Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question I Which ONE of the following describes an action and the reason for that action, in accordance with EP/1/A15000/E-O (Reactor Trip or Safety Injection)?

A. Verify all area monitor EMF Trip 1 lights dark.

Used to diagnose a LOCA outside of containment B. Isolate the ruptured S/G.

Prevent exceeding offsite dose limits.

C. Verify Monitor Light Panel Sp Lights lit.

Ensure ECCS flow path is properly aligned.

D. Trip all NCPs.

To reduce heat input into the NC system.

Page 1 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 2 Given the following sequence of events:

  • Unit 1 is at 100% power.
  • 1 NC-35B (PZR PORV Isol) is in the CLOSE position due to a seat leak on 1 NC-36B (PZR PORV).

Subsequently:

  • A pressure transient resulted in an NC system pressure increase.
  • 1 NC-34A (PZR PORV) opened but did not re-close.
  • NC pressure is 2200 psig and decreasing.

(1) What is the current MCB switch position for 1NC-33A?

(2) Which Selected Pressurizer Pressure channel is designed to provide a BLOCK signal to 1 NC-34A on decreasing pressure?

A. (1) CLOSE (2) Selected Pressurizer Pressure 1 (SPP-1)

B. (1) OVERRIDE (2) Selected Pressurizer Pressure 1 (SPP-1)

C. (1) CLOSE (2) Selected Pressurizer Pressure 2 (SPP-2)

D. (1) OVERRIDE (2) Selected Pressurizer Pressure 2 (SPP-2)

Page 2 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 3 Given the following Unit 1 conditions:

Initial:

  • A small break LOCA has occurred.
  • EP/1/A15000/E-1 (Loss of Reactor or Secondary Coolant) has been entered.
  • Neither train of lOOM is available.

Subsequently:

  • The crew has transitioned to EP/1IA/5000/ES-1 .2 (Post LOCA Cooldown and Depressurization).
  • S/G PORVs are being used for cooldown.
  • Current NC pressure is 665 psig.
  • Core exit thermocouple temperatures are 488° F.
  • T-Colds are 487.7°F.

(1) In accordance with E-1, the value of subcooling is Li)

(2) Based on current conditions, steam header pressure is (2)

Reference Provided A. (1) -8°F (2) 608 psig B. (1) -8°F (2) 593 psig C. (1) +12°F (2) 608 psig D. (1) +12°F (2) 593 psig Page 3 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 4 Given the following Unit 1 conditions:

  • A LOCA has occurred from 100% power.
  • 1ETB has de-energized due to an overcurrent actuation.
  • EPI1IN5000IE-1 (Loss of Reactor or Secondary Coolant) was implemented.
  • The crew has performed the appropriate steps of EP/11N5000/ES-1 .4 (Transfer to Hot Leg Recirculation).

For the above conditions, and in accordance with ES-i .4; (1) Is hot leg recirculation flow sufficient?

(2) Which 1 MC-1 1 control panel indication is used to verify whether hot leg recirculation has been established?

A. (1) YES (2) ND flow to Hot Legs B and C B. (1) NO (2) ND flow to Hot legs B and C C. (1) YES (2) NI Pump discharge flow D. (1) NO (2) NI Pump discharge flow Page 4 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 5 (1) The Thermal Barrier Heat Exchanger is the (1) cooling source for NC Pump seals.

(2) Thermal Barrier Heat Exchanger cooling (2) be available following a Hi-Hi Containment pressure signal.

A. (1) primary (2) will NOT B. (1) primary (2) will C. (1) backup (2) will NOT D. (1) backup (2) will Page 5 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 6 In accordance with AP/1/A15500/019, (Loss of Residual Heat Removal System), Enclosure 10, Long Term Core Cooling Parameters:

(1) For the Containment Sump Recirculation Criteria, if the ONLY sump level annunciators lit are 1AD-20, B12, and 1AD-21, B/2 (CONT. SUMP LEVEL >2.5 FT), then the containment sump level requirement (1) met.

(2) The operator is directed to stop all pumps taking suction from the FWST if level decreases to a maximum value of (2)

A. (1) is (2) 5%

B. (1) is (2) 10%

C. (1) is not (2) 5%

D. (1) is not (2) 10%

Page 6 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 7 Unit 1 was at 100%. Given the following conditions and sequence of events:

  • A plant transient results in a cooldown of the NC system causing the Backup Heaters to energize and the C PZR heaters to be full ON.
  • Pressurizer Pressure Channel 1 fails offscale high.

Subseci uently:

  • Pressurizer Pressure Channel 2 fails offscale low.
  • The following annunciators are received simultaneously with the second pressure channel failure:
  • The OATC notifies the rest of the crew that there is an Alternate Action on Pressurizer Pressure Select 1 and Select 2.

Assuming NO operator actions:

(1) The Pressurizer Pressure Master will (2) C Pressurizer heaters wilt (2)

A. (1) swap to Manual (2) de-energize B. (1) swap to Manual (2) remain energized C. (1) remain inAutomatic (2) de-energize D. (1) remain inAutomatic (2) remain energized Page 7 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 8 Given the following conditions:

  • Unit 1 was at 72% power and increasing following a refueling outage.
  • DRPI indicates Control Bank D at 178 steps and inserting.

(1) One of the required Immediate Actions is to (1)

(2) Following completion of this step, control rod speed will indicate (2)

A. (1) Verify Control Rods IN AUTO AND STEPPING IN (2) 72 steps per minute B. (1) Verify Control Rods IN AUTO AND STEPPING IN (2) 48 steps per minute C. (1) Insert Control Rods in MANUAL (2) 72 steps per minute D. (1) Insert Control Rods in MANUAL (2) 48 steps per minute Page 8 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 9 Given the following:

  • Unit 1 has experienced a SIG Tube Rupture.
  • The crew has transitioned to EPI1IAI5000IE-3 (Steam Generator Tube Rupture) and is preparing to initiate a cooldown.

(1) Concerning this cooldown, this procedure will specify (1)

(2) NC pump trip criteria, based on NC subcooling, (2) apply after starting a controlled cooldown.

A. (1) maximum rate while attempting to avoid a Main Steam Isolation (2) does NOT B. (1) maximum rate while attempting to avoid a Main Steam Isolation (2) does C. (1) as close as possible without exceeding 100°F per hour (2) does NOT D. (1) as close as possible without exceeding 100°F per hour (2) does Page 9 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 10 Given the following conditions on Unit 1:

  • The unit has experienced a feedwater line break of the 1A S/G inside containment and a total loss of feedwater.
  • EPI1/A15000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered and feed and bleed of the NC system was initiated.
  • Shortly after opening the PZR PORVs, the Turbine Driven CA pump is returned to service and a source of feedwater is available.
  • All S/G WR levels are indicating 8%.

(I) In accordance with FR-H. 1, Enclosure 6 (S/G CA Flow Restoration), CA flow is required to be restored to (1) at a rate not to exceed 100 gpm.

(2) The restoration of flow criteria is important in order to minimize (2 A. (1) ALL intact S/Gs (2) additional NC cooldown causing thermal stress to the reactor vessel B. (1) ALLintactS/Gs (2) the thermal stress to prevent failure of S/G components C. (1) onlyONEintactS/G (2) additional NC cooldown causing thermal stress to the reactor vessel D. (1) onlyONEintactS/G (2) the thermal stress to prevent failure of S/G components Page 10 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 11 Given the following:

  • Unit 1 is in Mode 4.
  • 1 ETA experienced a blackout due to Transformer 1ATC failure.
  • 1A DIG started and subsequently tripped on Generator Differential.

What TS LCO Required Actions apply, based on these events?

A. 3.8.1 (AC Sources Operating) ONLY B. 3.8.1 (AC Sources Operating) AND 3.8.9 (Distribution Systems Operating)

C. 3.8.2 (AC Sources Shutdown) ONLY D. 3.8.2 (AC Sources Shutdown) AND 3.8.10 (Distribution Systems Shutdown)

Page 11 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 12 Given the following:

  • A loss of offsite power occurred on Unit 1.
  • Both essential busses are powered by their DIGs.

Subsequently:

  • A train safety injection occurred on Unit 1 due to a LOCA.
  • B train safety injection did not actuate automatically or manually.
  • No other operator actions have occurred.

(1) Breaker ETA BIO ALT FDR FRM ETA will be (1)

(2) Breaker FTB BIO ALT FDR FRM ETB will be (2)

A. (1) open (2) open B. (1) open (2) closed C. (1) closed (2) open D. (1) closed (2) closed Page 12 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 13 Given the following:

  • Unit 1 is at 100% power.
  • All Channel 4 Instruments have failed low.

Which of the following status lights will be LIT as a result of this failure?

1. 1C SIG Steamline Lo Pressure
2. 1D SIG Steamline Lo Pressure
3. Containment Hi Pressure A. iand2 B. land3 C. 2and3 D. 1,2and3 Page 13 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 14 Given the following conditions:

  • Unit 1 NC system temperature is at 335°F and decreasing for a refueling outage.
  • Vital charger 1 ECC fails.
  • 1 EMXA is unavailable to power spare charger 1 ECS.

