Revision 309 to Final Safety Analysis Report, Chapter 4, Table of Contents
ML16256A206
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16256A206 (18)


Text

WSES-FSAR-UNIT-3 4-i Revision 309 (06/16)

REACTOR CHAPTER 4 TABLE OF CONTENTS

Section Title Page

4.0 REACTOR 4.1-1

4.1

SUMMARY

DESCRIPTION 4.1-1

4.1 REFERENCES

4.1-3

4.2 FUEL SYSTEM DESIGN 4.2-1

4.2.1 DESIGN BASES 4.2-1

4.

2.2 DESCRIPTION

AND DESIGN DRAWINGS 4.2-33

4.2.3 DESIGN EVALUATION 4.2-39

4.2.4 TESTING AND INSPECTION PLAN 4.2-63

4.2 REFERENCES

4.2-71

4.3 NUCLEAR DESIGN 4.3-1

4.3.1 DESIGN BASES 4.3-1

4.

3.2 DESCRIPTION

4.3-3

4.3.3 ANALYTICAL METHODS 4.3-20

4.3.4 CHANGES 4.3-34

4.3 REFERENCES

4.3-35 (DRN 02-1538, R12;04-502, R13;05-508, R14; EC-30663, R307, LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A FUEL CYCLE 21 4.3A-1 (DRN 02-1538, R12;04-502, R13;05-508, R14; EC-30663, R307, LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A.1 GENERAL DESCRIPTION 4.3A-1

4.3A.2 FUEL SYSTEM DESIGN 4.3A-1

4.3A.3 NUCLEAR DESIGN 4.3A-5

4.3A.4 THERMAL - HYDRAULIC DESIGN 4.3A-7

4.3A.5 REACTOR PROTECTION AND MONITORING SYSTEM 4.3A-8

4.3A.6 REFERENCES TO APPENDIX 4.3A 4.3A-9 WSES-FSAR-UNIT-3 4-ii CHAPTER 4 TABLE OF CONTENTS (Cont'd)

Section Title Page

4.4 THERMAL AND HYDRAULIC DESIGN 4.4-1

4.4.1 DESIGN BASES 4.4-1

4.

4.2 DESCRIPTION

OF THERMAL AND HYDRAULIC 4.4-2 DESIGN OF THE REACTOR CORE

4.

4.3 DESCRIPTION

OF THE THERMAL AND HYDRAULIC 4.4-14 DESIGN OF THE REAC TOR COOLANT SYSTEM (RCS)

4.4.4 EVALUATION 4.4-16

4.4.5 TESTING AND VERIFICATION 4.4-30

4.4.6 INSTRUMENTATION REQUIREMENTS 4.4-30

4.4 REFERENCES

4.4-34

4.5 REACTOR MATERIALS 4.5-1

4.5.1 CONTROL ELEMENT DRIVE STRUCTURAL MATERIALS 4.5-1

4.5.2 REACTOR INTERNALS MATERIALS 4.5-4

4.5 REFERENCES

4.5-12

4.6 FUNCTIONAL DESIGN OF REACTIVITY CONTROL SYSTEMS 4.6-1

4.6.1 INFORMATION FOR CONTROL ELEMENT ASSEMBLY DRIVE SYSTEM 4.6-1

4.6.2 EVALUATIONS OF THE CEADS 4.6-1

4.6.3 TESTING AND VERIFICATION OF THE CEADS 4.6-2

4.6.4 INFORMATION FOR COMBINED PERFORMANCE OF REACTIVITY SYSTEMS 4.6-2

4.6.5 EVALUATIONS OF COMBINED PERFORMANCE 4.6-2

4.6 REFERENCES

4.6-3 WSES-FSAR-UNIT-3 4-iii CHAPTER 4 LIST OF TABLES

Table Title

4.1-1 ANALYSIS TECHNIQUES

4.2-1 MECHANICAL DESIGN PARAMETERS

4.2-2 TENSILE TEST RESULTS ON I RRADIATED SAXTON CORE III CLADDING

4.3-1 NUCLEAR DESIGN CHARACTERISTICS

4.3-2 INTENTIONALLY DELETED

4.3-3 COMPARISON OF CORE REACTIVITY COEFFICIENT WITH THO SE USED IN VARIOUS SAFETY ANALYSES

4.3-4 REACTIVITY COEFFICIENTS

4.3-5 WORTHS OF CEA GROUPS

4.3-6 CEA REACTIVITY ALLOWANCES

4.3-7 CALCULATED CEA WORTHS AND ALLOWANCES ()

