|
---|
Category:License-Operator
MONTHYEARRA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19308A2502019-11-0404 November 2019 301 ADAMS 2D Page 1 Exam Admin Items Normal Release ML19281E0172019-10-0808 October 2019 301 Exam Report Items Delayed Release RO as Given ML19281E0202019-10-0808 October 2019 301 Post Exam Comments IR 05000413/20193012019-09-0303 September 2019 Operator Licensing Written Examination Approval 05000413/2019301 and 05000414/2019301 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML17241A2282017-08-29029 August 2017 301 ADAMS2D Page 1 Exam Admin Items Immediate Release ML17241A2162017-08-29029 August 2017 301 ADAMS2B Final Exam Items Delay Release ML17241A2232017-08-29029 August 2017 301 ADAMS 2C Exam Admin Items Delay Release IR 05000413/20173012017-08-15015 August 2017 NRC Operator License Examination Report 05000413/2017301 and 05000414/2017301 ML17215A7792017-08-0303 August 2017 301 Post Exam Comments ML17215A7942017-08-0303 August 2017 301 Exam Report Items RO as Given - Delay Release ML17215A8012017-08-0303 August 2017 301 Exam Report Items SRO as Given - Delay Release ML17192A1792017-07-11011 July 2017 301 Exam Final Items 2B - Delay Release 2 Yrs ML17192A1812017-07-11011 July 2017 301 Exam Administrative Items 2C - Delay Release 2 Yrs ML17178A2942017-06-21021 June 2017 Operator Licensing Written Examination Approval 05000413, 414/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 IR 05000413/20163012016-07-13013 July 2016 NRC Operator License Examination Report 05000413/2016301 and 05000414/2016301, May 16 19, 2016 and May 26, 2016 ML16166A1062016-06-13013 June 2016 301 Facility Post Exam Comments ML16166A0992016-06-13013 June 2016 301 as Given RO Written Exam with References and Answer Key ML16166A1022016-06-13013 June 2016 301 as Given SRO Written Exam with References and Answer Key ML16104A4262016-04-0808 April 2016 March 2016 - Catawba NRC Generic Fundamentals Examination Results ML15356A8282015-12-22022 December 2015 Notification of Licensed Operator Initial Examination 05000413/2016301 and 05000414/2016301 ML15245A3012015-08-31031 August 2015 Initial Exam 2015-301 Draft Sim In-plant JPMs ML15245A3162015-08-31031 August 2015 Initial Exam 2015-301 General Correspondence ML15245A2942015-08-31031 August 2015 Initial Exam 2015-301 Draft RO Written Exam ML15245A3112015-08-31031 August 2015 Initial Exam 2015-301 Post Exam Comments ML15245A3092015-08-31031 August 2015 Initial Exam 2015-301 Final Administrative JPMs ML15245A3072015-08-31031 August 2015 Initial Exam 2015-301 Final Sim In-Plant JPMs ML15245A3052015-08-31031 August 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15245A2962015-08-31031 August 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15245A3032015-08-31031 August 2015 Initial Exam 2015-301 Final Administrative Documents 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19308A2502019-11-0404 November 2019 301 ADAMS 2D Page 1 Exam Admin Items Normal Release ML19281E0172019-10-0808 October 2019 301 Exam Report Items Delayed Release RO as Given ML19281E0202019-10-0808 October 2019 301 Post Exam Comments IR 05000413/20193012019-09-0303 September 2019 Operator Licensing Written Examination Approval 05000413/2019301 and 05000414/2019301 RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML17241A2282017-08-29029 August 2017 301 ADAMS2D Page 1 Exam Admin Items Immediate Release ML17241A2162017-08-29029 August 2017 301 ADAMS2B Final Exam Items Delay Release ML17241A2232017-08-29029 August 2017 301 ADAMS 2C Exam Admin Items Delay Release IR 05000413/20173012017-08-15015 August 2017 NRC Operator License Examination Report 05000413/2017301 and 05000414/2017301 ML17215A7792017-08-0303 August 2017 301 Post Exam Comments ML17215A7942017-08-0303 August 2017 301 Exam Report Items RO as Given - Delay Release ML17215A8012017-08-0303 August 2017 301 Exam Report Items SRO as Given - Delay Release ML17192A1792017-07-11011 July 2017 301 Exam Final Items 2B - Delay Release 2 Yrs ML17192A1812017-07-11011 July 2017 301 Exam Administrative Items 2C - Delay Release 2 Yrs ML17178A2942017-06-21021 June 2017 Operator Licensing Written Examination Approval 05000413, 414/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16166A1022016-06-13013 June 2016 301 as Given SRO Written Exam with References and Answer Key ML16166A0992016-06-13013 June 2016 301 as Given RO Written Exam with References and Answer Key ML16166A1062016-06-13013 June 2016 301 Facility Post Exam Comments ML16104A4262016-04-0808 April 2016 March 2016 - Catawba NRC Generic Fundamentals Examination Results ML15356A8282015-12-22022 December 2015 Notification of Licensed Operator Initial Examination 05000413/2016301 and 05000414/2016301 ML15245A3072015-08-31031 August 2015 Initial Exam 2015-301 Final Sim In-Plant JPMs ML15245A3052015-08-31031 August 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15245A3032015-08-31031 August 2015 Initial Exam 2015-301 Final Administrative Documents ML15245A3022015-08-31031 August 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15245A3012015-08-31031 August 2015 Initial Exam 2015-301 Draft Sim In-plant JPMs ML15245A3112015-08-31031 August 2015 Initial Exam 2015-301 Post Exam Comments ML15245A3162015-08-31031 August 2015 Initial Exam 2015-301 General Correspondence ML15245A2932015-08-31031 August 2015 Initial Exam 2015-301 Draft Administrative Documents ML15245A2992015-08-31031 August 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15245A2942015-08-31031 August 2015 Initial Exam 2015-301 Draft RO Written Exam ML15181A2322015-06-30030 June 2015 Initial Exam 2015-301 Final SRO Written Exam ML15181A2292015-06-30030 June 2015 Initial Exam 2015-301 Final RO Written Exam ML14290A3322014-10-27027 October 2014 301 Post Exam Comments ML14290A3042014-10-27027 October 2014 301 Final Administrative Documents ML14240A6662014-10-27027 October 2014 301 Draft SRO Written Examination 2024-04-02
[Table view] |
Text
Catawba Nuclear Station 2017 NRC Exam Post Exam Comments Senior Reactor Operator Written Exam Question 79 The original intent of the question was to test knowledge of a failure of the Reactor Protection System by describing a failed Reactor Trip due to a signal generated by failed instrumentation in conjunction with a vital AC channel failure.
During exam administration, an applicant requested status of the main turbine.
This request prompted further discussion between the CNS Exam Team and Chief Examiner, and it was determined that the incorrect answer had been identified during the original submittal for this question.
Explanation: Safety Injection and Reactor Trip signals would be generated due to the initial failed instrumentation and subsequent loss of a vital AC channel.
Additionally, a Main Turbine trip signal would be generated directly from the Safety Injection signal. Since no information regarding the Main Turbine was provided in the stem, the applicant is required to determine that it has tripped.
Given that a separate Reactor Trip signal is generated based on a Main Turbine Trip greater than 69% power, the failed Reactor Trip listed in the question is no longer only based on instrument/vital channel failure. An ATWS would exist under these conditions due to the Unit being in a transient following the main turbine trip.
Resolution: Request the correct answer for Question 79 to be changed from D to C.
Note to Examiner: The preliminary grades provided via Written Exam Performance Analysis include this change.
Catawba Nuclear Station 2017 NRC Exam Post Exam Comments Operating Exam Scenario #2, Event 3 1B S/G PORV Failure Based on the failure of 1B S/G PORV, no applicable Tech Spec/ SLC determination was identified in the CNS original submittal documents. Following exam administration, it has been determined that the required actions of T.S.
3.7.4, Condition A should be declared.
Explanation:
The following information was documented by CNS Operations Management (Wayne Jarman, Assistant Operations Manager - Shift) and forwarded to the Regulatory Affairs Department for concurrence/clarification.
It is Operations Management position that when a SG PORV has failed open and is subsequently isolated by the associated PORV block valve, the affected SG PORV is inoperable. This conclusion was reached for the following reasons:
Technical Specification 3.7.4 (Steam Generator Power Operated Relief Valves (SG PORVs) contains Surveillance Requirement (SR) 3.7.4.2 which states: Verify one complete cycle of the SG PORV.
