UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 March 6, 2013 Edmund Baumgartner, Esquire Corporate Counsel Mitsubishi Nuclear Energy Systems, Inc.

1001 19th Street North Suite 2000 Arlington, VA 22209

SUBJECT:

MITSUBISHI HEAVY INDUSTRIES - REQUEST FOR WITHHOLDING ROOT CAUSE ANALYSIS AND SUPPLEMENTAL TECHNICAL EVALUATION REPORT INFORMATION FROM PUBLIC DISCLOSURE

Dear Mr. Baumgartner:

In a February 14, 2013, letter to you, the NRC requested Mitsubishi Heavy Industries (MHI) to provide the MHI document Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station, and a redacted version of that document. You provided the requested documents in a letter (ML13057A012) dated February 25, 2013, and requested that certain information contained within the root cause analysis (RCA) and a supplemental technical evaluation report (STER), provided as a supplement to the RCA, be withheld from public disclosure pursuant to 10 CFR 2.390.

Redacted versions of the RCA and STER documents were provided as Enclosures 4 and 6 of your letter, respectively (ML13057A013 and ML13057A014).

Mitsubishi Heavy Industries stated in affidavits dated February 22, 2013, that it considered certain information within MHIs RCA and STER to be proprietary and confidential and requested that the information be withheld from public disclosure pursuant to 10 CFR 2.390. A summary of the key points in the affidavits is as follows:

1. The information has been held in confidence by MHI.
2. The information describes unique design, manufacturing, experimental, and investigative information developed by MHI and not used in the exact form by any of MHIs competitors.
3. The information was developed at significant cost to MHI.
4. The RCA is MHIs organizational and programmatic root cause analysis, which is a sensitive, internal document of the type that MHI and others in the industry do not make public, because its purpose is to set forth a critical self-appraisal, with the benefit of hindsight, containing information and analyses that are the result of candid assessments performed by MHI.
5. MHI provided the information to the NRC voluntarily in confidence.

Mr. Edmund Baumgartner 6. The information is not available in public sources and could not be gathered readily from other publicly available information.

7. Disclosure of the information would assist competitors of MHI in their design and manufacture of nuclear plant components without incurring the costs or risks associated with the design and manufacture of the subject component.

We have carefully reviewed your original redacted documents and the information contained in your request. Additionally, we held several discussions with you regarding the redacted information in your documents. Based on these discussions, MHI made some revisions to release additional information. Subsequently, MHI provided final revised versions of Enclosures 4 and 6 via e-mail on February 28 and March 6, 2013, respectively. We have concluded that the submitted information sought to be withheld in the final revised versions contains proprietary and confidential information. Therefore, the final revised versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 C.F.R. 2.390(a)(4).

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future if, for example, the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely,

/RA/

Ryan E. Lantz, Chief SONGS Project Branch Dockets: 50-361, 50-362 Licenses: NPF-10, NPF-15

Enclosures:

MHIs Revised Non-Proprietary RCA and STER

Mr. Edmund Baumgartner Internal Distribution A. Howell, TM J. Andersen, DTM R. Lantz, C:SPB G. Werner, I&AL N. Taylor, SPE B. Parks, PE G. George, SRI J. Reynoso, RI K. Fuller, RC V. Dricks, PAO T. Rothschild, OGC R. Hall, NRR D. Broaddus, NRR E. Roach, NRO D. Dorman, NRR D. Merzke, OEDO J. Weil, OCA A. Powell, OCA R:\_REACTORS\_SONGS\2013\Review of MHI and STER MNES 2-25-13 Letter_Agreement with Revised NonProp Reviews G:\ORA\SPB\MHI Letter and RCA and STER Enclosures ML13065A097 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: GEW Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV:I&AL:SPB RC C:SPB GEWerner;dlf KDFuller RELantz

/RA/ /RA/ /RA/

3/6/13 3/6/13 3/6/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

UES-20120254Rev.0 (1/64) Non-Proprietary San Onofre Nuclear Generating Station, Unit 2 & 3 REPLACEMENT STEAM GENERATORS Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station Purchase Order No. 4500024051 Specification No. SO23-617-01R3 CONTENT REMARKS ORDER No. DATE PURCHASER QUALITY ASSURANCE DEPARTMENT DESCRIPTION PAGES ITEM No. REFERENCE FIGURE SHEETS Edison 2593015 APPROVED BY CHECKED BY Total 64 PAGES (MNES) 7000 PREPARED BY DRAWN BY ISSUEDATE Rev. No.

NPCDD Document No.

NPQAS E-Room Distribution SGDS NPMD SGS CQCS PM COPY UES-20120254 0 1 1 1 1 1 1 1 e 2 MITSUBISHI HEAVY INDUSTRIES, LTD.

UES-20120254Rev.0 (2/64) Non-Proprietary Revision History Date Approved Checked Prepared Rev. Summary of Changes issued By by by See See See See 0 Original Issue Cover Page Cover Page Cover Page Cover Page

UES-20120254 Rev.0 (3/64) Non-Proprietary Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (4/64) Non-Proprietary Disclosure Statement The following organization and programmatic Root Cause Analysis has been prepared in accordance with the Mitsubishi Heavy Industries (MHI) corrective action program, which uses an after-the-fact hindsight-based analysis. The information identified in this evaluation was discovered and analyzed using all information and results available at the time it was written. These results and much of the information considered in this evaluation were not available to the organizations, management, or individuals during the period that relevant actions were taken and decisions were made.

This evaluation does not attempt to make a determination whether any of the actions or decisions taken by management, internal organizations, or individual personnel at the time of the event was reasonable or prudent based on the information that was known or available at the time they took such actions or made such decisions. Any individual statements or conclusions included in the evaluation as to whether incorrect actions may have been taken or improvements are warranted are based upon all of the information considered, including information and results learned after-the-fact and evaluation in hindsight after the results of actions or decisions are known, and do not reflect any conclusion or determination as to the prudence or reasonableness of actions or decisions at the time they were made.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (5/64) Non-Proprietary Table of contents 1.0 Executive Summary.................................................................................... 6 2.0 Background of the Incident........................................................................ 7 2.1Project Background.............................................................................. 7 2.2 Technical Specification requirements potentially involved in the Problem................................................................................................ 9 3.0 Statement of Problem................................................................................ 10 4.0 Extent of Condition Evaluation................................................................... 10 5.0 Analysis, Results, and Conclusions.............................................................. 11 5.1 Evaluation Team Formation.................................................................. 11 5.2 Evaluation Methodology....................................................................... 11 5.3 Technical Investigation of the Incident................................................. 12 5.4 Description of Main Wear Mechanisms................................................ 14 5.5Discussion of Tube to Tube Wear.......................................................... 20 5.6 Discussion of Tube to AVB Wear........................................................... 23 5.7 Discussion of Retainer Bar to Tube Wear............................................. 23 5.8 Root Causes........................................................................................... 24 5.9 Contributing Causes............................................................................... 25 6.0 Corrective Action Matrix.............................................................................. 27 7.0 Extent of Cause Evaluation........................................................................... 32 8.0 Safety Culture Review.................................................................................. 33 Attachment-1 Cause-effect analysis............................................................ 41 Attachment-2 Barrier analysis..................................................................... 44 Attachment-3 Change analysis.................................................................... 47 Attachment-4 RCA charter.......................................................................... 54 Attachment-5 Time line.............................................................................. 55 Attachment-6 Interview list......................................................................... 60 Attachment-7 Reference documents.......................................................... 62 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (6/64) Non-Proprietary 1.0 Executive Summary On January 31, 2012, after the replacement steam generators (RSGs) supplied by MHI had been operating for approximately 11 months, SONGS Unit 3 was brought into an unplanned shutdown due to primary to secondary leakage of approximately 82 gallons/day in one RSG. The direct cause of the leakage was determined to be tube to tube wear in the free span section of the U-bend region of the RSG, leading to a leak from one of the tubes in that region.