(1) What other MCC can provide an alternate supply to 1 ECS?

(2) Does OPI1/A163501008 (125VDC/12OVAC Vital Instrument and Control Power System) allow alignment of the alternate supply to 1 ECS based on current Unit 1 conditions?

A. (1) 1EMXC (2) Yes B. (1) 1EMXC (2) No C. (1) 1EMXJ (2) Yes D. (1) 1EMXJ (2) No Page 14 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Wriften Exam SENIOR REACTOR OPERATOR Question 15 Given the following Unit 2 conditions:

  • The crew has entered EPI2IAI5000IECA-1 .2, (LOCA Outside Containment) from EP/2/A15000/E-0, (Reactor Trip or Safety Injection) based upon high radiation levels in the Auxiliary Building.
  • After closing 2N1-1 73A (ND Hdr 2A to Cold Legs C&D), the following conditions exist:
  • NC pressure is approximately 1500 psig and slowly increasing.
  • Pressurizer level is 19% and slowly increasing.
  • FWST level is decreasing at a slightly higher rate.

Which ONE of the following completes the statements below?

(1) The LOCA (1) isolated.

(2) The actions required to prevent further FWST depletion are to (2)

A. (1) IS (2) stop the 2A ND Pump and close 2FW-27A (ND Pump 2A Suct from FWST).

B. (1) IS (2) stop the 2B ND Pump and close 2N1-178B (ND Hdr 2B to Cold Legs A&B).

C. (1) IS NOT (2) re-open 2NI-1 73A, and close 2N1-1 78B (ND Hdr 2B to Cold Legs A&B).

D. (1) IS NOT (2) leave 2N1-173A closed and close 2N1-178B.

Page 15 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 16 Given the following Unit 1 conditions:

  • The crew is responding to a loss of all feedwater event from an initial 100% power.
  • The crew is implementing EP/1/A15000/FR-H.1 (Response to Loss of Secondary Heat Sink).
  • NCS pressure is 2335 psig.
  • Incore thermocouples indicate 545°F.

In accordance with Step 23 of FR-H.1, Establish NC System bleed path as follows:

(1) The operator will select OPEN on (1) PZR PORV(s).

(2) The reason for this requirement is (2)

Which ONE of the following completes the above statements?

A. (1) one (2) protect the S/G tubes from creep failure B. (1) one (2) to ensure adequate flow for decay heat removal C. (1) two (2) protect the S/G tubes from creep failure D. (1) two (2) to ensure adequate flow for decay heat removal Page 16 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 17 Given the following:

  • A large break LOCA has occurred on Unit 1.
  • EPI1IAI5000IES-1 .3 (Transfer to Cold Leg Recirculation) has been entered due to low FWST level.
  • All attempts to open containment sump isolation valves, in accordance with step 4 of ES-1.3, have been unsuccessful.

(1) Which procedure will the crew transition to?

(2) How will the crew respond to CSF Status Trees following transition?

A. (1) EP/1/A15000/ECA-1.3 (Containment Sump Blockage)

(2) Implement CSFs as required.

B. (1) EP/1/A15000/ECA-1.1 (Loss of Emergency Coolant Recirculation)

(2) Implement CSFs as required.

C. (1) EPI1IAI5000/ECA-1.3 (Containment Sump Blockage)

(2) Monitor CSFs for information only.

D. (1) EPI1IA/5000/ECA-1.1 (Loss of Emergency Coolant Recirculation)

(2) Monitor CSFs for information only.

Page 17 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 18 Given the following Unit 1 conditions:

  • Following a Unit trip from 100% power, the crew entered EP/1/A15000/ECA-2.1 (Uncontrolled Depressurization of All Steam Generators).
  • Attempts to close any MSIV using its individual valve control board pushbutton have failed.
  • 1AD-03, E/5 SM ISOL VLVS NOT FULLY OPEN - DARK (1) In accordance with ECA-2.1, (1) will be dispatched to isolate air to MSIVs?

(2) If an MSIV can be closed, what plant parameter is monitored to determine when this procedure can be exited?

A. (1) Maintenance (2) S/G pressure B. (1) Maintenance (2) NC loop T-hots C. (1) Auxiliary Operators (2) NC loop T-hots D. (1) Auxiliary Operators (2) S/G pressure Page 18 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 19 Given the following Unit 1 conditions:

  • The Unit is at 100% power.
  • While performing the RCCA movement test, control bank D rod H-8 slips into the core to 198 steps withdrawn.
  • All other Bank D control rods are at 216 steps withdrawn as indicated on DRPI and step demand counters.
  • The crew is performing AP111N55001014 (Control Rod Misalignment) and currently referring to 0P111N6150/008 (Rod Control).

(1) All required actions of Technical Specification 3.1.4 (Rod Group Alignment Limits) will be complete if rod H-8 is realigned within (1)

(2) To correct the above condition, which rod, or rods, will be repositioned in accordance with OP/1/A16150/008 (Rod Control)?

A. (1) 30 minutes (2) Rod H-8 B. (1) 30 minutes (2) All rods in the affected bank except H-8 C. (1) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (2) Rod H-8 D. (1) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (2) All rods in the affected bank except H-8 Page 19 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 20 Given the following conditions:

  • Unit 1 is at 50% following a runback.
  • Tavg is 3° F > Tref.
  • An Alternate Action occurs on Selected Tavg.

(1) What is Unit I current Pressurizer level control setpoint?

(2) If the same conditions (as detailed above) occurred on Unit 2, Tavg would be (2) than the Tavg for Unit 1.

A. (1) 40%

(2) higher B. (1) 40%

(2) lower C. (1) 43%

(2) higher D. (1) 43%

(2) lower Page 20 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 21 Given the following Unit 1 conditions:

  • A reactor startup is in progress.
  • Intermediate Range power is stable at 10-6 % power on both channels.

Subsequently:

Source Range N31 control power fails.

(1) The reactor (1) trip.

(2) N31 indication will (2)

A. (1) will (2) continue to indicate actual counts B. (1) will (2) be lost C. (1) will not (2) continue to indicate actual counts D. (1) will not (2) be lost Page 21 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 22 Given the following:

Unit 1 was stable at 8% power following reactor startup when the N-35 Intermediate Range Instrument Power supply failed.

(1) The reactor tripped due to a signal generated from (1)

(2) Following the reactor trip, N-31 (2) providing accurate indication of Source Range flux.

A. (1) N-35 ONLY (2) is NOT B. (1) N-35 ONLY (2) is C. (1) N-31ANDN-35 (2) is D. (1) N-31ANDN-35 (2) is NOT Page 22 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 23 Given the following:

  • The refueling crew is lowering an irradiated fuel assembly next to a new fuel assembly in the core for Unit 1.
  • The assembly inadvertently drops completely into the core.
  • The crew has entered AP111N55001025 (Damaged Spent Fuel).

As a result of this event:

(1) The Containment Evacuation Alarm will be (1) initiated.

(2) VP (Containment Purge) will be (2) secured.

A. (1) automatically (2) automatically B. (1) manually (2) automatically C. (1) automatically (2) manually D. (1) manually (2) manually Page 23 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 24 Given the following:

  • A plant fire has resulted in smoke intrusion in the Control Room and evacuation in accordance with AP/11AJ55001017 (Loss of Control Room).
  • Preparations to purge the Control Room are being made.

In accordance with API17:

(1) The smoke will be purged though the (1) building.

(2) The required alignment of the Control Room Ventilation system (2) result in an automatic transfer of Spent Fuel Pool Ventilation to Filter Mode.

A. (1) service (2) will B. (1) service (2) will NOT C. (1) auxiliary (2) will D. (1) auxiliary (2) will NOT Page 24 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 25 Given the following Unit 1 conditions:

  • The Unit experienced a Medium Break LOCA.
  • Containment pressure reached a maximum of 2.8 psig.
  • The crew is currently performing steps of EP/1IAI5000IES-1.2 (Post LOCA Cooldown and Depressurization).
  • The crew is at Step 14 for initiating NC System depressurization.

(1) When directed to initiate depressurization, the procedure FIRST directs use of (1)

(2) The purpose of this step is to ensure the Pressurizer is refilled to a MINIMUM required level of greater than (2)

A. (1) normal PZR spray valves (2) 25%

B. (1) normal PZR spray valves (2) 44%

C. (1) a single PZR PORV (2) 25%

D. (1) a single PZR PORV (2) 44%

Page 25 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 26 Given the following Unit 1 conditions:

Initial Conditions:

  • The Unit was in Mode 3.

Subsequent Conditions:

  • The crew entered EP/l/A/5000/FR-H.2 (Response to SIG Overpressure).

Current Conditions:

  • lB SIG pressure is 1235 psig.
  • lB SIG NR level is 99%.
  • The 1A, 10 and 1D S/G pressures are all 850 psig and 50% NR level.
  • All feedwater isolation status lights are DARK.

