ML17215A794

From kanterella
Jump to navigation Jump to search
301 Exam Report Items RO as Given - Delay Release
ML17215A794
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/03/2017
From:
NRC/RGN-II
To:
References
Download: ML17215A794 (80)


Text

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 1 (1 point)

Given the following Unit 1 conditions:

  • The Unit entered EP/1/A/5000/ECA-1.1, (Loss of Emergency Coolant Recirculation) following a LOCA outside containment
  • Safety Injection Termination criteria is NOT met o The crew has been directed to determine minimum SI flow per Enclosure 4 (Minimum S/I Flowrate Versus Time After Trip)

Current conditions:

  • Unit 1 Reactor was tripped 60 minutes ago
  • NCS pressure is 1000 psig.
  • 1B NI pump is running with flow indicated at 380 gpm
  • 1A NV pump is running with flow indicated at 400 gpm The MINIMUM S/I Flowrate required to remove current reactor decay heat is

_____(1)_____.

The _____(2)_____ pump is required to be secured.

Which ONE of the following completes the statements above?

REFERENCE PROVIDED A. 1. 340 gpm

2. 1A NV B. 1. 360 gpm
2. 1A NV C. 1. 340 gpm
2. 1B NI D. 1. 360 gpm
2. 1B NI Page 1 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 2 (1 point)

Given the following Unit 1 initial conditions:

  • The Unit is at 100% RTP
  • A Pressurizer Safety Valve begins leaking by its seat
  • 1NV-294 (NV Pmps A&B Disch Flow Ctrl) is throttled to the full open position, to establish 150 gpm charging line flow Subsequently:
  • Pressurizer Level is at 53% and decreasing at a rate of 0.3%/minute
  • Letdown flow is 75 gpm and stable
  • Pressurizer Pressure is 2215 psig and decreasing slowly Per AP/10, the crew will NEXT adjust 1NV-849 (Letdn Flow Var Orif Ctrl) to establish a MAXIMUM of _____(1)_____ Letdown Flow.

_____(2)_____ will be energized due to the current Pressurizer Pressure.

Which ONE of the following completes the statements above?

A. 1. 0 gpm

2. "C" Pressurizer heaters ONLY B. 1. 45 gpm
2. "C" Pressurizer heaters ONLY C. 1. 0 gpm
2. ALL Pressurizer heaters D. 1. 45 gpm
2. ALL Pressurizer heaters Page 2 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 3 (1 point)

Given the following Unit 1 timeline:

1015

  • Unit at 100% RTP
  • A Small Break LOCA occurs 1045
  • The crew is in EP/1/A/5000/ES-1.2 (Post LOCA Cooldown and Depressurization)
  • The CRS is reading the step to initiate NC System cooldown to Cold Shutdown
  • Current NC System T-Colds are at 480°F and decreasing slowly Per ES-1.2, if the OATC maintains the MAXIMUM required cooldown rate, at 1145 S/G Pressures will be __________ .

Which ONE of the following completes the statement above?

A. 710 psig B. 434 psig C. 330 psig D. 181 psig Page 3 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 4 (1 point)

Given the following Unit 1 conditions:

  • A Large Break LOCA occurred 30 minutes ago from 100% RTP
  • NC System Tcolds are 249° F and decreasing slowly Based on these conditions:

EP/1/A/5000/FR-P.1 (Response to Imminent Pressurized Thermal Shock) entry conditions _____(1)_____ met.

OMP 1-7 (Emergency/Abnormal Procedure Implementation Guidelines) MINIMUM monitoring requirements states that CSF Status Trees shall be monitored

_____(2)_____ .

Which ONE of the following completes the statements above?

REFERENCE PROVIDED A. 1. are

2. continuously B. 1. are
2. every 10 to 15 minutes C. 1. are NOT
2. continuously D. 1. are NOT
2. every 10 to 15 minutes Page 4 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 5 (1 point)

Given the following Unit 2 conditions:

  • The Unit is at 100% RTP
  • The BOP observes that vibration readings on the 2C NCP are increasing as follows:

Time 2100 2105 2110 2115 Shaft Vibration (mils) 5 15 19 22 Frame Vibration (mils) 2 4 6 8 Per 2AD-6 B/5 (NCP HI-HI VIBRATION), which ONE of the following indicates the EARLIEST time that the 2C NCP must be secured?

A. 2100 B. 2105 C. 2110 D. 2115 Page 5 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 6 (1 point)

Given the following Unit 1 initial conditions:

  • The Unit is at 100% RTP
  • The crew has entered AP/1/A/5500/012 (Loss of Charging or Letdown), Case I (Loss of Charging) following a trip of 1A NV Pump Subsequently:
  • The crew is in the process of re-establishing charging o 1B NV Pump has been started o 1NV-294 (NV Pmps A&B Disch Flow Ctrl) has been throttled to proper flow In accordance with AP/12, the BOP will next throttle 1NV-309 (Seal Water Injection Flow) in the _____(1)_____ direction to establish a MINIMUM of _____(2)_____

"Total Seal Water Flow".

Which ONE of the following completes the statement above?

A. 1. OPEN

2. 32 gpm B. 1. CLOSED
2. 32 gpm C. 1. OPEN
2. 40 gpm D. 1. CLOSED
2. 40 gpm Page 6 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 7 (1 point)

Given the following Unit 2 initial conditions:

  • The Unit is in MODE 5 and drained to Mid Loop
  • ND Train 2A is in service
  • ND system flow rate is 3200 gpm
  • NC system level is 6.5% and stable Subsequently:
  • 2A ND pump amps and discharge pressure begin to oscillate
  • The crew has entered AP/2/A/5500/019 (Loss of Residual Heat Removal System), Case IV (Loss of ND in Mid Loop or S/G Manway Removed)

Per AP/19 Case IV, the BOP will FIRST __________ to mitigate this issue.

Which ONE of the following completes the statements above?

A. secure 2A ND pump B. reduce ND flow to less than a MAXIMUM of 2000 gpm C. reduce ND flow to less than a MAXIMUM of 1500 gpm D. reduce ND flow to less than a MAXIMUM of 1000 gpm Page 7 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 8 (1 point)

Given the following Unit 1 timeline:

1000

  • The Unit is at 100% RTP
  • 1A2 KC Pump is in service
  • 1A KC flow is 5000 gpm and stable 1005
  • 1KC-9 (1A2 KC Pump Disch) is inadvertently closed 1007
  • No additional KC pumps have been started Following closure of 1KC-9, 1KC-C37A (Train A Miniflow Isol) opened as flow decreased to a MINIMUM value of _____(1)_____ .

