Letter Sequence Other |
---|
|
|
MONTHYEARML16056A5962016-02-22022 February 2016 Draft Request for Additional Information Project stage: Draft RAI ML16083A3942016-03-23023 March 2016 Changes to High Pressure Coolant Injection and Reactor Core Isolation Cooling Surveillance Requirements - Supplement 1, Response to Request for Additional Information Project stage: Supplement ML16159A1482016-07-0505 July 2016 Issuance of Amendments Surveillance Requirements for High Pressure Coolant Injection System and Reactor Core Isolation Cooling System Project stage: Approval ML16217A0082016-08-11011 August 2016 Correction to Amendment Nos. 308 and 312 Regarding Surveillance Requirements for High Pressure Coolant Injection System and Reactor Core Isolation Cooling System Project stage: Other 2016-03-23
[Table View] |
|
---|
Category:Letter
MONTHYEARML24313A1012024-11-13013 November 2024 SLRA Supplemental Environmental Audit Plan ML24310A2832024-11-0404 November 2024 Issuance of the Core Operating Limits Report for Reload 25, Cycle 26 IR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report 2024-09-06
[Table view] Category:Technical Specifications
MONTHYEARML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Va ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML19266A6222019-10-29029 October 2019 Issuance of Amendment Nos. 328 and 331 Revising Technical Specifications 3.81, AC Sources - Operating, for a One-Time Extension of Completion Time ML19182A0062019-08-28028 August 2019 Issuance of Amendment Nos. 327 and 330 Reduce High Pressure Service Water System Design Pressure and Temporarily Extend Completion Times ML19078A0182019-05-24024 May 2019 Issuance of Amendment Nos. 235, 198, 14, 325, and 328 to Revise the Emergency Response Organization Staffing Requirements ML18263A2322018-10-25025 October 2018 Issuance of Amendment Nos. 321 and 324 to Adopt 10 CFR 50.69 (CAC Nos. MG0181 and MG0181; EPID L-2017-LLA-0281) ML18249A2402018-09-28028 September 2018 Issuance of Amendment Nos. 320 and 323 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML18257A0172018-09-14014 September 2018 Response to Request for Additional Information Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite Update to ... ML18173A0422018-06-23023 June 2018 Issuance of Amendment Nos. 318 & 321 to Revise Technical Specifications 3.8.1 and 3.8.3, One-Time Change Suspending EDG Surveillance Test Completion Requirements (Emergency Situation) RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML16217A0082016-08-11011 August 2016 Correction to Amendment Nos. 308 and 312 Regarding Surveillance Requirements for High Pressure Coolant Injection System and Reactor Core Isolation Cooling System ML16162A1012016-06-0909 June 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Emergency Diesel Generator Fuel Oil Transfer Surveillance Requirements ML16084A9682016-05-0909 May 2016 Issuance of Amendments Inservice Leak and Hydrostatic Testing Operation ML16034A3722016-03-21021 March 2016 Issuance of Amendments Maximum Extended Load Line Limit Analysis Plus ML15343A1772016-02-0808 February 2016 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML15350A1792016-02-0101 February 2016 Issuance of Amendments Secondary Containment Access Openings ML15275A2652015-10-0202 October 2015 License Amendment Request, Proposed Changes to the Technical Specifications for High Pressure Coolant Injection and Reactor Core Isolation Cooling Surveillance Test Pressure and Clarification of Surveillance Requirements ML15196A5592015-09-0808 September 2015 Issuance of Amendments Extension of Type a and Type C Leak Rate Test Frequencies ML15189A1852015-08-11011 August 2015 Issuance of Amendment No. 305 Change to Replacement Steam Dryer License Condition ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15167A4562015-07-28028 July 2015 Issuance of Amendments Eliminate Main Steam Line Radiation Monitor Trip and Isolation Function ML15162A1392015-07-17017 July 2015 Issuance of Amendments Revise Technical Specification Definition for Recently Irradiated Fuel ML15154A6142015-06-30030 June 2015 