1 Fermi2LRANPEm Resource From:
Randall D Westmoreland [westmorelandr@dteenergy.com]
Sent:
Monday, January 26, 2015 9:31 AM To:
Wentzel, Michael Cc:
Kevin P Lynn; Lynne S Goodman; Angela Rudolph
Subject:
Re: Draft Phone Call Summary Attachments:
012315, Summary of Telephone Conference Call Between NRC and DTE Electric Company Concerning Responses to RAIs Pertaining to the Fermi 2 LRA SAMA Review.docx Follow Up Flag:
Follow up Due By:
Monday, January 26, 2015 12:00 PM Flag Status:
Completed Thank you Mike.
Randall Westmoreland DTE Electric Company Major Enterprise Projects Technical Expert Fermi Office: 734-586-1445 CARING ABOUT THE ENVIRONMENT IS THE NATURE OF OUR JOB.
"Wentzel, Michael" <Michael.Wentzel@nrc.gov> wrote: -----
To: "Randall D Westmoreland (westmorelandr@dteenergy.com)" <westmorelandr@dteenergy.com>
From: "Wentzel, Michael" <Michael.Wentzel@nrc.gov>
Date: 01/26/2015 06:36AM
Subject:
Draft Phone Call Summary (See attached file: 012315, Summary of Telephone Conference Call Between NRC and DTE Electric Company Concerning Responses to RAIs Pertaining to the Fermi 2 LRA SAMA Review.docx)
- Randy, Attached is a draft phone call summary for our call last Friday. Please let me know if you have any comments.
- Thanks, Mike Michael Wentzel
2 Project Manager NRR/DLR/RPB2 (301) 415-6459 michael.wentzel@nrc.gov
Hearing Identifier:
Fermi2_LR_NonPublic Email Number:
102 Mail Envelope Properties (OF410F0666.179C309E-ON85257DD9.004FB2E2-85257DD9.004FBB6B)
Subject:
Re: Draft Phone Call Summary Sent Date:
1/26/2015 9:30:53 AM Received Date:
1/26/2015 9:30:56 AM From:
Randall D Westmoreland Created By:
westmorelandr@dteenergy.com Recipients:
"Kevin P Lynn" <lynnk@dteenergy.com>
Tracking Status: None "Lynne S Goodman" <goodmanl@dteenergy.com>
Tracking Status: None "Angela Rudolph" <rudolpha@dteenergy.com>
Tracking Status: None "Wentzel, Michael" <Michael.Wentzel@nrc.gov>
Tracking Status: None Post Office:
dteenergy.com Files Size Date & Time MESSAGE 1062 1/26/2015 9:30:56 AM 012315, Summary of Telephone Conference Call Between NRC and DTE Electric Company Concerning Responses to RAIs Pertaining to the Fermi 2 LRA SAMA Review.docx 77379 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Follow up By 1/26/2015 12:00:00 PM
LICENSE FACILITY SUBJEC The U.S.
Company staffs req applicatio useful in Enclosur discusse The appl Docket N Enclosur As stated cc w/enc EE:
DTE E Y:
Fermi CT:
SUMM 2015 B ELECT INFOR ALTER APPLI
. Nuclear Re yheld a telep quests for a on severe ac identifying a re 1 provides ed with the a icant had an Number:50-3 res:
d cls: See nex NUCL Electric Com 2
MARY OF TE BETWEEN T TRIC COMP RMATION P RNATIVES R ICATION egulatory Co phone confe dditional info ccident mitig areas where s a listing of pplicant, inc n opportunity 341 xt page UNIT LEARREGU WASHINGT mpany ELEPHONE THE U.S. NU PANY CONC ERTAINING REVIEW OF ommission (N erence call o ormation (RA gation alterna further infor the participa cluding a brie y to commen TED STATES ULATORY C TON, D.C. 20555 CONFERE UCLEAR RE CERNING R G TO THE S F THE FERM NRC) and re on January 2 AIs) concern atives review rmation was ants and En ef descriptio nt on this su Michael We Projects Bra Division of L Office of Nu S
COMMISSIO 5-0001 NCE CALL EGULATOR REQUESTS EVERE ACC MI 2LICENS epresentative 23, 2015, to d ning the Ferm
- w. The telep s necessary.
closure 2 co n on the stat mmary.
entzel anch 2 License Ren uclear React ON HELD ON JA Y COMMISS FOR ADDIT CIDENT MIT E RENEWA es of DTE E discuss and mi 2 license phone confe ontains a list tus of the ite newal tor Regulatio ANUARY 23 SION AND D TIONAL TIGATION AL lectric clarify the N renewal erence call w ing of the RA ems.
on 3,
DTE NRC was AIs
OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME M Wentzel B Wittick M Wentzel DATE
/ /
/ /
/ /
/ /
TELEPHONE CONFERENCE CALL FERMI 2LICENSE RENEWAL APPLICATION SEVERE ACCIDENT MITIGATION ALTERNATIVES LIST OF PARTICIPANTS JANUARY 23, 2015 PARTICIPANTS AFFILIATIONS Jerry Dozier U.S. Nuclear Regulatory Commission (NRC)
Michael Wentzel NRC Roland Benke Center for Nuclear Waste Regulatory Bob Schmidt CNWRA Michael Koenemann DTE Electric Company (DTE)
Michael Lake DTE Kevin Lynn DTE Randall Westmoreland DTE Chad Kramer Enercon Brian Norman Enercon Gary Smith Enercon Joe Lavelline Maracor/Enercon Alex Duvall ERIN Engineering Grant Teagarden ERIN Engineering
REQUESTS FOR ADDITIONAL INFORMATION FERMI 2 LICENSE RENEWAL APPLICATION SEVERE ACCIDENT MITIGATION ALTERNATIVES JANUARY 23, 2015 The U.S. Nuclear Regulatory Commission (NRC) and representatives of DTE Electric Company(DTE) held a telephone conference call on January 23, 2015, to discuss and clarify the following requests for additional information (RAIs) concerning the Fermi 2 license renewal application severe accident mitigation alternatives (SAMA) review.
Regarding Response to RAI 1.c.iii What is the value for the phenomenological failure probability of the common cause failure of all four combustion turbine generators in the event of a weather centered loss of the 345kV (Division 2) Switchyard?
Discussion: DTE indicated that the question is clear.
Regarding Response to RAI 2.g.iii The RAI response provided a wealth of information supporting the selection of representative sequences in terms of the determination of the base case risk, however, the impact of representative selection on the calculation of delta risk for a SAMA is not specifically addressed.
Furthermore, the information provided indicates that the specific example in the RAI will not adversely impact the selection of cost-beneficial SAMAs; however, it does raise concern about the impact of combining Class IIA sequences with Class IV sequences. As indicated in the RAI response, separating the Class IIA sequences from the Class IV sequences in the H/E release category results in a 15% increase in dose risk and a 0.6% increase in OECR in the total risk.
Table 2.g-4 indicates the revised Class II contribution is 2.69 times the person-rem/yr and 1.08 times the OECR contributions when they are included in the H/E base case release category.
Thus, the staff believes, the benefit of any SAMA that significantly reduces the risk of Class IIA (loss of containment heat removal) sequences will be underestimated. Please address the impact of combining Class IIA sequences with Class IV sequences and clarify the impact of representative selection on the calculation of delta risk for a SAMA.
Discussion: DTE indicated that the question is clear.
Regarding Response to RAI 2.e The SAMA analysis release category frequency is based upon a truncation of 1E-12/yr which results in undercounting the Class II frequency by 3.14E-09/yr compared to the Class II frequency from the Level 1 quantification. This is stated to have been resolved by lowering the truncation to 1E-14/yr. It is stated that this 3.14E-09/yr difference was added to the PRA documentation release category (RC) medium/early (M/E) frequency but not that used in the SAMA analysis. What was the basis for assigning this undercounting due to truncation to RC M/E and not other RCs such as high/early (H/E)? Was it based on the results of the Level 2 quantification at the lower truncation?