SONGS Unit 2 was in a refueling outage when the event occurred in Unit 3. During the normally scheduled outage inspections of the Unit 2 RSGs, tube wear was discovered in the vicinity of the retainer bars in the U-bend region of both RSGs. This wear was determined to have been caused by random vibration of the retainer bars.

It was determined that all four RSGs experienced higher than expected tube wear. This wear is comprised of: (i) tube to tube wear in the tube free-span sections between the Anti-Vibration-Bars (AVBs) located in the U-bend region observed almost exclusively in Unit 3; (ii) tube to AVB wear, observed at discrete tube to AVB intersections, with no wear indications in the tube free-span sections (the tube to AVB wear indications are short in length, and are associated with small tube motions); (iii) tube to Tube Support Plate (TSP) wear; and (iv) retainer bar to tube wear. One RSG experienced minor tube wear from a foreign object, which has since been removed.

MHI, working in conjunction with SCE personnel and other industry experts, determined the mechanistic causes of the tube wear. MHI formed a team composed of personnel from MHI and its U.S. subsidiary, plus outside consultants, to perform the Root Cause Analysis (RCA) of the tube wear identified in the SONGS Unit 2 and Unit 3 RSGs. The two wear mechanisms that produced the deepest wear are evaluated in this report. They include:

1. Tube to tube wear in the in-plane direction due to fluid-elastic instability (FEI)
2. Retainer bar to tube wear due to turbulence induced vibration (also referred to as random vibration) and the low natural frequency of the retainer bar Additionally, because many tubes exhibit it, this report also addresses a third wear mechanism:
3. Tube-to-AVB wear caused by turbulence induced vibration (also referred to as random vibration).

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (7/64) Non-Proprietary The RCA team used Cause-effect analysis, Barrier analysis and Change analysis to arrive at two Root Causes and three Contributing Causes. The Root Causes are:

1. Insufficient programmatic requirement to assure effective AVB contact force to prevent in-plane fluid elastic instability and random vibration and subsequent wear under high localized thermal-hydraulic conditions (steam quality (void fraction), flow velocity and hydro-dynamic pressure).
2. The design control process did not provide sufficient direction to assure that an evaluation of the need for an analysis of flow induced vibration of the retainer bar was performed and verified.

The corrective actions to preclude repetition include:

1. Revise Procedure 5BBB60-N01 Procedure for Controlling of the Design Activities to require that the need for effective tube to AVB contact force under high localized thermal-hydraulic conditions (steam quality (void fraction),

flow velocity and hydro-dynamic pressure) be addressed in all MHI SG designs.

1.a Further revise Procedure 5BBB60-N01 Procedure for Controlling of the Design Activities to require that sufficient contact force is assured under high localized thermal-hydraulic conditions (steam quality (void fraction) flow velocity and hydro-dynamic pressure), e.g., compare to the design parameters of previous successful MHI steam generator designs.

2. Revise procedure 5BBB60-N01 Procedure for Controlling of the Design Activities to require that retainer bars and other steam generator parts subject to flow induced vibration be evaluated to determine the different analyses and the level of analysis that need to be performed to support the steam generator design.

2.0 Background of the Incident 2.1 Project Background In September 2004, MHI was awarded a contract to replace Southern California Edisons (SCE) original steam generators (OSGs) at Units 2 and 3 of the San Onofre Nuclear Generating Station (SONGS). The MHI-supplied replacement SGs (RSGs) had a number of differences from the OSGs provided by Combustion Engineering. One of the main differences was the substitution of Inconel 690 for Inconel 600 as the tube material. Inconel 690 is more resistant to corrosion than Inconel 600. However, Inconel Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (8/64) Non-Proprietary 690 has a thermal conductivity approximately 10% less than that of Inconel 600. The requirement that the SGs thermal performance be maintained, in conjunction with maintaining a specified tube plugging margin, necessitated increasing the tube bundle heat transfer surface area from 105,000 ft2 to 116,100 ft2 (an 11% increase).The Certified Design Specification SO23-617-01, Rev. 3 stated that SCE intended to use the provisions of 10 C.F.R. §50.59 as the justification for the RSG design, which imposed physical and other constraints on the characteristics of the RSG design in order to assure compliance with that regulation. The RSGs were also required to fit within the same space occupied by the OSGs.

The Certified Design Specification issued by SCE also required that MHI incorporate many design changes to minimize degradation and maximize reliability. The following are the design requirements specified for the U-bend supports:

3.10.3.5 The Supplier shall develop and submit for Edisons approval an Engineering and Fabrication Gap Control Methodology describing control of an effective zero tube-to-flat bar gap, gap uniformity and parallelism of the tube bundle in the out-of-plane direction prior to tube fabrication. The gap statistical size (mean value +3sigma) shall not exceed 0.003, and shall be validated by empirical data.

The Unit 2 RSGs were delivered to SONGS in February 2009 and installed during a refueling outage between September 2009 and April 2010. The Unit 3 RSGs were delivered to SONGS in October 2010 and installed during a refueling outage between October 2010 and February 2011.

On January 31, 2012, after the Unit 3 RSGs had been operating for approximately 11 months, the unit was brought into an unplanned shutdown due to maximum primary to secondary leakage of approximately 82 gallons/day in one RSG. The direct cause of the leakage was determined to be tube to tube wear in the free span section of the U-bend region of the RSG, leading to a leak from one of the tubes in that region.

Inspections of the Unit 2 RSGs(which was offline undergoing a refueling outage) revealed significant tube wear in the vicinity of the retainer bars in the U-bend region.

In addition to these two forms of tube wear, all four RSGs were found to have experienced higher than expected tube to Anti-Vibration-Bar (AVB) and tube to Tube Support Plate (TSP) wear. One RSG had experienced minor tube wear due to a foreign object.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (9/64) Non-Proprietary 2.2 Technical Specification requirements potentially involved in the Problem Technical Specification (TS) 3.4.17 requires that SG tube integrity be maintained and that all SG tubes meeting the tube repair criteria be plugged in accordance with the Steam Generator Program.

TS 5.5.2.11 requires a Steam Generator Program to be established and implemented to ensure that SG tube integrity is maintained.