Assuming no operator action, once 1KC-9 is reopened 1AD-9 F/5 "KC Train A Single Pump Runout" _____(2)_____ alarm.

Which ONE of the following completes the statement above?

A. 1. 1100 gpm

2. will B. 1. 3150 gpm
2. will C. 1. 1100 gpm
2. will NOT D. 1. 3150 gpm
2. will NOT Page 8 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 9 (1 point)

Given the following Unit 1 initial conditions:

  • The Unit was at 72% RTP and increasing following a refueling outage Subsequently:
  • DRPI indicates Control Bank "D" at 178 steps and inserting One of the required Immediate Action Steps is to _____(1)_____ .

Following completion of this step, control rod speed will indicate _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. Insert Control Rods in MANUAL

2. 48 steps per minute B. 1. Insert Control Rods in MANUAL
2. 72 steps per minute C. 1. Verify Control Rods IN "AUTO" AND STEPPING
2. IN 48 steps per minute D. 1. Verify Control Rods IN "AUTO" AND STEPPING
2. IN 72 steps per minute Page 9 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 10 (1 point)

Given the following Unit 2 conditions:

  • The Unit is at 45% RTP
  • The crew has entered AP/2/A/5500/028 (Secondary Steam Leak)

A steam leak at location A, will cause Main Turbine Megawatts to _____(1)_____ .

In order to isolate the leak, AP/28 will direct the crew to _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. increase

2. trip the Main Turbine B. 1. increase
2. trip the Reactor and close MSIVs C. 1. decrease
2. trip the Main Turbine D. 1. decrease
2. trip the Reactor and close MSIVs Page 10 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 11 (1 point)

Given the following Unit 1 initial conditions:

  • A feedwater line break on the 1A S/G inside containment and a total loss of feedwater occurred
  • EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) was entered and bleed and feed of the NC system was initiated
  • All CA Flow Control Valves have been closed Subsequently:
  • The Turbine Driven CA pump is returned to service and a source of feedwater is available
  • All S/G WR levels are indicating 8%

In accordance with FR-H.1, Enclosure 6 (S/G CA Flow Restoration), CA flow is required to be restored to _____(1)_____ .

This limit _____(2)_____ based on minimizing thermal stress to S/G components.

Which ONE of the following completes the statements above?

A. 1. ALL intact S/Gs at a rate not to exceed 100 gpm per S/G

2. is B. 1. only ONE intact S/G at a rate not to exceed 100 gpm
2. is C. 1. ALL intact S/Gs at a rate not to exceed 100 gpm per S/G
2. is NOT D. 1. only ONE intact S/G at a rate not to exceed 100 gpm
2. is NOT Page 11 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 12 (1 point)

Given the following Unit 2 timeline:

1000

  • A Loss of All Offsite Power has occurred
  • Both Unit 2 D/Gs started and loaded their associated bus 1005
  • While monitoring D/G operating parameters, the Unit 2 BOP notes that D/G 2B "VOLTS" indicates 3925 V 1007
  • Voltage is adjusted to within the normal operating range by operation of the "D/G 2B Volt Adjust" controls on 2MC-11 As a result of the 2B D/G voltage adjustment at 1007:

2B D/G "AMPS" _____(1)_____ .

2B D/G "P/F" _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. decreased

2. remained the same B. 1. decreased
2. became more lagging C. 1. increased
2. remained the same D. 1. increased
2. became more lagging Page 12 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 13 (1 point)

Given the following initial conditions:

  • 1B RN Pump in service
  • 1B1 KC Pump in service
  • 2A1 KC Pump in service Subsequently:
  • Both units enter AP/0/A/5500/030 (Plant Flooding), Enclosure 8 (Flooding From RN) following discovery of a large RN leak on the 1A Essential Header
  • Per AP/30 guidance, the crew has isolated the 1A RN Essential Header (ONLY)

Based on current conditions:

Cooling water supply _____(1)_____ available to the 1A KD Heat Exchanger.

Mini-Flow protection _____(2)_____ available for the 1B RN Pump.

Which ONE of the following completes the statements above?

A. 1. is

2. is B. 1. is
2. is NOT C. 1. is NOT
2. is D. 1. is NOT
2. is NOT Page 13 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 14 (1 point)

Given the following Unit 1 initial conditions:

  • A Loss of Instrument Air occurred while at 100% RTP Subsequently:
  • The reactor has been manually tripped due to low VI pressure
  • The crew has transitioned to EP/1/A/5000/ES-0.1 (Reactor Trip Response)
  • The OATC has been given S/G level guidance In accordance with the design of the CA system, the OATC will maintain control of CA flow for a MINIMUM of _____(1)_____ from the Control Room.

The purpose for this design feature is to protect from _____(2)_____ with a Loss of VI.

A. 1. 30 minutes

2. S/G overfill during a S/G Tube Rupture B. 1. 30 minutes
2. runout of the CA pumps during a Main Feedwater Line Rupture C. 1. 60 minutes
2. S/G overfill during a S/G Tube Rupture D. 1. 60 minutes
2. runout of the CA pumps during a Main Feedwater Line Rupture Page 14 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 15 (1 point)

Given the following conditions:

  • AP/1/A/5500/037 (Generator Voltage and Electric Grid Disturbances), Case I (Abnormal Generator or Grid Voltage) has been entered following a Grid Disturbance
  • The TCC has reported that "Real Time Contingency Analysis" (RTCA) indicates CNS switchyard voltage would NOT be adequate if the unit should trip
  • SPOC is making preparation for installation of Jumpers per AM/1/A/5100/008 (4KV Essential Power System Degraded Voltage Logic)

Unit 1 ECCS is currently _____(1)_____ .

Once jumpers are installed, LOCA sequencer actuation will cause a Blackout

_____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. operable

2. immediately B. 1. operable
2. after 5 seconds C. 1. inoperable
2. immediately D. 1. inoperable 2 after 5 seconds Page 15 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 16 (1 point)

In accordance with EP/1/A/5000/ECA-1.2 (LOCA Outside Containment):

The crew will FIRST attempt to isolate the leak by isolating the (1) system from the NC system.

The parameter used to verify the leak is isolated is (2) .

Which ONE of the following completes the statements above?