4.3-8 COMPARISON OF RODDED AND UNRODDED PEAKING FACTORS FOR VARIOUS RODDED CONFIGURATIONS AT BOC AND EOC

4.3-9 CALCULATED VARIATION OF THE AXI AL STABILITY INDEX DURING THE FIRST CYCLE (a) 4.3-10 MAXIMUM FAST FLUX GREATER THAN 1 MeV (n/cm 2 sec) 4.3-11 CONTROL ELEMENT ASSEMBLY SHADOWING FACTORS

4.3-12 FUEL ROD DESCRIPTION

4.3-13 RESULTS OF ANALYSIS OF CRITICAL UO 2 SYSTEMS 4.3-14 RESULTS OF ANALYSIS OF PuO 2 -UO 2 FUELED LATTICES

4.3-15 REACTION RATES

4.3-16 BEGINNING OF CYCLE, ZE RO POWER UNRODDED CHARACTERISTICS 4.3-17 CONTROL ROD WORTH, BEGINNING OF CYCLE

() HOT - ZERO POWER 4.3-18 COMPARISONS OF CALCULATED AND MEASURED CEA WORTHS

() 4.3-19 AT-POWER ISOTHERMAL TEMPERATURE COEFFICIENTS WSES-FSAR-UNIT-3 4-iv Revision 309 (06/16)

CHAPTER 4 LIST OF TABLES

Table Title

4.3-20 POWER DISTRIBUTIONS

SUMMARY

OF CALCULATION AND MEASUREMENT UNCERTAINTIES

4.3-21 AXIAL XENON OSCILLATIONS

4.3-22 DENSIFICATION CHARACTERISTICS

4.3-23 RADIAL PIN POWER CENSUS (DRN 04-502, R13;05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A-1 WATERFORD - 3 CYCLE 21 CORE LOADING DESCRIPTION (DRN 04-502, R13;05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A-2 NOMINAL PHYSI CS CHARACTERISTICS

4.3A-3 LIMITING VALUES OF REAC TIVITY WORTHS AND ALLOWANCES FOR HOT FULL POWER STEAM LINE BREAK, END-OF-CYCLE (EOC)

4.3A-4 REACTIVITY WORTH OF CEA REGULATING GROUPS AT HOT FULL POWER, (DRN 04-502, R13;05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A-5 CYCLE 21 THERMAL HYDRAULIC PARAMETERS AT FULL POWER (DRN 04-502, R13;05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308, LBDCR 15-035, R309) 4.4-1 THERMAL AND HYDRAULIC PARAMETERS

4.4-2 COMPARISON OF THE DEPART URE FROM NUCLEATE BOILING RATIOS COMPUTED WITH DIFFERENT CORRELATIONS

4.4-3 REACTOR COOLANT FLOWS IN BYPASS CHANNELS

4.4-4 REACTOR VESSEL BEST ESTIM ATE PRESSURE LOSSES AND COOLANT TEMPERATURES

4.4-5 DESIGN STEADY STATE HYDRA ULIC LOADS ON VESSEL INTERNALS AND FUEL ASSEMBLIES (a) 4.4-6 RCS VALVES AND PIPE FITTINGS

4.4-7 RCS DESIGN MINIMUM FLOWS

4.4-8 REACTOR COOLANT SYSTEM GEOMETRY

4.4-9 SAFETY INJECTION LINES LENGTHS

4.4-10 REACTOR COOLANT SYSTEM COMPON ENT THERMAL AND HYDRAULIC DATA (a)

4.6-1 POSTULATED EVENTS REQUIRING OPERATION OF TW O OR MORE REACTIVITY CONTROL SYSTEMS WSES-FSAR-UNIT-3 4-v Revision 308 (11/14)

CHAPTER 4 LIST OF FIGURES

Figure Title

4.1-1 REACTOR VERTICAL ARRANGEMENT

4.1-2 REACTOR CORE CROSS-SECTION

4.2-1 CIRCUMFERENTIAL STRAIN VS TEMPERATURE

4.2-2 DESIGN CURVE FOR CYCLIC ST RAIN USAGE OF ZIRCALOY-4 AT 700 F 4.2-3 FUEL ROD INTERNAL PRESSURE VARIATION WITH BURNUP AND POWER LEVEL MINIMUM PRESSURE ROD