TS 5.5.2.11.b specifies three performance criteria that must be met for SG tube integrity:

1. Structural integrity performance criterion: All in-service steam generator tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cool down and all anticipated transients included in the design specification) and Design Basis Accidents (DBAs). This includes retaining a safety factor of 3.0 against burst under normal steady state full power operation primary-to-secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials. Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or rupture. In the assessment of tube integrity, those loads that do significantly affect burst or rupture shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.
2. Accident induced leakage performance criterion: The primary to secondary accident induced leakage rate for any DBA, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for all SGs and leakage rate for an individual SG. Leakage is not to exceed 0.5 gpm per SG and 1 gpm through both SGs.
3. The operational leakage performance criterion is specified in LCO 3.4.13, RCS Operational Leakage. [This LCO is applicable in Modes 1-4 and states RCS operational leakage shall be limited to: (a) no pressure boundary leakage; (b) 1 gpm unidentified leakage; (c) 10 gpm identified leakage; and (d) 150 gallons per day (gpd) primary to secondary leakage through any one SG.]

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (10/64) Non-Proprietary 3.0 Statement of Problem This Root Cause Analysis (RCA) was performed based on the following problem statement, which was adopted as part of the Root Cause Analysis Team Charter:

(1) Requirement No Primary-to-Secondary Leakage due to Defects in any of the RSG Units for the duration of the Warranty Period. (per 17.2.3 of General T&C with EMS)

(2) Deviation Unit 3 SG-B (SCE SG088) experienced tube leakage during operation and failure of eight tubes during in-situ pressure testing. (Both due to Defects)

(3) Consequences (For MHI) 10CFR21 Report required 4.0 Extent of Condition Evaluation To determine the extent of condition, other MHI SGs with similar design and construction were analyzed to see if the same tube wear conditions identified at the SONGS RSGs were present.

The replacement steam generators for OPPDs Fort Calhoun Nuclear Generating Station are the only other steam generators designed by MHI operating in the United States. The OPPD RSGs replaced Combustion Engineering OSGs and are of a similar design and construction as the SONGS RSGs with certain differences, including:

Identical tube diameter (3/4) and wall thickness (0.043)

Identical tube pitch (1.0 equilateral triangle)

Identical pitch-to-diameter ratio (P/D = 1.33)

OPPD has greater average tube to AVB gap OPPD RSGs are smaller than SONGS RSGs Fewer AVBs than SONGS Fewer tubes than SONGS Smaller U-bend radius than SONGS Lower maximum steam quality (void fraction) than SONGS Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (11/64) Non-Proprietary The Fort Calhoun RSGs have operated more than three fuel cycles with no evidence of U-bend tube degradation (no tube-to-AVB wear, no tube-to-tube wear, and no retainer bar-to-tube wear).Other steam generators designed by MHI (operating outside of the United States)are of a different design and have a variety of tube sizes, tube pitches and operating conditions. These steam generators have years of operation without significant tube wear. Therefore, it is concluded that the MHI SGs in operation today are not part of extent of condition. However, these other MHI SGs will be evaluated for susceptibility based on extent of cause.

5.0 Analysis, Results, and Conclusions 5.1 Evaluation Team Formation On March 23, 2012 MHI formed a team composed of personnel from MHI and its U.S.

subsidiary, plus outside consultants, to perform the Root Cause Analysis of the tube wear identified in the SONGS Unit 2 and Unit 3 RSGs. The team was given the task of investigating the organizational and programmatic Root Causes of the tube wear. SCE also performed separate technical and Root Cause evaluations.

The Root Cause Analysis commenced on March 26, 2012, and was conducted concurrently with the development of MHIs technical evaluation reports.

5.2 Evaluation Methodology The evaluation team used the results of the technical investigations (identified below) as the basis for its analysis of the organizational and programmatic Root Causes for the tube to tube wear, retainer bar to tube wear, and tube to AVB wear seen in the RSGs.

The extent of cause was evaluated based on organizational and programmatic causes.

The team closely consulted with the MHI engineering team performing the technical evaluations, and with SCE representatives, in order to understand fully the technical causes of the tube wear. Additionally, the evaluation team gathered evidence through interviews, examination of procedures and plans and previous audits and surveillances, review of design and technical review meeting documents, and analysis of technical work products.

To determine the organizational and programmatic Root and Contributing Causes of the three wear mechanisms evaluated in this report, the evaluation team used three Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (12/64) Non-Proprietary cause analysis tools: Cause-effect analysis, Barrier analysis, and Change analysis. The Root and Contributing Causes were determined primarily through the Cause-effect analysis. The results of the Barrier analysis and the Change analysis support the findings of the Cause-effect analysis. In addition to supporting the Cause-effect analysis, the Change analysis identified an additional Contributing Cause.

In performing these analyses, the evaluation team closely looked at and took into account the technical evaluations prepared by MHI and SCE to understand fully the mechanistic causes of the tube to tube wear, the retainer bar to tube wear, and the tube to AVB wear, in order to better assess the underlying organizational and programmatic Root and Contributing Causes. The team then reviewed and evaluated, with the benefit of what is now known in hindsight, the design process for the RSGs to identify what could have been done differently that would have prevented the tube wear from occurring. Based on its reviews, the evaluation team identified the programmatic Root Causes of the RSG tube wear.

5.3 Technical Investigation of the Incident MHI performed technical evaluations to identify the mechanistic causes of the tube wear, which identified fluid elastic instability as the mechanistic cause of the tube to tube wear, turbulence induced vibration (often referred to as random vibration because the excitation modes over time are unpredictable) as the mechanistic cause of the tube to AVB wear, and turbulence induced vibration of the retainer bar as the mechanistic cause of the retainer bar to tube wear. These evaluations are reflected in the MHI reports Tube Wear of Unit-3 RSG Technical Evaluation Report, L5-04GA564 Rev.9; Retainer Bar Tube Wear Report, L5-04GA561 Rev.4; Validity of Use of the FIT-III Results During Design, L5-04GA591 Rev. 3;and Supplemental Technical Evaluation Report, L5-04GA588 draft. SCE also performed Root Cause evaluations.SCE reports Root Cause Evaluation NN201843216 Steam Generator Tube Wear San Onofre Nuclear Generating Station, Unit 2dated April 2, 2012, and Root Cause Evaluation: Unit 3 Generator Tube Leak and Tube-to-Tube Wear Condition Report: 201836127, Rev.0contain the SCE Root Cause evaluations.

The MHI and SCE mechanistic cause analysis reports used Fault Tree Analysis and Kepnor-Tregeo (respectively) as the primary analysis tools. Each of these analyses considered a broad range of potential causes. The following causes were evaluated in detail:

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (13/64) Non-Proprietary Manufacturing/fabrication Shipping Primary side flow induced vibration Divider plate weld failure and repair Additional rotations following divider TSP distortion plate repair Tube bundle distortion during operation T/H conditions/modeling (flowering)

Each of these causes is evaluated in the MHI and SCE technical evaluation reports.