A. 1. ND

2. PZR level B. 1. NI
2. PZR Level C. 1. ND
2. NC pressure D. 1. NI 2 NC pressure Page 16 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 17 (1 point)

EP/1/A/5000/FR-H.1 (Loss of Secondary Heat Sink) step 9 states "Stop all NC pumps".

Prior to stopping the NC pumps in this step, Steam Dumps are ensured to be in

_____(1)_____ mode.

The primary reason for stopping the NC pumps in this step is to _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. T-AVG

2. extend the time to align a feed source prior to meeting Bleed and Feed criteria B. 1. T-AVG
2. preserve the NC pumps for long term core cooling once a heat sink is restored C. 1. PRESS
2. extend the time to align a feed source prior to meeting Bleed and Feed criteria D. 1. PRESS
2. preserve the NC pumps for long term core cooling once a heat sink is restored Page 17 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 18 (1 point)

From the given "List of Reasons", which ONE of the following includes ALL correct reasons for performing a cooldown/depressurization in accordance with EP/1/A/5000/ECA-1.1, (Loss of Emergency Coolant Recirculation)?

List of Reasons

1. To inject Cold Leg Accumulators
2. Minimize reactor coolant break flow
3. To establish conditions for ND system operation
4. Minimize NC dilution potential in case of a subsequent tube rupture A. 1, 2, and 3 B. 2, 3, and 4 C. 1, 3, and 4 D. 1, 2, and 4 Page 18 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 19 (1 point)

Given the following Unit 1 conditions:

  • The refueling crew is lowering an irradiated fuel assembly next to a new fuel assembly in the core
  • The assembly inadvertently drops completely into the core
  • The crew has entered AP/1/A/5500/025 (Damaged Spent Fuel)

As a result of this event:

The Containment Evacuation Alarm _____(1)_____ automatically initiate.

AP/25 _____(2)_____ direct VP to be manually secured.

Which ONE of the following completes the statements above?

A. 1. will

2. does B. 1. will
2. does NOT C. 1. will NOT
2. does D. 1. will NOT
2. does NOT Page 19 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 20 (1 point)

Given the following Unit 2 conditions:

  • AP/2/A/5500/010 (Reactor Coolant Leak), Case I (S/G Tube Leak) has been entered due to indications of a 2B S/G tube leak.
  • Current conditions are as follows:

o Pressurizer level has been stabilized o Letdown flow is 75 GPM o Charging flow is 150 GPM Based on the above conditions, the estimated leak rate is _____(1)_____ GPM.

If leak rate increases, a S/G Tube Rupture will be indicated by the inability to maintain Pressurizer level above a MINIMUM of _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. 63

2. 2%

B. 1. 63

2. 4%

C. 1. 75

2. 2%

D. 1. 75

2. 4%

Page 20 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 21 (1 point)

Given the following Unit 2 conditions:

  • A leak has developed in the Spent Fuel Pool area
  • Water leaking from an overhead pipe is collecting on the floor
  • RP reports that the water is a Beta dose concern The primary biological concern for this spill is dose to _____(1)_____ .

The normal occupational dose limit for this body location is _____(2)_____ per year.

Which ONE of the following completes the statements above?

A. 1. skin

2. 15 rem B. 1. skin
2. 50 rem C. 1. internal organs
2. 15 rem D. 1. internal organs
2. 50 rem Page 21 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 22 (1 point)

Which ONE of the following statements represents a loss of Containment Integrity?

A. Both lower personnel airlock doors closed with all seals deflated B. Annulus doors blocked open for maintenance work C. Submarine hatch is found open D. Engineering discovery of major divider barrier seal degradation Page 22 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 23 (1 point)

In accordance with the following step of EP/1/A/5000/ES-0.0 (Rediagnosis):

A previous Safety Injection signal actuation _____(1)_____ required to proceed in ES-0.0.

Completion of EP/1/A/5000/E-0 (Reactor Trip or Safety Injection) _____(2)_____

required to proceed in ES-0.0.

Which ONE of the following completes the statements above?

A. 1. is

2. is B. 1. is
2. is NOT C. 1. is NOT
2. is D. 1. is NOT
2. is NOT Page 23 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 24 (1 point)

Given the following Unit 1 conditions:

  • A Small-Break LOCA has occurred
  • EP/1/A/5000/ES-1.2 (Post LOCA Cooldown and Depressurization) has been implemented
  • Containment pressure is 2.8 PSIG and STABLE
  • 1AD-9, C/8 "FWST Pre-Lo Level" is illuminated
  • 1AD-21, B2 "Cont Sump Level >2.5 ft" is DARK In accordance with the requirements of ES-1.2, Enclosure 1 (Foldout Page), the BOP _____(1)_____ secure Unit 1 ND Pumps because _____(2)_____ .

Which ONE of the following completes the statement above?

A. 1. will

2. ND Heat Exchanger cooling is NOT aligned B. 1. will
2. 1AD-20, B/2 and 1AD-21, B/2 are NOT LIT C. 1. will NOT
2. 1AD-9, D/8 "FWST 2/4 Lo Level" is NOT LIT D. 1. will NOT
2. EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) entry requirements are met Page 24 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 25 (1 point)

Given the following Unit 2 conditions:

  • The crew has reached the following step in EP/2/A/5000/FR-C.2 (Response to Degraded Core Cooling):

In accordance with FR-C.2, closing Cold Leg Accumulator Discharge valves will require a MINIMUM of _____(1)_____ NC Thot(s) < 370 degrees F and

_____(2)_____ require AO support for local power alignment.

Which ONE of the following completes the statements above?

A. 1. one

2. will B. 1. one
2. will NOT C. 1. two
2. will D. 1. two
2. will NOT Page 25 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 26 (1 point)

Given the following Unit 1 conditions:

  • The Reactor tripped following an inadvertent Main Steam Isolation
  • The crew has entered EP/1/A/5000/FR-H.2 (Response to Steam Generator Overpressure) immediately following the transition from EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)
  • The OATC has been directed to manually operate 1SV-19 (S/G 1A PORV) in order to decrease 1A S/G pressure In order to operate 1SV-19, in MANUAL, the Main Steam Isolation signal

_____(1)_____ required to be RESET.

Once 1SV-19 is opened, 1A S/G NR Level indication will initially change due to

_____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. is

2. SHRINK B. 1. is
2. SWELL C. 1. is NOT
2. SHRINK D. 1. is NOT
2. SWELL Page 26 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 27 (1 point)

Given the following Unit 1 conditions:

  • The CRS has elected to enter EP/1/A/5000/FR-Z.3 (Response to High Containment Radiation) following an event causing a Containment Radiation level of 37 R/hr
  • Containment Sump level instruments indicate bottom of scale In accordance with FR-Z.3, the BOP _____(1)_____ start the Containment Auxiliary Charcoal Filters (CACFU).

If required for inventory control, _____(2)_____ letdown must be placed in service.

Which ONE of the following completes the statements above?

A. 1. will

2. excess B. 1. will
2. normal C. 1. will NOT
2. excess D. 1. will NOT
2. normal Page 27 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 28 (1 point)

Given the following Unit 1 conditions:

  • The Unit is at 100% RTP
  • Total charging flow is currently 90 gpm
  • 1NV-294 (NV Pmps A&B Disch Flow Ctrl) is in MANUAL
  • 1NV-309 (Seal Water Injection Flow) is in AUTO Assuming stable plant conditions, as 1NV-294 is throttled OPEN, 1NV-309 will throttle in the _____(1)_____ direction.

In order to restore automatic control of the Pressurizer Level Control system

_____(2)_____ must be placed in AUTO.

Which ONE of the following completes the statements above?

A. 1. OPEN

2. 1NV-294 ONLY B. 1. CLOSED
2. 1NV-294 ONLY C. 1. OPEN
2. 1NV-294 AND PZR Level Master D. 1. CLOSED
2. 1NV-294 AND PZR Level Master Page 28 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 29 (1 point)

The 1A Boric Acid Transfer Pump receives power from __________ .

Which ONE of the following completes the statement above?

A. 1MXW B. SMXG C. 1EMXA D. 1EMXG Page 29 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 30 (1 point)

Given the following Unit 1 initial conditions:

  • The Unit is in MODE 5
  • NC temperature is 112°F
  • 1B NV pump is running
  • 1A NV pump is tagged out for maintenance
  • Both NI pumps are tagged out Subsequently:

_____(1)_____ required at this time.

ND Suction Relief Valves will open if NC Pressure exceeds the MINIMUM listed value of _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. is

2. 400 psig B. 1. is
2. 450 psig C. 1. is NOT
2. 400 psig D. 1. is NOT
2. 450 psig Page 30 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 31 (1 point)

Given the following Unit 1 initial conditions:

  • The Unit is at 100% RTP
  • 1B NV Pump is running
  • 1A NV Pump is OFF Subsequently:
  • KC cooling flow to the Unit 1 NV pumps is lost
  • The crew enters AP/1/A/5500/021 (Loss of Component Cooling), and has dispatched an operator to align backup cooling to an NV Pump
  • The crew is performing Enclosure 5 (Maximize NV Pump Run Time)

NV Pump alternate cooling water will be supplied by the _____(1)_____ system.

While the alternate cooling alignment is being performed, the operating pump will be _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. YD

2. secured immediately B. 1. YD
2. operated for a maximum of 10 minutes C. 1. YM
2. secured immediately D. 1. YM
2. operated for a maximum of 10 minutes Page 31 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 32 (1 point)

Given the following Unit 1 conditions:

  • ND is aligned in RHR mode A failure of _____(1)_____ will cause a PRT pressure increase.

If the input continues, PRT pressure will increase until rupture disc actuation at a MINIMUM value of _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. 1ND-31 (1A ND Train Cold Leg Inj Return Safety Relief)

2. 50 psig B. 1. 1ND-31 (1A ND Train Cold Leg Inj Return Safety Relief)
2. 100 psig C. 1. 1ND-3 (1A ND Pump Suction From NC Loop B Header Relief)
2. 50 psig D. 1. 1ND-3 (1A ND Pump Suction From NC Loop B Header Relief)
2. 100 psig Page 32 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 33 (1 point)

Given the following Unit 1 conditions:

  • The Unit is cooling down in Mode 4
  • 1A1 and 1A2 KC Pumps are in service
  • 1A ND is being aligned for RHR
  • 1AD-9 F/7 "KC Train A Two Pump Runout" has alarmed Aligning cooling water flow to 1A ND Heat Exchanger increased KC system flow by a MINIMUM of _____(1)_____ .

The setpoint for 1AD-9 F/7 is _____(2)_____ .

Which ONE of the following correctly completes the statements above?

A. 1. 5,000 gpm

2. 10,800 gpm B. 1. 5,000 gpm
2. 11,400 gpm C. 1. 5,600 gpm
2. 10,800 gpm D. 1. 5,600 gpm
2. 11,400 gpm Page 33 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 34 (1 point)

Given the following Unit 1 conditions:

  • The Unit is at 100% RTP
  • Attempts to manually close 1NC-36B (PZR PORV) were unsuccessful
  • NC Pressure is currently 2150 psig and increasing slowly Current PZR Pressure Error (psi) indicates a _____(1)_____ value.

In accordance with TS 3.4.11 (Pressurizer Power Operated Relief Valves),

1NC-35B _____(2)_____ required to be de-energized.

Which ONE of the following completes the statements above?

A. 1. positive

2. is B. 1. negative
2. is C. 1. positive
2. is NOT D. 1. negative
2. is NOT Page 34 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 35 (1 point)

Given the following Unit 1 initial conditions:

  • The Unit was at 100% power

Subsequently:

  • A pressure transient resulted in an NC system pressure increase
  • NC pressure is 2200 psig and decreasing

_____(2)_____ provides a BLOCK signal to 1NC-34A on decreasing pressure.

Which ONE of the following completes the statements above?

A. 1. OPEN

2. Selected Pressurizer Pressure 1 (SPP-1)

B. 1. OPEN

2. Selected Pressurizer Pressure 2 (SPP-2)

C. 1. CLOSED

2. Selected Pressurizer Pressure 1 (SPP-1)

D. 1. CLOSED

2. Selected Pressurizer Pressure 2 (SPP-2)

Page 35 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 36 (1 point)

Given the following Unit 2 initial conditions:

  • The Unit is at 45% RTP for 2A CFPT repairs
  • Power Range Channel N-41 Control Power fuse has blown Following this failure:

control rods _____(1)_____ be inserting in automatic.

manual control rod withdrawal _____(2)_____ blocked.

Which ONE of the following completes the statements above?

A. 1. will

2. is B. 1. will
2. is NOT C. 1. will NOT
2. is D. 1. will NOT
2. is NOT Page 36 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 37 (1 point)

Given the following Unit 2 conditions:

  • The Unit is at 3% RTP following a refueling outage Per Technical Specifications, which ONE of the following reactor trips is required to be operable to provide protection against DNB from the current power level to 100% RTP?