4.2-4 FUEL ROD INTERNAL PRESSURE VARIATION WITH BURNUP AND POWER LEVEL MAXIMUM PRESSURE ROD (DRN 02-1477, R12) 4.2-5 CONTROL ELEMENT ASSEMBLY (DRN 02-1477, R12)

(DRN 01-1103, R12) 4.2-6 FIGURE INTENTIONALLY DELETED 4.2-7 FIGURE INTENTIONALLY DELETED (DRN 01-1103, R12) 4.2-8 FUEL ASSEMBLY

4.2-9 FUEL SPACER GRID

4.2-10 FUEL ROD (DRN 02-1538, R12) 4.2-10A COMPARISON OF URANIA ROD ASSEMBLY FEATURES (DRN 02-1538, R12) (LBDCR 14-008, R308) 4.2-10B COMPARISON OF URANIA ROD ASSEMBLY FEATURES (LBDCR 14-008, R308) 4.2-11 BURNABLE POISON ROD (DRN 02-1538, R12; 06-1059, R15) 4.2-11A COMPARISON OF BURNABLE ABSORBER RODS (DRN 02-1538, R12; 06-1059, R15) (LBDCR 14-008, R308) 4.2-11B COMPARISON OF BURNABLE ABSORBER RODS (LBDCR 14-008, R308) 4.2-12 CONTROL ELEMENT ASSEMBLY LOCATIONS

4.3-1 FUEL MANAGEMENT PATTERN

4.3-2 PLANAR AVERAGE POWER DI STRIBUTION BOC, UNRODDED, FULL POWER, NO XENON

4.3-3 PLANAR AVERAGE POWER DISTRIBUTION BOC, UNRODDED FULL POWER, EQUILIBRIUM XENON

4.3-4 PLANAR AVERAGE POWER DISTRIBUTION EOC, FULL POWER, EQUILIBRIUM XENON

4.3-5 PLANAR AVERAGE POWER DISTRIBUTI ON BOC, BANK 6 FULL IN, FULL POWER, NO XENON WSES-FSAR-UNIT-3 4-vi Revision 9 (12/97)

CHAPTER 4 LIST OF FIGURES (Cont'd)

Figure Title

4.3-6 PLANAR AVERAGE POWER DISTRI BUTION BOC, BANK 6 FULL IN, FULL POWER EQUILIBRIUM XENON

4.3-7 PLANAR AVERAGE POWER DIST RIBUTION EOC, BANK 6 FULL IN, FULL POWER EQUILIBRIUM XENON

4.3-8 PLANAR AVERAGE POWER DIST RIBUTION BOC, PART-LENGTH ROD AS IF FULL LENGTH, FULL POWER, NO XENON

4.3-9 PLANAR AVERAGE POWER DIST RIBUTION BOC PART LENGTH ROD AS IF FULL LENGTH, FULL POWER, EQUILIBRIUM XENON

4.3-10 PLANAR AVERAGE POWER DIST RIBUTION EOC PART LENGTH ROD AS IF FULL LENGTH, FULL POWER, EQUILIBRIUM XENON

4.3-11 PLANAR AVERAGE POWER DIST RIBUTION BOC, PART LENGTH ROD AS IF FULL LENGTH BANK 6 FULL IN, FULL POWER NO XENON

4.3-12 PLANAR AVERAGE POWER DISTRIBU TION EOC, PART LENGTH ROD AS IF FULL LENGTH BANK 6 FULL IN, FULL POWER EQUILIBRIUM XENON 4.3-13 PLANAR AVERAGE POWER DISTRIBUTI ON EOC, PART-LENGTH ROD AS IF FULL LENGTH BANK 6 FULL IN, FU LL POWER EQUILIBRIUM XENON 4.3-14 AXIAL POWER DISTRIBUTION, BOC, UNRODDED