Issuance of Amendments Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15093A0532015-03-27027 March 2015 (PBAPS) Unit 1 Decommissioning Status Report - 2014 ML14363A2272015-03-11011 March 2015 Issuance of Amendments Revise Facility Operating License and the Technical Specifications to Incorporate Administrative Changes ML15055A5062015-02-23023 February 2015 License Amendment Request - Proposed Changes to the Technical Specifications to Address Administrative Control of Secondary Containment Access Openings ML15041A6302015-02-19019 February 2015 Correction to Amendments Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML14247A5242014-09-0303 September 2014 License Amendment Request Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Trip and Isolation Function ML14163A5892014-07-28028 July 2014 Issuance of Amendments Delete Non-Conservative Note from Limiting Condition for Operation 3.5.1 ML14192B1432014-07-11011 July 2014 License Amendment Request to Revise Facility Operating License and the Technical Specifications to Incorporate Administrative Changes ML14136A4852014-06-0505 June 2014 Issuance of Amendments Revise Normal Heat Sink Operability Requirements ML14160A6992014-06-0505 June 2014 Extended Power Uprate License Amendment Request - Supplement 27 Supplemental Information ML14079A1022014-05-0505 May 2014 Issuance of Amendments Safety Relief Valve and Safety Valve Lift Setpoint Tolerance ML14099A5372014-04-0808 April 2014 Response to Request for Additional Information - Revision of Normal Heat Sink Technical Specification to Remove the 24-Hour Average Temperature Limit with No Change to the Peak Maximum Temperature ML14092A3152014-03-28028 March 2014 Decommissioning Status Report for 2013 ML13109A4632013-06-18018 June 2013 Issuance of Amendments Revise Technical Specifications to Add Residual Heat Removal System Drywell Spray Function Requirements ML13018A2252013-01-17017 January 2013 Response to Request for Additional Information - Revision of Normal Heat Sink Technical Specification to Remove the 24-Hour Average Temperature Limit with No Change to the Peak Maximum Temperature ML12286A0122012-09-28028 September 2012 License Amendment Request - Extended Power Uprate ML12243A2862012-08-29029 August 2012 License Amendment Request to Add LCO 3.0.8 on the Lnoperability of Snubbers Using the Consolidated Line Item Improvement Process ML12200A3882012-07-18018 July 2012 Revision of Normal Heat Sink Technical Specification to Remove the 24-Hour Average Temperature Limit with No Change to the Peak Maximum Temperature ML1130814412011-11-0303 November 2011 License Amendment Request - Use of Neutron Absorbing Inserts in Spent Fuel Pool Storage Racks ML1116001802011-06-0808 June 2011 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML1109700672011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 2023-08-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 11, 2016 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -
CORRECTION TO AMENDMENT NOS. 308 AND 312 REGARDING SURVEILLANCE REQUIREMENTS FOR HIGH PRESSURE COOLANT INJECTION SYSTEM AND REACTOR CORE ISOLATION COOLING SYSTEM (CAC NOS. MF6774 AND MF6775)
Dear Mr. Hanson:
By letter dated July 5, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16159A148), the U.S. Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 308 and 312 to Renewed Facility Operating License Nos. DPR-44 and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The amendments: (1) revised the allowable test pressure band in the technical specification (TS}
surveillance requirements (SRs) for the pump flow testing of the high pressure coolant injection system and the reactor core isolation system; (2) revised the surveillance frequency requirements for verifying the sodium pentaborate enrichment of the standby liquid control system; and (3) deleted SRs associated with verifying the manual transfer capability of the normal and alternate power supplies for certain motor-operated valves associated with the suppression pool spray and drywell spray sub-systems of the residual heat removal system.
