Initial Operator Licensing Written Examination Approval - Calvert Cliffs Nuclear Power Plant Units 1 and 2
ML16155A226
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/01/2016
From: Diane Jackson
Operations Branch I
To: George Gellrich
Exelon Generation Co
Shared Package
ML15308A607 List:
References
Download: ML16155A226 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 June 1, 2016 Mr. George H. Gellrich Site Vice President Calvert Cliffs Nuclear Power Plant, LLC Exelon Generation Company, LLC 1650 Calvert Cliffs Pkwy.

Lusby, MD 20657-4702

SUBJECT:

INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -

CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2

Dear Mr. Gellrich:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examinations at the Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Please note that operating test approval has been communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Pete Beavers, Director - Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject written examinations in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. Your staff will administer the written examinations during the week of June 20, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this written examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046.

Please contact your Chief Examiner, Mr. David Silk, at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety

Mr. George H. Gellrich Site Vice President Calvert Cliffs Nuclear Power Plant, LLC Exelon Generation Company, LLC 1650 Calvert Cliffs Pkwy.

Lusby, MD 20657-4702

SUBJECT:

INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -

CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2

Dear Mr. Gellrich:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examinations at the Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Please note that operating test approval has been communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Pete Beavers, Director - Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject written examinations in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. Your staff will administer the written examinations during the week of June 20, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this written examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046.

Please contact your Chief Examiner, Mr. David Silk, at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY16-CalvertCliffs Jun13 (U01923)\ExamApproval-W-Ltr.docx ADAMS PKG: ML15308A607 ADAMS ACCESSION NO.: ML16155A226 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS NAME DSilk/DJ DEJackson DATE 6/1/16 6/1/16 OFFICIAL RECORD COPY

G. Gellrich Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 cc: Distribution via ListServ

G. Gellrich Letter to G. Gellrich from D. Jackson

SUBJECT:

INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -

CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2 Distribution w/encl: (via E-mail)

DLew, RA (R1ORAMAIL RESOURCE)

SFlanders, DRA (R1ORAMAIL RESOURCE)

MScott, DRP (R1DRPMAIL RESOURCE)

DPelton, DRP (R1DRPMAIL RESOURCE)

RLorson, DRS (R1DRSMAIL RESOURCE)

BSmith, DRS (R1DRSMAIL RESOURCE)

ADimitriadis, DRP ARosebrook, DRP ASiwy, DRP RClagg, DRP, SRI CRoettgen, DRP, RI CFragman, DRP, AA JBowen, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1-1 Resource ROPReports Resource DJackson, DRS DSilk, Chief Examiner, DRS CBixler (w/concurrences)

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 June 1, 2016 Mr. George H. Gellrich Site Vice President Calvert Cliffs Nuclear Power Plant, LLC Exelon Generation Company, LLC 1650 Calvert Cliffs Pkwy.

Lusby, MD 20657-4702

SUBJECT:

INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -

CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2

Dear Mr. Gellrich:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examinations at the Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Please note that operating test approval has been communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Pete Beavers, Director - Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject written examinations in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. Your staff will administer the written examinations during the week of June 20, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this written examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046.

Please contact your Chief Examiner, Mr. David Silk, at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety

Mr. George H. Gellrich Site Vice President Calvert Cliffs Nuclear Power Plant, LLC Exelon Generation Company, LLC 1650 Calvert Cliffs Pkwy.

Lusby, MD 20657-4702

SUBJECT:

INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -

CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2

Dear Mr. Gellrich:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examinations at the Calvert Cliffs Nuclear Power Plant, Units 1 and 2. Please note that operating test approval has been communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Pete Beavers, Director - Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject written examinations in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. Your staff will administer the written examinations during the week of June 20, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this written examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046.

Please contact your Chief Examiner, Mr. David Silk, at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY16-CalvertCliffs Jun13 (U01923)\ExamApproval-W-Ltr.docx ADAMS PKG: ML15308A607 ADAMS ACCESSION NO.: ML16155A226 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS NAME DSilk/DJ DEJackson DATE 6/1/16 6/1/16 OFFICIAL RECORD COPY

G. Gellrich Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 cc: Distribution via ListServ

G. Gellrich Letter to G. Gellrich from D. Jackson

SUBJECT:

INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -

CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2 Distribution w/encl: (via E-mail)

DLew, RA (R1ORAMAIL RESOURCE)

SFlanders, DRA (R1ORAMAIL RESOURCE)

MScott, DRP (R1DRPMAIL RESOURCE)

DPelton, DRP (R1DRPMAIL RESOURCE)

RLorson, DRS (R1DRSMAIL RESOURCE)

BSmith, DRS (R1DRSMAIL RESOURCE)

ADimitriadis, DRP ARosebrook, DRP ASiwy, DRP RClagg, DRP, SRI CRoettgen, DRP, RI CFragman, DRP, AA JBowen, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1-1 Resource ROPReports Resource DJackson, DRS DSilk, Chief Examiner, DRS CBixler (w/concurrences)