May 1, 2015 Administrative Judge Administrative Judge Ronald M. Spritzer, Chair Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Gary S. Arnold Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2)
Docket No. 50-341-LR
Dear Administrative Judges:
Pursuant to 10 C.F.R. §§ 2.336 and 2.1203 and as modified by the Atomic Safety and Licensing Boards (Board) Initial Scheduling Order (ISO) dated February 27, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff (Staff) is providing notification that a hearing file has been created for this proceeding. The hearing file includes the Staffs documents subject to disclosure under 10 C.F.R. §§ 2.336 and 2.1203 and the ISO. On or about May 8, 2015, materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS) or through the Electronic Hearing Docket (EHD), which may be accessed at http://adams.nrc.gov/ehd/. An index containing the ADAMS accession number, document date, and document title or description of each item in the hearing file is appended hereto as Attachment 1.
Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Elaine Keegan, certifying that all potentially relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified as of April 30, 2015 (Attachment 2).
The Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding, while excluding those documents for which there is a claim of privilege or protected status, based on the information and documentation reasonably available to it. In identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.
The Staff anticipates publishing the Draft Supplemental Environmental Impact Statement in June 2015 and the Final Supplemental Environmental Impact Statement in February 2016. The Safety Evaluation Report (SER) with open items and the final SER are anticipated to be published in September 2015 and February 2016, respectively.
Respectfully submitted,
/signed (electronically) by/
Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 Brian.harris@nrc.gov
Enclosures:
Attachment 1: Hearing File Index Attachment 2: Affidavit of Elaine Keegan Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Initial Disclosures - May 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number 00001 ML14177A283 07/31/1972 Final Environmental Statement Related to Enrico Fermi Atomic Power Plant, Unit 2.
00002 ML14125A189 07/28/1987 Drawing 6M721-2000, Rev D., "Index and Legend of Abbrevations."
ML14125A190 09/28/2004 Drawing 6M721-2001, Rev S, "Legend Symbols & Instrumentation Identification for Plant System 00003 Diagrams".
ML14344B005 04/30/2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 -
00004 Part 1 of 5.
ML14344B006 04/30/2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 -
00005 Part 2 of 5.
ML14344B007 04/30/2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 -
00006 Part 3 of 5.
ML14344B011 04/30/2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 -
00007 Part 4 of 5.
ML14344B008 04/30/2011 Response to LRA Environmental RAIs - Ducks Unlimited Wetland Investigation Report April 2011 -
00008 Part 5 of 5.
00009 ML14125A203 10/03/2012 Drawing LRA-E-001-0, Rev. 0, "SBO Offsite Power Recover Paths".
ML14125A200 12/13/2012 Drawing LRA-I-2181-04, Rev. J, "System Diagram - Process Radiation Monitoring System (Gulf 00010 Supplied Equipment)".
00011 ML14126A579 12/13/2012 Drawing LRA-M-5709-2, Rev. F, RCIC Turbine Lube Oil/Control Oil Functional Operating Sketch.
00012 ML14126A578 12/18/2012 Drawing LRA-M-5708-2, Rev. L, HPCI Turbine Lube Oil/Control Oil Functional Operating Sketch.
00013 ML14125A373 01/18/2013 Drawing LRA-M-2040, Rev. AQ, Floor Drain Collector System Diagram Radwaste System.
ML14126A423 01/22/2013 Drawing LRA-M-2847, Rev Z, System Diagram Control Center Air Conditioning Air Side Reactor 00014 Building.
00015 ML14126A473 01/22/2013 Drawing LRA-M-4127, Rev. W, Reactor Drywell Cooling System Flow Diagram (P&ID).
00016 ML14125A278 03/01/2013 Drawing LRA-M-2010-1, Rev. 0, "Diagram General Service Water".
00017 ML14125A319 03/01/2013 Drawing LRA-M-2012, Rev. 0, Passive Zinc Injection System (P&ID).
00018 ML14125A443 03/01/2013 Drawing LRA-M-2740, Rev. AV, Diagram Potable Water System.
ML14126A554 03/06/2013 Drawing LRA-M-4325, Rev. AA, System Diagram - Water, Side & Misc. Chiller Inst. Control Center 00019 A/C System Reactor Bldg.
00020 ML14125A204 03/18/2013 Drawing LRA-I-2156-02, Rev K, "Instrument Diagram Reactor Protection System".
00021 ML14126A626 03/20/2013 Drawing LRA-M-N-2056, Revision Q, "Diesel Generator Ventilation RHR Complex Division I".
00022 ML14126A638 03/20/2013 Drawing LRA-M-N-2057, Revision R, "Diesel Generator Ventilation RHR Complex Division I".
00023 ML14126A639 03/20/2013 Drawing LRA-M-N-2058, Rev. R, "Diesel Generator Ventilation RHR Complex Division 2".
00024 ML14126A640 03/20/2013 Drawing LRA-M-N-2059, Revision Q, "Diesel Generator Ventilation RHR Complex Division 2".
Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Initial Disclosures - May 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number 00025 ML14126A581 04/02/2013 Drawing LRA-M-5730-7, Rev. F, Emergency Breathing Air System Functional Operating Sketch.
00026 ML14125A436 04/26/2013 Drawing LRA-M-2535, Rev. H, Diagram Floor Drains All Floors Turbine Building.
00027 ML14126A641 04/26/2013 Drawing LRA-M-V-2002-1, Rev. K, "Flow Diagram South Auxiliary Steam Boiler P6100B002".
00028 ML14125A248 05/07/2013 Drawing LRA-I-2400-25, Rev. H, "Post Accident Sampling System P&ID". Sheet 1.
ML14125A370 05/07/2013 Drawing LRA-M-2035, Rev. BK, Diagram High Pressure Coolant Injection System (HPCI) Reactor 00029 Building.
ML14126A577 05/08/2013 Drawing LRA-M-5702-2, Rev. L, Functional Operating Sketch Reactor Recirculation MG Sets A & B 00030 Lube Oil/Control Oil.
00031 ML14126A563 05/09/2013 Drawing LRA-M-5083, Rev. T, Piping & Instrument Diagram Standby Feedwater System.
ML14125A255 06/04/2013 Drawing LRA-I-2745-04, Rev. A, "Control Diagram TB, Second Floor Decon Room and I&C Hot 00032 Shop Exhaust Fan".
00033 ML14125A276 06/05/2013 Drawing LRA-M-2008, Rev. BB, "Diagram Turbine Building Closed Cooling Water System".
00034 ML14125A314 06/05/2013 Drawing LRA-M-2020, Rev. C, Supplemental Cooling Chilled Water System Diagram.
00035 ML14125A409 06/07/2013 Drawing LRA-M-2082, Rev. AA, Diagram Standby Liquid Control System.
00036 ML14126A573 06/15/2013 Drawing LRA-M-5358-1, Rev. 0, Reactor Building Closed Cooling Water.
ML14126A569 06/15/2013 Drawing LRA-M-5449, Rev. T, Diagram Control Rod Drive Hydraulic System Reactor Building (Part 00037 2 of 2).
ML14126A587 06/15/2013 Drawing LRA-M-N-2048, Rev. AJ, Diesel Fuel Oil System & Lube Oil System Division I RHR 00038 Complex.
00039 ML14125A201 07/02/2013 Drawing LRA-I-2181-06, Rev. N, "Diagram Process Radiation Monitoring Subsystems".
ML14125A254 08/08/2013 Drawing LRA-I-2346-08, Rev. F, "Instrument Flow Diagram ICFD 167/1 Turbine Flange Heating 00040 System".
ML14125A292 08/16/2013 Drawing LRA-M-2005, Rev. BE, "Diagram Feedwater Heater Drains, Emergency Drains and Heater 00041 Air Vents System".
ML14125A266 08/16/2013 Drawing LRA-M-2005-1, Rev. AI, "Diagram Feedwater Heater Drains, Emergency Drains and 00042 Heater Air Vents System".
00043 ML14125A432 08/16/2013 Drawing LRA-M-2224, Rev. Y, Diagram Floor Drains All Floors Auxiliary and Reactor Buildings.
00044 ML14126A589 08/20/2013 Drawing LRA-M-N-2050, Rev. N, Equipment Drains & Floor Drains Division I & II RHR Complex.
ML14126A625 08/20/2013 Drawing LRA-M-N-2054, Revision V, "System Diagram Service Water, Makeup, Decant and 00045 Overflow Systems Divisions 1 and 2 RHR Complex".
ML14126A588 08/27/2013 Drawing LRA-M-N-2049, Rev. AT, Diesel Fuel Oil System & Lube Oil System Division II RHR 00046 Complex.
00047 ML14126A628 08/27/2013 Drawing LRA-M-N-2052, Rev. AD, P&ID RHR Service Water System Division I RHR Complex.
Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Initial Disclosures - May 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number 00048 ML14125A262 08/28/2013 Drawing LRA-M-2004, Rev. AX, "Diagram Condensate System".
00049 ML14125A279 08/28/2013 Drawing LRA-M-2010, Rev. CX, "Diagram General Service Water".
ML14125A364 08/29/2013 Drawing LRA-M-2042, Rev. AN, Diagram Lube Oil Purification, Transfer & Waste System &
00050 Cleaning and Decon System.
00051 ML14125A425 08/29/2013 Drawing LRA-M-2240, Rev. AT, Flow and Refrigeration Diagram Turbine House Ventilation.
00052 ML14125A427 08/29/2013 Drawing LRA-M-2534, Rev. G, Diagram Equipment Drains All Floors Turbine Building.
00053 ML14125A316 09/11/2013 Drawing LRA-M-2031, Rev. AK, Sump Pump Diagram Sheet #1 Radwaste System.
00054 ML14125A404 09/11/2013 Drawing LRA-M-2089, Rev. BG, System Diagram Nuclear Boiler System.
00055 ML14125A414 09/12/2013 Drawing LRA-M-2090, Rev. AL, System Diagram Nuclear Boiler System.
00056 ML14126A476 09/12/2013 Drawing LRA-M-3045, Rev. R, Diagram Main Steam Isolation Valve Leakage Control System.
00057 ML14126A572 09/12/2013 Drawing LRA-M-5357, Rev. BL, Emergency Equipment Cooling Water System Division II.
00058 ML14126A567 09/12/2013 Drawing LRA-M-5444, Rev. BP, Emergency Equipment Cooling Water Division l.
ML14126A580 09/12/2013 Drawing LRA-M-5715-4, Rev. E, Standby Feedwater Lube Oil System Turbine Building Functional 00059 Operating Sketch.
00060 ML14126A475 09/17/2013 Drawing LRA-M-2985, Rev. AN, Diagram Drips and Drains from Steam Lines and Main Turbine.
00061 ML14126A564 09/24/2013 Drawing LRA-M-5358, Rev. AE, Reactor Building Closed Cooling Water.
ML14125A365 09/25/2013 Drawing LRA-M-2043, Rev. AG, Diagram High Pressure Coolant Injection System Barometric 00062 CNDR (HPCI) Reactor Building.
00063 ML14126A629 09/30/2013 Drawing LRA-M-N-2053, Rev. AH, P&ID RHR Service Water System Division II RHR Complex.
ML14344B001 10/16/2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and 00064 Assessment Report - Part 1 of 3.
ML14344B002 10/16/2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and 00065 Assessment Report - Part 2 of 3.
ML14344B003 10/16/2013 Response to LRA Environmental RAIs - Final Threatened and Endangered Species Survey and 00066 Assessment Report Part 3 of 3.
ML14125A407 11/18/2013 Drawing LRA-M-2081, Rev. AV, Diagram Control Rod Drive Hydraulic System Reactor Building 00067 (Part 1 of 2).
00068 ML14126A480 01/20/2014 Drawing LRA-M-3445, Rev. AO, Diagram Nitrogen Inerting and Supply System.
00069 ML14125A251 01/28/2014 Drawing LRA-I-2679-01, Rev. BH, "Primary Containment Monitoring System".
00070 ML14125A412 02/05/2014 Drawing LRA-M-2085, Rev. U, Diagram Station Air Risers in Reactor & Auxiliary Buildings.
00071 ML14125A440 02/05/2014 Drawing LRA-M-2707, Revision N, Flow Diagram Reactor & Auxiliary Building Ventilation System.
00072 ML14125A439 02/05/2014 Drawing LRA-M-2707-1, Rev. C, Flow Diagram Reactor & Auxiliary Building Ventilation System.
Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Initial Disclosures - May 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number 00073 ML14126A420 02/06/2014 Drawing LRA-M-2751, Rev. R, Diagram - Air Flow for Control Center Air Conditioning System.
00074 ML14126A586 02/06/2014 Drawing LRA-M-N-2046, Rev. AC, Diesel Generator System Division I RHR Complex.
00075 ML14126A590 02/06/2014 Drawing LRA-M-N-2047, Rev. AG, Diesel Generator System Division II RHR Complex.
00076 ML14126A424 02/10/2014 Drawing LRA-M-2985-1, Rev. P, Diagram Drips and Drains from Steam Lines and Main Turbine.
ML14125A442 02/14/2014 Drawing LRA-M-2709, Rev. U, Diagram Standy Bas Treatment and Primary Containment Purge 00077 System Reactor Building.
ML14125A202 03/06/2014 Drawing LRA-I-2336-05, Rev.U, "Instrument Flow Diagram ICFD 166 Turbine Gland Steam Sealing 00078 System".
ML14125A205 03/07/2014 Drawing LRA-I-2336-06, Rev. AE, "Instrument Flow Diagram ICFD 168 Turbine Low Press Exhaust 00079 Spray Cooling System".
ML14125A252 03/07/2014 Drawing LRA-I-2336-26, Rev. AB, "Instrument Flow Diagram ICFD 165/1 Turine Lubrication Oil 00080 System".
00081 ML14125A253 03/07/2014 Drawing LRA-I-2346-05, Rev. W, "Instrument Flow Diagram Turbine Generator Seal Oil Systems".
ML14125A247 03/07/2014 Drawing LRA-I-2400-10, Rev. H, "Sample Line Tie-in and Return Diagram Post Accident Sampling 00082 System".
00083 ML14125A249 03/10/2014 Drawing LRA-I-2400-26, Rev. H, "Post Accident Sampling System P&ID". Sheet 2.
ML14125A250 03/10/2014 Drawing LRA-I-2649-1, Rev. P, "Standby Gas Treatment System Diagram Instrumentation &
00084 Controls".
00085 ML14125A263 03/10/2014 Drawing LRA-M-2002, Rev. BP, "Main and Reheat Steam System".
00086 ML14125A264 03/10/2014 Drawing LRA-M-2003, Rev. AN, "Diagram Main Turbine Extraction Steam System".
00087 ML14125A265 03/10/2014 Drawing LRA-M-2004-1, Rev.AF, "Diagram Condensate System".
00088 ML14125A283 03/10/2014 Drawing LRA-M-2006, Rev. BE, "Condensate Storage and Transfer System Diagram".
00089 ML14125A284 03/10/2014 Drawing LRA-M-2007, Rev. BW, "Diagram Circulating Water System".
00090 ML14125A285 03/10/2014 Drawing LRA-M-2008-1, Rev. AB, "Diagram Turbine Building Closed Cooling Water System".
00091 ML14125A318 03/10/2014 Drawing LRA-M-2011, Rev. AK, "Diagram Condensate Polishing Demineralizer System". Sh 1 of 2.
ML14125A317 03/10/2014 Drawing LRA-M-2011-1, Rev. R, "Diagram Condensate Polishing Demineralizer System". Sh 2 of 00092 2.
ML14125A321 03/10/2014 Drawing LRA-M-2017-1, Rev. BF, Diagram Off-Gas Process System and Vacuum System-Sheet 1 00093 Vacuum System and Recombiner Chains.
ML14125A322 03/10/2014 Drawing LRA-M-2017-1A, Rev. G, Diagram Off-Gas Process System and Vacuum System Sheet 00094 1A Vaccuum System and Reccombiner Chains.
ML14125A323 03/10/2014 Drawing LRA-M-2017-2, Rev. AN, Diagram Off-Gas Process System Vacuum System - Sheet 2 00095 Activity Reduction Chain.
Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Initial Disclosures - May 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number 00096 ML14125A320 03/11/2014 Drawing LRA-M-2015, Rev. CD, Diagram Station and Control Air.
00097 ML14125A315 03/11/2014 Drawing LRA-M-2023, Rev. BE, Diagram Feedwater System.
00098 ML14125A368 03/12/2014 Drawing LRA-M-2032, Rev. BQ, Sump Pump Diagram Radwaste System.
00099 ML14125A367 03/12/2014 Drawing LRA-M-2032-1, Rev. AJ, Sump Pump Diagram Radwaste System.
00100 ML14125A369 03/12/2014 Drawing LRA-M-2034, Rev. AO, Diagram Core Spray System C.S.S. Reactor Building.
00101 ML14125A372 03/12/2014 Drawing LRA-M-2038, Rev. A, Diagram OLNC Mitigation Monitoring System.
00102 ML14125A374 03/12/2014 Drawing LRA-M-2044, Rev. BC, Diagram Reactor Core Isolation Cooling System.
ML14125A375 03/12/2014 Drawing LRA-M-2045, Rev AQ, Diagram Reactor Core Isolation Cooling (RCIC) System Barometric 00103 Condenser.
00104 ML14125A376 03/13/2014 Drawing LRA-M-2046, Rev. BH, Diagram Reactor Water Cleanup Reactor Building.
00105 ML14125A405 03/19/2014 Drawing LRA-M-2047, Rev. AC, System Diagram Reactor Water Cleanup Filter Demineralizers.
00106 ML14125A406 03/19/2014 Drawing LRA-M-2048, Rev. AI, Diagram Fuel Pool Cooling & Cleanup System.
00107 ML14125A410 03/19/2014 Drawing LRA-M-2083, Rev. BP, Diagram Residual Heating Removal (RHR) Div 2.
00108 ML14125A411 03/19/2014 Drawing LRA-M-2084, Rev. BJ, Diagram Residual Heat Removal (RHR) Div 1.
00109 ML14125A413 03/19/2014 Drawing LRA-M-2087, Rev. S, Diagram (Post LOCA) Combustible Gas Control System.
00110 ML14125A403 03/19/2014 Drawing LRA-M-2088, Rev. U, Diagram Reactor Water Cleanup Phase Separators.
ML14125A431 03/19/2014 Drawing LRA-M-2223, Rev. W, Diagram Equipment Drains All Floors Auxiliary and Reactor 00111 Buildings.
00112 ML14125A426 03/19/2014 Drawing LRA-M-2271, Rev. AD, Heating Flow Diagram for Turbine - Radwaste & Reactor Building.
ML14125A438 03/19/2014 Drawing LRA-M-2678, Rev. AM, Diagram Demineralized Service Water Risers for Turbine, 00113 Radwaste and Reactor Buildings.
00114 ML14126A421 03/19/2014 Drawing LRA-M-2833, Rev AH, Reactor Recirculation System Nuclear Boiler System.
00115 ML14126A477 03/19/2014 Drawing LRA-M-3445-1, Rev. M, Diagram Nitrogen Inerting and Supply System.
00116 ML14126A472 03/19/2014 Drawing LRA-M-4100, Rev. AM, Diagram Torus Water Management System.
00117 ML14126A556 03/19/2014 Drawing LRA-M-4615, Rev. AF, Diagram Interruptible and Non-Interruptible Control Air.
00118 ML14126A558 03/19/2014 Drawing LRA-M-5007, Rev. Z, Diagram Primary Containment Pneumatic Supply System.
00119 ML14125A187 04/24/2014 Fermi 2 License Renewal Boundary Drawings.
00120 ML14125A188 04/24/2014 Fermi 2 LRA Drawing List.
00121 ML14121A538 04/24/2014 Fermi 2, License Renewal Application, Appendix D through Appendix E, Page 3-169.
00122 ML14121A540 04/24/2014 Fermi 2, License Renewal Application, Appendix E, Page 10-1 through End.
00123 ML14121A539 04/24/2014 Fermi 2, License Renewal Application, Appendix E, Page 3-170 through Page 9-23.
Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Initial Disclosures - May 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number 00124 ML14121A535 04/24/2014 Fermi 2, License Renewal Application, Cover through Page 3.3-1.
00125 ML14121A536 04/24/2014 Fermi 2, License Renewal Application, Page 3.3-2 through Appendix C, Page C-13.
00126 ML14121A532 04/24/2014 Fermi 2, Submittal of License Renewal Application.
ML14128A316 05/07/2014 Press Release-14-031: NRC Announces Public Availability of Fermi 2 Nuclear Plant License 00127 Renewal Application.
00128 ML14156A237 06/05/2014 Fermi 2 License Renewal Application - Update to Section 1.
ML14150A416 06/11/2014 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and 00129 Opportunity for a Hearing Regarding the Application from DTE Electric Company, for Renewal of the Operating License for FERMI 2.
ML14169A497 06/18/2014 Press Release-14-036: NRC Announces Opportunity to Request a Hearing on Fermi 2 Nuclear 00130 Plant License Renewal Application.
ML14160B055 06/20/2014 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for 00131 License Renewal for Fermi, Unit 2.
ML14164A037 07/01/2014 Request for Concurrence with List of Federally-Listed Species and Habitats for the Proposed 00132 Enrico Fermi, Unit 2, License Renewal.
ML14171A427 07/03/2014 Notice of Intent Prepare an Environmental Impact Statement and Conduct Scoping Process for 00133 License Renewal of Fermi 2.
00134 ML14157A383 07/08/2014 Fermi 2, License Renewal Application Review (SHPO Scoping).
00135 ML14155A207 07/08/2014 Fermi, Unit 2, License Renewal Application Review.
ML14157A354 07/08/2014 Request for Scoping Comments Concerning the Enrico Fermi, Unit 2. License Renewal Application 00136 Review.
ML14197A618 07/16/2014 Press Release-III-14-030: NRC Seeks Public Input on Fermi Nuclear Plant License Renewal 00137 Application.
ML14219A583 07/21/2014 Comment (3) of Dr. Stephen J. McNew, on Behalf of Monroe County Intermediate School District, 00138 re DTE Electric Co. Application for a 20-Year Extension of the Operating License for Enrico Fermi, Unit 2.
ML14216A376 07/21/2014 Comment (4) of Jim McDevitt, on Behalf of Frenchtown Charter Township, Supporting DTE Electric 00139 Company's Application for a 20-year Extension of the Operating License for Enrico Fermi Unit 2.
00140 ML14204A058 07/23/2014 Fermi, Unit 2, License Renewal Process and Environmental Scoping Meeting Slides.
00141 ML14234A189 07/24/2014 Comment (6) of Jessie Pauline Collins on Draft Environmental Impact Statement.
00142 ML14254A465 07/24/2014 Fermi 2 Scoping Meeting Afternoon Trancript.
00143 ML14254A470 07/24/2014 Fermi 2 Scoping Meeting Evening Transcipt.
ML14195A221 07/24/2014 Plan for Scoping and Screening Regulatory Audit Regarding the Fermi 2 License Renewal 00144 Application Review (TAC NO. MF4222).
Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Initial Disclosures - May 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number 00145 ML14213A061 07/30/2014 Fermi 2, License Renewal Application - Supplement for LR-ISG-2012-02.
00146 ML15041A658 07/31/2014 2014/07/31 Fermi 2 LRA - Draft Environmental Audit Needs 00147 ML15041A805 08/19/2014 2014/08/19 Fermi 2 LRA - SAMA Info 00148 ML14234A339 08/19/2014 Comment (10) by Vic and Gail Macks on DTE Electric Co Re-license Application for Fermi 2.
00149 ML15041A752 08/27/2014 2014/08/27 Fermi 2 LRA - Fermi 2 Environmental Audit Schedule 00150 ML14252A142 08/27/2014 Comment (15) of Mary Ann Baier Opposing License Renewal Application for Fermi 2.
00151 ML15041A758 08/28/2014 2014/08/28 Fermi 2 LRA - Re: FW: Fermi 2 Environmental Audit Schedule 00152 ML15041A755 08/28/2014 2014/08/28 Fermi 2 LRA - Re: FW: Fermi 2 Environmental Audit Schedule ML14252A176 08/29/2014 Comment (00022) of Carol Izant on DTE Electric Co., Fermi, Unit 2; Notice of Intent to Prepare an 00153 Environmental Impact Statement.
ML14252A138 08/29/2014 Comment (11) of Michael J. Keegan on Behalf of Don't Waste Michigan on Fermi 2 Docket ID 00154 NRC-2014-0109 License Renewal Application.
00155 ML15041A803 09/03/2014 2014/09/03 Fermi 2 LRA - Draft SAMA audit needs list 00156 ML14224A353 09/03/2014 License Renewal Environmental Site Audit Regarding Fermi, Units 2 (TAC NOS. MF4064).
00157 ML15041A797 09/05/2014 2014/09/05 Fermi 2 LRA - Re: FW: Please send to Fermi....: Clarification on SAMA Request ML15041A801 09/09/2014 2014/09/09 Fermi 2 LRA - Re: FW: Fermi Socioeconomics Information Needs (Taxes) - Review of 00158 Portal Materials ML14233A450 09/18/2014 Public Meeting to Discuss the License Renewal Process and Environmental Scoping Process for 00159 Fermi, Unit 2.
00160 ML15041A655 09/22/2014 2014/09/22 Fermi 2 LRA - RE: Question Regarding RAIs ML14279A561 09/22/2014 LTR-14-0582 - Chief Dan Miskokomon, Walpole Island First Nation, The Council of Three Fires Ltr.
00161 re: Fermi 2 Nuclear Reactor License NPF-43 Extension Application.
00162 ML15041A819 10/01/2014 2014/10/01 Fermi 2 LRA - Environmental Audit Participant List 00163 ML15041A821 10/01/2014 2014/10/01 Fermi 2 LRA - Environmental Draft RAIs 00164 ML15041A828 10/03/2014 2014/10/03 Fermi 2 LRA - RE: SAMA audit ML14252A831 10/03/2014 License Renewal Environmental Site Audit Regarding Fermi 2 Severe Accident Mitigation 00165 Alternatives (TAC Nos. MF4064).
00166 ML15041A653 10/14/2014 2014/10/14 Fermi 2 LRA - Re: SAMA RAIs ML14274A304 10/15/2014 Summary Of The Site Audit Related To The Review Of The License Renewal Application For Fermi 00167 2 (TAC No. MF4064).
00168 ML15041A823 10/17/2014 2014/10/17 Fermi 2 LRA - List of participates for SAMA audit ML14266A344 10/20/2014 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 00169 2 (TAC NO. MF4222).
Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Initial Disclosures - May 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number 00170 ML15041A014 10/22/2014 2014/10/22 Fermi 2 LRA - Re: New Environmental PM 00171 ML14294A792 10/28/2014 Project Manager Change for the License Renewal of Fermi, Unit 2, (TAC NO. MF4064).
00172 ML15041A013 10/29/2014 2014/10/29 Fermi 2 LRA - Draft RAI TE-1 ML14295A239 10/31/2014 LTR-14-0582-1-Ticket - Chief Dan Miskokomon, Walpole Island First Nation, The Council of Three 00173 Fires Ltr. re: Fermi 2 Nuclear Reactor License NPF-43 Extension Application.
00174 ML15040A554 11/05/2014 2014/11/05 Fermi 2 LRA - Draft SAMA RAIs 00175 ML15040A306 11/10/2014 2014/11/10 Fermi 2 LRA - RE: Environmental RAIs for the Fermi 2 LRA 00176 ML15040A145 11/10/2014 2014/11/10 Fermi 2 LRA - SAMA RAI Telecon ML14275A004 11/10/2014 Requests for Additional Information for the Environmental Review of the Fermi 2 License Renewal 00177 Application.
ML14294A812 11/17/2014 Summary of the Severe Accidents Mitigation Alternatives Environmental Site Audit Related to the 00178 Review of the License Renewal Application for Fermi 2 (TAC NO. MF4064)
ML14308A358 11/18/2014 Requests for Additional Information for the Review of the Fermi, Unit 2 License Renewal 00179 Application - Severe Accident Mitigation Alternatives.
ML14308A530 11/20/2014 10/14/14, Summary of Phone Call Between the NRC and DTE Electric Co, Concerning RAIs 00180 Pertaining to the Fermi 2 LRA Environmental Review.
ML14308A598 11/20/2014 10/20/2014, Summary of Telephone Conference Call Held between NRC and DTE Electric Co.,
00181 Concerning Requests for Additional Information Pertaining to Fermi, Unit 2 License Renewal Application.
00182 ML15040A297 11/24/2014 2014/11/24 Fermi 2 LRA - RE: Call 00183 ML15040A143 11/25/2014 2014/11/25 Fermi 2 LRA - Phone Call Summary 00184 ML15040A041 11/25/2014 2014/11/25 Fermi 2 LRA - Re: Phone Call Summary 00185 ML14344B000 12/09/2014 Response to License Renewal Environmental Request for Additional Information.
ML14330A263 12/15/2014 Summary Of Telephone Conference Call Held On November 17, 2014, Between The U.S. Nuclear 00186 Regulatory Commission And DTE Electric Company, Concerning Requests For Additional Information Pertaining To The Fermi 2 License Renewal Application Environmental.
00187 ML15040A039 12/18/2014 2014/12/18 Fermi 2 LRA - RE: Fermi 3 COLA ER Statement 00188 ML15040A141 12/19/2014 2014/12/19 Fermi 2 LRA - Draft Phone Summary for December 18, 2014 Phone Call 00189 ML15040A148 12/19/2014 2014/12/19 Fermi 2 LRA - RE: Draft Phone Summary for December 18, 2014 Phone Call ML15009A358 01/09/2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License 00190 Renewal Application - Severe Accident Mitigation Alternatives.
ML15005A538 01/12/2015 121814, Summary of Telephone Conference Call Between NRC and DTE Electric Company 00191 Concerning Responses to RAIs Pertaining to the Fermi 2 LRA Environmental Review.
Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Initial Disclosures - May 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number 00192 ML15040A033 01/20/2015 2015/01/20 Fermi 2 LRA - SAMA RAI Response Questions 00193 ML15040A558 01/21/2015 2015/01/21 Fermi 2 LRA - RE: SAMA RAI Response Questions 00194 ML15040A640 01/23/2015 2015/01/23 Fermi 2 LRA - Draft SAMA RAIs 00195 ML15041A052 01/23/2015 2015/01/23 Fermi 2 LRA - Fermi 2 SAMA RAI Call 00196 ML15040A639 01/26/2015 2015/01/26 Fermi 2 LRA - Draft Phone Call Summary 00197 ML15041A051 01/26/2015 2015/01/26 Fermi 2 LRA - Re: Draft Phone Call Summary 00198 ML15040A562 02/03/2015 2015/02/03 Fermi 2 LRA - Fermi 2 SAMA RAIs 00199 ML15041A050 02/03/2015 2015/02/03 Fermi 2 LRA - Re: Fermi 2 SAMA ML15026A307 02/03/2015 Requests for Additional Information for the Environmental Review of the Fermi 2 License Renewal 00200 Application-Severe Accident Mitigation Alternatives.