In preparation for implementation of the above referenced amendments, the Exelon Generation Company, LLC (Exelon) staff informed the NRC staff that several of the TS pages revised by Amendment Nos. 308 and 312, did not reflect changes made in PBAPS, Units 2 and 3, Amendment Nos. 297 and 300, issued by the NRC staff on June 30, 2015 (ADAMS Accession No. ML15154A614). The error resulted, in part, due to the wrong camera ready pages being provided by Exelon in support of the issuance of Amendment Nos. 308 and 312. The corrected pages are enclosed.
B. Hanson If you have any questions, I can be reached at (301) 415-1420 or by e-mail at Rick.Ennis@nrc.gov.
Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
Enclosures:
- 1. Corrected TS pages for Amendment No. 308 to Renewed DPR-44
- 2. Corrected TS pages for Amendment No. 312 to Renewed DPR-56 cc w/enclosures: Distribution via Listserv
CORRECTIONS TO LICENSE AMENDMENT NO. 308 PEACH BOTTOM ATOMIC POWER STATION. UNIT 2 RENEWED FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.
Remove Insert 3.5-13 3.5-13 3.6-30 3.6-30 3.6-30b 3.6-30b Enclosure 1
RCIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.l Verify the RCIC System locations In accordance susceptible to gas accumulation are with the sufficiently filled with water. Survei 11 ance Frequency Control Program.
SR 3.5.3.2 - - - - - - - - - - - - - - - - - - - NOTE - - - - - - - - - - - - - - - - - - - -
Not required to be met for system vent flow paths opened under administrative control.
Verify each RCIC System manual, power In accordance operated, and automatic valve in the flow with the path, that is not locked, sealed, or Surveillance otherwise secured in position, is in the Frequency correct position. Control Program.
SR 3.5.3.3 - - - - - - - - - - - - - - - - - - - NOTE - - - - - - - - - - - - - - - - - - - -
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure~ 1053 psig In accordance and~ 915 psig, the RCIC pump can develop a with the flow rate~ 600 gpm against a system head Surveillance corresponding to reactor pressure. Frequency Control Program.
SR 3.5.3.4 - - - - - - - - - - - - - - - - - - - NOTE - - - - - - - - - - - - - - - - - - - -
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure~ 175 psig, In accordance the RCIC pump can develop a flow rate with the
~ 600 gpm against a system head Surveillance corresponding to reactor pressure. Frequency Control Program.
(continued)
PBAPS UNIT 2 3.5-13 Amendment No. 308
RHR Suppression Pool Spray 3.6.2.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.4.l Verify each RHR suppression pool spray In accordance subsystem manual, power operated, and with the automatic valve in the flow path that is Surveillance not locked, sealed, or otherwise secured Frequency in position is in the correct position or Control can be aligned to the correct position. Program.
SR 3.6.2.4.2 Verify each suppression pool spray nozzle In accordance is unobstructed. with the Surveillance Frequency Control Program.
SR 3.6.2.4.3 Deleted SR 3.6.2.4.4 - - - - - - - - - - - - - - - - - - NOTE - - - - - - - - - - - - - - - - - - -
HPSW system related components are excluded.
Verify RHR suppression pool spray In accordance subsystem locations susceptible to gas with the accumulation are sufficiently filled with Survei 11 ance water. Frequency Control Program.
PBAPS UN IT 2 3.6-30 Amendment No. 308
RHR Drywel l Spray 3.6.2.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.5.l Verify each RHR drywell spray subsystem In accordance manual, power operated, and automatic with the valve in the flow path that is not locked, Survei 11 ance sealed, or otherwise secured in position Frequency is in the correct position or can be Control aligned to the correct position. Program.
SR 3.6.2.5.2 Verify each drywell spray nozzle is In accordance unobstructed. with the Survei 11 ance Frequency Control Program.
SR 3.6.2.5.3 Deleted SR 3.6.2.5.4 - - - - - - - - - - - - - - - - - - NOTE - - - - - - - - - - - - - - - - - - -
HPSW system related components are excluded.
