|
---|
Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] Category:License-Operator
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23179A1242023-06-14014 June 2023 Final QA Related Forms ML22221A0302022-08-0202 August 2022 Administrative Files ML22221A0432022-08-0202 August 2022 Quality Checklists RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21252A0452021-09-15015 September 2021 Requalification Program Inspection ML22073A1172021-06-21021 June 2021 2021 Final Written Exam Original Modified Questions ML21187A3102021-06-16016 June 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21193A3692021-06-16016 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21187A3072021-06-16016 June 2021 Draft Written Examination (Folder 2) ML21187A3082021-06-16016 June 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21189A2882021-06-16016 June 2021 Final Qa/Related Forms (Folder 1) ML21193A3212021-06-16016 June 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21193A2982021-06-16016 June 2021 Miscellaneous Exam Material (Folder 1) ML21193A3122021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21202A1642021-06-16016 June 2021 Handouts to Applicants (Folder 3) ML21193A3072021-06-16016 June 2021 Final Qa/Related Form - ES-401-6 (Folder 1) ML21193A3162021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21105A4352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21187A3092021-03-29029 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21074A3242021-03-15015 March 2021 LLC - Licensed Operator Positive Fitness-For-Duty Test ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1222020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) ML20274A0942020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19157A0962019-06-0606 June 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20193012019-05-0606 May 2019 NRC Initial and Retake Operator Licensing Examination Report Er 05000317/2019301 and 05000318/2019301 ML18312A3882018-11-0707 November 2018 Senior Reactor and Reactor Operator Initial and Retake License Examinations ML18311A1292018-10-0101 October 2018 Handouts to Applicants (Folder 3) ML18311A1142018-08-0202 August 2018 Examination Approval Letter (Folder 1) ML18214A4482018-08-0202 August 2018 Initial Operator Licensing Written Examination Approval: Calvert Cliffs Nuclear Power Plant Units 1 and 2 RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18311A1132017-12-14014 December 2017 NRC Corporate Notification Letter (Folder 1) 2023-06-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23179A1242023-06-14014 June 2023 Final QA Related Forms ML22221A0432022-08-0202 August 2022 Quality Checklists ML22221A0302022-08-0202 August 2022 Administrative Files RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22073A1172021-06-21021 June 2021 2021 Final Written Exam Original Modified Questions ML21193A3692021-06-16016 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21187A3082021-06-16016 June 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21189A2882021-06-16016 June 2021 Final Qa/Related Forms (Folder 1) ML21187A3072021-06-16016 June 2021 Draft Written Examination (Folder 2) ML21193A2982021-06-16016 June 2021 Miscellaneous Exam Material (Folder 1) ML21193A3122021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21202A1642021-06-16016 June 2021 Handouts to Applicants (Folder 3) ML21193A3212021-06-16016 June 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21193A3072021-06-16016 June 2021 Final Qa/Related Form - ES-401-6 (Folder 1) ML21193A3162021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21187A3102021-06-16016 June 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21187A3092021-03-29029 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20274A0942020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19157A0962019-06-0606 June 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20193012019-05-0606 May 2019 NRC Initial and Retake Operator Licensing Examination Report Er 05000317/2019301 and 05000318/2019301 ML18312A3882018-11-0707 November 2018 Senior Reactor and Reactor Operator Initial and Retake License Examinations ML18311A1292018-10-0101 October 2018 Handouts to Applicants (Folder 3) ML18311A1142018-08-0202 August 2018 Examination Approval Letter (Folder 1) ML18214A4482018-08-0202 August 2018 Initial Operator Licensing Written Examination Approval: Calvert Cliffs Nuclear Power Plant Units 1 and 2 RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18311A1132017-12-14014 December 2017 NRC Corporate Notification Letter (Folder 1) RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000317/2017301 and 05000318/2017301 ML17072A3982017-02-0909 February 2017 Op Test Retake - Post Exam Comments and Technical References, and Resolution (Folder 1) ML17069A4072017-02-0909 February 2017 Op Test Retake -Final Operating Test Sections a & B) (Folder 3) 2023-06-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 November 7, 2018 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CALVERT CLIFFS UNITS 1 AND 2 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL AND RETAKE LICENSE EXAMINATIONS
Dear Mr. Hanson:
In a telephone conversations on October 30, 2018, between Mr. Scott Stillings, Interim Operations Training Manager, and Mr. David Silk, Senior Operations Engineer, arrangements were made for the administration of operator licensing examinations at Calvert Cliffs Nuclear Power Plant during the week of March 25, 2019. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of March 4, 2019.
As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by January 14, 2019. The NRC staff provided the written examination outline to your staff on October 30, 2018. The written examinations, operating tests, and supporting reference materials discussed with Mr. Stillings will be due by February 18, 2019. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use.
We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
B. Hanson 2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. David Silk at 610-337-5372 to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications Statement - Licensee, or as directed by Mr. Silk when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these mandatory information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection through the Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html.
B. Hanson 3 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
Thank you for your cooperation in this matter. Mr. Stillings has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact David Silk at (610)-337-5372 or me at (610) 337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-317 and 50-318 License Nos.: DPR-53 and DPR-69 cc: Distribution via ListServ
B. Hanson 4
SUBJECT:
CALVERT CLIFFS UNITS 1 AND 2 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS DISTRIBUTION (e-mail)
DLew, RA (R1ORAMAIL RESOURCE)
RLorson, DRA (R1ORAMAIL RESOURCE)
DPelton, DRP (R1DRPMAIL RESOURCE)
PKrohn, DRP (R1DRPMAIL RESOURCE)
JYerokun, DRS (R1DRSMAIL RESOURCE)
BWelling, DRS (R1DRSMAIL RESOURCE)
DJackson, DRS DSilk, DRS ECarfang, DRP ARosebrook, DRP SObadina, DRP RClagg, DRP, SRI CRoettgen, DRP, RI CFragman, DRP, AA CCook, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource ROPReports Resource DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY19-CalvertCliffs Retake Mar25\CC ES-201-Rev11-CorpNotifyLtr.docx ADAMS PKG: ML18296A408 ADAMS ACCESSION NO.: ML18312A388 Publicly Available Non-Sensitive SUNSI Review Non-Publicly Sensitive Available OFFICE RI/DRS RI/DRS NAME DMSilk DEJackson DATE 11/02/2018 11/07/18 OFFICIAL RECORD COPY