Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | 16 June 2023 | Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML23179A124 | 14 June 2023 | Final QA Related Forms | Job Performance Measure |
ML22221A030 | 2 August 2022 | Administrative Files | Job Performance Measure |
ML22221A043 | 2 August 2022 | Quality Checklists | Probabilistic Risk Assessment Job Performance Measure |
RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | 25 March 2022 | Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML21252A045 | 15 September 2021 | Requalification Program Inspection | |
ML22073A117 | 21 June 2021 | 2021 Final Written Exam Original Modified Questions | |
ML21187A310 | 16 June 2021 | Final Operating Test (Sections a, B, and C) (Folder 3) | Safe Shutdown Boric Acid Coatings Job Performance Measure Fire Watch Downpower |
ML21193A369 | 16 June 2021 | Final Written Examination and Operating Test Outlines (Folder 3) | Boric Acid |
ML21187A307 | 16 June 2021 | Draft Written Examination (Folder 2) | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Post Accident Monitoring Locked High Radiation Area Missed surveillance Surveillance Frequency Control Program Operability Determination Downpower |
ML21187A308 | 16 June 2021 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | Safe Shutdown Boric Acid Coatings Job Performance Measure Fire Watch Downpower |
ML21189A288 | 16 June 2021 | Final Qa/Related Forms (Folder 1) | Job Performance Measure |
ML21193A321 | 16 June 2021 | Draft Written Examination and Operating Test Outlines (Folder 2) | Boric Acid Downpower |
ML21193A298 | 16 June 2021 | Miscellaneous Exam Material (Folder 1) | |
ML21193A312 | 16 June 2021 | NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) | |
ML21202A164 | 16 June 2021 | Handouts to Applicants (Folder 3) | |
ML21193A307 | 16 June 2021 | Final Qa/Related Form - ES-401-6 (Folder 1) | |
ML21193A316 | 16 June 2021 | NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) | |
ML21105A435 | 20 April 2021 | March 10, 2021, NRC Generic Fundamentals Examination Results for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) | Generic Fundamentals Examination |
ML21187A309 | 29 March 2021 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Post Accident Monitoring Locked High Radiation Area Missed surveillance Surveillance Frequency Control Program Operability Determination Downpower |
ML21074A324 | 15 March 2021 | LLC - Licensed Operator Positive Fitness-For-Duty Test | |
ML21012A269 | 12 January 2021 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 | Generic Fundamentals Examination COVID-19 |
ML20105A122 | 14 April 2020 | March 4, 2020, NRC Generic Fundamentals Examination Results for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) | Generic Fundamentals Examination |
ML20057E560 | 7 February 2020 | Final Operating Test (Sections a, B, and C) (Folder 3) | |
ML20057E559 | 7 February 2020 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | |
ML21025A073 | 7 February 2020 | Final QA Related Forms (Folder 1) | Job Performance Measure |
ML20274A105 | 7 February 2020 | Draft Written Examination and Operating Test Outlines (Folder 2) | Boric Acid Shutdown Margin Time to boil Pressure Boundary Leakage Downpower |
ML20274A136 | 7 February 2020 | Final Written Examination and Operating Test Outlines (Folder 3) | Boric Acid Shutdown Margin Time to boil Downpower |
ML20279A331 | 7 February 2020 | Handouts to Applicants (Folder 3) | |
ML20274A092 | 7 February 2020 | NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) | |
ML20274A066 | 7 February 2020 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | Safe Shutdown Boric Acid Fitness for Duty Shutdown Margin Grab sample Stroke time Time to boil Post Accident Monitoring Met Tower Job Performance Measure Pressure Boundary Leakage Power change Downpower |
ML20274A083 | 7 February 2020 | Draft Written Examination (Folder 2) | Safe Shutdown Time of Discovery Missed surveillance Surveillance Frequency Control Program Pressure Boundary Leakage Through Wall Leak Downpower |
ML20274A094 | 7 February 2020 | NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) | Shutdown Margin Time to boil |
ML21025A414 | 7 February 2020 | Original Questions for Modified Questions | |
ML21025A143 | 7 February 2020 | ES-401-6 (Folder 1) | |
ML19352D657 | 16 December 2019 | Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 | Generic Fundamentals Examination |
ML19157A096 | 6 June 2019 | Senior Reactor and Reactor Operator Initial License Examinations | |
RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations | 16 May 2019 | Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations | |
IR 05000317/2019301 | 6 May 2019 | NRC Initial and Retake Operator Licensing Examination Report Er 05000317/2019301 and 05000318/2019301 | |
ML18312A388 | 7 November 2018 | Senior Reactor and Reactor Operator Initial and Retake License Examinations | |
ML18311A129 | 1 October 2018 | Handouts to Applicants (Folder 3) | Surveillance Frequency Control Program |
ML18311A114 | 2 August 2018 | Examination Approval Letter (Folder 1) | |
ML18214A448 | 2 August 2018 | Initial Operator Licensing Written Examination Approval: Calvert Cliffs Nuclear Power Plant Units 1 and 2 | |
RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations | 25 April 2018 | Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations | |
ML18005A420 | 3 January 2018 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 | Generic Fundamentals Examination |
ML18311A113 | 14 December 2017 | NRC Corporate Notification Letter (Folder 1) |