ML15027A355 02/11/2015 01/23/2015, Summary of Telephone Conference Call between NRC and DTE Electric Company 00201 Concerning RAIs Pertaining to the Fermi, Unit 2 LRA SAMA Review.
00202 ML15049A165 02/18/2015 2015/02/18 Fermi 2 LRA - RE: DTE Fermi 2 ER correction letter advanced copy 00203 ML15050A231 02/18/2015 2015/02/18 Fermi 2 LRA - RE: Weekly Environmental Check In Call 00204 ML15050A596 02/18/2015 Fermi, Unit 2 - Revision to Response to License Renewal Environmental RAI SSSH-1.
00205 ML15054A624 02/23/2015 2015/02/23 Fermi 2 LRA - RE: Schedule for Public Meeting 00206 ML15082A266 03/23/2015 2015/03/23 Fermi 2 LRA - Draft Round 3 RAIs 00207 ML15089A276 03/30/2015 2015/03/30 Fermi 2 LRA - List of Attendance from Friday Sama Call 00208 ML15090A808 03/31/2015 2015/03/31 Fermi 2 LRA - Example Response methodology 00209 ML15092A532 04/02/2015 2015/04/02 Fermi 2 LRA - RE: Any Flexibility on next Monday's weekly Call?
00210 ML15110A407 04/20/2015 2015/04/20 Fermi 2 LRA - FW: Question on applicant submittal of MACCS2 deck 00211* ML050190193 01/31/1997 NUREG/BR-0184, "Regulatory Analysis Technical Evaluation Handbook."
ML042820192 09/30/2004 NUREG/BR-0058, Rev 4, "Regulatory Analysis Guidelines of the US Nuclear Regulatory 00212*
Commission."
00213* ML060530203 11/30/2005 Final Version of Rev. A to NEI-05-01, SAMA Analysis Guidance Document.
ML13067A354 06/20/2013 Regulatory Guide 4.2 Supplement 1, Revision 1, "Preparation of Environmental Reports for Nuclear 00214*
Power Plant License Renewal Applications".
ML13106A246 06/30/2013 NUREG-1555 Sup 1, Rev. 1, "Standard Review Plans for Environmental Reviews for Nuclear 00215*
Power Plants Supplement 1: Operating License Renewal," Final Report.
ML13106A241 06/30/2013 NUREG-1437, Vol 1, Rev 1 "Generic Environmental Impact Statement for License Renewal of 00216*
Nuclear Plants" Main Report, Final Report.
Attachment 1 -- Fermi Nuclear Power Plant, Unit 2 License Renewal Hearing File Index Initial Disclosures - May 1, 2015 ADAMS Document ID # Accession Document Title/Description Date Number ML13106A242 06/30/2013 NUREG-1437, Vol 2, Rev 1 "Generic Environmental Impact Statement for License Renewal of 00217*
Nuclear Plants" Public Comments, Final Report.
ML13106A244 06/30/2013 NUREG-1437, Vol 3, Rev 1 "Generic Environmental Impact Statement for License Renewal of 00218*
Nuclear Plants" Appendices, Final Report.
- NRC guidance pertaining to license renewal application reviews. These documents are publicly available in ADAMS, but have not been placed in the Electronic Hearing Docket for this proceeding.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
DTE ELECTRIC COMPANY ) Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2) )
AFFIDAVIT OF ELAINE KEEGAN CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Elaine Keegan, do hereby state as follows:
- 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). I serve as a project manager for the Fermi Nuclear Power Plant, Unit 2, license renewal application (LRA). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
- 2. I hereby certify that all potentially relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(b) and (c) in the above-captioned proceeding have been disclosed in the attached Hearing File Index and that the disclosures are accurate and complete for documents identified as of April 30, 2015.
- 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information, and belief.
/Executed in Accord with 10 C.F.R. § 2.304(d)/
Elaine Keegan Senior Project Manager Division of License Renewal, NRR U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: 301-415-8517 E-mail: Elaine.Keegan@nrc.gov Executed in Rockville, Maryland this 30th day of April, 2015
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
DTE ELECTRIC COMPANY ) Docket No. 50-341-LR
)
(Fermi Nuclear Power Plant, Unit 2) )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of: Letter from Brian G. Harris to the Board, dated May 1, 2015; Attachment 1 - Hearing File Index; and Attachment 2 -
Affidavit of Elaine Keegan, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 1st day of May, 2015.
/Signed (electronically) by/
Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov