IR 05000250/2017405

From kanterella
(Redirected from ML17129A550)
Jump to navigation Jump to search
Cyber Security Problem Identification and Resolution Follow-Up Inspection Report 05000250/2017405 and 05000251/2017405 - OUO Removed
ML17129A550
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/04/2017
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Nazar M
Florida Power & Light Co
References
IR 2017405
Download: ML17129A550 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 4, 2017 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd.

Juno Beach, FL 33408 SUBJECT: TURKEY POINT NUCLEAR PLANT - CYBER SECURITY PROBLEM IDENTIFICATION AND RESOLUTION FOLLOW-UP INSPECTION REPORT 05000250/2017405 AND 05000251/2017405

Dear Mr. Nazar:

On March 23, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Plant, Units 3 and 4. The enclosed report documents the results of this inspection which were discussed with Mr. Eric Katzman and other members of your staff.

No NRC-identified or self-revealing findings were identified during this inspection.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA: Rodney J. Fanner for/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket No.: 50-250, 50-251 License No.: DPR-31, DPR-41 Enclosure:

Inspection Report No. 05000250/2017405 and 05000251/2017405 w/ Attachment:

Supplementary Information (OUO)

cc: (See page 3) cc:

Thomas Summers Southern Regional Vice President Florida Power & Light Company 9760 SW 344th St.

Homestead, FL 33035 Brian Stamp Plant General Manager Florida Power & Light Company 9760 SW 344th Street Homestead, FL 33035 Mitch Guth Licensing Manager Florida Power & Light Company 9760 SW 344th Street Homestead, FL 33035 Robert Bitner Nuclear Fleet Security Florida Power & Light Company Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478 Orlando Hernandez, Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Homestead, FL 33035 _________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE MJS6 SMS LJB4 RJF2 NAME MSINGLETARY SSHAEFFER LSUGGS SSHAEFFER DATE 5/2/2017 5/2/2017 5/2/2017 5/4/2017 5/ /2017 5/ /2017 5/ /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO