ML15118A014

From kanterella
Jump to navigation Jump to search
4/16/2015 Summary of Annual Assessment Meeting for Calvert Cliffs Nuclear Power Plant
ML15118A014
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/27/2015
From: Daniel Schroeder
Reactor Projects Branch 1
To:
Schroeder D
References
MN 15-012
Download: ML15118A014 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 27, 2015 MEETING

SUMMARY

LICENSEE: EXELON GENERATION COMPANY, LLC FACILITIES: CALVERT CLIFFS NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 16, 2015, from 5:00 p.m. to 6:30 p.m., at the Springhill Suites Hotel, Prince Frederick, MD, the U. S. Nuclear Regulatory Commission (NRC) conducted a public open-house to discuss its assessment of the safety performance at the Calvert Cliffs Nuclear Power Plant for 2014.

A notice of the open-house was issued March 25, 2015, and posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML15084A189. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and fact sheets, and was available to discuss its assessment of the safety performance of the Calvert Cliffs Nuclear Power Plant Units 1 and 2 for the period of January 1 through December 31, 2014, as documented in our letter dated March 4, 2015 (ADAMS Accession No. ML15058A295). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of the Calvert Cliffs Nuclear Power Plant can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and local officials attended the open-house and were offered the opportunity to question the NRC regarding the Calvert Cliffs Nuclear Power Plants performance, and the role of the agency in ensuring safe plant operations.

/RA/

Daniel L. Schroeder, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet (ML15114A387)

ML15058A295). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of the Calvert Cliffs Nuclear Power Plant can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and local officials attended the open-house and were offered the opportunity to question the NRC regarding the Calvert Cliffs Nuclear Power Plants performance, and the role of the agency in ensuring safe plant operations.

/RA/

Daniel L. Schroeder, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet (ML15114A387)

Distribution: (via email) C. Roettgen, DRP D. Schroeder, DRP RidsNrrPMCalvertCliffs S. McCarver, DRP Resource R. Clagg, DRP DOC NAME: G:\DRP\BRANCH1\ROP Assessment\2014 ROP EOC\Calvert Cliffs 2015AAM Summary.docx ADAMS Accession No. ML15118A014 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SMcCarver/SCM DSchroeder/DLS DATE 4/27/15 4/27/15