Other: ML18074A052, ML18074A053, ML18074A054, ML18074A055, ML18134A128, ML18134A137, ML18149A494, ML18323A272, ML18323A273, ML18323A274, ML19038A054, ML19038A101, ML19038A126, ML19045A271, ML19045A343, ML19045A424, ML19065A224, ML19065A230, ML19066A204, ML19066A214, ML19092A047, ML19217A267, ML19217A268, ML19217A269, ML19217A272, ML19217A273, ML19217A274, ML19298B558, ML19298B559, ML19302E287, ML19302F311, ML19302F437, ML19302F487, ML19330E279, ML19330E366, ML20020A001, ML20020A002, ML20022A259, ML20022A260, ML20022A261, ML20022A262, ML20055D883, ML20055E009, ML20057E559, ML20057E560, ML20087G852, ML20087H514, ML20184A247, ML20184A248, ML20240A318... further results
|
MONTHYEARML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML18323A2722018-01-29029 January 2018 Final Operating Test (Parts a, B and C) (Folder 3) Project stage: Other ML18323A2742018-01-29029 January 2018 Post Exam Comments and Resolution, and Technical References Project stage: Other ML18323A2732018-01-31031 January 2018 Final Written Examination with Answer Key (401-5 Format)(Folder 3) Project stage: Other ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) Project stage: Other ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) Project stage: Other ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) Project stage: Other ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) Project stage: Other ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) Project stage: Other ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19050A3742018-04-25025 April 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) Project stage: Draft Other ML19217A2712019-02-0101 February 2019 TMI - Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19038A1262019-02-0707 February 2019 Post Exam Comments and Technical References (Folder 1) Project stage: Other ML19038A0542019-02-0707 February 2019 Final Operating Test (Sections a, B, and C)(Folder 3) Project stage: Other ML19038A1012019-02-0707 February 2019 Final Written Examination with Answer Key (401-5 Format)(Folder 3) Project stage: Other ML19044A5862019-02-13013 February 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19044A6062019-02-13013 February 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML19045A4162019-02-14014 February 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19045A4242019-02-14014 February 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19045A3432019-02-14014 February 2019 Final QA Related Forms (Folder 1) Project stage: Other ML19045A2712019-02-14014 February 2019 Handouts to Applicants (Folder 3) Project stage: Other ML19050A3652019-02-19019 February 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML19065A2302019-03-0606 March 2019 Final Qa/Related Forms (Folder 1) Project stage: Other ML19065A2242019-03-0606 March 2019 Post Exam Comments Resolution References (Folder 1) Project stage: Other ML19065A0662019-03-0606 March 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19065A0772019-03-0606 March 2019 Draft Operating Test (Section a, Section B, Section C)(Folder 2) Project stage: Draft Other ML19066A2142019-03-0707 March 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19066A2042019-03-0707 March 2019 Final QA Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19092A0472019-04-0202 April 2019 Handouts to Applicants (Folder 3) Project stage: Other ML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML19217A2722019-07-0202 July 2019 TMI - Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19217A2692019-07-15015 July 2019 TMI - Post Exam Comments and NRC Resolution (Folder 1) Project stage: Other ML19330E3662019-07-17017 July 2019 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19302F6342019-07-23023 July 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML19302F5982019-07-23023 July 2019 Draft Written Examination (Folder 2) Project stage: Draft Other ML19217A2732019-07-26026 July 2019 TMI - Handouts to Applicants (Folder 3) Project stage: Other ML19217A2742019-07-26026 July 2019 TMI - Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19217A2672019-07-26026 July 2019 TMI - Final Qa/Related Forms (Folder 1) Project stage: Other ML19217A2682019-07-26026 July 2019 TMI - Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML19298B5582019-08-26026 August 2019 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19298B5592019-08-26026 August 2019 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19302F4872019-09-13013 September 2019 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML19302E2872019-09-13013 September 2019 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML19302F3112019-09-13013 September 2019 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML19302F4372019-09-27027 September 2019 Handouts to Applicants (Folder 3) Project stage: Other 2019-02-07
[Table View] |
Text
QUESTION PREVIEW CC EXAM ROOM Page: 1 of 1 06 November 2019 Original RO #59 ID: Q20602 Points: 1.00 Given the following conditions:
Unit-2 is in Mode 6 with Core Reload in progress
Containment Purge has been established
The Containment Outage Door (COD) is shut
One of the PAL doors is shut
A momentary loss of power results in tripping the operating Main Exhaust Fan Which ONE of the following choices is the most likely effect on containment parameters?
A.
Containment pressure rises 1.5 to 2 PSIG.
B.
Containment refueling pool level changes.
C.
Containment temperature rises between 3° F to 5° F.
D.
Containment area radiation monitors (RI-5316A, B, C, and D) counts rise.
Answer B
QUESTION PREVIEW CC EXAM ROOM Page: 1 of 1 06 November 2019 Original RO #62 ID: Q96633 Points: 1.00 Unit 1 was operating at 100% power when a Main Turbine trip occurred on low bearing oil pressure. The Reactor automatically tripped on Loss of Load. All other plant equipment operated as designed on the trip.
Which of the following correctly describes the effect of on secondary and primary parameters, immediately after Turbine-Reactor trip?
A.
SG pressure rises, RCS temperature rises, pressurizer pressure rises.
B.
SG pressure rises, RCS temperature lowers, pressurizer pressure lowers.
C.
SG pressure lowers, RCS temperature rises, pressurizer pressure rises.
D.
SG pressure lowers, RCS temperature lowers, pressurizer pressure lowers.
Answer B