A. OTDT B. OPDT C. Low NC loop flow D. Pressurizer low pressure Page 37 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 38 (1 point)

Given the following Unit 1 initial conditions:

  • The CRS has provided direction to the OATC for manually tripping the Reactor and the BOP for initiating Safety Injection Subsequently:
  • Attempts to trip the Reactor have failed
  • Containment pressure is 0.55 psig and increasing slowly
  • PZR Pressure is 1950 psig and decreasing slowly Given the above conditions, EP/1/A/5000/F-0 (Critical Safety Function Status Trees) _____(1)_____ required to be implemented.

The BOP _____(2)_____ initiate Safety Injection at this time.

Which ONE of the following completes the statements above?

A. 1. is

2. will B. 1. is
2. will NOT C. 1. is NOT
2. will D. 1. is NOT
2. will NOT Page 38 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 39 (1 point)

Given the following Unit 2 conditions:

  • Containment Pressure Channel III has failed high Following this malfunction, a High Containment Pressure Safety Injection signal will be generated if a MINIMUM of _____(1)_____ of the remaining channels exceed the setpoint of _____(2)_____ .

Which ONE of the following completes the statement above?

A. 1. one

2. 1.2 psig B. 1. one
2. 3.0 psig C. 1. two
2. 1.2 psig D. 1. two
2. 3.0 psig Page 39 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 40 (1 point)

Concerning the Containment Chilled Water System (YV):

Chilled water cooling _____(1)_____ supplied to the Containment Pipe Tunnel Booster Fans.

YV cooling water supply to NC Pump Motor Air Cooler will isolate upon a

_____(2)_____ signal.

Which ONE of the following completes the statements above?

A. 1. is

2. Phase A B. 1. is
2. Phase B C. 1. is NOT
2. Phase A D. 1. is NOT
2. Phase B Page 40 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 41 (1 point)

Given the following Unit 1 conditions:

  • 1AD-13, D/8 "GLYCOL EXPANSION TNK LO-LO LVL" has alarmed 1NF-228A (Glycol Sup Cont Isol Otsd) _____(1)_____ closed.

The Glycol Expansion Tank Lo-Lo Level Interlock bypass switch is located on the

_____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. is

2. main control board B. 1. is
2. local NF control panel C. 1. is NOT
2. main control board D. 1. is NOT
2. local NF control panel Page 41 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 42 (1 point)

Given the following Unit 1 conditions:

  • The Unit is at 10% RTP
  • 1AD-13 A/7 "ICE COND LOWER INLET DOORS OPEN" alarm is lit
  • The lower inlet door position display panel indicates that a door is open
  • The door is confirmed to be cracked opened. The door will not move further open and cannot be closed
  • No other alarms related to the ice condenser, NF system or AHUs are lit The Action Statement of Tech Spec 3.6.12 (Ice Bed) _____(1)_____ required to be entered.

The Action Statement of Tech Spec 3.6.13 (Ice Condenser Doors) _____(2)_____

required to be entered.

Which ONE of the following completes the statement above?

A. 1. is

2. is B. 1. is
2. is NOT C. 1. is NOT
2. is D. 1. is NOT
2. is NOT Page 42 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 43 (1 point)

Concerning operation of the Containment Spray System (NS):

Aligning suction from the _____(1)_____ with a specific _____(2)_____ limits post-accident Iodine concentration and minimizes stress corrosion.

Which ONE of the following completes the statement above?

A. 1. FWST

2. pH B. 1. FWST
2. boron concentration C. 1. containment sump
2. pH D. 1. containment sump
2. boron concentration Page 43 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 44 (1 point)

Given the following Unit 1 conditions:

  • The Unit is at 35% RTP
  • The crew has entered AP/1/A/5500/010 (Reactor Coolant Leak) due to a 1C S/G Tube leak 1EMF-73 (S/G C Leakage) _____(1)_____ provide accurate indication of S/G tube leakage at the current power level.

If the leak size increases, EP/1/A/5000/E-3 (Steam Generator Tube Rupture) will FIRST direct closure of _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. will

2. 1C MSIV B. 1. will
2. All MSIVs C. 1. will NOT
2. 1C MSIV D. 1. will NOT
2. All MSIVs Page 44 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 45 (1 point)

Given the following Unit 1 initial conditions:

  • The Unit is at 25% RTP following a refueling outage.
  • AP/1/A/5500/028 (Secondary Steam Leak) has been entered following a discovery of a leak on the Unit 1 Main Turbine Crossover line Subsequently:
  • Reactor power is currently 11%

modulating At this time, _____(1)_____ steam dumps are operating to control NC temperature at _____(2)_____ degrees F.

Which ONE of the following completes the statement above?

A. 1. ONLY condenser

2. 557 B. 1. ONLY condenser
2. 560 C. 1. condenser AND atmospheric
2. 557 D. 1. condenser AND atmospheric
2. 560 Page 45 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 46 (1 point)

Given the following Unit 1 initial conditions:

  • EP/1/A/5000/E-0 (Reactor Trip or Safety Injection) was entered following a Small Break LOCA
  • Both trains of Safety Injection automatically actuated
  • 1B Reactor Trip Breaker (RTB) failed to open from the Control Room
  • All CA pumps failed to start Subsequently:
  • The crew has entered EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) and is attempting to align feed flow from 1A CFPT In order to reset 1B ECCS, 1B RTB _____(1)_____ required to be locally opened.

1A CFPT will be reset _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. is

2. locally B. 1. is NOT
2. locally C. 1. is
2. at 1MC-10 D. 1. is NOT
2. at 1MC-10 Page 46 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 47 (1 point)

Given the following Unit 1 conditions:

  • EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been implemented
  • Following Bleed and Feed initiation, CA flow has been restored from CAPT #1
  • Containment pressure peaked at 3.2 psig and is now 2.1 psig In accordance with FR-H.1, which ONE of the following indicates the MINIMUM heat sink requirements that must be met to allow termination of NC system bleed and feed?

A. NR level in at least ONE S/G > 11%

B. NR level in at least ONE S/G > 29%

C. WR level in at least ONE S/G > 24%

D. WR level in at least ONE S/G > 36%

Page 47 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 48 (1 point)

Given the following conditions:

Unit 1 and Unit 2 are at 100% RTP when the following switchyard PCBs open:

  • PCB 17
  • PCB 18

_____(1)_____ will experience a Turbine Runback due to loss of the associated

_____(2)_____ offsite power.

Which ONE of the following completes the statement above?

A. 1. Unit 1

2. "A" train B. 1. Unit 1
2. "B" train C. 1. Unit 2
2. "A" train D. 1. Unit 2
2. "B" train Page 48 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 49 (1 point)

Which ONE of the following describes which of the DC breakers (labeled 1, 2, 3, 4 in the drawing above) that will cause an alarm to be received in the Control Room when the breakers OPEN?

A. Any one of the four breakers B. Breakers 1 and 3 ONLY C. Breakers 2 and 3 ONLY D. Breakers 2 and 4 ONLY Page 49 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 50 (1 point)

Given the following Unit 2 conditions:

  • 2ETB has experienced a Blackout while at 100% RTP
  • No operator action has been taken Which ONE of the following lists parameters which will cause a trip of the 2B D/G if a setpoint is exceeded?

A. Engine Speed Jacket Water Temperature B. Engine Speed Lube Oil Pressure C. Lube Oil Temperature Jacket Water Temperature D. Lube Oil Temperature Lube Oil Pressure Page 50 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 51 (1 point)

Given the following Unit 2 conditions:

  • 2EMF-39 has been declared Non-Functional
  • 2EMF-36 is in service In accordance with SLC 16.11-7 (Radioactive Gaseous Effluent Monitoring Instrumentation):

An in-progress Containment Purge (VP) release _____(1)_____ continue.

A new Containment Purge (VP) release _____(2)_____ be initiated.

Which ONE of the following completes the statements above?

A. 1. may

2. may B. 1. may NOT
2. may C. 1. may
2. may NOT D. 1. may NOT
2. may NOT Page 51 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 52 (1 point)

Given the following conditions:

  • Unit 1 and 2 are at 100% RTP
  • "A" and "B" RL pumps are in service
  • "C" RL pump is tagged out while the pump is being rebuilt
  • RL Pressure Controller malfunctions and causes all turnaround valves to fail full open As a result of this failure, RL flow to the _____(1)_____ will _____(2)_____ .

Which ONE of the following completes the statement above?

A. 1. KR heat exchangers

2. increase B. 1. KR heat exchangers
2. decrease C. 1. IPB air coolers
2. increase D. 1. IPB air coolers
2. decrease Page 52 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 53 (1 point)

The power supply for Instrument Air (VI) Compressor E is __________.

Which ONE of the following completes the statement above?

A. 1SLXC B. 2SLXC C. 1LXI D. 2LXH Page 53 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 54 (1 point)

Given the following Unit 2 initial conditions:

  • The Unit is in Mode 4 In accordance with Tech Spec 3.6.4 (Containment Pressure), the MINIMUM Containment air pressure is _____(1)_____ .

In accordance with Tech Spec 3.6.5 (Containment Air Temperature), the MINIMUM Lower Containment air temperature is _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. - 0.1 psig

2. 60° F B. 1. - 0.1 psig
2. 100° F C. 1. - 0.3 psig
2. 60° F D. 1. - 0.3 psig
2. 100° F Page 54 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 55 (1 point)

Given the following Unit 1 conditions:

  • A rapid downpower is in progress due to a secondary steam leak inside Containment
  • 1A, 1B, and 1D Lower Containment Vent Units (LCVU) are in operation
  • Current Unit 1 Containment pressure is 0.58 psig and increasing slowly Assuming no operator action, 1RN-473 (LCVU A Full Flow Valve) _____(1)_____ currently open.

1A LCVU _____(2)_____ operating in "Hi Speed".

Which ONE of the following completes the statements above?

A. 1. is

2. is B. 1. is
2. is NOT C. 1. is NOT
2. is D. 1. is NOT
2. is NOT Page 55 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 56 (1 point)

Given the following Unit 1 initial conditions:

  • A unit shutdown to Mode 5 is in progress for a refueling outage
  • Containment Purge (VP) system startup is in progress Subsequently:
  • The crew enters AP/1/A/5500/019 (Loss of Residual Heat Removal System) following indications of a NC system leak inside Containment
  • 1EMF-39 (Containment Gas Hi Rad) has exceeded Trip 2 actuation
  • Containment pressure is 0.28 psig and increasing slowly Based on current conditions:

The VP system _____(1)_____ isolated.

Phase "A" containment isolation _____(2)_____ occurred.

Which ONE of the following completes the statements above?

A. 1. is

2. has B. 1. is
2. has NOT C. 1. is NOT
2. has D. 1. is NOT
2. has NOT Page 56 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 57 (1 point)

Given the following Unit 1 conditions:

  • The Unit is at 100% RTP
  • Control Banks A, B, & C are 228 steps withdrawn
  • Control Bank D is 215 steps withdrawn
  • 1AD-2 E/10 "RPI Non-Urgent Failure" is illuminated
  • DRPI displays "Data A Failure" Subsequently:
  • The OATC performs the following evolution in accordance with PT/1/A/4600/001 (RCCA Movement Test) o Withdraws Control Bank "B" to 238 steps as indicated by the applicable step demand counter o Inserts Control Bank "B" to 228 steps as indicated by the applicable step demand counter Following completion of this step (and plant stabilization):

DRPI will indicate within _____(1)_____ of actual control rod position.

DRPI accuracy is _____(1)_____ .

NC system temperature will be _____(2)_____ (as compared to temperature prior to testing).

Which ONE of the following completes the statements above?

A. 1. -10/+4 steps

2. lower B. 1. -10/+4 steps
2. the same C. 1. +10/-4 steps
2. lower D. 1. +10/-4 steps
2. the same Page 57 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 58 (1 point)

Given the following Unit 1 initial conditions:

  • PZR Pressure Channel 1 has failed HIGH
  • A Unit plant transient results in a cooldown of the NC system causing the PZR Backup Heaters to energize and "C" Heaters to be full ON Subsequently:
  • No Tech Spec actions have been taken related to PZR Pressure Channel 1
  • Unit 1 PZR Pressure Channel 3 fails LOW

The "C" Heaters _____(1)_____ remain full ON.

The PZR Backup Heaters _____(2)_____ remain energized.

Which ONE of the following completes the statements above?

A. 1. will

2. will B. 1. will
2. will NOT C. 1. will NOT
2. will D. 1. will NOT
2. will NOT Page 58 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 59 (1 point)

Which ONE of the following is the power supply for the 1A VE Fan?