These technical evaluations identified five different wear categories for the tubewear observed in the SONGS RSGs. Two of these wear categories are responsible for the most significant instances of tube degradation(in terms of the depth of wear and potential for failing to meet the technical specification requirements) and are being evaluated in this report to determine their organizational and programmatic causes.

The two significant wear categories that are evaluated in this RCA are:

1. Tube to Tube Wear due to in-plane FEI: Tube to tube wear was found in the U-bend region, located between AVBs, in the free span. Many of the tubes exhibiting tube to tube wear also exhibited wear at the AVBs and TSPs, in particular at the top tube support plate. For tubes with wear at the top tube support plate, it is considered that the entire tube, including its straight region, is vibrating. Tube to tube wear occurs when there is tube in-plane motion (vibration) with a displacement (amplitude) greater than the distance between the tubes in the adjacent rows, resulting in tube-to-tube contact.1
2. Retainer Bar to Tube Wear due to Flow Induced Vibration: Tube wear occurred on tubes at the periphery of the U-bend, adjacent to the retainer bars. These tubes have no wear indications at any other location along their length, which 1

Some of the tubes with tube-tube wear did not experience large amplitude vibration but were impacted by tubes that did experience large amplitude vibration. Also the two tubes in Unit 2 with tube-to-tube wear had different wear characteristics than the Unit 3 tube-to-tube wear.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (14/64) Non-Proprietary indicates that they are stationary, and that the wear is caused by the movement (vibration) of the retainer bars.

Additionally, because many tubes have smaller-depth wear indications at the AVB intersections, this report also addresses another wear category:

3. Tube to AVB Wear (for tubes without free span wear) due to random vibration:

Tube wear occurred at discrete tube-to-AVB intersections, with no wear indications in the tube free-span sections. These wear indications are short in length and are associated with small tube motions.

The other two categories of wear identified were: (i) wear at the TSPs (small bend radius tubes and tubes at the tube bundle periphery), and (ii) wear due to a foreign object. These two categories are not considered in this report because the degree of wear due to them is relatively small.

The conclusions of the MHI and SCE technical evaluations have been accepted as the basis of this analysis. To the extent these evaluations are revised or amended to reflect additional information or new understandings, this evaluation may be affected.

5.4 Description of Main Wear Mechanisms Fluid Elastic Instability In a tube array, a momentary displacement of one tube from its equilibrium position will alter the flow field and change the forces to which the neighboring tubes are subjected, causing them to change their positions in a vibratory manner. When the energy extracted from the flow by the tubes exceeds the energy dissipated by damping it produces fluid elastic vibration.

Fluid Elastic Instability (FEI) is a term used to describe a range of tube vibrations that starts at a point on a curve of vibration amplitude versus flow velocity. As depicted in Figure 1, one axis (Y) of that curve is vibration amplitude and the other (X) is flow velocity. The graph shows that as flow velocity increases vibration amplitude increases at a small linear rate until it reaches a point where the slope of the curve increases abruptly. The point in the curve where the slope changes is termed critical velocity.

The critical velocity is a function of several variables. These include tube natural frequency, which is dependent on the tube geometry and support conditions, damping, Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (15/64) Non-Proprietary which is a function of the steam-to-water ratio, flow velocity, which is dependent of the tube spacing.

Figure 1 As discussed below and in the technical reports referenced above (See Supplemental Technical Evaluation Report), MHI has determined that, due to ineffective support for the tubes in the in-plane direction resulting from the very small and uniform tube-to AVB gaps, some of the tubes exceeded the fluid elastic critical velocity resulting in in-plane FEI, which in turn produced the large amplitude tube-to-tube wear. This mechanism is influenced by the local thermal hydraulic conditions around the tube.

Regions of high void fraction have lower tube damping, which reduces the fluid elastic critical velocity threshold. High void fraction regions also have higher cross flow velocities. Therefore, tubes with low or no contact force in the region of highest void fraction are most susceptible to this mechanism.

Random Vibration Random vibration is the vibration mechanism caused by flow turbulence that changes proportionately to changes in the fluid flow forces(dynamic pressure) and is present at all flow velocities. Turbulent flow forces are random in nature, so this form of vibration is referred to as random vibration. As discussed below and in the technical reports referenced above, MHI has determined that the tube wear at the AVB intersections Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (16/64) Non-Proprietary with no wear indications in the tube free span sections is due to turbulence induced vibration caused by insufficient contact force between the tube and the AVBs due to very small, uniform tube-to-AVB gaps. Since dynamic pressure and damping is proportional to the void fraction, tubes in the region of highest void fraction are most susceptible to this mechanism.

Tube to Tube Wear Tube-to-tube wear was caused by large displacements of tubes in the in-plane direction. Tubes are known to have moved in-plane because of the locations and magnitudes of their wear scars. The wear scars indicate that the tubes were generally vibrating in their first fundamental in-plane mode, which implies that none of the twelve (12) AVB supports were restraining the tube motion. Yet, it also indicates that the tube-to-AVB gaps are very small and uniform, because none of the tubes exhibited out-of-plane FEI, which is the tubes preferential fluid elastic vibration mode. 2 It can therefore be concluded that the tube-to-AVB contact forces were negligible and the tube-to-AVB gaps (on both sides of each tube at each of the 12 AVB intersections) were very small. Both of these conclusions are consistent with the original design intent discussed below.

In-plane FEI is a phenomenon that had not been experienced in nuclear U-tube steam generators prior to its being identified in the SONGS RSGs. The practice in the nuclear industry at the time the SONGS RSGs were designed was to provide measures to preclude out-of-plane FEI in the U-bend region, which was based on the understanding set forth above. Reflecting this industry practice, the Japan Society of Mechanical Engineers Guideline for Fluid-elastic Vibration Evaluation of U-bend Tubes in Steam Generators states that in-plane FEI does not need to be considered if out-of-plane FEI is controlled. The design of the SONGS RSGs is consistent with the contemporary industry practice and guidance. The RSGs were designed to provide effective tube support (by means of AVBs) to avoid out-of-plane FEI. MHI sought to maximize the 2

In U-bend SGs, because the tubes are curved, for the same support conditions the critical velocity for out-of-plane FEI will be lower than that for in-plane FEI because the natural frequency of tubes in the in-plane direction is higher, due to the tubes greater stiffness in-plane, than the natural frequency of the tubes in the out-of-plane direction.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (17/64) Non-Proprietary adequacy of the supports against out-of-plane FEI by increasing the number of AVBs to a number, 12, that exceeds that in other U-tube SGs designed by MHI or by other major U-tube SG manufacturers.

Minimizing tube vibration wear in the U-bend region was given high priority in the SONGS RSG Design Specification, the RSG design program, and in the manufacturing processes. Early in the project, SCE and MHI formed an AVB Design Team with the goal of minimizing U-bend tube vibration and wear. The AVB Design Team conducted numerous technical and design review meetings. The agreed-upon tube bundle U-bend support design and fabrication were as follows:

Six (6) V-shaped AVBs (three sets of two) were to be provided between each tube column (12 AVB intersections total around the U-bend).

Tube and AVB dimensional control, including increasing the AVB thickness was to achieve an effective zero tube-to-AVB gap under operating (hot) conditions with gap uniformity and parallelism being maintained throughout the tube bundle. Effective zero gap was desirable as an industry practice in order to maximize the effectiveness of the supports. The tube and AVB tolerances were to be tighter than that of any prior MHI SG.

Excessive preload contact force was to be avoided in order to minimize ding/dent indications, and to maintain mechanical damping and thus minimize tube vibration.

MHI investigated field experience with U-bend tube degradation using INPO, NRC and NPE data bases, and concluded that the SONGS RSGs were designed to minimize the potential for tube wear by providing extra support points with shorter spans in the U-bend region along with effective zero tube-to-AVB gaps.

In the fabrication process, MHI manufacturing focused on achieving very small, uniform tube-to-AVB gaps during assembly.

The AVB Design Team included consultants with knowledge and experience in the design and construction large U-bend SGs. One consultant had experience with the design of a plant whose SGs were similar to the proposed RSGs (the comparison or reference plant). Together, the AVB Design Team concluded that the SONGS RSGs had more tube vibration margin than the comparison plant, which had experienced only a small number of tube wear occurrences. This conclusion was due to the following considerations:(i) SONGS RSG tubes are larger, have thicker walls, and are Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (18/64) Non-Proprietary stiffer than those of the comparison plant; (ii) the SONGS distances between AVB tube supports are shorter than those at the comparison plant; (iii) SONGS has 12 AVB tube supports where the comparison plant only has 10; (iv) SONGSs tube-to-AVB gap requirement was more stringent than that of the comparison plant.

The Certified Design Specification SO23-617-01, Rev. 3, issued by SCE required an effective zero gap and gap uniformity and parallelism of the tube bundle in the out-of-plane direction. Establishing the goal to reduce tube-AVB gaps to an effective zero gap was in accordance with well accepted industry practice and understanding that minimizing gaps was highly desirable in preventing tube vibration wear. MHI had sought to minimize tube-AVB gaps in its previous SG designs. However, MHI took additional steps to minimize the tube-AVB gaps for the SONGs RSGs and to provide for gap uniformity throughout the U-bend region of the tube bundle.

These steps included increasing the nominal thickness of the AVB compared to previous MHI SGs and reducing the manufacturing tolerance of AVB thickness and twist in order to achieve effective zero gaps and provide gap uniformity. Steps were taken as well to minimize tube ovality and to minimize variations from the design value.

Also, numerous additional steps were taken in fabricating the tube bundle to assure gap uniformity throughout the U-bend region. Additionally, in the fabrication of the Unit 2 RSGs MHI identified other enhancements that were implemented in the fabrication of the Unit 3 RSGs. These included, for example, taking steps to minimize AVB twist by applying a larger(from tons to tons) pressing force in the Unit 3 fabrication and thus providing for more uniform AVBs in the Unit 3 RSGs.

The adequacy of the design against out-of-plane FEI was confirmed through test data and analyses that conservatively assumed that one of the AVBs provided in the design was inactive (that is, ineffective against out-of-plane FEI).Analyses using this criterion showed that an adequate margin against out-of-plane FEI exists in the SONGS RSGs. An additional AVB had been added to the design to provide further margin against out-of-plane FEI.

The MHI technical evaluations performed after the January 2012 incident determined that, despite the robustness of the MHI design, in-plane FEI had occurred. This occurrence was due to a combination of a lack of effective contact forces between the tube and AVB in the in-plane direction and localized thermal-hydraulic (T/H) conditions (high steam quality (void fraction) and high fluid velocity).The evaluations found that the average contact force in the Unit 3 RSGs was smaller than the average contact force in the Unit 2 RSGs. Therefore, the contact forces of the Unit 3 RSGs were more Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (19/64) Non-Proprietary likely to be ineffective in preventing in-plane motion of tubes so that the Unit 3 RSGs were more susceptible to in-plane tube vibration than those in Unit 2. The difference in the contact forces between the Unit 2 and Unit3 RSGs is caused by the reduction in dimensional variations during the manufacture of the Unit 3 RSGs, mainly due to improvement of the control over tube and AVB dimensions in the manufacture of the Unit 3 RSGs. The reduced contact forces resulted in far more tubes in the Unit 3 RSGs experiencing tube-to-tube wear than those in the Unit 2 RSGs. For those tubes, given these support conditions, the vibratory energy in high localized thermal-hydraulic (T/H) environment produced in-plane FEI that led to large amplitude displacement of the tubes in the in-plane direction, which caused wear from contact between adjacent tubes.

Tube Wear at AVBs Tube-to-AVB wear is a function of the amplitude of the random tube vibration and the tube-to-AVB gap. Where there is a gap between the AVB and the tube and the vibration amplitude is less than the gap, there will be minimal or no wear. If the AVB is in contact with the tube but there is insufficient contact force to lock the two together, there will be relative motion between the two and wear will occur. In the case where there is sufficient contact force to lock the two together, there will be minimal or no relative motion and only minimal wear will occur. In the SONGS RSGs, the zero gap design philosophy resulted in the AVBs being in contact with the tubes or very close to the tubes, but there was insufficient contact force to lock the two together, thus allowing tube wear at the AVBs.

The degree of wear is also affected by the amount of damping provided by the water film between the tubes and AVBs. In the SONGS RSGs, damping was reduced in areas of high steam quality (void fraction)because there is less two-phase damping and little or no water film in the gaps between the tubes, resulting in more pronounced wear.

Tube Wear at Retainer Bars The tubes exhibiting retainer bar wear have no indications of tube-to-tube or tube-to-AVB wear, which indicates that the wear is caused solely by retainer bar vibration. The SONGS RSGs have two types of retainer bars:

diameter and diameter. Tube wear was only found on tubes adjacent to the smaller diameter retainer bars. The retainer bars with the smaller diameter have a relatively long span as compared with those for other SGs fabricated by MHI, which means that the natural frequency of these retainer bars is lower, making them more Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (20/64) Non-Proprietary likely to vibrate. This type of wear is caused by random flow-induced vibration of the retainer bars caused by the secondary fluid exiting the tube bundle.

5.5 Discussion of Tube to Tube Wear Tube Contact Force During the fabrication of the AVBs and the tubing and assembly of the tube bundle, MHIs manufacturing practices achieved dimensional control that resulted in smaller tube-to-AVB gaps and smaller tube-to-AVB contact forces. It was not recognized at the time that a certain amount of tube-to-AVB contact force was required to prevent in-plane FEI under high steam quality (void fraction) conditions, because the contact force serves to increase the in-plane natural frequency of the tube.

The technical investigations after the tube leak incident determined that the amount of contact force necessary to prevent in-plane FEI depends on the localized thermal-hydraulic conditions (steam quality (void fraction), flow velocity and hydro-dynamic pressure).As the steam quality (void fraction) increases, the amount of contact force necessary to prevent vibration increases. This increase in required contact force occurs because as the steam quality (void fraction) becomes higher, the damping provided by the liquid phase in the form of a liquid film decreases.

