the three outstanding items, lack of information, not marginal stress conditions, was the principal concern.'s a result of the conversa-tion. I have reexamined the thr ee open items and can eliminate the steam generator tube support overstress problem by using Level 0 Service (faulted condition) allowable stresses and scaling up the original analysis results to applicable floor spectral accelerations. The control rod drive and primary coolant pump items still remain open but should be easily resolved with submittal of the necessary information. The remaining action items and resolution of the steam generator tube support stress problem are sum-marized in the attachment.
Very truly yours, STRUCTURAL MECHANICS ASSOCIATES, INC.
Robert D. Campbell Project Manager RDC:lca Attachment cc: J. Stevenson
ATTACHMENT
SUMMARY
OF OPEN ITEMS FOR ROBERT E. GINNA NUCLEAR POMR PLANT AS PART OF THE SEP PROGRAM CONTROL ROD DRIVE MECHANISM The submittals provided by the licensee, References 2 and 3, do not contain a correlation between loading used in the analyses and accel-erations at the RPV support. A conclusion regarding seismic resistance of the CRD system cannot be reached without such a correlation. Mesting-house should be able to supply the necessary information to Rochester Gas and Electric.
REACTOR COOLANT PUMPS The Reactor Coolant Pump Stress Report submitted for review, Reference 4, is illegible due to poor reproduction quality. A legible report needs to be submitted for review.
STEAM GENERATOR TUBE SUPPORTS Section 16 of Reference 5 documents the stress analysis of Series 44 steam generator internals for seismic loading. A conservative analysis of the tube supports resulted in a primary membrane stress of.
7900 psi for an equivalent static coefficient of 0;19g horizontal. The stress was calculated in the ligaments between the tube holes and circu-lating holes in a local area adjacent to a wrapper channel. The analysis
'conservatively ignored a redundant load path from the. edge of the tube "support to the tube holes. Reference 6, submitted for review, is an update analysis of the Series 44 steam generator but does not address the
~ 1
tube support for horizontal loading. Neither Reference 5 or 6 describe the dynamic characteristics of the steam generator and its internals nor identify the material of construction for the tube support plates.
Reference 7, obtained during the SSMRP program, documents a generic dynamic analysis of the Series 51 steam generator for varying support stiffnesses and locations. The Series 44 steam generator is similar, but smaller. The fundamental frequency of the Series 51 steam generator ranges from 4.8 to 9.6 Hz depending upon the support stiffness and location. The fundamental mode is predominantly translation and rocking of the steam generator shell. A generic response spectrum that is flat through most of this frequency range was used to compute response accelerations and loadfngs in the steam generator. A review was conducted of Reference 7 to determine the degree of coupling between the steam generator shell and the internal structures and to establish the validity of considering the steam generator as a SDOF system for estimating an appropriate equivalent static coefficient for evaluation of the tube support plates.. It was concluded from review of Reference 7 that at the most critical support location, as determined in Reference 5, that the tubes and tube supports would accelerate as rigid bodies with the shell; thus, using the spectral acceleration from the Ginna spectrum for a funda-mental frequency of about. 5 Hz is a reasonable approximation of an equiva-lent static coefficient, to use for evaluation of the tube supports.
From the response spectra in Reference 8, for 7X damping, the maximum spectral accelerations at 5 Hz are 0.58 g's in each of two ortho-gonal directions. Combining the two directional accelerations, the resulting maximum vector is 0.82g. Using this value and scaling the ligament stress computed in Reference 5, the resulting ligament stress is 34,095 psi.
Reference 7 indicates that Series 51 steam generator internals are constructed of SA 285-Grade C carbon steel. A compar ison of the allowable stress for this material at the design .temperature of 556 F to the allowable stress quoted for the Series 44 steam generator tube
supports in Reference 5, indicates that the Series 44 tube supports are also constructed of SA 285-Grade C or equivalent. This material and a design temperature of'556 F are used as a basis for establishing allowable stresses for the Safe Shutdown Earthquake.
The tube supports are considered to be Class 1 plate and shell type component supports and the allowable primary membrane stress is computed for Level 0 Service from Appendix F of the ASME Code, Reference
- 9. The allowable stress is the greater of 1.5 Sm and 1.2 Sy. For SA 285-Grade C material, 1.2 Sy governs and the allowable stress is 27840 psi. Note that the original design criteria limited the tube support stress to S .