Discussion: Based on the discussion with DTE, the NRC staff modified the draft request, as follows, to make clear the information that the NRC staff is requesting:
The SAMA analysis release category frequency is based upon a truncation of 1E-12/yr which results in undercounting the Class II frequency by 3.14E-09/yr compared to the Class II frequency from the Level 1 quantification. This is stated to have been resolved by lowering the truncation to 1E-14/yr. It is stated that this 3.14E-09/yr difference was added to the PRA documentation release category (RC) medium/early (M/E) frequency but not that used in the SAMA analysis. Discuss the basis for assigning this undercounting due to truncation to RC M/E and not other RCs such as high/early (H/E) and the impact of not including these truncated out Class II cutsets in the evaluation of the benefit for the SAMAs.
Regarding Response to RAI 4.c The economic multiplier stated in the RAI response is 2.1384 which is different from the value of 1.2964 stated on page D-96 of the environmental report (ER). The RAI response does not mention any reason for the ER value to be different from the original value. Please clarify which is the correct value for the economic multiplier value(s) used in the assessment of cost beneficial SAMAs.
Discussion: DTE indicated that the question is clear.
Regarding Response to RAIs 5.a.ii, 5.a.vi, 5.a.vii, 6.h and 7.a The response to these RAIs provides the result of new cost benefit analyses. Was this based on doing the complete analysis similar to that for the ER evaluation involving determining the new release category frequencies and resulting cost risks, or were some assumptions made? Some of the results do not appear to be consistent with those given in Table D.2-1. Are these results conservative?
Discussion: DTE indicated that the question is clear.
Regarding Response to RAI 6.c While Fermi 2 may not have the same vulnerability that prompted SAMA 023 to develop procedures to repair or replace failed 4 kV breakers, this SAMA was cited to mitigate a number of important Fermi events in Table D.1-2 and screening it out is not considered appropriate. If the transfers cited in the source of this SAMA are not required, why were they cited in the evaluation of the benefit of SAMA 023?
Discussion: Based on the discussion with DTE, the NRC staff modified the draft request, as follows, to make clear the information that the NRC staff is requesting:
While Fermi 2 may not have the same vulnerability that prompted SAMA 023 to develop procedures to repair or replace failed 4 kV breakers, this SAMA was cited to mitigate a number of important Fermi events in Table D.1-2 and screening it out is not considered appropriate.
Evaluate the benefit of a procedure to develop or replace failed 4 kV breakers where ever it may be of a benefit at Fermi 2.
Regarding Response to RAI 6.e
The response indicates that assuming a 15% reduction in main steam isolation valves (MSIVs) failure to close and safety relief valves (SRVs) failure to open has essentially no impact (~<0.01) on risk. On the other hand, operator failures to depressurize have risk reduction worths of 1.10, 1.05, and 1.03. These are equivalent to SRVs failure to open and would indicate that the above reduction in SRV failure to open would lead to a 2% reduction in CDF. Please clarify this disparity.
Discussion: Based on the discussion with DTE, the NRC staff modified the draft request, as follows, to make clear the information that the NRC staff is requesting:
The response indicates that assuming a 15% reduction in main steam isolation valves (MSIVs) failure to close and safety relief valves (SRVs) failure to open has essentially no impact (~<0.01) on risk. On the other hand, operator failures to depressurize have risk reduction worths of 1.10, 1.05, and 1.03. These are equivalent to SRVs failure to open and would indicate that the above reduction in SRV failure to open would lead to a 2% reduction in CDF. Please discuss the MSIV and SRV hardware failure modeling characteristics included in the Fermi 2 PRA that lead to this very small risk impact.
SUBJECT:
Summary of Telephone Conference Call conducted on January 23, 2015 DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMFermi Resource DMeléndez-Colón MWentzel YDiaz-Sanabria BWittick JDozier UShoop BHarris, OGC MKunowski, RIII BKemker, RIII PSmagacz, RIII VMitlyng, RIII PChandrathil, RIII HLogaras, RIII ABarker, RIII