The reduced in-plane contact force due to the SONGS effective zero gap design and the avoidance of excessive preload resulted in lowering the tubes natural frequency in the in-plane direction. The combination of the localized high steam quality (void fraction) and reduced tube to AVB contact force resulted in exceeding the in-plane critical velocity, which created a condition that led to tube to tube contact.

The dominant role played by the low contact force is reflected by the differences in the tube-to-tube wear that was observed in the Unit 2 and the Unit 3 RSGs. Each of the Unit 3 RSGs had approximately 160 tubes that experienced tube-to-tube wear whereas only one of the Unit 2 RSGs experienced tube-to-tube wear in just two tubes, even though the Unit 2 RSGs have operated twice as long as the Unit 3 RSGs. MHI did a comprehensive statistical evaluation of the contact forces between the tubes and the AVBs of the two units and concluded, based on the manufacturing data , that the contact force between the tubes and the AVBs in the Unit 2 RSGs is approximately double the contact force in the Unit 3 RSGs. Thus, the lower contact forces in Unit 3 are consistent with the conditions determined necessary to permit in-plane FEI to occur and with the fact that tube-to-tube wear occurred almost exclusively in Unit 3.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (21/64) Non-Proprietary Thermal-hydraulic Conditions Many analyses are performed during the steam generator design process. One of these is MHIs FIT-III tube bundle flow analysis, which calculates tube bundle thermal /

hydraulic parameters, including U-bend flow velocity and steam quality (void fraction).An after-the-fact comparison between the T/H parameters that FIT-III predicted and those predicted by ATHOS, another T/H code, determined that FIT-IIIs calculated values are lower than those obtained using ATHOS. Part of the difference was because the pressure loss coefficients for the tube bundle and the two-phase mixture density utilized in the two codes were different.

Also, during the computation of the flow velocity, MHI used an inappropriate definition of the gap between tubes, with the result that the flow velocities were underestimated.

These differences between MHIs use of the FIT-III model and the ATHOS model resulted in a higher margin to out-of-plane FEI than the margin that would have been determined using the appropriate the definition of the gap and an ATHOS-calculated steam quality (void fraction). The margin calculated using ATHOS, nonetheless, would still have resulted in adequate margin against out-of-plane FEI. Using the ATHOS outputs, with all AVBs assumed active, the stability ratio was less than 1.0 for out-of-plane FEI, even for those case studies assuming reduced damping that could occur under high void fraction conditions.3 Thus, the use of ATHOS as opposed to FIT-III would not have identified an inadequate design margin against FEI.

Moreover, because industry practice was focused on out-of-plane FEI, use of ATHOS would not have identified the potential for in-plane vibration. Both the academic literature and subsequently conducted tests show that the thermal-hydraulic environment under which in-plane FEI arises is different from those that result in out-of-plane FEI. (See Supplemental Technical Evaluation Report). If the steam quality (void fraction) predicted by FIT-III had been the same as the ATHOS calculated value, 3

The maximum stability ratio based on ATHOS outputs for all supports are active is , which is less than 0.75, which is the conservative industry practice for judging acceptability of stability ratios (which in turn is less than the ASME Section III Appendix N-1330 recommended stability ratio criterion of 1.0). Assuming reduced damping, the maximum stability ratio calculated using ATHOS is .

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (22/64) Non-Proprietary and if the appropriate tube to tube gap value had been utilized to compute the flow velocity, MHI would have identified a decreased margin against out-of-plane FEI. In that case, MHI might have incorporated an additional AVB to increase the design margin against out-of-plane FEI, but would not have taken measures to protect against in-plane FEI, for it was assumed (as was the practice and guidance in the industry) that the controlling effect of a well-designed AVB system was adequate to preclude it.

Thus, not using ATHOS, which predicts higher void fractions than FIT-III at the time of design represented, at most, a missed opportunity to take further design steps, not directed at in-plane FEI, that might have resulted in a different design that might have avoided in-plane FEI. However, the AVB Design Team recognized that the design for the SONGS RSGs resulted in higher steam quality (void fraction) than previous designs and had considered making changes to the design to reduce the void fraction (e.g.,

using a larger downcomer, using larger flow slot design for the tube support plates, and even removing a TSP). But each of the considered changes had unacceptable consequences and the AVB Design Team agreed not to implement them. Among the difficulties associated with the potential changes was the possibility that making them could impede the ability to justify the RSG design under the provisions of 10 C.F.R.

§50.59. Thus, one cannot say that use of a different code than FIT-III would have prevented the occurrence of the in-plane FEI observed in the SONGs RSGs or that any feasible design changes arising from the use of a different code would have reduced the void fraction sufficiently to avoid tube-to-tube wear.

For the same reason, an analysis of the cumulative effects of the design changes including the departures from the OSGs design and MHIs previously successful designs would not have resulted in a design change that directly addressed in-plane FEI.

Summary Thus, the organizational and programmatic Root Cause for the in-plane FEI as set forth in this RCA is the insufficient programmatic requirement to assure effective AVB contact force to control in-plane FEI under high localized thermal-hydraulic conditions (steam quality (void fraction), flow velocity and hydrodynamic pressure). The underlying reason for this insufficiency is that the MHI SONGS RSG design did not consider the phenomenon of in-plane FEI because contemporary knowledge and industry U-tubeSG operation experience did not indicate a need to consider in-plane FEI.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (23/64) Non-Proprietary 5.6 Discussion of Tube to AVB Wear Tube-to-AVB wear in the SONGS RSG occurs at the tube-to-AVB intersections and is produced by turbulence induced (random) vibration. This population only includes tubes with wear at the tube-to-AVB intersections with no wear indications in the tube free-span sections.

Tube wear at the AVB intersections (in the absence of tube-to-tube free span wear) occurs when the tube movement causes it to impact or slide along the supporting AVBs. The most common cause of this condition is out-of-plane FEI. In the SONGS RSG design, the large number of AVB supports and the superior gap control prevent out-of-plane FEI. However, because of the low contact forces between tubes and AVBs, the very small and uniform tube-to-AVB gaps, and the localized T/H conditions (high steam quality (void fraction) and high flow velocity), turbulent flow conditions are sufficient to produce tube wear at the AVB intersections. Again the effect of the different contact forces between Unit 3 and Unit 2 can be seen in the observed tube-to-AVB wear populations of the two units. Unit 2 had about two-thirds as many tube-to-AVB indications than Unit-3 and Unit 2 operated longer than Unit 3, indicated that the wear rate is greater at Unit 3. This is attributable to the lower contact forces.

(See Supplemental Technical Evaluation Report).

As was the case with tube-to-tube wear, it was not recognized at the time of the RSG design that a certain amount tube to AVB contact force is required to prevent random vibration under high localized thermal-hydraulic conditions (steam quality (void fraction), flow velocity and hydro-dynamic pressure).The combination of the reduced tube to AVB contact force and the localized T/H conditions (high steam quality (void fraction) and high flow velocity) resulted in tube to AVB wear.