Which ONE of the following describes the FIRST action to be taken in accordance with this procedure?

A. Open the 1 B S/G PORV to immediately reduce pressure in the 1 B S/G.

B. Dump steam from the 1 B S/G using CA pump #1 to immediately reduce pressure in the 1 B SIG.

C. Manually isolate feedwater to the 1 B S/G to prevent additional feedwater from further pressurizing the lB S/G.

D. Dump steam from the 1A, 10 and 1D S/Gs to reduce NC system temperature and reduce pressure in the lB S/G.

Page 26 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 27 Given the following Unit 1 conditions:

  • 1 EMF.-53A (Containment High Range) Trip 2 alarm has actuated.
  • 1 EMF-53B (Containment High Range) has lost power due to supply breaker trip.

(1) The loss of power (1) require entry into the action statement of Tech. Spec.

3.3.3 (Post Accident Monitoring Instrumentation).

(2) VUCDT (Ventilation Unit Condensate Drain Tank) has been isolated by closure of Containment Isolation Valve (s) (2)

Nomenclature: 1WL-867A (VUCDT Cont Isol) 1WL-869B (VUCDT Cont Isol)

A. (1) will (2) 1WL-867A ONLY B. (1) will NOT (2) 1WL-867A ONLY C. (1) will (2) 1WL-867A AND 1WL-869B D. (1) will NOT (2) 1WL-867A AND 1WL-869B Page 27 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 28 Regarding the cooling of the NC Pump motor and seals:

(1) For normal conditions, (1) cools the air as it exits the motor.

(2) Following a complete loss of KC (with NO Safety Injection), NCP seal cooling (2) be maintained.

Which ONE of the following completes the statements above?

A. (1) RN (2) can B. (1) RN (2) can NOT C. (1) YV (2) can D. (1) YV (2) can NOT Page 28 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 29 Given the following:

A 1000 gallon dilution is being performed on Unit 1 in accordance with OP/11A161501009 (Boron Concentration Control).

During this addition:

(1) If left in Automatic, 1 NV-i 72A (3-Way Divert To VCT-RHT) will begin to divert flow when VCT level reaches (1)

(2) VCT pressure will be controlled (2) by use of a Hydrogen supply makeup valve.

A. (1) 75%

(2) manually B. (1) 75%

(2) automatically C. (1) 70%

(2) manually D. (1) 70%

(2) automatically Page 29 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 30 Given the following:

  • Unit 1 is currently in Mode 5.
  • Plant cooldown is in progress for refueling outage.
  • 1A ND has been placed in service.
  • Preps are being made to place lB ND in service.
  • 1A and lB NC Pumps are in operation.

Subsequently:

  • 1ND-3 (1A ND Pump Suction From NC Loop B Header Relief) fails open.
  • PZR level and NC pressure are decreasing.

(1) What is the correct procedure entry for this condition?

(2) What is the first action required?

A. (1) AP111A155001019 (Loss of Residual Heat Removal System)

(2) Secure 1A and lB NCPs B. (1) AP/11A155001019 (Loss of Residual Heat Removal System)

(2) Secure 1A ND Pump C. (1) API1/A155001027 (Shutdown LOCA)

(2) Secure 1A and lB NCP5 D. (1) API1/A155001027 (Shutdown LOCA)

(2) Secure 1A ND Pump Page 30 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 31 Unit 2 is making preparations to enter Mode 3 following refueling. In accordance with the following Technical Specifications:

  • 3.5.2 (ECCS - Operating)
  • 3.5.3 (ECCS - Shutdown)

(1) additional ND pump(s) is/are required in Mode 3 as compared to Mode 4, AND (2) additional NI pump(s) is/are required in Mode 3 as compared to Mode 4.

A. (1)One (2) One B. (1)One (2) Two C. (1)No (2) One D. (1)No (2) Two Page 31 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 32 In describing automatic operation of valves associated with the Pressurizer Relief Tank (PRT):

(1) receives a CLOSE signal on a (2) actuation.

Which ONE of the following completes the above statement?

A. (1) 1NC-53B (N2 to PRT Cont Isol)

(2) Phase A B. (1) 1NC-54A (N2 to PRT Cont Isol)

(2) Phase B C. (1) 1 NC-56B (RMW Pump Disch to PRT Cont Isol)

(2) Phase B D. (1) 1NC-58A (PRT Spray Supply Isol)

(2) Phase A Page 32 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 33 Given the following:

  • Unit 1 is in Mode 3 at normal operating pressure/temperature.
  • 1 RAD-1 A14 (1 EMF-46A Train A KC Hi Rad) has actuated.
  • Pressurizer level is stable.
  • Charging flow has increased.
  • The crew is attempting to identify a NC system leak into the KC system.
  • KC Surge Tank levels have changed as follows in the last 40 minutes:

o KC Surge Tank 1A level has increased from 41% to 43%

o KC Surge Tank 1 B level has increased from 45% to 47%

Reference Provided (1) The current leakage rate into the KC system is (1) gpm.

(2) The CRS will enter (2)

A. (1) 2.5 (2) AP/1/A15500/010 (Reactor Coolant Leak)

B. (1) 2.5 (2) AP/1/A15500/027 (Shutdown LOCA)

C. (1) 5 (2) AP/11N5500/010 (Reactor Coolant Leak)

D. (1) 5 (2) AP/1/A/5500/027 (Shutdown LOCA)

Page 33 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 34 If a NC pump thermal barrier heat exchanger develops a leak, the A. KC surge tank vent to atmosphere will close due to high radiation.

B. thermal barrier heat exchanger return isolation valve will close due to high flow.

C. reactor building non-essential header will isolate due to high flow.

D. thermal barrier heat exchanger supply isolation valve will close due to high activity.

Page 34 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 35 Given the following Unit 2 initial conditions:

  • Preparations are in progress for Unit startup.
  • The Unit is at normal operating pressure and temperature.

Subsequently:

  • A loss of offsite power occurs.
  • 2ETA is now powered from 2A DIG.
  • 2ETB is de-energized.
  • PZR level is 90% and stable.

In accordance with Tech. Spec. 3.4.9 (Pressurizer):

(1) Action (1) required to address Pressurizer level.

(2) Action (2) required to address Pressurizer heater capacity.

A. (1) is (2) is B. (1) is not (2) is C. (1) is (2) is not D. (1) is not (2) is not Page 35 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 36 Given the following initial conditions:

  • Unit 1 is at 45% power.
  • 1 B CFPT has been tagged for condenser leak repair.

Subsequently:

  • 1A CFPT trips due to low oil pressure.

In response to this condition:

(1) The Main Turbine (1) immediately trip.

(2) The Reactor (2) immediately (automatically) trip.

A. (1) will (2) will B. (1) will (2) will NOT C. (1) will NOT (2) will D. (1) will NOT (2) will NOT Page 36 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 37 Given the following;

  • Unit 1 is at 43% following a power reduction for Main Turbine work.

(1) The Reactor Trip Protective feature that will protect the core from exceeding thermal limits due to excessive local power density if z\l is not corrected is (1)

(2) Technical Specification 3.2.3 (Axial Flux Difference) (2) applicable under these conditions.

A. (1) OTz\T (2) is NOT B. (1) OThT (2) is C. (1) OPAT (2) is NOT D. (1) OPAT (2) is Page 37 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 38 In order to manually start 1A NS Pump, a containment pressure signal equal to (1) must be inserted at the (2)

A. (1) 0.35 psig (2) Spray Test Panel (Logic Bay)

B. (1) 0.35 psig (2) 1CPCC1 (1ETA) panel C. (1) 0.90 psig (2) Spray Test Panel (Logic Bay)

D. (1) 0.90 psig (2) 1CPCC1 (1ETA) panel Page 38 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Wriften Exam SENIOR REACTOR OPERATOR Question 39 (1) Immediately following an inadvertent manually initiated Safety Injection Signal (Ss), a P-4 Signal (1) required in order to allow reset of the Ss.

(2) If the 1A DIG load sequencer signal cannot be reset, control power must be removed at (2)

A. (1) is (2) 1EDE B. (1) is NOT (2) 1EDE C. (1) is (2) 1EADAand1VADA D. (1) is NOT (2) 1EADAand1VADA Page 39 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 40 During the performance of AP/1/A/5500/017, (Loss of Control Room), the operators are performing Enclosure 3 (Turbine Bldg Operator Actions).

In accordance with this procedure:

(1) Locally (at both CPCS control cabinets) verify that containment pressure does not exceed a maximum of (1)

(2) Local monitoring of containment pressure once per hour (2) meet the requirement of AP/1 7.

A. (1) O.3psig (2) does NOT B. (1) O.3psig (2) does C. (1) 3psig (2) does NOT D. (1) 3psig (2) does Page 40 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 41 Given the following:

  • Unit 2 is in Mode 4.
  • 2AD-13 A17 ICE COND LOWER INLET DOORS OPEN is LIT.
  • 2AD-13 A18 ICE BED RTD LO/HI/HI-HI TEMP is LIT.
  • The lower inlet door position display panel indicates that a door is open.
  • Ice Bed temperature is confirmed to be 23° F.
  • No other alarms related to the ice condenser, NE system or AHUs are lit.

LCO 3.6.12 (Ice Bed) requirements (1) met due to (2)

A. (1) are NOT (2) ice condenser door position B. (1) are NOT (2) ice bed temperature C. (1) are (2) ice condenser door position D. (1) are (2) ice bed temperature Page 41 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 42 Given the following Unit 1 conditions;

  • The unit is at 100% power.

ally

  • It has been determined that two Ice Condenser Lower Inlet doors are physic restrained from opening.

d to restore (1) In accordance with Tech. Spec. 3.6.13, (Ice Condenser Doors), the time require operability of inlet doors (1) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

(2) The value of Containment design pressure is (2)

A. (1) is (2) 15 psig B. (1) is (2) 3 psig C. (1) is NOT (2) 3 psig D. (1) is NOT (2) 15 psig Page 42 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 43 (1) lB NS (Containment Spray) Pump is normally powered from (1)

(2) In accordance with Extensive Damage Mitigation Guidelines, when 1 B NS pump is powered from the alternate source, starting of the pump will be from (2)

Which ONE of the following completes the statements above?

A. (1) 1ETB (2) Unit 1 B. (1) 1EMXB (2) Unit 2 C. (1) 1ETB (2) Unit 2 D. (1) 1EMXB (2) Unit 1 Page 43 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 44 Given the following initial conditions:

  • Unit 1 is in Mode 3 at normal operating temperature and pressure.
  • All Shutdown Banks have been withdrawn.
  • Steam dumps are in Automatic with a setpoint of 1092 psig.

Subsequently:

  • An Auxiliary Operator assigned to warm steam piping downstream of the MSIVs inadvertently OPENS all steamline drains.

(1) If no operator action is taken, the primary system cooldown will stop at an NC system temperature of approximately (1)

(2) Tech Spec 3.4.2 (RCS Minimum Temperature for Criticality) mode of applicability conditions (2) been entered.

A. (1) 553°F (2) have B. (1) 553°F (2) have NOT C. (1) 516°F (2) have D. (1) 516°F (2) have NOT Page 44 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 45 (1) At 85% turbine load MSR exhaust is (1) aligned to supply steam to the main feed pumps.

(2) Following a main turbine trip, a manual alignment of Main Steam (2) required in order to supply steam to the main feed pumps.

A. (1) automatically (2) is NOT B. (1) automatically (2) is C. (1) manually (2) is NOT D. (1) manually (2) is Page 45 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 46 In accordance with OP/1/A161001003, (Controlling Procedure for Unit Operation), which ONE of the following will require that the CF Flow Venturi Correction Factor be reset to 1.0?

A. An increase in turbine MW output from 50% to 60% at 2 MW/mm.

B. One channel of feedwater flow fails low.

C. A load rejection from 85% to 65% due to a feed pump trip.

D. Mode 3 entry from Mode 4.

Page 46 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 47 The following table reflects Steam Generator parameters following a Reactor Trip/Safety Injection.

SIG NRLeveI Pressure MSIV 1A 8% decreasing

- 230 psig decreasing

- Open 1B 35% Stable

- 840 psig decreasing

- Closed 1C 8% decreasing

- 230 psig decreasing

- Open 1D 0% Stable

- 0 psig stable

- Open (1) The first direction to isolate CA flow to 1 D S/G is contained in (1) of EP/1/A15000/E-0 (Reactor Trip or Safety Injection).

(2) If conditions are met to enter EP/1/S/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition), direction will be given to provide (2) flow to 1A and 1C S/Gs.

A. (1) Enclosure 1 (Foldout Page)

(2) Ogpm B. (1) Enclosure 4 (NC Temperature Control)

(2) Ogpm C. (1) Enclosure 1 (Foldout Page)

(2) 75gpm D. (1) Enclosure 4 (NC Temperature Control)

(2) 75gpm Page 47 of 100

n Exam Catawba Nuclear Station 2014 NRC Initial Licensed Operator Writte SENIOR REACTOR OPERATOR Question 48 Given the following:

  • Operators are preparing to perform the 1A DIG surveillance PT.
  • The BOP has placed the DIG 1A CTRL LOCATION switch to LOCAL (1) 1ETA-03 (ETA Norm Fdr Frm ATC) (1) be operated from 1MC-1 1.

r will (2) In order to prevent a reverse power trip following parallel of the D/G, the operato depress Raise on the (2)

A. (1) can (2) speed control B. (1) can NOT (2) speed control C. (1) can (2) voltage control D. (1) can NOT (2) voltage control Page 48 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 49 Given the following condition lnverter 1 KXIA experienced a total loss of output voltage.

(1) 1 KXPA power supply will be automatically transferred to (1)

(2) Once 1 KXIA has returned to normal operating parameters, how will 1 KXPA supply be swapped back to 1 KXIA?

A. (1) CDA (2) Automatically after 60 seconds.

B. (1) CDA (2) Manually.

C. (1) RDA (2) Automatically after 60 seconds.

D. (1) RDA (2) Manually.

Page 49 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 50 Regarding the 1A DIG VG air compressor 1A1:

(1) 1A1 VG air compressor is powered from (1)

(2) Following a blackout, compressor 1A1 (2) be loaded as part of the first D/G sequencer load group.

A. (1) 1EMXE (2) will B. (1) 1EMXC (2) will not C. (1) 1EMXE (2) will not D. (1) 1EMXC (2) will Page 50 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 51 In accordance with SLC 16.11-7 (Radioactive Gaseous Effluent Monitoring Instrumentation), and assuming 1 EMF-36 (Unit Vent Monitor) is functional:

(1) Initiation of a VP (Containment Purge) release (1) require 1 EMF-39 (Containment Monitor Gas) to be functional.

(2) Following initiation of a VP release, 1 EMF-39 (2) required to remain functional in order to continue the release.

A. (1) does NOT (2) is B. (1) does NOT (2) is NOT C. (1) does (2) is D. (1) does (2) is NOT Page 51 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 52 Given the following Unit 1 conditions:

At 1000

  • The Unit was at 100% power.
  • A Zone A and Zone B lockout occurs.
  • While performing steps of EPI1IAI5000IE-0, the CRS has implemented AP/11A155001007, (Loss of Normal Power).

At 1005

  • Zone A and Zone B lockouts have been cleared and RESET.

At 1010 KV

  • The CRS has directed that preparations for performance of Case Ill (Loss of All 6.9 Busses) actions be initiated.
  • The crew performs Step 14 of AP/007, Case I, (Loss of Normal Power to an Essential Power Train), and notes that the YV Operable light is NOT lit.

Which ONE of the following describes at time 1010; (1) The status of the YV Isolated and the RN Operable lights.

in (2) What action is required which will maintain containment cooling for these conditions, accordance with AP/007?

A. (1) LIT.

(2) Ensure at least two (2) RN pumps operating.

B. (1) LIT.

(2) Return YV to normal operation.

C. (1) DARK.

(2) Ensure at least two (2) RN pumps operating.

D. (1) DARK.

(2) Return YV to normal operation.

Page 52 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 53 Given the following:

  • VI compressors E & F are in operation.

ISABLED

  • D VI compressor is secured. The REMOTE COMMUNICATION ENABLED/D switch is in the DISABLED position.

Subsequently:

  • An instrument air leak developed.
  • VI pressure is currently 78 psig and decreasing.

Assuming no operator action:

(1) 1VI-670 (VI Dryer Bypass Valve) is currently (1 (2) D VI compressor is currently (2)

A. (1) closed (2) secured B. (1) closed (2) operating C. (1) open (2) secured D. (1) open (2) operating Page 53 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 54 Unit 1 containment pressure has exceeded 0.5 psig due to a steam leak. As a result, Lower Containment Vent Unit (LCVU) cooling water flow will be controlled (1) and LCVU speed will be controlled (2)

A. (1) manually (2) manually B. (1) automatically (2) manually C. (1) manually (2) automatically D. (1) automatically (2) automatically Page 54 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 55 Which ONE of the following completes the statements below?

(1) The minimum design pressure of containment is (1)

(2) The Containment Air Release (VQ) Fans are designed to automatically trip on (2)

A. (1) -1.5psig (2) low air flow B. (1) -1.5psig (2) low containment pressure C. (1) -O.5psig (2) low air flow D. (1) -O.5psig (2) low containment pressure Page 55 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 56 Given the following:

  • Unit 1 is at 100% power.
  • Loop 10 Tavg has failed high.
  • The RO suspects this is because the loop Tcold instrument has failed high.

(1) In order to verify this, the RO will expect to see the loop delta temperature gauge at (1)

(2) Each loop Tavg is calculated using one Tcold and (2) Thot input(s).

