ML21189A288

From kanterella
Jump to navigation Jump to search

Final Qa/Related Forms (Folder 1)
ML21189A288
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/16/2021
From: Thomas Setzer
Operations Branch I
To:
Exelon Generation Co
Shared Package
ML20261H327 List:
References
EPID L-2021-OLL-0028
Download: ML21189A288 (10)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility:

Calvert Cliffs Date of Examination:

June 7, 2021 Developed by: Written: Facility NRC // Operating: Facility NRC Target Date*

Task Description (Reference)

Chief Examiners Initials

-240

1.

Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).

10/10/2020

-210

2.

NRC examiners and facility contact assigned (C.1.d; C.2.f).

11/09/2020

-210

3.

Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).

11/09/2020

-210

4.

Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).

11/09/2020

-210

5.

Corporate notification letter sent (C.2.e).

11/09/2020

-195

6.

NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e).

11/24/2020

-150

7.

Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).

01/08/2021

-136

8.

Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; C.3.d-e).

01/22/2021

-75

9.

Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3);

supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).

03/24/2021

-75

10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g).

03/24/2021

-60

11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).

04/08/2021

-50

12. Written exam and operating test reviews completed (C.3.f).

04/18/2021

-35

13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.

05/03/2021

-30

14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).

05/08/2021

-14

15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).

05/24/2021

-7

16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).

05/31/2021

-7

17. Request facility licensee management feedback on the examination (C.2.l).

05/31/2021

-7

18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; ; ES-202, C.3.j; ES-204).

05/31/2021

-7

19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).

05/31/2021

-7

20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).

05/31/2021

  • Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

Donald E. Jackson 5/27/2021 5/27/2021 Thomas Setzer

Donald E. Jackson 5/27/2021 5/27/2021 Thomas Setzer

ES-301 Transient and Event Checklist Form ES-301-5 Facility: CCNPP Date of Exam: 6/7/2021 Operating Test #: 2021 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 3

4 T

O T

A L

MINIMUM

(*)

Crew Position Crew Position Crew Position Crew Position S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

Scenario Rollup RX 1

4 4

1 1

1 0

NOR 1

1 1

1 1

1 1

1 1

1 I/C 2,3,4 5,6 3,4,5 6

2,3,6 2,3,4 5,6 2,5,6 3,4,6 2,3 4,6 3,6 2,3,4 2,3 4,6 3,4 2,3,4 6

4 4

2 MAJ 7

7 7

7 7

7 5,7 5,7 5,7 5,7 5,7 5,7 2

2 1

TS 2,3 2,3 2,3 2,3 0

2 2

RO-1 RX 1

1 1

1 0

NOR 0

1 1

1 I/C 3,4,6 2,3,4 3,4 8

4 4

2 MAJ 7

5,7 5,7 5

2 2

1 TS 0

0 2

2 RO-2 RX 4

1 1

1 0

NOR 1

1 1

1 1

I/C 3,4,6 3,6 5

4 4

2 MAJ 7

5,7 3

2 2

1 TS 0

0 2

2 SROU-1 RX 0

1 1

0 NOR 1

1 1

1 1

I/C 2,3,4 5,6 2,3,4 8

4 4

2 MAJ 7

5,7 3

2 2

1 TS 2,3 2

0 2

2 SROU-2 RX 0

1 1

0 NOR 1

1 1

1 1

I/C 2,3,4 5,6 2,3,4 8

4 4

2 MAJ 7

5,7 3

2 2

1 TS 2,3 2

0 2

2

ES-301 Transient and Event Checklist Form ES-301-5 Facility: CCNPP Date of Exam: 6/7/2021 Operating Test #: 2021 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 3

4 T

O T

A L

MINIMUM

(*)

Crew Position Crew Position Crew Position Crew Position S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

Scenario Rollup RX 1

4 4

1 1

1 0

NOR 1

1 1

1 1

1 1

1 1

1 I/C 2,3,4 5,6 3,4,5 6

2,3,6 2,3,4 5,6 2,5,6 3,4,6 2,3 4,6 3,6 2,3,4 2,3 4,6 3,4 2,3,4 6

4 4

2 MAJ 7

7 7

7 7

7 5,7 5,7 5,7 5,7 5,7 5,7 2

2 1

TS 2,3 2,3 2,3 2,3 0

2 2

SROI-1 RX 4

1 1

1 0

NOR 1

1 2

1 1

1 I/C 2,5,6 2,3 4,6 7

4 4

2 MAJ 7

5,7 3

2 2

1 TS 2,3 2

0 2

2 SROI-2 RX 4

1 1

1 0

NOR 1

1 2

1 1

1 I/C 2,5,6 2,3 4,6 7

4 4

2 MAJ 7

5,7 3

2 2

1 TS 2,3 2

0 2

2 SROI-3 RX 4

1 1

1 0

NOR 1

1 2

1 1

1 I/C 2,5,6 2,3 4,6 7

4 4

2 MAJ 7

5,7 3

2 2

1 TS 2,3 2

0 2

2 SROI-4 RX 4

1 1

1 0

NOR 1

1 1

3 1

1 1

I/C 2,3,4 5,6 3,6 2,3,4 6

11 4

4 2

MAJ 7

5,7 5,7 5

2 2

1 TS 2,3 2

0 2

2 SROI-5 RX 4

1 1

1 0

NOR 1

1 2

1 1

1 I/C 3,4,6 3,6 2,3 4,6 9

4 4

2 MAJ 7

5,7 5,7 5

2 2

1 TS 2,3 2

0 2

2

ES-301 Competencies Checklist Form ES-301-6 Facility: CCNPP Date of Exam: 6/7/2021 Operating Test #: 2021 Competencies APPLICANTS RO/ATC BOP SRO-I SRO-U RO/ATC BOP SRO-I SRO-U RO/ATC BOP SRO-I SRO-U RO/ATC BOP SRO-I SRO-U SCENARIO SCENARIO SCENARIO SCENARIO 1

2 3

4 1

2 3

4 1

2 3

4 1

2 3

4 Interpret/Diagnose Events and Conditions 3,4,5 6,7 2,4,5 6,7 3,4,5 6,7 3,4 5,7 2,3 6,7 3,4 6,7 2,3,4 5,7 2,3,4 5,6,7 1-7 1-7 1-7 1-7 1-7 1-7 1-7 1-7 Comply With and Use Procedures (1) 1,3,4 5,6,7 1,2,4 5,6,7 1,3,4 5,6,7 1,3,4 5,7 2,3 6,7 3,4 6,7 2,3,4 5,7 1-7 1-7 1-7 1-7 1-7 1-7 1-7 1-7 1-7 Operate Control Boards (2) 1,3,4 5,6,7 1,2,4 5,6,7 1,3,4 5,6,7 1,3,4 5,7 2,3 6,7 3,4 6,7 2,3,4 5,7 1-7 Communicate and Interact 1,3,4 5,6,7 1,2,4 5,6,7 1,3,4 5,6,7 1,3,4 5,7 2,3 6,7 3,4 6,7 2,3,4 5,7 1-7 1-7 1-7 1-7 1-7 1-7 1-7 1-7 1-7 Demonstrate Supervisory Ability (3) 1-7 1-7 1-7 1-7 1-7 1-7 1-7 1-7 Comply With and Use Tech Specs (3) 2,3 2,3 2,3 2,3 2,3 2,3 2,3 2,3 Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

(3) Only applicable to SROs.

Instructions:

Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.) Competency Rating factors are described on forms ES-303-1 and ES303-3.)

Donald E. Jackson N/A N/A N/A Thomas Setzer 6/28/2021 6/28/2021