Letter Sequence Other |
|---|
TAC:MF2400, Control Room Habitability (Approved, Closed) TAC:MF2409, Control Room Habitability (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML13295A222, ML13323A183, ML13323A186, ML13323A189, ML13323A190, ML13323A191, ML13323B187, ML13323B188, ML13323B191, ML13323B194, ML13323B196, ML13323B198, ML13323B199, ML13323B200, ML13323B201, ML13323B202, ML13323B204, ML13323B207, ML13323B208, ML13323B209, ML13338A165, ML14015A312, ML14052A053, ML14072A076, ML14086A386, ML14086A387, ML14087A126, ML14149A089, ML14149A353, ML14149A354, ML14149A434, ML14149A435, ML14149A437, ML14178A481, ML14178A485, ML14202A045, ML14321A438, ML14321A677, ML14344A545, ML14344A546, ML14344A547, ML14349A790, ML15072A092, ML15091A440, ML15119A326, ML15175A024, ML15183A007, ML15183A009, ML15246A126, ML15246A128... further results
|
MONTHYEARML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results Project stage: Other ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures Project stage: Other NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. Project stage: Other ML13323B1882012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test Project stage: Other ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations Project stage: Other ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition Project stage: Other ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 Project stage: Other ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End Project stage: Other ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal Project stage: Other ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report Project stage: Other ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects Project stage: Other ML13043A0132013-01-31031 January 2013 Pilot Submittal and Request for Exemption for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 Project stage: Request ML13214A0312013-08-13013 August 2013 Acceptance Review, Exemption Requests and License Amendment Request to Revise UFSAR for Resolution of Generic Safety Issue 191, Assessment of Debris Accumulation on PWR Sump Performance (TAC MF0613-MF0614; MF2400-09) Project stage: Acceptance Review ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions Project stage: Other ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) Project stage: Other NOC-AE-13003039, Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)2013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13295A2222013-10-0303 October 2013 Corrections to Information Provided in Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI) Project stage: Other ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5) Project stage: Other ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis Project stage: Other ML13323B1872013-10-31031 October 2013 Submittal of GSI-191 Chemical Effects Test Reports Project stage: Other ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 Project stage: Other ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 Project stage: Other ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 Project stage: Other ML13323A1852013-11-13013 November 2013 Enclosure 3 - License Amendment Request for STP Piloted Risk-Informed Approach to Closure for GSI-191 Project stage: Request NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items2013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13323A1922013-11-13013 November 2013 Enclosure 5 - Response to NRC Supplemental Information Items Project stage: Supplement ML13316B9052013-11-13013 November 2013 Albrz Testing Update for NRR Final Project stage: Request ML13323A1832013-11-13013 November 2013 To Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 Project stage: Other ML13338A1652013-11-21021 November 2013 To Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Other NOC-AE-13003054, Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal2013-11-21021 November 2013 Supplement 1 to Revised STP Pilot Submittal for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 to Supersede and Replace the Revised Pilot Submittal Project stage: Supplement ML13330B2222013-12-0505 December 2013 Notice of Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (TAC MF2400-MF24 Project stage: Meeting NOC-AE-13003065, Response to STP-GSI-191-EMCB-RAI-12013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other ML14015A3112013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request 05000498/LER-2013-003, Regarding Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection2013-12-23023 December 2013 Regarding Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection Project stage: Request ML14015A3122013-12-23023 December 2013 Response to STP-GSI-191-EMCB-RAI-1 Project stage: Other NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application Project stage: Request ML13357A2662013-12-24024 December 2013 1/8/14 - Notice of Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14009A3072014-01-0909 January 2014 NRR E-mail Capture - Request for Additional Information - TACs MF2400 Through MF2409 Project stage: RAI NOC-AE-13003057, Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application2014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14029A5332014-01-0909 January 2014 Response to Request for Additional Information Re Use of RELAP5 in Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Response to RAI ML14015A0452014-01-14014 January 2014 NRR E-mail Capture - RAIs Regarding South Texas Projects Submittal for Risk-Informed Resolution of GS-191 Project stage: RAI ML13358A0622014-01-14014 January 2014 Summary of 12/16/13 Meeting with STP Nuclear Operating Co. to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 Project stage: Meeting ML14052A0542014-02-13013 February 2014 STP-Specific Casa Grande Inputs CASA01 JT4, CASA09 JT4, CASA22 JT4, CASA26 JT4, & CASA43 JT4 Project stage: Request ML14052A0532014-02-13013 February 2014 Submittal of Casa Grande Code & Analyses for Risk-Informed GSI-191 Licensing Application Project stage: Other ML14149A4352014-02-14014 February 2014 ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 Project stage: Other ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 Project stage: Request ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 Project stage: Request ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 Project stage: Request ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 Project stage: Request ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 Project stage: Request 2013-11-21
[Table View] |
Text
Nuclear Operating Company 1EMW It-ff South Texas Pro/ect Electric Generating Station P.O Box 289 Wadsworth, Texas 77483 March 10, 2015 NOC-AE-15003232 10 CFR 50.12 10 CFR 50.90 Attention: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498 and 50-499 Submittal of Updated CASA Grande Input for STP's Risk-Informed GSI-191 Licensing Application (TAC Nos. MF2400 through MF2409)
References:
- 1. Letter, G. T. Powell, STPNOC, to NRC Document Control Desk, "Supplement 1 to Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191", November 13, 2013, NOC-AE-13003043, ML13323A183
- 2. Letter, G. T. Powell, STPNOC, to NRC Document Control Desk, "Submittal of CASA Grande Code and Analyses for STP's Risk-Informed GSI-191 Licensing Application", February 13, 2014, NOC-AE-14003081, ML14052A053 The CASA Grande computer code was used in the analyses supporting Reference 1. This submittal transmits to the NRC updates to the CASA Grande computer input that were provided in Reference 2.
The updates to Reference 2 more accurately describe insulation applied to pipes and equipment consistent with as-built Computer Aided Design (CAD) models. Verification records of CASA Grande input files are maintained with the software vendor, Alion Science and Technology.
The attachment to this submittal provides the South Texas Project (STP) - specific input files for the staff s review and use. Attached is a CD containing the updated Reference 2 input that can be run in CASA Grande. It is recommended that (1) the input file and instructions provided in Folder 1 be reviewed for consistency with current staff analysis settings, and (2) all existing "master files" provided in Reference 2 be replaced with those provided in Folder 2.
There are no commitments and no proprietary information in this submittal.
STI 34068078
NOC-AE-15003232 Page 2 of 3 If there are any questions regarding this request, please contact Wayne Harrison at (361) 972-8774 or me at (361) 972-7566.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on:
zol G. T. Powell Site Vice President awh Attachment Non-Proprietary CD with two folders and the following content:
STP CASA Grande Input Deck - Updated (Folder)
InputDeckUpdatehistructions.txt Pump Case 01 CRN - Updated.txt STP Updated Master Files - Revised Straight Pipe and Equip Insul (Folder)
Master Concrete File.mat Master Equipment File.mat Master Frequency File.mat Master Grating File.mat Master Insulation File.mat Master Pipe File.mat Master Weld File.mat Master WP File.mat IN6
NOC-AE-15003232 Page 3 of 3 cc:
(paper copy w/o attachment except as shown)
Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner (w/attachment)
Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 G9A) 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth, TX 77483 (electronic copy w/o attachment)
Morgan, Lewis & Bockius LLP Steven P. Frantz, Esquire U. S. Nuclear Regulatory Commission Lisa M. Regner Michael Markley John Stang NRG South Texas LP John Ragan Chris O'Hara Jim von Suskil CPS Energy Kevin Pollo Cris Eugster L. D. Blaylock Crain Caton & James, P.C.
Peter Nemeth City of Austin Cheryl Mele John Wester Texas Dept of State Health Services Richard A. Ratliff Robert Free