A. 1MXK B. 1MXJ C. 1EMXB D. 1EMXI Page 59 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 60 (1 point)

Given the following Unit 1 initial conditions:

  • 1A1 KC Pump is in service
  • 1A KF Pump is in service Subsequently:
  • 1KC-50A (Aux Bldg Non-Ess Hdr Isol) has spuriously closed 1KC-149 (KF Hx 1A Cool Wtr Otlt) _____(1)_____ AUTOMATICALLY reposition in order to maintain Spent Fuel Pool temperature.

If 1AD-13, E/1 "SPENT FUEL POOL TEMP HI" alarms, entry into the actions of SLC 16.7-9 (Standby Shutdown System) _____(2)_____ be required.

Which ONE of the following completes the statements above?

A. 1. will

2. will B. 1. will
2. will NOT C. 1. will NOT
2. will D. 1. will NOT
2. will NOT Page 60 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 61 (1 point)

Which ONE of the following describes the effect of 1EMF-15, Spent Fuel Building Refueling Bridge Monitor losing power?

A. The Auxiliary Hoist cannot be raised B. New fuel elevator cannot be operated in the UP direction C. SFP Ventilation System automatically swaps to filter mode D. Fuel movement in the Spent Fuel Pool must be stopped immediately Page 61 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 62 (1 point)

Given the following Unit 1 conditions:

  • The Unit is at 100% RTP
  • A DCS failure has caused the 1A S/G CF Main Feed Reg Valve to transfer to MANUAL and begin opening
  • The crew enters AP/1/A/5500/006 (Loss of S/G Feedwater), Case III (CF Control Not in Auto) to address the failure If 1A S/G level control is not established, AP/06 will direct the crew to trip the reactor prior to reaching the S/G Hi-Hi Level setpoint of _____(1)_____ .

AP/06 _____(2)_____ direct the crew to place 1A S/G CF Feed Reg Bypass Valve in Manual.

Which ONE of the following completes the statements above?

A. 1. 77%

2. will B. 1. 77%
2. will NOT C. 1. 83%
2. will D. 1. 83%
2. will NOT Page 62 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 63 (1 point)

Given the following conditions:

  • A release has been initiated from "C" Waste Gas Decay Tank
  • A calculation error resulted in improper determination of EMF setpoints for the release o The release has been secured following EMF Trip 2 actuation of the Unit Vent Gas Monitor Following this event (assuming no operation action):

ABUXF-1A (1A Auxiliary Building Ventilation Unfiltered Exhaust Fan)

_____(1)_____ be in operation.

ABUXF-2A (2A Auxiliary Building Ventilation Unfiltered Exhaust Fan)

_____(2)_____ be in operation.

Which ONE of the following completes the statements above?

A. 1. will

2. will B. 1. will NOT
2. will C. 1. will
2. will NOT D. 1. will NOT
2. will NOT Page 63 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 64 (1 point)

Given the following conditions:

  • 1AD-8 A/7 (VI Lo Press) is received
  • 0VIP5260 (VI Pressure) indicates 74 psig and slowly decreasing Which ONE of the following describes the position of VI system valves (and correct setpoint) in response to the lowering VI header pressure?

A. VS-78 (VS Supply to VI) opens at 80 psig B. VI-500 (VI Supply to VS) closes at 76 psig C. VS-78 (VS Supply to VI) opens at 76 psig D. VI-500 (VI Supply to VS) closes at 78 psig Page 64 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 65 (1 point)

Given the following Unit 2 conditions:

  • 2ETA has experienced a blackout Following sequencer loading, the _____(1)_____ Main Fire Pump will be operating.

The "Main Fire Pumps Running" annunciator will alarm on annunciator panel _____(2)_____.

Which ONE of the following completes the statements above?

A. 1. "A"

2. 1AD-13 B. 1. "A"
2. 2AD-13 C. 1. "C"
2. 1AD-13 D. 1. "C"
2. 2AD-13 Page 65 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 66 (1 point)

Which ONE of the following describes an appropriate example of information to be communicated to the shifts by use of an OPS Guide, in accordance with the requirements of SOMP 01-13 (Operations Work List, Routine Task List, and OPS Guides)?

A. Notification that engineering has determined a Tech Spec inoperability may exist under certain conditions due to new analyzed failure scenarios B. SM direction to verify 1A D/G Lube Oil Temp two times per shift due to an annunciator failure C. Temporary procedure instructions for a system which is currently being modified, while a procedure change is being completed D. Direction, from the unit lead, concerning work (or evolutions) that need(s) to be completed on a particular shift Page 66 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 67 (1 point)

Given the following Unit 1 initial conditions:

  • IAE is scheduled to perform a calibration of 1A S/G NR Level Channel I
  • A Pre-Job Brief has been completed with all affected Control Room personnel and IAE technicians
  • The OATC has received a "Tear Sheet" and reviewed Annunciator Response Procedures for expected alarms Subsequently:
  • IAE has begun the calibration procedure
  • An annunciator listed on the provided Tear Sheet alarms for the FIRST time In accordance with AD-OP-ALL-1000 (Conduct of Operations):

The OATC _____(1)_____ required to communicate receipt of this alarm to the CRS.

Receipt of this alarm _____(2)_____ required to be documented in the Narrative Log.

Which ONE of the following completes the statements above?

A. 1. is

2. is B. 1. is
2. is NOT C. 1. is NOT
2. is D. 1. is NOT
2. is NOT Page 67 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 68 (1 point)

Upon a Loss of All AC Power, a subgroup of bank _____(1)_____ Pressurizer Heaters can be powered from the SSF D/G.

When controlled from the SSF, this subgroup of heaters _____(2)_____ automatically de-energize if Pressurizer level decreases below the low level setpoint.

Which ONE of the following completes the statement above?

A. 1. D

2. will B. 1. B
2. will C. 1. D
2. will NOT D. 1. B
2. will NOT Page 68 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 69 (1 point)

Given the following Unit 1 conditions:

  • The unit is at 100% RTP In accordance with Tech Spec 2.1.1 (Reactor Core SLs), Departure from Nucleate Boiling Ratio (DNBR) shall be maintained greater than or equal to _____(1)_____.

If this Safety Limit is exceeded, DNBR must be restored within limits in a MAXIMUM of _____(2)_____ .

Which ONE of the following completes the statements above?