4.3-15 AXIAL POWER DISTRIBU TION, AT 3,000 MWD/MTU UNRODDED

4.3-16 AXIAL POWER DISTRIBU TION AT 6,000 MWD/MTU UNRODDED

4.3-17 AXIAL POWER DISTRIBU TION AT 9,000 MWD/MTU UNRODDED

4.3-18 AXIAL POWER DISTRIBUTION AT THE END OF THE FIRST CYCLE, UNRODDED

4.3-19 DELETED

4.3-20 DELETED

4.3-21 DELETED

4.3-22 DELETED

4.3-23 DELETED WSES-FSAR-UNIT-3 4-vii CHAPTER 4 LIST OF FIGURES (Cont'd)

Figure Title

4.3-24 DELETED

4.3-25 DAILY REACTOR POWER MANEU VERING NEAR BEGINNING OF CYCLE (100% TO 35% TO 100% POWER)

4.3-26 DAILY REACTOR POWER MANEUVERING NEAR END OF CYCLE (100% TO 35% TO 100% POWER)

4.3-27 DAILY REACTOR POWER MANEUVER ING NEAR THE BEGINNING OF CYCLE (100% TO 50% TO 100% POWER)

4.3-28 DAILY REACTOR POWER MANE UVERING NEAR THE END OF CYCLE (100% TO 50% TO 100% POWER)

4.3-29 DAILY REACTOR POWER MANE UVERING NEAR THE BEGINNING OF CYCLE (2-HOUR RAMPS)

4.3-30 DAILY REACTOR POWER MANE UVERING NEAR THE END OF CYCLE (2-HOUR RAMPS)

4.3-31 F N Q VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 1 OF 3) 4.3-31 F N Q VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 2 OF 3) 4.3-31 F N Q VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 3 OF 3) 4.3-32 F N R VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 1 OF 3) 4.3-32 F N R VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 2 OF 3) 4.3-32 F N R VS TIME FOR A LOAD FOLLOWING TRANSIENT (SHEET 3 OF 3) 4.3-33 NORMALIZED POWER DISTRIBUTI ON WITHIN TYPICAL UNSHIMMED ASSEMBLY

4.3-34 FUEL TEMPERATURE COEFFICI ENT VS EFFECTIVE FUEL TEMPERATURE

4.3-35 MODERATOR TEMPERATURE COEFFICI ENT VS MODERATOR TEMPERATURE AT BOC 1

4.3-36 MODERATOR TEMPERATURE COEFFICI ENT VS MODERATOR TEMPERATURE AT EOC 1

4.3-37 MODERATOR DENSIT Y COEFFICIENT VS DENSITY

4.3-38 FUEL TEMPERATURE CONTRIBUTI ON TO POWER COEFFICIENT AT EOC

4.3-39 CEA BANK IDENTIFICATION

4.3-40 TYPICAL POWER DEPENDENT CEA INSERTION LIMIT WSES-FSAR-UNIT-3 4-viii Revision 9 (12/97)

CHAPTER 4 LIST OF FIGURES (Cont'd)

Figure Title

4.3-41 INTEGRAL WORTH VS WITHDRAWA L AT ZERO POWER, EOC CONDITIONS

4.3-42 INTEGRAL WORTH VS WITHDRAWA L AT FULL POWER EOC, EQUILIBRIUM XENON CONDITIONS

4.3-43 REACTIVITY DIFFERENCE BET WEEN FUNDAMENTAL AND EXCITED STATES OF A BARE CYLINDRICAL REACTOR

4.3-44 EXPECTED VARIATION OF THE AZIMUTHAL STABILITY INDEX 4.3-45 STABILITY INDEX 4.3-46 ROD SHADOWING EFFECT VS RO D POSITION FOR ROD INSERTION AND WITHDRAWAL TRANSIENTS AT PALISADES

4.3-47 TYPICAL THREE SUB CHANNEL ANNEALING

4.3-48 GEOMETRY LAYOUTS

4.3-49 COMPARISON OF MEASURED AND CALCULATED SHAPE ANNEALING CORRECTION FOR PALISADES

4.3-50 TYPICAL TEMPERATURE DEFE CT VS REACTOR INLET TEMPERATURE

4.3-51 COMPARISON OF CALCULATED AND MEASURED PLUTONIUM TO URANIUM MASS RATION IN THE ASYMPTOT IC NEUTRON SPECTRUM FOR YANKEE