Comparison of the calculated and allowable stress for Level D Service-results in a 22% overstress condition. If site specific spectra anchored to 0.172g are considered in lieu of regulatory guide spectra anchored to 0.2g, the calculated. stress decreases. Decreasing the calcu-lated stress by the ratios of the site specific peak ground acceleration divided by the 0.2g peak ground acceleration used to generate floor spectra, the resulting ligament stress is 29,320 psi. This is still .
about. 5'.3X over the Level D Service allowable of 27,840 psi. In consideration of the conservatism inherent in obtaining the calculated stress, the computed 5.3X overstress condition is considered acceptable for several reasons.
- 1. The site specific spectrum envelope has lower spectral accelerations in the frequency range of the containment structure than the regulatory guide spectrum if both are anchored to the same peak ground acceleration. Conse-quently, the in-structure response spectra will be lower than those in Reference 8.
'. The static analysis from Reference 5 did not account redundant load path between the outside diameter of the for'he tube support plate and the outer row of tube holes. 'The degree of conservatism could not be evaluated since perti-nent dimensions are not provided in Reference 5. The
'egree of conservatism is certainly greater than 5X though.
- 3. The evaluation considered the applicable acceleration to be the vector. sum of the two orthogonal directional acceler-ations. This assumes that both directional responses are in phase and that the resulting vector is aligned in the worst direction.
4- The in-structure response spectra were peak broadened +15%
and smoothed so that the resulting spectra are essentially flat from 2-1/2 to 9 Hz, which covers the range of funda-mental frequency for the steam generators.
Items 3 and 4 are consistent with current regulatory criteria and are prudent conservatisms to cover many of the uncertainties in the simplified treatment of the tube support. Recommended acceptance is, therefore, based on the conservatism of Items 1 and 2 being sufficient to overcome the estimated 5.3f overstress condition. Further analyses or submittals from the licensee are not considered necessar y.
REFERENCES
- 1. SMA letter, R. D. Campbell to T. R. Nelson, Review of Open Items Resulting from Seismic Review of the Robert E. Ginna Nuclear Power Plant as Part of the SEP Program, 4 May 1981.
- 2. High Speed Control Rod Drive Stress Analysis June 26, 1968.
- 3. Control Rod Drive Mechanism Seismic Frame Calculations, August 13, 1968.
- 4. Static Seismic Load Stress Analysis, Model RGE Pump (V-11001-BI),
July 30, 1968.
- 5. Vertical Steam Generator Stress Report, Mestinghouse Electric Corporation, Tampa Division, April, 1969.
- 6. MTO-SM-75-028, 44 Series Steam Generator Stress Report, External Load Analysis Update, May, 1975.
J
- 7. Stress Report; 51 Series Steam Generator, Generic Seismic Analysis, westinghouse Electric Corporation, Tampa Division, December, 1974..
- 8. NUREG/CR-1821, Seismic Review of the Robert E. Ginna Nuclear Power Plant as Part of the Systematic Evaluation Program, 15 November 1980.
- 9. ASME Boiler and Pressure Vessel Code, Section III, Nuclear Power Plant Components, Appendices, 1980.
STRUCTURAL ICCHAAICS ASSOCIATES SMA 12205.20 A C ~ Ilt. Coro.
5160 Birch Street, Newport Beach, Calif: 82660 (714) 833-7552 May 4, 1981 Mr. Thomas A. Nelson (L-90)
Lawrence Livermore Laboratory Nuclear Test Engineering Division P.O. Box 808 Livermore,California 94550
Dear Tom:
SMA has reviewed the package of documents transmitted with your April 15 letter addressing open items on Ginna. Our comments and r ecommended action are contained in the enclosure.
Very truly'yours, STRUCTURAL MECHANICS ASSOCIATES, INC.
pi Robert D. Campbell Project Manager RDC.mw Encl osur e cc: J. Stevenson w/encl.
REVIEW OF OPEN ITEMS RESULTING FROM SEISMIC REYIEM OF THE ROSERT E. GINNA NUCLEAR POWER PLANT AS PART OF THE SEP PROGRAM Reference 1 documents a review. conducted by the Lawrence Livermore Laboratory and their consultants on the seismic adequacy of the Robert E. Ginna Nuclear Power Plant. Conclusions of the adequacy of the several items in the NSSS system were based upon summary information provided; however, the sources of the summary informa-tion were not available for independent review'. Those items listed in Section 5.4 of the report as components for which seismic design analyses. have not been independently verified are:
Reactor Control Rod Drive Reactor Vessel'upports Steam Generator Reactor Coolant Pumps-Pressurizer and its Supports References 2 through 7 were provided to SMA in response to the above identified open items. - The following summary and conclusions resulted from SMA's review'of the submittals-.
