Initial Information Request for NRC Triennial Baseline Component Design Bases Inspection NRC Inspection Report 05000498/2013007; 05000499/2013007
ML13168A418
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/17/2013
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Koehl D
South Texas
References
IR-13-007
Download: ML13168A418 (8)


See also: IR 05000498/2013007

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

June 17, 2013

Mr. Dennis L. Koehl

President & CEO/CNO

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT - INITIAL INFORMATION REQUEST FOR NRC

TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC

INSPECTION REPORT 05000498/2013007; 05000499/2013007

Dear Mr. Koehl:

On September 24, 2013, the NRC will begin a triennial baseline Component Design Bases

Inspection at the South Texas Project. A seven person team will perform this inspection using

NRC Inspection Procedure 71111.21, "Component Design Bases Inspection."

The inspection focuses on components, operating experience, and operator actions that have

high risk and low design margins. The samples reviewed during this inspection will be identified

during an information gathering visit and during the subsequent in-office preparation week. In

addition, a number of operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a senior

reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of

four NRC inspectors and two contractors, of which five will focus on engineering and one on

operations. The current inspection schedule is as follows:

Onsite information gathering visit: September 24 - 26, 2013

Preparation Week: September 30 - October 4, 2013

Onsite weeks: October 7 - 11, 2013; October 21 - 25, 2013; November 4-8, 2013

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant components and operator actions. The lead inspector will also request

a tour of the plant with members of your operations staff and probabilistic safety assessment

staff. During the onsite weeks, several days of time will be needed on the plant-referenced

simulator in order to facilitate the development of operator action-based scenarios. Additional

information and documentation needed to support the inspection will be identified during the

inspection, including interviews with engineering managers, engineers, and probabilistic safety

assessment staff.

D. Koehl -2-

Our experience with these inspections has shown that they are extremely resource intensive,

both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact

on the site and to ensure a productive inspection, we have enclosed a request for information

needed for the inspection. The request has been divided into three groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than September 16, 2013. Insofar

as possible, this information should be provided electronically to the lead inspector. Since the

inspection will be concentrated on high risk/low margin components, calculations associated

with your list of high risk components should be available to review during the information

gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested is those items that the team will need access to

during the preparation week in order to finalize the samples to be inspected. The third group

lists information necessary to aid the inspection team in tracking issues identified as a result of

the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. Additional requests by inspectors will be made

throughout all three onsite weeks for specific documents needed to complete the review of that

component/selection. It is important that all of these documents are up to date and complete in

order to minimize the number of additional documents requested during the preparation and/or

the onsite portions of the inspection. In order to facilitate the inspection, we request that a

contact individual be assigned to each inspector to ensure information requests, questions, and

concerns are addressed in a timely manner.

During the onsite portion of our inspection, we request that you make available a conference

room large enough to accommodate the inspection team. In that conference room, please

make available a computer with access to a printer, your condition reporting database, and your

documentation database.

The lead inspector for this inspection is Wayne Sifre. We understand that our licensing

engineer contact for this inspection is Robin Savage. If there are any questions about the

inspection or the requested materials, please contact the lead inspector at (817) 200-1193 or via

e-mail at Wayne.Sifre@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

D. Koehl -3-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/ Ray L. Kellar for

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-498; 50-499

Licenses: NPF-76; NPF-80

Enclosure:

Component Design Basis Inspection

Document Request

D. Koehl -4-

Electronic distribution by RIV:

Regional Administrator (Art.Howell@nrc.gov)

Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Acting Resident Inspector (David.You@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Doug.Huyck@nrc.gov)

R:\_REACTORS\_STP\2013\STP 2013007-RFI-CDBI-WCS.docx ML13168A418

ADAMS: No Yes SUNSI Review Complete Reviewer Initials: WCS

Publicly Available Non-Sensitive WCS

Non-publicly Available Sensitive

RIV:RI:DRS/EB1 BC/EB1

WSifre TFarnholtz RLK for

/RA/ /RA/

6/17/2013 6/17/2013

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INFORMATION REQUEST FOR SOUTH TEXAS PROJECT COMPONENT DESIGN BASES

(CDBI) INSPECTION

Inspection Report: 05000498/2013007; 05000499/2013007

Information Gathering Dates: September 24-26, 2013

On-site Inspection Dates: October 7-11, 2013; October 21-25, 2013;

November 4-8, 2013

Inspection Procedure: IP 71111.21, "Component Design Bases

Inspection"

Lead Inspector/Team Leader: Wayne Sifre

817-200-1193

Wayne.Sifre@nrc.gov

I. Information Requested Prior to the information Gathering Visit (September 24,

2013)

The following information (Section I of this enclosure) should be sent to the Region IV

office in hard copy or electronic format (ims.certrec.com or compact disc, preferred), in

care of Wayne Sifre, by September 16, 2013, to facilitate the reduction in the items to be

selected for a final list during the preparation week of September 30, 2013. The

inspection team will finalize the selected list during the prep week using the additional

documents requested in Section II of this enclosure. The specific items selected from

the lists shall be available and ready for review on the day indicated in this request.