4.3-52 PLUTONIUM ISOTOPIC COMPOS ITION VS FUEL DEPLETION IN THE ASYMPTOTIC SPECTRUM FOR YANKEE

4.3-53 CRITICAL BORON - REACTIVITY DEPLETION OF PALISADES

4.3-54 CRITICAL BORON FOR MAIN YANKEE

4.3-55 CRITICAL BORON FOR FORT CALHOUN 4.3-56 LIMITING INTEGRAL RA DIAL PIN POWER DISTRIBUTION 4.3-57 A DIVERGENT AXIAL OSCILLATION IN AN EOC CORE WITH REDUCED POWER FEEDBACK (//) = 0.96 X 10

-4KWFT 4.3-58 DAMPING COEFFICIENT VS REACTI VITY DIFFERENCE BETWEEN FUNDAMENTAL AND EXCITED STATE 4.3-59 LIMITING SINGLE GAP POWER PEAKING AND ASSOCIATED ROD LOCATION RELATIVE TO THE GAP LOCATION

4.3-60 AUGMENTATION FACTOR WSES-FSAR-UNIT-3 4-ix Revision 309 (06/16)

CHAPTER 4 LIST OF FIGURES (Cont'd)

Figure Title (LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A-1 WATERFORD - 3 CYCLE 21 - IN TEGRAL BURNABLE POISON SHIM AND ENRICHMENT ZONING PATTERNS (LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A-1A WATERFORD 3 - FIG URE INTENTIONALLY DELETED

4.3A-1B WATERFORD 3 - FIG URE INTENTIONALLY DELETED (DRN 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A-2 WATERFORD 3 - CYCLE 21 FUEL MANAGEMENT SCHEME (DRN 04-502, R13;05-508, R14) 4.3A-3 WATERFORD 3 - FIG URE INTENTIONALLY DELETED (DRN 04-502, R13;05-508, R14; 06-1059, R15) 4.3A-3a WATERFORD 3 - CYCLE 21 BEGINNING OF CYCLE FROM SHORT ENDPOINT OF PREVIOUS CYCLE (BOCS) ASSEMBLY AVERAGE BURNUP

4.3A-3b WATERFORD 3 - CYCLE 21 END OF CYCLE FROM LONG ENDPOINT OF PREVIOUS CYCLE (EOCL) ASSEMBLY AVERAGE BURNUP (EC-30663, R307, LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A-4 WATERFORD 3 - CEA BANK IDENTIFICATION

4.3A-5 WATERFORD 3 - IN-CORE INSTRUMENT ASSEMBLIES CORE LOCATIONS

4.3A-6 WATERFORD 3 - PDIL FOR REGULATING GROUPS (DRN 04-502, R13, LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A-7 WATERFORD 3 - CEA GROUP P INSERTION LIMIT VS THERMAL POWER (DRN 05-508, R14; 06-1059, R15; EC-30663, R307) 4.3A-8 WATERFORD 3 - CYCLE 21 ASSEMBLY RELATIVE POWER DENSITY, BOC HFP, EQUILIBRIUM XENON, ARO

4.3A-9 WATERFORD 3 - CYCLE 21 ASSEMBLY RELATIVE POWER DENSITY MOC, HFP, EQUILIBRIUM XENON, ARO

4.3A-10 WATERFORD 3 - CYCLE 21 ASSEMBLY RELATIVE POWER DENSITY EOC, HFP, EQUILIBRIUM XENON, ARO (DRN 04-502, R13;05-508, R14; 06-1059, R15; EC-30663, R307, LBDCR 14-008, R308, LBDCR 15-035, R309) 4.3A-11 WATERFORD 3 - FIG URE INTENTIONALLY DELETED

4.3A-12 WATERFORD 3 - FIG URE INTENTIONALLY DELETED

4.3A-13 WATERFORD 3 - FIG URE INTENTIONALLY DELETED

4.3A-14 WATERFORD 3 - FIG URE INTENTIONALLY DELETED

4.3A-15 WATERFORD 3 - FIG URE INTENTIONALLY DELETED

4.3A-16 WATERFORD 3 - FIG URE INTENTIONALLY DELETED

4.3A-17 FUEL ROD AND LOWER END FITTING CHANGES

4.3A-18 FUEL ROD DESIGNS WSES-FSAR-UNIT-3 4-x Revision 308 (11/14)

CHAPTER 4 LIST OF FIGURES (Cont'd)