5.7 Discussion of Retainer Bar to Tube Wear The design function of the retainer bar is to support the AVB assembly during manufacturing and prevent excessive AVB assembly movement during operational transients. The retainer bar must be strong enough to support the AVB assembly and fit within the physical constraints of the U-bend.

The tubesheet drilling pattern is one of the first design decisions made for a new steam generator and it is at that time that each tube location along the periphery of the tube bundle is established. The tube bundle design thus determines the retainer bars length and thickness. At SONGS, in order to accommodate the increased number of Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (24/64) Non-Proprietary tubes, the retainer bars are relatively long and thin as compared to the retainer bars in other SGs designed by MHI, resulting in their having low natural frequencies.

The engineer responsible for the retainer bar design did not recognize the need to analyze the retainer bar for flow induced vibration because no such analysis had been performed on previous MHI SG designs. The design control procedure for this design activity did not identify this issue, nor was it recognized during the design review process.

During operation, the secondary flow velocity and steam quality (void fraction) created turbulent flow conditions capable of causing high amplitude vibration if the retainer bar natural frequency was low enough, which turned out to be the case. The high amplitude vibration resulted in the retainer bar contacting some tubes and causing tube wear.

5.8 Root Causes As used in this evaluation, Root Causes are defined as the basic reasons (e.g.,

hardware, process, or human performance) for a problem, which if corrected, will prevent recurrence of that problem.

The programmatic Root Causes of the RSG tube wear are:

1. Insufficient programmatic requirement to assure effective AVB contact force to prevent in-plane fluid elastic instability and random vibration and subsequent wear under high localized thermal-hydraulic conditions (steam quality (void fraction), flow velocity and hydro-dynamic pressure).

Basis: The evaluation team concluded that the fundamental Root Cause for the in-plane FEI and the resulting tube-to-tube wear was the fact that in-plane FEI was not considered in the design of the SONGS RSGs. The fundamental reason for this lack of consideration was that industry practice and guidance, supported by the operating experience up to that time of U-bend type steam generators, indicated that the control out-of-plane FEI would prevent the occurrence of in-plane FEI.

Likewise, the evaluation team concluded that the tube to AVB wear was caused by insufficient contact force under high localized thermal-hydraulic conditions, which was not recognized at the time of the design of the SONGS RSGs, and that the fundamental reasons for the ineffectiveness of the contact force were the established industry practice of minimizing the tube support gaps and Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (25/64) Non-Proprietary avoiding an excessive preload as well as other steps to control gap uniformity and parallelism.

2. The design control process did not provide sufficient direction to assure that an evaluation of the need for an analysis of flow induced vibration of the retainer bar was performed and verified.

Basis: The evaluation team concluded that the fundamental reason for the retainer bar FIV was the lack of clear direction in the MHI design procedures to require an evaluation to determine the different analyses and the level of analysis that were required for the RSG design in light of changes in the SONGS RSG design from previous MHI steam generator designs.

5.9 Contributing Causes As used in this evaluation, Contributing Causes are defined as causes that by themselves would not create the problem but are important enough to be recognized as needing corrective action. Contributing causes are sometimes referred to as causal factors. Causal factors are those actions, conditions, or events that directly or indirectly influence the outcome of a situation or problem. The evaluation team closely evaluated the mechanistic causes and the design process for the potential existence of Contributing Causes.

The programmatic Contributing Causes of the RSG tube wear are:

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (26/64) Non-Proprietary Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (27/64) Non-Proprietary 6.0 Corrective Action Matrix Cause Corrective Action Due Date Root Cause CAPR 1:Revise Procedure Completed 1:Insufficient 5BBB60-N01 Procedure for programmatic Controlling of the Design Activities requirement to assure to require that the need for effective effective AVB contact tube to AVB contact force under high force to prevent localized thermal-hydraulic in-plane fluid elastic conditions(steam quality (void instability and random fraction), flow velocity and vibration and hydro-dynamic pressure) be subsequent wear addressed in all MHI SG designs.

under high localized CAPR 1.a:Further revise Procedure 11/15/2012 thermal-hydraulic 5BBB60-N01 Procedure for conditions (steam Controlling of the Design Activities quality (void fraction),

to require that sufficient contact flow velocity and force is assured under high localized hydro-dynamic thermal-hydraulic conditions (steam pressure).

quality (void fraction) flow velocity and hydro-dynamic pressure), e.g.,

compare to the design parameters of previous successful MHI steam generator designs.

CA 1:Provide training for all Steam Completed Generator Engineers (included new hires and continuing training) covering this event and the details concerning in-plane FEI and tube-AVB wear under high localized thermal-hydraulic conditions (steam quality (void fraction), flow velocity and hydro-dynamic pressure).

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (28/64) Non-Proprietary Cause Corrective Action Due Date Root Cause 2:The CAPR 2:Revise procedure 10/31/2012 design control process 5BBB60-N01 Procedure for did not provide Controlling of the Design Activities sufficient direction to to require that retainer bars and assure that an other steam generator parts subject evaluation of the need to flow induced vibration be for an analysis of flow evaluated to determine the different induced vibration of analyses and the level of analysis that the retainer bar was need to be performed to support the performed and steam generator design.

verified.

CA 2:Revise Engineer Training 10/31/2012 program (included new hires and continuing training) to include the necessary assessment for required analyses of each Steam Generator part subject to flow induced vibration.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (29/64) Non-Proprietary Cause Corrective Action Due Date Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (30/64) Non-Proprietary Cause Corrective Action Due Date Extent of Cause CA 6: Conduct a program design 3/31/2013 review for other SG design procedures and primary pressure boundary components (Reactor vessel, Core internals, Pressurizer, Reactor coolant piping, CRDMs) using senior engineers to determine if other design features have assumptions that are not programmatically captured and evaluated.

CA 7: Reconfirm MHI steam 11/30/2012 generator designs using the for SONGS SG design procedure developed for Root Cause 3/31/2013

2. for OTHER SG designs CA 8: Reconfirm that the appropriate Completed for analyses were performed and that SONGS SG design correct values were used as inputs 10/31/2012 for each thermal hydraulic analysis, for OTHER SG designs vibration analysis, and wear analysis (FIT-III, FIVATS, IVHET) in the design and fabrication processes of MHI steam generators.

CA 9: Reconfirm that the computer Completed validation was performed adequately for each thermal hydraulic analysis, vibration analysis, and wear analysis (FIT-III, FIVATS, IVHET).

  • If necessary, additional comparison to other validation methods shall be performed.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (31/64) Non-Proprietary Cause Corrective Action Due Date Effectiveness Review In accordance with MHIs QA program, Corrective action reports will be issued for all CAPRs and CAs and the confirmation of effectiveness of completed corrective actions will be performed by the Nuclear Plant Quality Assurance Section.

Effectiveness reviews will be completed in six (6) months by verifying corrective actions for the addressed problems.

In addition, review the results of the initial Unit 2 & 3 mid-cycle outage and SG inspections to determine the effectiveness of corrective actions.

