Correction to Amendments Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs
ML15041A630
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/19/2015
From: Joel Wiebe
Plant Licensing Branch III
To: Bryan Hanson
Exelon Generation Co
Joel Wiebe, NRR/DORL
References
TAC MF2541, TAC MF2542, TSTF-535
Download: ML15041A630 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 19, 2015 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -

CORRECTION TO AMENDMENTS REGARDING ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER, TSTF-535, "REVISE SHUTDOWN MARGIN DEFINITION TO ADDRESS ADVANCED FUEL DESIGNS" (TAC NOS. MF2541 AND MF2542)

Dear Mr. Hanson:

The U.S. Nuclear Regulatory Commission has corrected the technical specification pages issued with our letter dated January 29, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No ML14295A300) regarding Amendment Nos. 295 and 298 to Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3.

The corrected pages include the uprated power levels revised by Amendment Nos. 294 and 297.

Sincerely,

Joel S. Wiebe, Senior Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosures:

1. Technical Specification Page for Renewed DPR-44
2. Technical Specification Page for Renewed DPR-56 cc w/encls: Distribution via Listserv

Definitions

1. 1 1.1 Definitions PHYSICS TESTS b. Authorized under the provisions of (continued) 10 CFR 50.59; or
c. Otherwise approved by the Nuclear Regulatory Commission.

PRESSURE AND TEMPERATURE The PTLR is the unit-specific document that LIMITS REPORT (PTLR) provides the reactor vessel pressure and temperature limits, including heatup and cooldown rates, for the current reactor vessel fluence period. These pressure and temperature limits shall be determined for each fluence period in accordance with Specification 5.6.7.

RATED THERMAL POWER RTP shall be a total reactor core heat transfer (RTP) rate to the reactor coolant of 3951 MWt.

REACTOR PROTECTION SYSTEM The RPS RESPONSE TIME shall be that time interval (RPS) RESPONSE TIME from the opening of the sensor contact up to and including the opening of the trip actuator contacts.

RECENTLY IRRADIATED RECENTLY IRRADIATED FUEL is fuel that has occupied FUEL part of a critical reactor core within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. When using this definition to suspend the Applicability of LCOs, secondary containment ground-level hatches Hl5, Hl6, H17, Hl8, Hl9, and H33 shall be closed during the movement of any irradiated fuel in Secondary Containment.

SHUTDOWN MARGIN (SOM) SOM shall be the amount of reactivity by which the reactor is subcritical or would be subcritical throughout the operating cycle assuming that:

a. The reactor is xenon free;
b. The moderator temperature is~ 68°F, corresponding to the most reactive state; and
c. All control rods are fully inserted except for the single control rod of highest reactivity worth, which is assumed to be fully withdrawn.

With control rods not capable of being fully inserted, the reactivity worth of these control rods must be accounted for in the determination of SOM.

(continued)

PBAPS UN IT 2 1. 1- 5 Amendment No. 2 95

Definitions 1.1 1.1 Definitions PHYSICS TESTS b. Authorized under the provisions of (continued) 10 CFR 50.59; or

c. Otherwise approved by the Nuclear Regulatory Commission.

PRESSURE AND TEMPERATURE The PTLR is the unit-specific document that LIMITS REPORT (PTLR) provides the reactor vessel pressure and temperature limits, including heatup and cooldown rates, for the current reactor vessel fl uence period. These pressure and temperature limits shall be determined for each fluence period in accordance with Specification 5.6.7.

RATED THERMAL POWER RTP shall be a total reactor core heat transfer

( RTP) rate to the reactor coolant of 3951 MWt.

REACTOR PROTECTION SYSTEM The RPS RESPONSE TIME shall be that time interval (RPS) RESPONSE TIME from the opening of the sensor contact up to and including the opening of the trip actuator contacts.

RECENTLY IRRADIATED RECENTLY IRRADIATED FUEL is fuel that has occupied FUEL part of a critical reactor core within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. When using this definition to suspend the Applicability of LCOs, secondary containment ground-level hatches H20, H21, H22, H23, H24, and H34 shall be closed during the movement of any irradiated fuel in Secondary Containment.

SHUTDOWN MARGIN (SOM) SOM shall be the amount of reactivity by which the reactor is subcritical or would be subcritical throughout the operating cycle assuming that:

a. The reactor is xenon free;
b. The moderator temperature is ~ 68°F, corresponding to the most reactive state; and
c. All control rods are fully inserted except for the single control rod of highest reactivity worth, which is assumed to be fully withdrawn.

With control rods not capable of being fully inserted, the reactivity worth of these control rods must be accounted for in the determination of SOM.

(continued)

PBAPS UN IT 3 1. 1- 5 Amendment No. 2 98

February 19, 2015 B Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -

CORRECTION TO AMENDMENTS REGARDING ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER, TSTF-535, "REVISE SHUTDOWN MARGIN DEFINITION TO ADDRESS ADVANCED FUEL DESIGNS" (TAC NOS. Mf2541 AND Mf2542)

Dear Mr. Hanson:

The U.S. Nuclear Regulatory Commission has corrected the technical specification pages issued with our letter dated January 29, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No ML14295A300) regarding Amendment Nos. 295 and 298 to Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3.

The corrected pages include the uprated power levels revised by Amendment Nos. 294 and 297.

Sincerely,

!RAJ Joel S. Wiebe, Senior Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosures:

1. Technical Specification Page for Renewed DPR-44
2. Technical Specification Page for Renewed DPR-56 cc w/encls: Distribution via Listserv DISTRIBUTION:

Public LPLlll-2 R/F RidsNrrLAABaxter Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDirsltsb Resource RidsNrrDorlLpl3-2 Resource RidsRgn1 MailCenter Resource RidsNrrPMPeachBottom Resource RidsNrrLAABaxter Resource Accession Number* ML15041A630 OFFICE NRR/LPLlll-2/PM N RR/LPLI 11-2/LA NRR/LPLI 11-2/BC N RR/LPLI 11-2/PM NAME JWiebe SRohrer DBroaddus JWiebe DATE 2/10/15 21 11 /15 2/13/15 2/19/15 OFFICIAL RECORD COPY