A. (1) top of scale (2) one B. (1) bottom of scale (2) one C. (1) top of scale (2) three D. (1) bottom of scale (2) three Page 56 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 57 The Turbine Load Inhibit (C-16) signal prevents (1) turbine load increase when active. The temperature error portion of this circuit is based on the difference between reference temperature and the second (2) NC loop Tavg.

A. (1) ONLY an automatic (2) highest B. (1) ONLY an automatic (2) lowest C. (1) Automatic AND Manual (2) highest D. (1) Automatic AND Manual (2) lowest Page 57 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 58 Given the following Unit 1 initial conditions:

  • The Unit was in Mode 3.

Subsequently:

  • A Large Break LOCA occurred.
  • The crew has entered EP/1IAI5000IE-l (Loss of Reactor or Secondary Coolant).
  • A core exit thermocouple (CET) for quadrant II on the plasma display is reading 50°F lower than other adjacent nearby CETs.

(1) How does the lower reading CET affect the subcooling value displayed on the Plasma Display, if at all?

(2) In addition to the control room, CET indication is also available at the (2)

A. (1) The indicated subcooling will increase.

(2) ASP B. (1) The indicated subcooling will increase.

(2) SSF C. (1) The indicated subcooling will not be affected.

(2) ASP D. (1) The indicated subcooling will not be affected.

(2) SSF Page 58 of 100

Catawba Nuclear Station 2014 NRC initial Licensed Operator Wriften Exam SENIOR REACTOR OPERATOR Question 59 Unit 1 was operating at 100% power when the following sequence of events occurred:

  • A Loss of Offsite Power occurred.
  • The reactor tripped.
  • When 1A DIG attempted to load 1 ETA, 87G (Generator Differential) relay actuated due to a fault.
  • Containment pressure has risen to 3.1 psig and is slowly increasing.

Which ONE of the following describes the status of the VE (Annulus Ventilation) fans?

A. ONLY 1 B VE fan is running.

B. 1A AND 1 B VE fans are running.

C. ONLY lB VE fan will start after a 9 minute time delay.

D. 1A AND 1 B VE fans will start after a 9 minute time delay.

Page 59 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 60 Given the following:

  • Unit 1 is at 100% power.
  • 1A KF (Spent Fuel Cooling) Pump is in service.
  • 1A VF (Spent Fuel Pool Ventilation) is operating in a normal alignment.

Subsequently:

  • A large break LOCA has occurred on Unit 1.
  • Containment pressure is 3.2 psig.
  • 1EMF-39 (Containment) is in Trip 2.
  • 1 EMF-35 (Unit Vent) is in Trip 1.
  • 1 EMF-42 (Fuel Building Ventilation) indicates normal.
  • 1 EM F-i 5 (Spent Fuel Bldg Refueling Bridge) has experienced a loss of power.

As a result of the above conditions:

(1) 1A KF (1) have cooling water aligned.

(2) 1A VF (2j in Filter Mode.

A. (1) does (2) is NOT B. (1) does (2) is C. (1) does NOT (2) is NOT D. (1) does NOT (2) is Page 60 of 100

n Exam Catawba Nuclear Station 2014 NRC Initial Licensed Operator Writte SENIOR REACTOR OPERATOR Question 61 Regarding Tech. Spec. 3.9.6, Refueling Cavity Water Level:

ined at 23 ft. above (1) The specification is that the refueling cavity water level is to be mainta thetopof (1)

(2) This specification (2) apply during unlatching of control rod drive shafts.

A. (1) the fuel assemblies (2) does B. (1) the fuel assemblies (2) does not C. (1) the reactor vessel flange (2) does D. (1) the reactor vessel flange (2) does not Page 61 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 62 Auxiliary During a loss of switchyard accident with a turbine/generator trip, what is the source of Feedwater (CA) to each steam generator? (Assume no operator action).

Turbine A. CA pump A supplying A & C S/Gs; CA pump B supplying B & D S/Gs; Driven Auxiliary Feedwater Pump {CAPT#1(2) } supplying B and C S/Gs.

B. CA pump A supplying A & B SIGs; CA pump B supplying C & D SIGs; Turbine Driven Auxiliary Feedwater Pump {CAPT#1(2)} supplying all four S/Gs.

Turbine C. CA pump A supplying A & C SIGs; CA pump B supplying B & D SIGs; Driven Auxiliary Feedwater Pump {CAPT#1 (2)} Supplying all four S/Gs.

D. CA pump A supplying A & B SIGs; CA pump B supplying C & D SIGs; Turbine Driven Auxiliary Feedwater Pump {CAPT#1(2)} supplying B & C S/Gs.

Page 62 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 63 Storage (1) To limit public exposure, (Selected Licensee Commitment) SLC 16.11-19 (Gas Tanks) requires that a waste gas storage tank be limited to no more than (1)

(2) if this limit is exceeded the Required Action is to immediately (2)

A. (1) 97,000 Curies (2) reduce tank contents within limits B. (1) 10 Curies (2) reduce tank contents within limits C. (1) 97,000 Curies (2) suspend all additions of radioactive material to the tank D. (1) lOCuries (2) suspend all additions of radioactive material to the tank Page 63 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 64 Given the following:

  • 1AD-8 A17 (VI LO PRESS) is received.
  • The BOP verifies pressure as indicated on 0V1P5260 (VI Pressure) to be 74 psig and slowly decreasing.

Which ONE of the following describes the position of VI system valves (and correct setpoint) in response to the lowering VI header pressure?

A. 1VS-78 (VS supply to VI) opens at 80 psig B. 1VS-78 (VS supply to VI) opens at 76 psig C. 1VI-500 (VI supply to VS) closes at 76 psig D. 1VI-500 (VI supply to VS) closes at 78 psig Page 64 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 65 Given the following conditions:

  • A fire started in Unit 1 cable spread room.
  • Fire protection system malfunctions occurred and the fire spread to the Unit 2 cable spread room and control room.
  • Crews are transferring control to the Safe Shutdown Facility (SSF).

Which ONE of the following evolutions can be performed using controls available within the SSF once control function is transferred to the SSF?

A. Energize 1 EMXA from the SSF diesel generator.

B. Increase pressurizer pressure with D pressurizer heater sub-banks.

C. Throttle auxiliary feedwater flow to B Steam Generator using its flow control valve.

D. Initiate cooldown by throttling B Steam Generator PORV.

Page 65 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 66 ance Which ONE of the following events specifically requires a plant announcement in accord with AD-OP-ALL-bOO (Conduct of Operations)?

A. Starting 1A2 KC Pump B. Latching the Unit 1 Main Turbine C. Unit 1 Reactor Trip D. Mode 4 entry Page 66 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 67 Which ONE of the following completes the statement below?

On the Operator Aid Computer, a computer point color of (1) indicates that the computer point is (2)

A. (1) RED (2) LOCK OUT B. (1) BLUE (2) GOOD C. (1) MAGENTA (2) BAD D. (1) YELLOW (2) SUSPECT Page 67 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 68 In accordance with 0P111A162001001, (Chemical and Volume Control System), if normal Pressurizer Spray is not available and the crew is using Auxiliary Spray during a cooldown of the Pressurizer:

(1) Letdown (1) required to be in service.

(2) The above procedure guidance is based on concerns for thermal stress of the (2)

A. (1) is (2) PZR spray nozzle B. (1) is (2) Auxiliary Spray line piping C. (1) is not (2) PZR spray nozzle D. (1) is not (2) Auxiliary Spray line piping Page 68 of 100

Exam Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written SENIOR REACTOR OPERATOR Question 69 Given the following Unit 1 conditions:

Procedure

  • A Unit startup is in progress in accordance with OP/11A161001001 (Controlling for Unit Startup).
  • Auxiliary Steam (AS) from Unit 2 is being used for turbine warming.
  • NC system pressure is 2235 psig.
  • Steam dumps are controlling NC Tavg at 557°F.

, Steam

  • The crew is preparing to restore AS to a normal alignment by closing 1AS-4 (Main to AS HDR CTRL Bypass).

(1) Operation of 1AS-4 is performed (1) the Control Room.

will require a (2) In accordance with SOMP 01-02, (Reactivity Management), the Unit startup dedicated (2) with no concurrent duties.

A. (1) outside (2) ROANDSRO B. (1) inside (2) RO AND SRO C. (1) outside (2) RO ONLY D. (1) inside (2) RO ONLY Page 69 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 70 In accordance with Tech Spec 2.1.1 (Reactor Core SLs), the peak centerline fuel temperature shall be maintained (1) . This limit (2) change over core life.

A. (1) less than 5080°F (2) does NOT B. (1) less than 2200°F (2) does NOT C. (1) lessthan5080°F (2) does D. (1) less than 2200°F (2) does Page 70 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 71 Given the following condition:

A Liquid Waste Release from the 543 elevation is in progress.

(1) In accordance with appropriate procedures, can a release from the Monitor Tank Building also be initiated concurrently?

(2) If YES, under what conditions?