A. 1. 1.14

2. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B. 1. 1.14
2. 5 minutes C. 1. 1.3
2. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D. 1. 1.3
2. 5 minutes Page 69 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 70 (1 point)

Given the following Unit 1 timeline:

1000

  • The Unit has experienced a runback, from 100% power, following a trip of 1A CFPT 1003
  • Steam Dumps have closed
  • Temperature Error meter indicates (+) 1.8° F Entry into the Action Statement of Tech Spec 3.1.6 (Control Bank Insertion Limits) is FIRST required at _____(1)_____ .

Per the conditions provided at 1005, OMP 1-7 _____(2)_____ state that control rods should be placed in MANUAL.

Which ONE of the following completes the statements above?

A. 1. 1003

2. does B. 1. 1003
2. does NOT C. 1. 1005
2. does D. 1. 1005
2. does NOT Page 70 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 71 (1 point)

Consider the following Unit 1 conditions:

  • EMF-50 (WG Disch Monitor - Waste Gas) Trip 2 actuated
  • EMF-31 (Turbine Building Sump) Trip 2 actuated Consider Each Statement Separately Re-initiation of the Waste Gas release at least once WITHOUT resampling

_____(1)_____ allowed.

Re-initiation of the Turbine Building Sump release at least once WITHOUT sampling _____(2)_____ allowed.

Which ONE of the following completes the statements above?

A. 1. is

2. is B. 1. is NOT
2. is C. 1. is
2. is NOT D. 1. is NOT
2. is NOT Page 71 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 72 (1 point)

An Operator needs to access an area with a general area radiation dose rate of 1100 mREM/hr to hang a clearance tag In accordance with PD-RP-ALL-0001 (Radiation Worker Responsibilities):

the correct radiation posting for this area is a _____(1)_____.

continuous RP coverage _____(2)_____ be required.

Which ONE of the following completes the statements above?

A. 1. High Radiation Area

2. will B. 1. High Radiation Area
2. will NOT C. 1. Locked High Radiation Area
2. will D. 1. Locked High Radiation Area
2. will NOT Page 72 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 73 (1 point)

Given the following Unit 1 initial conditions:

  • Unit is at 100% RTP
  • A Steam Line Rupture occurs inside containment
  • The CRS direct a Unit 1 reactor trip and S/I based on increasing containment pressure Subsequently:
  • 1A S/G is depressurized
  • 1A S/G N/R level is off-scale low
  • All other S/G N/R levels are 30% and increasing
  • EP/1/A/5000/E-0 (Reactor Trip or Safety Injection) is entered Which ONE of the following describes the FIRST time that the OATC is authorized to throttle CA flow to the 1A S/G to minimize NC system cooldown?

A. When any S/G reaches the normal level setpoint B. When E-0 Enclosure 1 (Foldout Page) is given to the OATC C. When direction is provided by E-0 Enclosure 4 (NC Temperature Control)

D. When direction is provided by EP/1/A/5000/E-2 (Faulted Steam Generator Isolation)

Page 73 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 74 (1 point)

Given the following Unit 2 conditions:

  • An automatic Safety Injection has occurred following a LOCA
  • The crew has entered EP/2/A/5000/E-0 (Reactor Trip or Safety Injection)
  • While performing a board walkdown, the BOP notes the following equipment did not position/actuate as required o 2NV-252A (NV Pumps Suct from FWST) failed to OPEN o 2B NI Pump failed to start Approval and guidance from the CRS _____(1)_____ required to open 2NV-252A.

Approval and guidance from the CRS _____(2)_____ required to reset the 2B D/G sequencer and start 2B NI Pump.

Which ONE of the following completes the statements above?

A. 1. is

2. is B. 1. is
2. is NOT C. 1. is NOT
2. is D. 1. is NOT
2. is NOT Page 74 of 75

Catawba Nuclear Station ILT-17 NRC Written Exam CNS RO NRC Examination Question: 75 (1 point)

Given the following Unit 1 conditions:

  • The Unit is in Mode 6. The following indications are noted:

o 1AD-10 C/1 "ND & NS Rooms Sump Level Emerg Hi" - LIT o 1AD-10 C/2 "ND & NS Rooms Sump Level Hi-Hi" - LIT o NC System WR level indication - decreasing o EMF-41 (Aux Bldg Ventilation) reading 5 x 105 cpm Based on listed symptoms, _____(1)_____ contains the proper guidance for mitigation of this event.

Based on current EMF-41 indication (ONLY), Site Assembly initiation

_____(2)_____ required.

Which ONE of the following completes the statements above?

A. 1. AP/1/A/5500/027 (Shutdown LOCA)

2. is B. 1. AP/1/A/5500/027 (Shutdown LOCA)
2. is NOT C. 1. AP/1/A/5500/019 (Loss of Residual Heat Removal System)
2. is D. 1. AP/1/A/5500/019 (Loss of Residual Heat Removal System)
2. is NOT Page 75 of 75

Examination KEY for: ILT-17 NRC Written Exam CN Question Answer Number 1 B 2 B 3 D 4 A 5 C 6 B 7 D 8 B 9 A 10 B 11 B 12 A 13 A 14 C 15 C 16 C 17 C 18 A 19 A 20 B 21 B 22 A 23 A 24 B 25 C Printed 7/5/2017 10:49:55 AM Page 1 of 3

Examination KEY for: ILT-17 NRC Written Exam CN Question Answer Number 26 D 27 A 28 C 29 C 30 D 31 B 32 D 33 A 34 B 35 B 36 C 37 A 38 B 39 A 40 D 41 B 42 C 43 C 44 C 45 B 46 C 47 B 48 A 49 D 50 B Printed 7/5/2017 10:49:55 AM Page 2 of 3

Examination KEY for: ILT-17 NRC Written Exam CN Question Answer Number 51 C 52 B 53 C 54 A 55 B 56 B 57 A 58 B 59 D 60 C 61 B 62 C 63 B 64 C 65 C 66 A 67 B 68 C 69 A 70 C 71 C 72 C 73 B 74 C 75 D Printed 7/5/2017 10:49:55 AM Page 3 of 3

&16 /2662)(0(5*(1&<&22/$175(&,5&8/$7,21 3$*(12

(3$(&$ RI

(QFORVXUH3DJHRI

5HYLVLRQ

0LQLPXP6,)ORZUDWH9HUVXV7LPH$IWHU7ULS S/I FLOW REQUIRED TO MATCH DECAY HEAT