  • Please provide requested documentation electronically in "pdf" files, Excel, or other

searchable formats, if possible. The information should contain descriptive names, and

be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain

enough information to be easily understood by someone who has knowledge of boiling

water reactor technology. If requested documents are large and only hard copy formats

are available, please inform the inspector(s), and provide subject documentation during

the first day of the onsite inspection.

1. An excel spreadsheet of equipment basic events (with definitions) including importance

measures sorted by risk achievement worth (RAW) and Fussell-Vesely (FV) from your

internal events probabilistic risk assessment (PRA). Include basic events with RAW

value of 1.3 or greater.

2. Provide a list of the top 500 cut-sets from your PRA.

3. Copies of PRA "system notebooks," and the latest PRA summary document.

4. An excel spreadsheet of PRA human action basic events or risk ranking of operator

actions from your site specific PSA sorted by RAW and FV. Provide copies of your

human reliability worksheets for these items.

-1- Enclosure

5. If you have an external events or fire PSA model, provide the information requested in

items 1-4 for external events and fire.

6. Any pre-existing evaluation or list of components and associated calculations with low

design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel

generator close to design required output, heat exchangers close to rated design heat

removal, etc.).

7. List of high risk maintenance rule systems/components and functions; based on

engineering or expert panel judgment.

8. A list of operating experience evaluations for the last 2 years.

9. A list of all time-critical operator actions in procedures.

10. A list of permanent and temporary modifications sorted by component identified in

Item 1.

11. List of current "operator work arounds/burdens."

12. A list of the design calculations, which provide the design margin information for

components included in Item 1. (Calculations should be available during the information

gathering visit).

13. List of root cause evaluations associated with component failures or design issues

initiated/completed in the last 5 years.

14. Current management and engineering organizational charts.

15. South Texas Project IPE and IPEEE, if available electronically.

16. List of any common-cause failures of components in the last 3 years.

17. An electronic copy of the licensing bases documents (i.e., Updated Final Safety Analysis

Report, Technical Specifications).

18. An electronic copy of the System Health notebooks.

19. System Description Manuals with simplified drawings of plant systems

II. Information Requested to be Available on First Day of Preparation Week

(September 30, 2013)

1. List of condition reports (corrective action documents) associated with each of the

selected components for the last 5 years.

2. The corrective maintenance history associated with each of the selected components for

the last 2 years.

-2- Enclosure

3. Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and also

provide copies of reference material (such as drawings, engineering requests, and

vendor letters).

4. Copies of operability evaluations associated with each of the selected components and

plans for restoring operability, if applicable.

5. Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

6. Copies of any open temporary modifications associated with each of the selected

components, if applicable.

7. Trend data on the selected electrical/mechanical components performance for last 3

years (for example, pumps performance including in-service testing, other vibration

monitoring, oil sample results, etc., as applicable).

8. A copy of any internal/external self-assessments and associated corrective action

documents generated in preparation for the inspection.

9. A copy of engineering/operations related audits completed in the last 2 years.

10. List of motor operated valves (MOVs) in the program, design margin and risk ranking.

11. List of air operated valves (AOVs) in the valve program, design and risk ranking.

12. Structure, system and components in the Maintenance Rule (a)(1) category.

13. Site top 10 issues list.

14. Procedures used to accomplish operator actions associated with the basic events in

your PRA.

15. List of licensee contacts for the inspection team with pager or phone numbers.

16. Mechanical piping drawings for:

Engineered safety features

Emergency core cooling systems

Emergency diesel generators

17. Electrical one-line drawings for:

Offsite power/switchyard supplies

Normal AC power systems

Emergency AC/DC power systems including

120VAC power, and

125VDC/24VDC safety class systems

-3- Enclosure

III. Information Requested to be provided throughout the inspection.

1. Copies of any corrective action documents generated as a result of the teams questions

or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the status/resolution

of the information requested (provide daily during the inspection to each team member).

3. Reference materials (available electronically and as needed during all onsite weeks):

General set of plant drawings

Procurement documents for components selected

Plant procedures (normal, abnormal, emergency, surveillance, etc.)

Vendor manuals

Inspector Contact Information:

Wayne Sifre

Senior Reactor Inspector

(817) 200-1193

Wayne.Sifre@nrc.gov

Mailing Address:

US NRC, Region IV

Attn: Wayne Sifre

1600 East Lamar Blvd.

Arlington, TX 76011

-4- Enclosure