If NO, why not?

A. (1) YES (2) Provided a separate Liquid Release Permit is initiated and signed by the CRS.

B. (1) YES (2) Provided the Trip 2 setpoint on EMF-49 (Liquid Waste Discharge Monitor) is recalculated for the higher combined limit.

C. (1) NO (2) Because there is the potential for activity to be released into the Standby Nuclear Service Water Pond (SNSWP).

D. (1) NO (2) Both discharge into the same line, which invalidates the RL Flow interlock for automatic termination.

Page 71 of 100

ator Written Exam Catawba Nuclear Station 2014 NRC Initial Licensed Oper SENIOR REACTOR OPERATOR Question 72 Given the following Unit 1 conditions:

  • The NV system is being aligned for startup.

single valve located in a room

  • The procedure in use requires independent verification of a with a general dose rate of 130 mREM/hr.

10 minutes.

  • Estimated time to independently verify the valves position is
  • There are no known hot spots in the area.
  • There is no airborne activity in this room.
  • The room has no surface contamination areas.

ndent verification of the valve In accordance with NSD 700, (Verification Techniques), indepe above (1) be waived because (2)

Which ONE of the following completes the statement above?

A. (1) may (2) the general area dose rate is greater than 100 mREM/hr B. (1) may NOT (2) the general area dose rate is less than 1 REM/hr C. (1) may the allowable limit (2) the radiation exposure for a single verification would exceed D. (1) may NOT allowable limit (2) the radiation exposure for a single verification is within the Page 72 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 73 Operators have entered EP/1/A15000/FR-P.1 (Response to Imminent Pressurized Thermal Shock Condition) due to a valid Orange Path status for Reactor Coolant Integrity.

Consider each question SEPARATELY as it relates to the initial condition.

(1) If Integrity status turns Red during performance of FR-P.1, the CRS (1) return to step 1.

(2) If Core Cooling status turns Orange during performance of FR-P.1 (i.e. while Integrity is Orange), the CRS (2) go to EP/1/N5000/FR-C.2.

In accordance with OMP 1-7, (Emergency/Abnormal Procedure Implementation Guidelines),

which ONE of the following completes the above statements?

A. (1) will (2) will B. (1) will (2) will NOT C. (1) will NOT (2) will D. (1) will NOT (2) will NOT Page 73 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 74 Of the four (4) nuclear instruments listed in F-O, (Critical Safety Function Status Trees), for assessing the Subcriticality safety function, which ONE is a Post-Accident Monitoring (PAM) instrument required by LCO 3.3.3, PAM (Post-Accident Monitoring) Instrumentation?

A. Source Range B. Intermediate Range C. Power Range D. Wide Range Page 74 of 100

Written Exam Catawba Nuclear Station 2014 NRC Initial Licensed Operator SENIOR REACTOR OPERATOR Question 75 Given the following conditions:

Aid Computer (OAC)

  • The Fire Detection System (EFA) is aligned to the Unit 1 Operator for monitoring.
  • A loss of the Unit 1 OAC then occurs.

As a result of these conditions, the EFA OAC monitoring:

A. automatically swaps to the Unit 2 OAC.

B. must be manually swapped to the Unit 2 OAC.

C. automatically swaps to the computer at the fire detection panel.

D. must be manually swapped to the computer at the fire detection panel.

Page 75 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 76 Given the following Unit 1 conditions:

  • EP/11A15000/FR-C.1 (Response to Inadequate Core Cooling) has been entered following a LOCA.
  • The CRS is reading step 21 (Verify Core Cooling adequate).

Step 22 will direct transition to EPI1IA/50001E-1 (step 14) if adequate core cooling is verified by CETs less than (1) and RVLIS level greater than (2)

A. (1) 700°F (2) 41%

B. (1) 700°F (2) 61%

C. (1) 1200°F (2) 41%

D. (1) 1200°F (2) 61%

Page 76 of 100

n Exam Catawba Nuclear Station 2014 NRC Initial Licensed Operator Writte SENIOR REACTOR OPERATOR Question 77 Given the following initial conditions:

  • Unit 2 is in Mode 4 cooling down for a refueling outage.

Subsequently:

  • Pressurizer level begins to slowly decrease.
  • NC pressure begins to decrease.

al System),

  • The CRS has implemented API2IA/5500/019 (Loss of Residual Heat Remov Case II (Leak in ND).

(1) an available (1) Gravity feed from the FWST to ND pump suctions to the hot legs option listed in Enclosure 7 (Assured NC System Makeu p Alignm ents).

(2) If the leak is determined to be in containment, AP/1 9 will (2)

A. (1) is NOT (2) be exited to API2/A15500/27 (Shutdown LOCA)

B. (1) is (2) be exited to API2/A15500/27 (Shutdown LOCA)

C. (1) is (2) continue attempts to isolate the leak D. (1) is NOT (2) continue attempts to isolate the leak Page 77 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 78 Given the following:

  • Unit 2 is at 100% power.
  • SPOC has determined that 2KC-56A (KC to ND Hx 2A Sup Isol) will not open due to breaker damage.

(1) If required for core cooling, EPI2IAI5000/ES-1 .3 (Transfer to Cold Leg Recirculation) will verify a minimum flow of (1) gpm through 2KC-56A.

(2) 2KC-56A failure will require entry into the action statement of T.S. (2)

A. (1) 5700 (2) 3.5.2 (ECCS Operating)

B. (1) 5700 (2) 3.7.7 (Component Cooling Water System)

C. (1) 5000 (2) 3.5.2 (ECCS Operating)

D. (1) 5000 (2) 3.7.7 (Component Cooling Water System)

Page 78 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 79 Given the following initial conditions:

  • Unit 1 is in Mode 5 cooling down for an upcoming outage.
  • Unit2isatlO0%.

Subsequently:

  • At 0800 both units experienced a loss of offsite power.
  • Only the 1A DIG started.
  • At 0818 attempts to start all other D/Gs have failed.

(1) State and county warning points will be notified that CNS has entered a(n)

(1) classification.

(2) Documented notification time will be (2)

Reference Provided A. (1) Alert (2) fax confirmation time B. (1) Site Area Emergency (2) fax confirmation time C. (1) Alert (2) first agency phone contact D. (1) Site Area Emergency (2) first agency phone contact Page 79 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 80 Given the following:

  • Unit 1 has cooled down in preparation for a refueling outage.
  • NC Tavg is currently 205°F and stable.
  • 1A ND has been placed in RHR mode.
  • 1 B ND remains in injection mode due to an inoperable loop suction valve.
  • IAE has requested permission to isolate VI (Instrument Air) to PZR PORVs 1 NC-32B and 1 NC-34A in order to troubleshoot a solenoid power supply issue.

If allowed to perform this work which of the following valves will be considered available to meet the requirements of T.S. 3.4.12 (Low Temperature Overpressure Protection)?

1. 1NC-32B (PZR PORV)
2. 1NC-34A (PZR PORV)
3. 1NC-36B (PZR PORV)
4. 1ND-3 (1A ND Pump Suction From NC Loop B Header Relief)
5. 1ND-38 (lB ND Pump Suction From NC Loop C Header Relief)

A. 4 ONLY B. 4 and 5 ONLY C. 3and4ONLY D. 1,2&4ONLY Page 80 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 81 Given the following:

  • Unit 1 was at 85% power when a LOCA occurred outside of containment.
  • OEMF-41 reached 1.8 x 106 cpm.
  • The crew has entered EPI1IAI5000IECA-1 .2 (LOCA Outside Containment).
  • The CRS is reading Step 3 Verify leak path is isolated as follows: in order to determine procedure flowpath.

(1) The next procedure will be entered based on (1)

(2) Based on OEMF-41 countrate ONLY, a Site Assembly (2) be required.

A. (1) PZR level (2) will B. (1) PZR level (2) will NOT C. (1) NC pressure (2) will D. (1) NC pressure (2) will NOT Page 81 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 82 Given the following:

  • Unit 1 is at 100% power.
  • At 0500 Rod M-14 (located near Loop A and excore NI N-44) dropped fully into the core.

(1) Soon after this failure, the setpoint of Loop A (1) will increase.

(2) In accordance with the guidance of CNEI-0400-45 (McGuire and Catawba Nuclear Stations Dropped/Misaligned RCCA Recovery Guidelines), a waiting period (2) required prior to attempting rod retrieval?

A. (1) OTAT only (2) is B. (1) OTAT only (2) is not C. (1) OTAT and OP/xT (2) is D. (1) OThTandOPzT (2) is not Page 82 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 83 Given the following:

  • Unit 1 is at 100%.
  • PZR level Channel I transmitter has just experienced a power supply failure.

(1) The minimum requirements of Tech Spec. 3.3.3 (Post Accident Monitoring Instrumentation) (1) met.

(2) The Tech Spec evaluation will be addressed per the (2) process.