Verify RHR drywell spray subsystem In accordance locations susceptible to gas accumulation with the are sufficiently filled with water. Surveillance Frequency Control Program.
PBAPS UN IT 2 3.6-30b Amendment No. 308
CORRECTIONS TO LICENSE AMENDMENT NO. 312 PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 RENEWED FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.
Remove Insert 3.5-13 3.5-13 3.6-30 3.6-30 3.6-30b 3.6-30b Enclosure 2
RCIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.1 Verify the RCIC System locations In accordance susceptible to gas accumulation are with the sufficiently filled with water. Survei 11 ance Frequency Control Program.
SR 3.5.3.2 - - - - - - - - - - - - - - - - - - - NOTE - - - - - - - - - - - - - - - - - - - -
Not required to be met for system vent flow paths opened under administrative control.
Verify each RCIC System manual, power In accordance operated, and automatic valve in the flow with the path, that is not locked, sealed, or Survei 11 ance otherwise secured in position, is in the Frequency correct position. Control Program.
SR 3.5.3.3 - - - - - - - - - - - - - - - - - - - NOTE - - - - - - - - - - - - - - - - - - - -
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure~ 1053 psig In accordance and~ 915 psig, the RCIC pump can develop a with the flow rate~ 600 gpm against a system head Survei 11 ance corresponding to reactor pressure. Frequency Control Program.
SR 3.5.3.4 - - - - - - - - - - - - - - - - - - - NOTE - - - - - - - - - - - - - - - - - - - -
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure~ 175 psig, In accordance the RCIC pump can develop a flow rate with the
~ 600 gpm against a system head Survei 11 ance corresponding to reactor pressure. Frequency Control Program.
(continued)
PBAPS UN IT 3 3.5-13 Amendment No. 312
RHR Suppression Pool Spray 3.6.2.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.4.1 Verify each RHR suppression pool spray In accordance subsystem manual, power operated, and with the automatic valve in the flow path that is Surveillance not locked, sealed, or otherwise secured Frequency in position is in the correct position or Control can be aligned to the correct position. Program.
SR 3.6.2.4.2 Verify each suppression pool spray nozzle In accordance i s unobstructed. with the Survei 11 ance Frequency Control Program.
SR 3.6.2.4.3 Deleted SR 3.6.2.4.4 - - - - - - - - - - - - - - - - - - NOTE - - - - - - - - - - - - - - - - - - -
HPSW system related components are excluded.
Verify RHR suppression pool spray In accordance subsystem locations susceptible to gas with the accumulation are sufficiently filled with Survei 11 ance water. Frequency Control Program.
PBAPS UN IT 3 3.6-30 Amendment No. 312
RHR Drywel l Spray 3.6.2.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.5.1 Verify each RHR drywell spray subsystem In accordance manual, power operated, and automatic with the valve in the flow path that is not locked, Surveillance sealed, or otherwise secured in position Frequency is in the correct position or can be Control aligned to the correct position. Program.
SR 3.6.2.5.2 Verify each drywell spray nozzle is In accordance unobstructed. with the Survei 11 a nee Frequency Control Program.
SR 3.6.2.5.3 Deleted SR 3.6.2.5.4 - - - - - - - - - - - - - - - - - - NOTE - - - - - - - - - - - - - - - - - - -
HPSW system related components are excluded.
Verify RHR drywell spray subsystem In accordance locations susceptible to gas accumulation with the are sufficiently filled with water. Survei 11 ance Frequency Control Program.
PBAPS UN IT 3 3.6-30b Amendment No. 312
ML16217A008 OFFICE DORL/LPL 1-2/PM DORL/LPL 1-2/LA DORL/LPL 1-2/BC DORL/LPL 1-2/PM NAME REnnis LRonewicz DBroaddus REnnis DATE 8/10/2016 8/09/2016 8/10/2016 8/11/2016