The Tech Spec Bases for this Surveillance Requirement states the following: To perform a controlled cooldown of the RCS, the SG PORVs must be able to be opened remotely and throttled through their full range using the safety-related nitrogen gas supply. This SR ensures that the SG PORVs are tested through a full control cycle at least once per fuel cycle. Performance of inservice testing or use of an SG PORV during a unit cooldown may satisfy this requirement. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program. With a SG PORV failed open (and unable to close) this Surveillance Requirement cannot be met, thus the affected PORV is inoperable.
Technical Specification 5.5.8 (In Service Testing Program) requires SG PORVs to be stroked from open to closed on a quarterly basis. The procedure governing this valve stroke is PT/1(2)/4200/031 (SV Valve Inservice Test). Per this test procedure, should a SG PORV not stroke within the allowable stroke time, the affect PORV is declared inoperable.
==
Conclusion:==
When a SG PORV is failed open, the surveillance for a valve stroke cannot be met.
The SG PORV is also not available for a "controlled" cooldown.
Catawba Nuclear Station 2017 NRC Exam Post Exam Comments The following response was received from regulatory affairs (Cecil Fletcher, Regulatory Affairs Manager):
I agree with your original conclusion regarding the SG PORV being Inoperable.
Specifically, for the reasons that you stated for not being able to meet the TS surveillance and another reason that I will discuss as well.
Addressing the TS surveillance issue first. IMC 326 Section 03.08 states in part:
An SSC that does not meet an SR must be declared inoperable because the LCO operability requirement(s) are not metWhen an SSC capability is degraded to a point where it cannot perform with reasonable expectation or reliability, the SSC should be judged inoperable, even if at this instantaneous point in time the system could provide the specified safety function.
Also, IMC 326 Section C.05 states the following regarding the use of temporary manual actions in place of automatic actions in support of operability:
Automatic action is frequently provided as a design feature specific to each SSC to ensure that specified safety functions will be accomplished. Limiting safety system settings for nuclear reactors are defined in 10 CFR Part 50.36, Technical Specifications, as settings for automatic protective devices related to those variables having significant safety functions. Where a limiting safety system setting is specified for a variable on which a safety limit has been placed, the setting must be so chosen that automatic protective action will correct the abnormal situation before a safety limit is exceeded. Accordingly, it is not appropriate to consider SSCs operable by taking credit for manual action in place of automatic action for protection of safety limits. This does not forbid operator action to put the plant in a safe condition, but operator action cannot be a substitute for automatic safety limit protection.
CNS TS section B 2.0 SAFETY LIMITS specifically states in part that the safety analyses assumes that the safety valves on the secondary plant are assumed to open when the steam pressure reaches the secondary plant safety valve settings Resolution: Request the applicable ES-D-2 be updated to include required application of T.S. 3.7.4 Condition A following the failure of the 1B S/G PORV.
Catawba Nuclear Station 2017 NRC Exam Post Exam Comments Scenario #3, Event 4 1B S/G Tube Leak During administration of Scenario #3 of the operating exam, an approximate 50-60 GPM S/G Tube Leak on 1B S/G was given to the applicants. The original submittal identified Tech Spec 3.4.13 (RCS Operational Leakage) condition B and SLC 16-7.9 (Standby Shutdown System (SSS)) condition B as being the applicable Tech Specs and SLCs for this failure. It has since been determined that Tech Spec 3.4.18 (SG Tube Integrity) Condition B is also applicable for this particular scenario. The following information is from the Tech Spec 3.4.18 Bases:
A SG tube has tube integrity when it satisfies the SG performance criteria. The SG performance criteria are defined in Specification 5.5.9, Steam Generator (SG) Program, and describe acceptable SG tube performance. The Steam Generator Program also provides the evaluation process for determining conformance with the SG performance criteria.
There are three SG performance criteria: structural integrity, accident induced leakage, and operational LEAKAGE. Failure to meet any one of these criteria is considered failure to meet the LCO.
Based on the fact that the operational LEAKAGE for this scenario exceeded the limit of 150 Gallons Per Day identified in Tech Spec 3.4.13, it is the opinion of the station (Operations Management and Regulatory Affairs) that Tech Spec 3.4.18 LCO is also not met, and that Condition B is applicable.
Resolution: Request the applicable ES-D-2 be updated to include required application of T.S. 3.4.18 Condition B following the 1B S/G Tube Leak.