A. (1) are NOT (2) SRO Risk Recognition/Decision Making B. (1) are NOT (2) Operational Decision Making Issue (ODMI)

C. (1) are (2) SRO Risk Recognition/Decision Making D. (1) are (2) Operational Decision Making Issue (ODMI)

Page 83 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 84 Given the following:

  • The control room has been evacuated due to toxic gas.
  • Unit 1 is currently in Mode 3 with control established from the Auxiliary Shutdown Panels.
  • 1A S/G level instrumentation has failed.
  • All other instruments are functioning properly.

In accordance with T.S. 3.3.4 (Remote Shutdown System) BASES document:

(1) The above conditions (1) meet the definition of a safe shutdown condition.

(2) The instrumentation requirement for verification of decay heat removal via Steam Generators (2) met.

A. (1) do (2) is B. (1) do (2) is NOT C. (1) do NOT (2) is D. (1) do NOT (2) is NOT Page 84 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 85 Initial conditions:

  • The crew was performing steps in EPI1IAI5000IES-0.2, Natural Circulation Cooldown.
  • Station management recommended a rapid cooldown due to secondary inventory concerns.
  • The crew transitioned to EPI1IAI5000IES-0.3, (Natural Circulation Cooldown with Steam Void in the Vessel).

Current conditions:

  • Pressurizer level is 92% and increasing.
  • Reactor vessel Upper Range (UR) level is 70% and decreasing.
  • The STA notes a YELLOW path on NC INVENTORY and confers with the OSM regarding the need to transition to EPI1IAI5000IFR-l.3, (Response to Voids in Reactor Vessel).

Which ONE of the following identifies:

(1) the action the SRO is required to direct the crew to perform in order to control void growth without interrupting natural circulation; (2) the required procedure which directs this action?

A. (1) Open reactor vessel head vents (2) EP/11A15000/FR-l.3 B. (1) Open reactor vessel head vents (2) EP/1/A15000/ES-0.3 C. (1) Energize pressurizer heaters (2) EPI1IAI5000/FR-l.3 D. (1) Energize pressurizer heaters (2) EP/1/A15000/ES-0.3 Page 85 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 86 Unit 1 was initially at 100% power. Given the following:

(1) A MANUAL Reactor Trip will be required following validation of the alarm received at (1)

(2) In accordance with the 1AD-7 C/i Annunciator Response Procedure, entry into the actions of SLC 16.7-9 (Standby Shutdown System) (2) required.

A. (1) 1007 (2) is B. (1) 1010 (2) is C. (1) 1007 (2) is not D. (1) 1010 (2) is not Page 86 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 87 Given the foflowing:

  • Unit 1 is in Mode 5 following a refueling outage.
  • Enclosure 4.3 (Shutdown and Alignment For Standby Readiness During Plant Startup) of OPI1/A162001004 (Residual Heat Removal System) is in progress.
  • The RO has requested completion of step 3.2.1.3 (as shown below).

3.2 Pnor to entering Mode 4. remove one train ol ND from R}IR aligiunent as follows:

3.2.1 IA ND Train is to he removed from RHR alignment prior to Mode 4. perform the following.

3.2.1 1 Ensure ND Pump lB is in service.

3.2.1.2 Verify Ni) Pump IA is stopped.

3.2.1.3 Log IND-3 (lAND Pump Suction From NC Loop B Header Relief>

in TSA1L as inoperable per Tech Spec LCD 3.4.12.

(1) Completion of this step will require the SRO to create a(n) (1) entry into the TSAIL program.

(2) In order for 1 ND-3 to be considered OPERABLE, the associated NC loop suction isolation valves must be OPEN; removal of power from the valve operators (2) required.

A. (1) active (2) is NOT B. (1) tracking (2) is NOT C. (1) active (2) is D. (1) tracking (2) is Page 87 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 88 In accordance with the following Technical Specification BASES:

(1) T.S. 2.1.2 (RCS Pressure SL)

Pressurizer Safeties, Reactor Trip Setpoints, and (1) are required in order to ensure Reactor Coolant System Pressure Safety Limits are not exceeded.

(2) T.S. 3.3.1 (Reactor Trip System Instrumentation)

Only three channels of pressurizer level (vs. four) are required because (2)

A. (1) Pressurizer PORVs (2) pressurizer level does NOT provide a backup signal to any other reactor trips B. (1) Pressurizer PORVs (2) of the slow rate of charging that is available C. (1) Steam Generator Safeties (2) pressurizer level does NOT provide a backup signal to any other reactor trips D. (1) Steam Generator Safeties (2) of the slow rate of charging that is available Page 88 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 89 Given the following Unit 1 conditions:

Initial

  • The Unit is at 100% power.
  • 1 B RN Pump is in service.

Subsequent The following indications are observed:

  • lB RN Pump amps are oscillating.
  • lAD-i 2, B15 RN PIT B SCREEN HI DIP is lit.
  • 1AD-12, B14 RN PUMP INTAKE PIT B LEVEL-LOis lit.

(1) The actions required to mitigate this event (1) contained in Case I (Loss of RN Train).

(2) These conditions (2) require alignment to the Nuclear Service Water Pond.

A. (1) are (2) will B. (1) are (2) will NOT C. (1) are NOT (2) will D. (1) are NOT (2) will NOT Page 89 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 90 Regarding the VP (Containment Purge) System:

(1) In accordance with Tech. Spec. 3.6.3 (Containment Isolation Valves) Basis, what is the basis for maintaining the VP (Containment Purge) supply and return valves sealed CLOSED in Modes 1-4?

(2) What would be the proper alignment of the NORMAL-REFUEL SELECTOR switch if aligning the system for purge prior to initial containment entry during plant cooldown for a refueling outage?

A. (1) A detailed analysis has not been performed to prove it will close during a LOCA in time to ensure offsite dose remains within limits.

(2) NORMAL B. (1) A detailed analysis has not been performed to prove it will close during a LOCA in time to ensure offsite dose remains within limits.

(2) REFUEL C. (1) Ensures the measured leakage rate for purge system valves is maintained at 0.01 La when pressurized to Pa, since the valves have a history of leaking after each operation.

(2) NORMAL D. (1) Ensures the measured leakage rate for purge system valves is maintained at 0.01 La when pressurized to Pa, since the valves have a history of leaking after each operation.

(2) REFUEL Page 90 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 91 Given the following:

A Unit 1 runback occurred from 100% power to 50% power.

Subsequently (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> later):

  • Thermal Power Best Estimate (TPBE) reads 50.2%.
  • N41 indicates 52.5%.
  • N42 indicates 50.2%.
  • N43 indicates 49.4%.
  • N44 indicates 51.9%.

In accordance with Surveillance Requirement 3.3.1.2 and the associated basis:

(1) Adjustment of NIs (1) required.

(2) The Nls (2) operable.

A. (1) is (2) are B. (1) is (2) are NOT C. (1) is NOT (2) are D. (1) is NOT (2) are NOT Page 91 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 92 Given the following:

  • A release has been initiated from the Monitor Tank Building.
  • OEMF-57 has entered Trip 2 condition.
  • The CRS is informed that the recirc pump associated with the tank being released has experienced a sheared shaft.
  • The time at which the recirc pump failed is UNKNOWN.

(1) The CRS (1) use the guidance of 0P101B165001060 (Discharge of an AMT to the Environment) which allows the release to be re-initiated a maximum of two more times.

(2) Per SLC 16.11-4 (Liquid Radwaste Treatment System), the Liquid Radwaste Treatment System shall be demonstrated Functional by meeting (2)

A. (1) should (2) SLC 16.11-1 (Liquid Effluents) AND 16.11-3 (Dose)

B. (1) should NOT (2) SLC 16.11-1 (Liquid Effluents) AND 16.11-3 (Dose)

C. (1) should (2) SLC 16.11-1 (Liquid Effluents) ONLY D. (1) should NOT (2) SLC 16.11-1 (Liquid Effluents) ONLY Page 92 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 93 Regarding the Waste Gas Disposal System:

(1) In accordance with SLC 16.11-7 (Radioactive Gaseous Effluent Monitoring Instrumentation), a release from Waste Gas Decay Tank C (1) be initiated with OEMF-50 (Waste Gas Discharge Monitor) non-function al.

(2) In accordance with SLC 16.11-19 (Gas Storage Tanks), the activity limit is based on preventing exposure to a member of the public (at the nearest site boundary) from exceeding (2) rem total body upon an uncontrolled release.

A. (1) may (2) 0.5 B. (1) may (2) 1.5 C. (1) may NOT (2) 0.5 D. (1) may NOT (2) 1.5 Page 93 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Wriften Exam SENIOR REACTOR OPERATOR Question 94 Given the following Unit 2 conditions:

  • The Unit is at 100% power.
  • Maintenance has requested entry into the lower airlock.
  • This work will require physically restraining open the airlock vestibule door (CAD door) and the outer airlock door.
  • The inner airlock door will remain closed.

(1) During this work, the Annulus Ventilation System will (1) , in accordance with Technical Specifications.