Figure Title

(DRN 02-1538, R12) 4.3A-18a COMPARISON OF URANIA ROD ASSEMBLY FEATURES (DRN 02-1538, R12)

(LBDRC 14-008, R308) 4.3A-18b COMPARISON OF URANIA ROD ASSEMBLY FEATURES 4.3A-19 POISON ROD DESIGNS (DRN 02-1538, R12; 06-1059, R15) 4.3A-19b COMPARISON OF BURNABLE ABSORBER RODS (DRN 02-1538, R12; 06-1059, R15, LBDCR 14-008, R308) 4.4-1 CORE WIDE PLANAR POWER DI STRIBUTION FOR SAMPLE DNB ANALYSIS

4.4-2 ROD RADIAL POWER FACTORS IN HOT ASSEMBLY FOR SAMPLE DNB ANALYSIS

4.4-3 TYPICAL AXIAL POWER DISTRIBUTIONS

4.4-4 AVERAGE VOID FRACTIONS AND QUALITIES AT THE EXIT OF DIFFERENT CORE REGIONS

4.4-5 AXIAL DISTRIBUTION OF VOID FRACTION AND QUALITY IN THE SUB CHANNEL ADJACENT TO THE ROD WITH MINIMUM DNBR

4.4-6 REACTOR VERTICAL ARRANG EMENT SHOWING BYPASS FLOW PATHS

4.4-7 ISOMETRIC VIEW OF THE REACTOR COOLANT SYSTEM

4.4-8 SAFETY INJECTION SYSTEM (SHEET 1 OF 4)

4.4-8 SAFETY INJECTION SYSTEM (SHEET 2 OF 4) (DRN 01-416) 4.4-8 SAFETY INJECTION SYSTEM (SHEET 3 OF 4) (DRN 01-416) 4.4-8 SAFETY INJECTION SYSTEM (SHEET 4 OF 4)

4.4-9 PRESSURE DROP PREDICTIONS FOR A 21-ROD BUNDLE

4.4-10 SENSITIVITY OF MINIMUM DNBR TO SMALL CHANGES IN REACTOR COOLANT CONDITIONS

4.4-11 VIBRATION AND LOOSE PARTS MONITORING SYSTEM SCHEMATIC

4.6-1 REACTOR VESSEL CLOSURE H EAD PLAN VIEW CEPM LAYOUT WSES-FSAR-UNIT-3 4-xi Revision 14 (12/05)

UPDATE REFERENCE LIST Chapter 4

Section Cross References

Revision 12-B

Section 4.3A.6 ER-W3-2000-1027/DRN 03-270

Revision 13

Section 4.2.1.2.1 ER-W3-2003-0678/DRN 03-1821

TOC Page 4-i ER-W3-2003-0654/DRN 04-502

TOC Page 4-iv

TOC Page 4-ix

Section 4.2.4.2.3.2

Table 4.2-1 Sht 3

Section 4.3A.1

Section 4.3A.2

Section 4.3A.3

Table 4.3A-1

Table 4.3A-5 Sht 1

Table 4.3A-5 Sht 2

Figure 4.3A-2

Figure 4.3A-3

Figure 4.3A-7

Figure 4.3A-8

Figure 4.3A-9

Figure 4.3A-10

Revision 13-A

Section 4.4.6.1 ER-W3-2003-0418-000/DRN 03-1689

Revision 14

Section 4.2.1 ER-W3-2001-1149-000/DRN 03-2058 Section 4.2.1.2.2.1 Section 4.2.1.2.5 Section 4.2.1.3.3 Section 4.2.1.3.3.1 Section 4.2.1.3.3.3 Section 4.2.3.1.2.3 Section 4.2.3.1.3 Section 4.3A.4.1 Section 4.3A.4.2 Section 4.4.1.1 Section 4.4.2.6.3 Section 4.5.2.4.2.3

Table 4.3A-5 Table 4.6-1

WSES-FSAR-UNIT-3 4-xii Revision 15 (03/07)

UPDATE REFERENCE LIST Chapter 4

Section Cross References

Revision 14 Cont'd

Section 4.2.1.2.4.4 ER-W3-2002-0110-001/DRN 04-1096 Section 4.2.1.2.7 Section 4.3.2.2.1 Section 4.4.1.3 Reference 4.4

