MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21182A2902021-07-0101 July 2021 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements ML21147A2982021-05-27027 May 2021 Correction to Projected Review Completion Date, ASME Section XI Inservice Inspection Program Relief Requests, Limited Coverage Examinations, Third Period, 3rd 10-year Inservice Inspection Interval (EPID L-2020-LLR-0081 to LLR-0088) ML21141A0482021-05-18018 May 2021 5/18/2021 E-mail Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate 2024-07-31
[Table view] Category:Letter
MONTHYEARIR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) IR 05000336/20244402024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. 2024-08-06
[Table view] |
Text
Dominion Nuclear Connecticut, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 Web Address: www.dom.com May 9, 2016 U. S. Nuclear Regulatory Commission Serial No.: 16-199 Attention: Document Control Desk NRA/WDC: RO Washington, DC 20555-0001 Docket No.: 50-423 License No.: NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 3 REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE This letter is to confirm the subject information sent separately to the NRC in an email dated April 27, 2016 and discussed in a clarification call on April 28, 2016. The April 27, 2016 email is provided as an attachment to this letter.
If you should have any questions regarding this submittal, please contact Wanda Craft at (804) 273-4687.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering
Attachment:
Email dated April 27, 2016 Commitments contained in this letter: None
Serial No.16-199 Docket No. 50-423 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 Richard V. Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station
Serial No.16-199 Docket No. 50-423 ATTACHMENT EMAIL DATED APRIL 27, 2016 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 3
Wanda D Craft (Generation - 6)
From: Wanda D Craft (Generation - 6)
Sent: Wednesday, April 27, 2016 4:08 PM To: Guzman, Richard
Subject:
MPS3 RV Surveillance Capsule Withdrawal Schedule revision Rich, In letters dated July 2, 2015 and January 28, 2016, DNC requested NRC review and approval of a revision to the surveillance capsule withdrawal schedule for MPS3. The NRC approved the revised withdrawal schedule in a letter dated March 15, 2016.
DNC planned to reinstall standby Capsule Y into the reactor vessel from the spent fuel pool during the spring 2016 refueling outage. Capsule Y was scheduled for reinsertion at the 241°location but could not be reinserted there due to the obstruction caused by the lift rig for the upper internals. This obstruction limited travel of the refuel bridge and therefore, restricted access to the 241° specimen guides. DNC proposes to revise the capsule withdrawal schedule for reinsertion of Capsule Y at the 61° location, which has the same lead factor as the 241° location. No other changes are proposed to the withdrawal schedule previously approved in.the March 15, 2016 NRC safety evaluation.
The proposed revision to the reactor vessel surveillance capsule withdrawal schedule is shown below.
Proposed revisions to the capsule withdrawal schedule are shown with additions in bold, italicized text and deletions are shown with strikethrough.
Proposed Millstone Unit 3 Reactor Vessel Surveillance Capsule Withdrawal Schedule REMOVAL/
LEAD FACTOR(al FLU ENCE CAPSULE LOCATION INSTALLATION (n/cm2,E>1.0MeV)(a)
TIME (EFPY)!bl u 58.5° 4.06 1.3 4.00 X 1018(c) x 238.5° 4.35 8.0 1.98 X 1019(c) w 121.5° 4.22 13.8 3.16 X 1019(c. d) y<e)\11 241° 3.98 13.8 P:eetRete ~i) y<tJ 61° 3.98 Footnote (i) v<e> 61° 3.98 Storage z<g> 301.5° 4.22 23.4 5.37x 10 19<hl
- a. Updated m Capsule W dosimetry analysis.
- b. Effective Full Power Years (EFPY) from plant startup.
- c. Plant specific evaluation.
- d. This fluence is not less than once or greater than twice the peak end of license fluence, and is approximately equal to the peak vessel fluence at 63 EFPY.
19
- e. Capsules Y and V were withdrawn after 13.8 EFPY (EOC 10) and placed into storage after accruing 2.98 x 10 n/cm 2 fluence.
- f. Capsule Y was reinserted into its original location ~61°1 at EOC 17 (approximately 23.4 EFPY~.
- g. Capsule Z was withdrawn at 23.4 EFPY (EOC 17) after accruing approximately 5.37 x 10 19 n/cm fluence. Dosimetry analysis was performed and the test specimens placed into vendor storage for future testing.
- h. This projected fluence is greater than once and less than twice the projected 72 EFPY and 90 EFPY peak vessel fluence.
- i. Capsule Y is installed for fluence monitoring during the operating license in accordance with ASTM E 185-82.
Thanks for your review and we are looking forward to discussing this with you in a call tomorrow. We will need NRC approval of the revised capsule withdrawal schedule prior to entering Mode 2, which is currently expected to occur on May 91h. If you have any questions, please let me know. Thanks.
Wanda D. Craft Nuclear Licensing and Operations Support Dominion Resources Services, Inc 1
Dominion Nuclear Connecticut, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 Web Address: www.dom.com May 9, 2016 U. S. Nuclear Regulatory Commission Serial No.: 16-199 Attention: Document Control Desk NRA/WDC: RO Washington, DC 20555-0001 Docket No.: 50-423 License No.: NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 3 REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE This letter is to confirm the subject information sent separately to the NRC in an email dated April 27, 2016 and discussed in a clarification call on April 28, 2016. The April 27, 2016 email is provided as an attachment to this letter.
If you should have any questions regarding this submittal, please contact Wanda Craft at (804) 273-4687.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering
Attachment:
Email dated April 27, 2016 Commitments contained in this letter: None
Serial No.16-199 Docket No. 50-423 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 Richard V. Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station
Serial No.16-199 Docket No. 50-423 ATTACHMENT EMAIL DATED APRIL 27, 2016 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNIT 3
Wanda D Craft (Generation - 6)
From: Wanda D Craft (Generation - 6)
Sent: Wednesday, April 27, 2016 4:08 PM To: Guzman, Richard
Subject:
MPS3 RV Surveillance Capsule Withdrawal Schedule revision Rich, In letters dated July 2, 2015 and January 28, 2016, DNC requested NRC review and approval of a revision to the surveillance capsule withdrawal schedule for MPS3. The NRC approved the revised withdrawal schedule in a letter dated March 15, 2016.
DNC planned to reinstall standby Capsule Y into the reactor vessel from the spent fuel pool during the spring 2016 refueling outage. Capsule Y was scheduled for reinsertion at the 241°location but could not be reinserted there due to the obstruction caused by the lift rig for the upper internals. This obstruction limited travel of the refuel bridge and therefore, restricted access to the 241° specimen guides. DNC proposes to revise the capsule withdrawal schedule for reinsertion of Capsule Y at the 61° location, which has the same lead factor as the 241° location. No other changes are proposed to the withdrawal schedule previously approved in.the March 15, 2016 NRC safety evaluation.
The proposed revision to the reactor vessel surveillance capsule withdrawal schedule is shown below.
Proposed revisions to the capsule withdrawal schedule are shown with additions in bold, italicized text and deletions are shown with strikethrough.
Proposed Millstone Unit 3 Reactor Vessel Surveillance Capsule Withdrawal Schedule REMOVAL/
LEAD FACTOR(al FLU ENCE CAPSULE LOCATION INSTALLATION (n/cm2,E>1.0MeV)(a)
TIME (EFPY)!bl u 58.5° 4.06 1.3 4.00 X 1018(c) x 238.5° 4.35 8.0 1.98 X 1019(c) w 121.5° 4.22 13.8 3.16 X 1019(c. d) y<e)\11 241° 3.98 13.8 P:eetRete ~i) y<tJ 61° 3.98 Footnote (i) v<e> 61° 3.98 Storage z<g> 301.5° 4.22 23.4 5.37x 10 19<hl
- a. Updated m Capsule W dosimetry analysis.
- b. Effective Full Power Years (EFPY) from plant startup.
- c. Plant specific evaluation.
- d. This fluence is not less than once or greater than twice the peak end of license fluence, and is approximately equal to the peak vessel fluence at 63 EFPY.
19
- e. Capsules Y and V were withdrawn after 13.8 EFPY (EOC 10) and placed into storage after accruing 2.98 x 10 n/cm 2 fluence.
- f. Capsule Y was reinserted into its original location ~61°1 at EOC 17 (approximately 23.4 EFPY~.
- g. Capsule Z was withdrawn at 23.4 EFPY (EOC 17) after accruing approximately 5.37 x 10 19 n/cm fluence. Dosimetry analysis was performed and the test specimens placed into vendor storage for future testing.
- h. This projected fluence is greater than once and less than twice the projected 72 EFPY and 90 EFPY peak vessel fluence.
- i. Capsule Y is installed for fluence monitoring during the operating license in accordance with ASTM E 185-82.
Thanks for your review and we are looking forward to discussing this with you in a call tomorrow. We will need NRC approval of the revised capsule withdrawal schedule prior to entering Mode 2, which is currently expected to occur on May 91h. If you have any questions, please let me know. Thanks.
Wanda D. Craft Nuclear Licensing and Operations Support Dominion Resources Services, Inc 1