(2) Per Site Directive 3.1.2 (Access to Reactor Building and Areas Having High Pressure Steam Relief Devices), this (2) considered a containment entry.

A. (1) remain OPERABLE (2) is B. (1) remain OPERABLE (2) is NOT C. (1) be INOPERABLE (2) is D. (1) be INOPERABLE (2) is NOT Page 94 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 95 Given the following:

10/10/13 @ 1000 While checking 1A DIG governor oil level, a technician inadvertently moved an adjustment knob.

10/11/13 @ 1200 1A D/G failed to meet the acceptance criteria during a scheduled PT.

Misadjusted governor control is found during the PT.

10/11/13 1800 1 A D/G is tagged for governor repair.

10/12/13 @ 1000 All tags are cleared and 1A D/G is returned to service.

10/12/13 @ 2000 1A D/G surveillance PT is completed successfully.

(1) The 1A D/G was required to be declared inoperable at (1)

(2) The 1A D/G can be declared operable at (2)

A. (1) 10/10/13@1000 (2) 10/12/13@1000 B. (1) 10/10/13@1000 (2) 10/12/13@2000 C. (1) 10/11/13@1200 (2) 10/12/13 @ 1000 D. (1) 10/11/13@1200 (2) 10/12/13@2000 Page 95 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 96 Which ONE of the following changes requires a 10CFR5O.59 review?

A. A change to the Site Physical Security Plan that reduces the shift staffing requirements for security guards.

B. A system modification that adds a backup Nitrogen accumulator to an air operated containment isolation valve.

C. A revision to the Site Emergency Plan that changes the designated assembly areas for accountability.

D. A change to the Nuclear Quality Assurance Plan.

Page 96 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 97 Given the following Unit 1 conditions:

  • A LOCA has occurred with 10% failed fuel.
  • 1NI-184B (lB ND Pump Suction from Cont Sump Isol) must be manually aligned to protect the health and safety of the general public.
  • Dose rates in the area of the valve are 150 REM/hr.
  • Valve operation will take 12 minutes.

In accordance with RP/0/A15000/01 8 (Emergency Worker Dose Extension):

(1) Approval by the Site Vice President for this Emergency Exposure (1) required.

(2) The plant operator (2) required to be a volunteer.

A. (1) is (2) is B. (1) is (2) is NOT C. (1) is NOT (2) is D. (1) is NOT (2) is NOT Page 97 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 98 For a planned release of discharging the contents of a Monitor Tank to the Low Pressure Service Water discharge (RL) via the Nuclear Service Water System (RN), which ONE of the following describes a condition that does NOT meet the requirements for approving the release?

A. The pH of the contents is 8.8.

B. A boron release with a boron concentration at 480 ppm.

C. Planned release flowrate is 95 gpm.

D. RN is aligned to the Standby Nuclear Service Water Pond.

Page 98 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 99 Given the following:

  • The operators completed E-O (Reactor Trip and Safety Injection) and transitioned to EP/1 1A15000/E-2 (Faulted Steam Generator Isolation).
  • A RED PATH on Containment Integrity occurred and the operators transitioned to EP/1/A15000/FR-Z.1 (Response to High Containment Pressure) at Step 8 of E-2.
  • A RED PATH on NC Integrity occurred and the operators transitioned to EP/1/A/5000IFR-P.1 (Response to Imminent Pressurized Thermal Shock Condition) from Step 4 of FR z.1.

Following a completion of FR-P.1 and a report from the STA that all CSFs are now GREEN, what is the correct procedure transition?

A. Return to E-2 Step 1 and continue.

B. Return to E-2 step 8 and continue.

C. Return to FR-Z.1 Step 4 and complete the procedure, then return to E-2 step 8.

D. Enter EP/1/A15000/ES-O.O (Rediagnosis) and use guidance for procedure entry.

Page 99 of 100

Catawba Nuclear Station 2014 NRC Initial Licensed Operator Written Exam SENIOR REACTOR OPERATOR Question 100 Given the following Unit 2 conditions:

  • An Unusual Event was declared on Unit 2.
  • Initial Notification to the States, Counties and the NRC has been completed.
  • The Emergency Coordinator has just made the decision to upgrade the classification to an Alert.

(1) The NRC is required to be notified immediately, but no later than, (1) after change of classification.

(2) After the initial notification, any changes to Protective Action Recommendations (PARs) shall be communicated to the states and counties within (2)

Which ONE of the following completes the statements above?

A. (1) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (2) 15 minutes B. (1) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (2) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> C. (1) 15 minutes (2) 15 minutes D. (1) 15 minutes (2) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Page 100 of 100

SENIOR REACTOR OPERATOR Catawba Nuclear Station ILT 2014 NRC Written Exam (May 2014)

REFERENCE PACKAGE CONTENTS EXAM ID: ILT2O14NRC Exam SRO Exam 1 Databook Figure 57, Reactor Coolant Saturation Curve, Wide Range 2 Graph - KC Surge Tank Volume vs. Level 3 RPIOIAI5000IOO1 (Classifcation of Emergency), Enclosure 4.5 (Loss of Power)

( KEYID SCORING & RICS(ORiC 5IULTiPLE.NSWiCR S(ORING Scantron Test Sheet PRINTING ( COI?RECTIVSWER L OPTIONS: ------

2MRK .V I !OTL ONLTh 100

  • t, I. T I I (I)©CD(D 51 12) 7;n iYo. 11)6173 V.

1)6))

26 I)(2)(1)) 76 (2)2)() m7 2.I)ID©OI) ?eorder Form Vi. 10617.1 52 *D2)CD 1-800-367-6627 27 C1)GDCD(G 77CD©O Fax 1-9-19-639-7710 3 (2)((I) w ww.,S can!ro,,.S tore. coin 53 1D 28 (CDI) 2) CD 7I)CDCDCD 4*CD *CDCLI)()

2900GD) 79 CD 72) O

..DCD)CD *CD(6)CD

.1?) (D©GD (ANSWER (PERFORMANCE OflO© KEY INFO. ASSESSMENT 56 .,D2)©CD #01 KEYS I

V1 31 (2) ©6I) 32 GD(DCD 33 *GD 57(2) øC1)C6)CD 58 XI CD 82 *(iD(E) 1TEI1 COUNT I_-i L3 59 ©CD CD(D 1

142) CDC6)CD (DIcD1CD-C CD(DC D CD DCDG) 60 D6)*CD(D CD 35()D© CD 11CD©©CD 85 CDC2)O CD CI) DCD CD CDCD(2)(D CD CD 36 (D© (CD CD

86C2)*O@6)D CD CD 62(2) (CDD 37 (D©CD CD GD (DC!)

13 CD * (6) (2) 63 (D©*CDCD CD CDI CE (2) 38 C2)6)OCD CD LLJ 14 (DO) C2) 64 (1) *C!)i2)iC1)

IS ø©CD© 39 (2) * (CD (6) (2) 89 2)6)) ©C2)

U 3CSN riloNi cof(oPArION 2(5)8 LL RIGHTS RESRRVED.

65 (2) 6)) (6)6))

49 6) ©(O) 90 I6CDC6)© .2) Cd) (6) C!)

66 2)ç6)6)tC) 41GD©GD 91 ©6)D

67S(I) 42 *©CDCD 92CdD©(6)

IS *©CD 68 m.DD 43C2)CD@

93 *@© 69 .GD@© 33CDGD /

70CD6)DcD( \ 1 .

45 C!)!)

.4 . V 71 (6)(6)QI)GD .

22fl©C2) 46GD 96C6D©6)D71D 7, .

726)D(5D 47(6)CD 97(I)GD©O 23 C2) (II)

  • CD 6)) 73 CDCI)C6)CD V-s 48 (6) 74(CDGDc6)a© 19 CDCDCD 25 6)UI) 75 (CDS(2)(.CD(

So C6)C

VLMBER Tfl COMBINED 10(2 CORRECT POINTS EARNED

PERCENT COMBiNED -J

( ORRECT I?

S C A N T R 0 N ROSTER LETTER NUMBER GRADE SCORE RESCORE SCORE RESCORE STUDENT ID NUMBER 1

MARKING

2) CD (2)6)) 2) cuJ INSTRUCTIONS CD (I) CD (DI)) CD CD NAME VVV V;8 (1) (2) (2) (2) 5 6)) 2) (2) GD, cCDLC Use a No. 2 Pencil CD CD CD CD C!) 6)) C!) CD (2)11)1 (2) CD CD 6))

SUBJECT CD

  • GD. CD CD (2) 1) CD CD CD C!) C!) CD CD 7)),

Ji// n,i,? oi,iiIc/elv (2) 6)) CD CD CD CD CD (3 (2) (DJ L PERIOD DATE 1fl O..k( 9, ao fLf E,a.ce (lean/v V CD I) CD C!) CD CD (2) CD 6))

CD 3 1 A S 3 1 0 N ,hrk (e(Iex() AM- IN I 79-(: 75 (/VJ1(P(/ II 1((:Ifl(( . ,umr