- 1) Control Rod D~ive Mechanism In reference 7, the allowable bending'oment in the CRDM due to seismic loads is developed. This report does not, however, provide a correlation between bending moments and acceleration levels, Thus, no conclusion can be reached on the basis of the submittal.
Reference 2 contains a stress analysis of the control rod drive support structure. The analysis provides stresses as '
function of a static load "P" in pounds. There is no corre-lation between this static load and acceleration level. Therefore, a conclusion on the seismic capability of the support structure cannot be reached based upon the submittal.
ls 5
~ ~
SMA's experience with the SSMRP reference plant, which uses 106Afull length control rod drive. mechanisms, indicated that a large margin of safety exists for a 1.15g spectral accel-eration loading condition and we would not anticipate a seismic problem with the Ginna CROM.
Recomme'rided action - CROM loads documentation applicable to Ginna need to be supplied to SMA for final resolution.
2J Reactor'Vessel Su orts Docume'ntation l
verifying the seismic adequacy of the reactor vessel; supports was not submitted. Based upon SMA's SSMRP experience for nozzle supported RPY's the seismic induced stresses in the nozzles and adjacent shell are very small and the gover ning element for RPV support is the concrete, .
shield wall. The shield wall was considered in Ref. 1 to be adequate to withstand the 0.2g SSE.
3l Steam Generator Reference 6 contains a 1969 static analysis of the Series 44 steam geneator. The most critical area due to seismic load-ing identified in this report is the tube support baffle ligaments which are stressed past yield for a 0.38g horizon-tal static load. The SEP revised spectra 'result in an SRSS response of 0.85g horizontal which will increase the stresses by a factor of 2.24. Thus, based on the submittal, the tube support baffles are overstressed for the 0.2g SSE. .The static analysis at these tube support baffles was .done quite conser-vatively, however, and a more rigorous '~nalysis will most likely result in lower state of stress.
In 1975, an update on the series 44 steam generator was con-ducted (Reference 4) but the tube support area was only evaluated for vertical seismic loading and not for the
PI horizontal seismic loading. Thus, the results of Reference 4 cannot be used to update the results of Reference 6 in the area of concern.
Recommended Action - Documentation evaluating the tube support baffle ligaments for horizontal seismic loading should be submitted for review,
- 4) Reactor Coolant Pum s Reference 3 summarizes the stresses induced in the reactor coolant pump by a 0.8g'orizontal and a 0.54g vertical load-ing. The reported stresses are below the ASME Code allowables, but SMA is unable to 'evaluate the model or the ana1ysis due to poor reproduction quality of Reference 3. If the static analysis of the pump can be shown to be valid, then the stresses due to the revised Ginna spectra loading will be less than those contained within Reference 3," and thus accept-able.
Recommended Action -- A legible copy of Reference.3 should be provided to SMA for review.
5). Pressurizer Reference 5 contains a 1969 stress report of an 1800 cubic foot pressurizer. All pressurizers from 800 to 1800 cubic with cast and'fabricated heads utilize the same support 'eet skir ts, thus conservative generic analysis was conducted for.
the heavier 1800 cubic foot models. Based on this report, the loads resulting from the new Ginna spectra will. cause an over-stressed condition within the support f1ange, This is a very conservative conclusion, however, since the Ginna pressurizer is a smaller 800 cubic foot model plus, the flange analysis itself was very conservatively conducted using a beam bending model in lieu of a more rigorous finite element model.
The 1973 pressurizer report referred to in Reference 1 and the pr'essurizer summary stress report (reference 45 of Refer-ence 1) were not supplied to SMA for review; thus, the ade-quate capacity for a 6.7g equivalent static load portrayed in reference 45 of Reference 1 cannot be verified.
Later analysis (References 8 and 9) obtained in the SSHRP program,'for the Series 51 1800 cubic foot cast and fabricated head pressurizers showed the supports to be acceptable for a 0.96g. horizontal and 0.64g vertical loading condition.
This later analysis utilized a finite element model of the skirt and flange as opposed to the conservative beam theory .
used in reference 5.
Recommended Action - No action required. The pressurizer stress analysis within references 8 and 9 and the statements in References 5, 8 and 9 that the support skirts are identical for the 1800 cubic foot and the 800 cubic foot designs sub-
=
stantiate the adequacy of the Ginna pressurizer for a 0.2g .SSE.