Section 4.4.6.1 ER-W3-2003-0418-001/DRN 04-1780

Table Of Contents ER-W3-2004-0116-003/DRN 05-508 Section 4.3A Section 4.3A.1 Section 4.3A.2.1.1 Section 4.3A.2.3 Section 4.3A.2.5 Section 4.3A.3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3

Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5

Figure 4.3A-2 Figure 4.3A-3 Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10

Revision 15

Section 4.3.3.1.1 ER-W3-2006-0281-000/DRN 06-871 Section 4.4.4.2.1 Section 4.4.6.1 Section 4.6.5

Section 4.2.1.1.5 ER-W3-2001-1023-000/DRN 06-895 Section 4.2.1.4.4 Section 4.2.4.1.2 Section 4.3.2.3.2 Section 4.3.3.1.2.1 Figure 4.3-57 Table 4.3-1 Sh. 1

Section 4.3.2.7.2 ER-W3-2006-0223-000/DRN 06-914

WSES-FSAR-UNIT-3 4-xiii Revision 302 (12/08)

UPDATE REFERENCE LIST Chapter 4

Section Cross References

Revision 15 Cont'd

Section 4.2.1.2.2.1 ER-W3-2004-0116-018/DRN 06-992 Table 4.2-1 Sh. 3

Table of Contents ER-W3-2005-0447-004/DRN 06-1059 Section 4.2.1.1.2 Section 4.2.1.2.1 Section 4.2.1.2.2.1 Section 4.2.1.2.2.2 Section 4.2.1.2.5 Section 4.2.1.2.5.1 Section 4.2.1.2.8 Section 4.2.1.3 Section 4.2.2.2 Section 4.2.2.3 Section 4.2.3.1.3 Section 4.2.3.1.4 Section 4.2.3.3.1 Section 4.2: References Table 4.2-1 Sh. 2 Figure 4.2-11A Section 4.3A Section 4.3A.1 Section 4.3A.2.1.1 Section 4.3A.2.1.2 Section 4.3A.2.3 Section 4.3A.2.5 Section 4.3A.3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3 Section 4.3A.3.3.3 Section 4.3: References Table 4.3A-1 thru Table 4.3A-5 Figure 4.3A-1 thru Figure 4.3A-3 Figure 4.3A-8 thru Figure 4.3A-10 Figure 4.3A-19a

Section 4.2.3.2.3 ER-W3-2004-0094-003/DRN 06-1141

Revision 302

Section 4.1 EC-9533 Figure 4.1.2a Section 4.2.1.1.2 Section 4.2.1.1.5 Section 4.2.1.1.7

WSES-FSAR-UNIT-3 4-xiv Revision 302 (12/08)

UPDATE REFERENCE LIST Chapter 4

Section Cross References

Revision 302 Cont'd

Section 4.2.1.1.8 Section 4.2.1.1.9 Section 4.2.1.2.1 Section 4.2.1.2.2.1 Section 4.2.1.2.2.2 Section 4.2.1.2.5 Section 4.2.1.2.6 Section 4.2.1.2.8 Section 4.2.2.1 Section 4.2.2.2 Section 4.2.2.3 Section 4.2.3.1.1 Section 4.2.3.1.3 Section 4.2.3.1.4 Section 4.2.3.2.3 Section 4.2.3.2.4.2 Section 4.2.3.2.7 Section 4.2.3.2.12 Section 4.2.4.1.1 Section 4.2.4.1.2 Section 4.2: References Table 4.2-1 Sh. 1 Table 4.2-1 Sh. 2 Table 4.2-1 Sh. 3 Figure 4.2-8a Figure 4.2-10B Figure 4.2-11B Section 4.3: References Section 4.3A Section 4.3A.1 Section 4.3A.2.1.1 Section 4.3A.2.1.2 Section 4.3A.2.3 Section 4.3A.2.4 Section 4.3A.2.5 Section 4.3A.3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3 Section 4.3A.3.3.1 Section 4.3A.3.3.2 Section 4.3A.3.3.3 Section 4.3A.4.1 Section 4.3A.4.2 Table 4.3A-1 Table 4.3A-2 Table 4.3A-3

WSES-FSAR-UNIT-3 4-xv Revision 304 (06/10)

