ML16118A132

From kanterella
Jump to navigation Jump to search
4/21/2016 - Summary of Annual Assessment Meeting for Calvert Cliffs Nuclear Power Plant
ML16118A132
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/26/2016
From: Anthony Dimitriadis
Reactor Projects Branch 1
To:
Dimitriadis A
References
Download: ML16118A132 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 26, 2016 MEETING

SUMMARY

LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: CALVERT CLIFFS NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF PUBLIC MEETING The U.S. Nuclear Regulatory Commission (NRC) conducted a public open-house to discuss its assessment of the safety performance at the Calvert Cliffs Nuclear Power Plant for 2015. The open-house was held on April 21, 2016, from 5:00 p.m. to 6:30 p.m., at the Springhill Suites Hotel, Prince Frederick, MD.

A notice of the open-house was issued March 15, 2016, and posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16076A115. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and fact sheets, and NRC staff was available to discuss its assessment of the safety performance of the Calvert Cliffs Nuclear Power Plant Units 1 and 2 for the period of January 1, 2015, through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16061A169). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of the Calvert Cliffs Nuclear Power Plant can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of Marylands US Senate staff, media, local officials, and the public attended the open-house and were offered the opportunity to question the NRC regarding the Calvert Cliffs Nuclear Power Plants performance, and the role of the agency in ensuring safe plant operations.

/RA/

Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet and Handout (ML16117A197)

ML16061A169). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of the Calvert Cliffs Nuclear Power Plant can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of Marylands US Senate staff, media, local officials, and the public attended the open-house and were offered the opportunity to question the NRC regarding the Calvert Cliffs Nuclear Power Plants performance, and the role of the agency in ensuring safe plant operations.

/RA/

Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet and Handout (ML16117A197)

Distribution: (via email) CRoettgen, DRP ADimitriadis, DRP RidsNrrPMCalvertCliffs ARosebrook, DRP Resource ASiwy, DRP RClagg, DRP

DOCUMENT NAME: \\nrc.gov\nrc\R1\Office\DRP\BRANCH1\ROP Assessment\2015 ROP EOC\Calvert Cliffs 2016AAM Summary.docx ADAMS Accession No. ML16118A132 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/AD for ADimitriadis/AD DATE 4/26/16 4/26/16 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 26, 2016 MEETING

SUMMARY

LICENSEE: EXELON GENERATION COMPANY, LLC FACILITY: CALVERT CLIFFS NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF PUBLIC MEETING The U.S. Nuclear Regulatory Commission (NRC) conducted a public open-house to discuss its assessment of the safety performance at the Calvert Cliffs Nuclear Power Plant for 2015. The open-house was held on April 21, 2016, from 5:00 p.m. to 6:30 p.m., at the Springhill Suites Hotel, Prince Frederick, MD.

A notice of the open-house was issued March 15, 2016, and posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16076A115. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and fact sheets, and NRC staff was available to discuss its assessment of the safety performance of the Calvert Cliffs Nuclear Power Plant Units 1 and 2 for the period of January 1, 2015, through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16061A169). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of the Calvert Cliffs Nuclear Power Plant can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of Marylands US Senate staff, media, local officials, and the public attended the open-house and were offered the opportunity to question the NRC regarding the Calvert Cliffs Nuclear Power Plants performance, and the role of the agency in ensuring safe plant operations.

/RA/

Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet and Handout (ML16117A197)

ML16061A169). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of the Calvert Cliffs Nuclear Power Plant can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of Marylands US Senate staff, media, local officials, and the public attended the open-house and were offered the opportunity to question the NRC regarding the Calvert Cliffs Nuclear Power Plants performance, and the role of the agency in ensuring safe plant operations.

/RA/

Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosure:

Public Meeting Sign-In Sheet and Handout (ML16117A197)

Distribution: (via email) CRoettgen, DRP ADimitriadis, DRP RidsNrrPMCalvertCliffs ARosebrook, DRP Resource ASiwy, DRP RClagg, DRP

DOCUMENT NAME: \\nrc.gov\nrc\R1\Office\DRP\BRANCH1\ROP Assessment\2015 ROP EOC\Calvert Cliffs 2016AAM Summary.docx ADAMS Accession No. ML16118A132 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ARosebrook/AD for ADimitriadis/AD DATE 4/26/16 4/26/16