IR 05000250/2017404

From kanterella
Jump to navigation Jump to search
U.S. Nuclear Regulatory Commission Security Inspection Report 05000250/2017404 and 05000251/2017404
ML17171A027
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/19/2017
From: Otis Smith
NRC/RGN-II/DRS/PSB2
To: Hernandez O
Florida Power & Light Co
References
IR 2017404
Download: ML17171A027 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 19, 2017 Mr. Orlando Hernandez, Security Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Homestead, FL 33035 SUBJECT: TURKEY POINT NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000250/2017404 AND 05000251/2017404

Dear Mr. Hernandez:

On May 25, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Plant, Units 3 and 4, and discussed the results of this inspection with Mr. G. Mellin and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA James C. Shehee FOR/

Otis Smith Jr., Acting Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DPR-41 Enclosure:

Inspection Report 05000250/2017404, and 05000251/2017404 w/Attachment: Supplemental Info (OUO)

cc: (See page 3) cc:

Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & light Company Mail Stop NT3/JW 15430 Endeavor Drive Jupiter, FL 33478 Thomas Summers Site Vice President Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 Robert Bitner Nuclear Fleet Security Florida Power & Light Company 700 Universe Boulevard Juno Beach, FL 33408-0420 Mitch Guth Licensing Manager Turkey Point Nuclear Generating Station Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035 SUBJECT: TURKEY POINT NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000250/2017404 AND 05000251/2017404 Dated : June 19, 2017 DISTRIBUTION:

N. Simonian, NSIR C. Johnson, NSIR L. Suggs, RII, DRP L. Pressley, SPE A. Wilson, PE D. Orr, SRI R. Reyes, RI S. Price, ORA/RC K. Sloan, RII, EICS Public RIDSNRRDIRS

  • See previous page for concurrence PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRP RII:DRS/PSB2 SIGNATURE JHW2 LJB4 OXS NAME J. Wallo L. Suggs O. Smith Jr.

DATE 6/15/2017 6/19/2017 6/19/2017 E-MAIL COPY YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSBII\REACTORS\Turkey Point ()\REPORTS\2017\Turkey Point Insp Report 2017-404DOC