UPDATE REFERENCE LIST Chapter 4

Section Cross References

Revision 302 Cont'd

Table 4.3A-4 Table 4.3A-5 Figure 4.3A-1 Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10 Figure 4.3A-18b Figure 4.3A-19b Section 4.4.1.1 Section 4.4.2.1 Section 4.4.2.2.1 Section 4.4.2.2.2 Section 4.4.2.9.4 Section 4.4.4.1 Section 4.4: References

Revision 304

Section 4.5.2.1 EC-10453

Section 4.2.2.2 EC-13881 Section 4.3.2.2.2 Section 4.3A Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5 Figure 4.3A-1 Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10 Figure 4.3A-19b Section 4.4.2.1 Section 4.4.2.2.1 Section 4.4.2.2.2 Section 4.4.2.2.2.2 Section 4.4.2.4 Section 4.4.2.6.3 Section 4.4.2.8 WSES-FSAR-UNIT-3 4-xvi Revision 307 (07/13)

UPDATE REFERENCE LIST Chapter 4 Section Cross References

Revision 304 Cont'd

Section 4.4.2.9.4 EC-13881 (Continued)

Section 4.4.4.1 Section 4.4.4.2.3 Section 4.4.4.5.2 Section 4.4: References

Figure 4.3A-5 EC-18688

Revision 305

Table 4.4-6 Sheet 2 of 3 EC-14765

Section 4.4.6.1 EC-26965

Revision 307

Section 4.1 EC-1020 Table 4.1-1 Sh. 1 of 3

Section 4.1 EC-2800 Table 4.1-1 Sh. 1 of 3 Table 4.3-1 Sh. 1 of 2 Section 4.5.1.1 Section 4.5.1.3 Section 4.5.1.3.2 Section 4.5.1.3.3 Section 4.5.1.4 Section 4.5.2.4.2.2 Section 4.5.2.4.2.4 Section 4.5.2.4.3 Figure 4.6-1

Table of Contents EC-30663 Section 4.2.1.1.7 Section 4.2.2.1 Section 4.3A Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5 Section 4.4.1.1 Section 4.4.2.2.1 Section 4.4.2.2.2 Section 4.4.2.9.4 Section 4.4.4.1 WSES-FSAR-UNIT-3 4-xvii Revision 309 (06/16)

UPDATE REFERENCE LIST Chapter 4 Section Cross References

Revision 307 (Continued)

Figure 4.3A-1 EC-30663 (Continued)

Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9 Figure 4.3A-10

Revision 308

Table of Contents LBDCR 14-008 Section 4.3A Section 4.3A.1 Section 4.3A.2 Section 4.3A.2.3 Section 4.3A.2.4 Section 4.3A.2.5 Section 4.3A3.1.1 Section 4.3A.3.1.2 Section 4.3A.3.1.3 Section 4.3A.6 Table 4.3A-1 Table 4.3A-2 Table 4.3A-3 Table 4.3A-4 Table 4.3A-5 Figure 4.3A-1 Figure 4.3A-2 Figure 4.3A-3a Figure 4.3A-3b Figure 4.3A-8 Figure 4.3A-9

Figure 4.3A-10

Revision 309 LBDCR 13-014 Section 4.2.1.2.5.3

Section 4.3.2

Section 4.3.2.4

Section 4.3.2.4.4.3

Section 4.4.5

Section 4.4.6

Table of Contents LBDCR 15-035

4-i 4-iv WSES-FSAR-UNIT-3 4-xviii Revision 309 (06/16) 4-ix LBDCR 15-035 (con't)

Section 4.2.1.2.2.1

Section 4.2.2.1

Section 4.2.2.2

Section 4.2.3.2.3

Section 4.2.3.2.12

Reference 4.2

Section 4.3A

Section 4.3A.2.2

Section 4.3A.3.1.1

Section 4.3A.3.1.3

Table 4.3A-1

Table 4.3A-2

Table 4.3A-3

Table 4.3A-4

Table 4.3A-5

Figure 4.3A-1

Figure 4.3A-2

Figure 4.3A-3a

Figure 4.3A-3b

Figure 4.3A-8

Figure 4.3A-9

Figure 4.3A-10

Section 4.2.4.4 LBDCR 15-039

Section 4.2.1.1.2 LBDCR 15-025

Section 4.2.1.1.6

Section 4.2.2.1

Section 4.2.2.3

Section 4.2.2.3

Section 4.2.4.1.1

.