There is no evidence of :

Additional tube to tube wear (in-plane FEI)

Additional tube to retainer bar wear (turbulence induced vibration (random vibration))

Additional tube to AVB wear (turbulence induced vibration (random vibration)).

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (32/64) Non-Proprietary 7.0 Extent of Cause Evaluation The Root Causes were evaluated for the extent to which they would be applicable and present elsewhere in the MHI steam generator design process.

The two Root Causes are:

1. Insufficient programmatic requirement to assure effective AVB contact force to prevent in-plane fluid elastic instability and random vibration and subsequent wear under high localized thermal-hydraulic conditions (steam quality (void fraction), flow velocity and hydro-dynamic pressure).
2. The design control process did not provide sufficient direction to assure that an evaluation of the need for an analysis of flow induced vibration of the retainer bar was performed and verified.

Root Cause 1 is associated with the design program and procedures not capturing necessary design elements affecting the primary pressure boundary. MHI has different nuclear engineering sections responsible for different aspects of the primary pressure boundary design, and each section has its own controlling design programs and procedures. Therefore, the extent of cause applies to the SG design program and areas of design outside the SG design program that could impact the primary pressure boundary. Sections outside the SG program with design responsibility related to the primary pressure boundary include:

a. Reactor Vessel
b. Core internals
c. Pressurizer
d. Reactor coolant piping
e. Control Rod Drive Mechanisms To address this extent of cause evaluation, each MHI engineering section will conduct a program and procedures review, based on what was learned from this event, to determine if there are other SG program elements or other primary components that rely on design assumptions that are not captured in the design program or procedures.

For Root Cause 2, an analysis that should have been performed was not. Therefore, this extent of cause applies to other SG design analyses that should have been performed but were not. Because there is no controlling document that identifies what analyses should be performed for each component, CAPR 2 must be developed and Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (33/64) Non-Proprietary then a complete review of the different MHI SG project needs to be performed to confirm that all required analyses have been completed.

8.0 Safety Culture Review A safety culture review was performed using the NRCs Inspection Manual Section IMC0310 COMPONENTS WITHIN THE CROSS-CUTTING AREAS and applying the guidance in that section to the Root and Contributing Causes identified in this report.

The review examined all four safety culture areas, the thirteen cross-cutting and other area components, and the thirty-seven aspects comprised in those components. A summary table 1 that compares the identified Root and Contributing Causes with the requirements of each of the safety culture areas, components and aspects is provided below.

As the table 1 shows, both Root Causes and all Contributing Causes are associated with aspect 6 (H.2(c)) of the resources component in the Human Performance Area. One Root Cause and all Contributing Causes are associated with aspect 2 (H.1(b)), of the decision-making component in the Human Performance Area. One Root Cause and all Contributing Causes are associated with aspect 4 (H.2(a)), of the resources component in the Human Performance area. Finally, one Root Cause and two of the Contributing Causes are associated with aspect 12 (H.4(c)) of the work practices component in the Human Performance Area.

The component from the Human Performance Area applicable to the second Root Cause and the three Contributing Causes is aspect 6 (H.2(c)) of the resources component, which calls for complete, accurate and up-to-date design documentation, procedures, and work packages, and correct labeling of components. This aspect of the resources component was not satisfied because, while the decision making and the designs were properly documented, they were inaccurate in that they did not require analyses to evaluate the potential FIV of the retainer bars (Root Cause 2);

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (34/64) Non-Proprietary This component from the Human Performance Area is also associated with Root Cause 1, in that the design procedures did not contain any requirement to assure effective AVB contact force. However, there is no safety culture related deficiency with respect to Root Cause 1 in that MHI was following accepted industry practices to design AVB and in fact sought to make its design more conservative than previous AVB designs.

An aspect of a component from the Human Performance Area applicable to one of the Root Causes and the three Contributing Causes is aspect 2 (H.1(b)) of the decision-making component, which requires that conservative assumptions be used in the design. The design did not require analyses to evaluate the potential FIV of the retainer bars (Root Cause 2);

The discrepancies between the design and aspect 2 (H.1(b)) of the decision-making component also apply to aspect 4 (H.2(a)) of resources component.

Finally, an aspect of a component from the Human Performance Area applicable to one Root Cause and two of the Contributing Causes is aspect 12 (H.4(c)) of component 4 (work practices), which requires that appropriate supervision and management oversight be applied to the design. While design activities were reviewed and confirmed by the design section the design supervision and review process failed to recognize that FIV analysis of the retainer bars was needed (Root Cause 2);

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (35/64) Non-Proprietary MHI has identified a number of corrective actions, which are being taken or will be completed in the near future, to address the safety culture discrepancies identified in this review. These corrective actions are described in Section 6.0 above. . The predominant safety culture aspect was determined to be H.2.(c) Work Documents because the decision making and work practices were not influenced by programmatic requirements. The H.2.(c) safety culture aspect has the associated corrective action to establish the programmatic requirements for both Root Causes and the Contributing Causes.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (36/64) Non-Proprietary Table 1 Safety Culture Review - Cross Cutting Components and Aspect X: Not sufficient Safety Culture Area, Component, Aspect Root Cause 1 Root Cause 2 Contributing Cause 1 Contributing Cause 2 Contributing Cause 3 Insufficient programmatic requirement to assure effective AVB contact force to The design control process did not provide prevent in-plane fluid elastic instability sufficient direction to assure that an and random vibration and subsequent evaluation of the need for an analysis of wear under high localized flow induced vibration of the retainer bar thermal-hydraulic conditions (steam was performed and verified.

quality (void fraction), flow velocity and hydro-dynamic pressure).

Area 1. Human Performance (H)

Component 1. Decision-Making Aspect 1.

Risk significant decisions Sufficient - MHIs AVB and tube bundle designs were reviewed and confirmed followed a decision-making process to evaluate and review the technical aspects of the design.

H.1(a)

Aspect 2.

Conservative Sufficient - The AVB design decision was assumptions H.1(b) Not sufficient - The engineer based on a FIT-III analysis which had a responsible for the retainer bar design built in safety margin and assumed one X did not recognize the need to analyze inactive support as an additional measure the retainer bar for potential flow of conservatism additionally MHIs design induced vibration had more AVBs than previous designs.

Aspect 3.

Timely communication Sufficient - The decisions of the AVB and SG team were documented and distributed to the team members in a timely manner.

H.1(c)

Component 2. Resources Aspect 4.

Managing maintenance Sufficient - The FIT-III analysis had a built H.2(a) Not sufficient - The engineer did not in safety margin and assumed that one X recognize the need to analyze the inactive support as an additional measure retainer bars for potential FIV.

of conservatism.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (37/64) Non-Proprietary Safety Culture Area, Component, Aspect Root Cause 1 Root Cause 2 Contributing Cause 1 Contributing Cause 2 Contributing Cause 3 Aspect 5.

Training and X Not sufficient - While the design section included experts in SG design and manufacture, however procedure for training program was not sufficient because the training materials and procedures were inadequate.

qualification personnel H.2(b)

Aspect 6.

Work documents H.2(c)

Not deficient The decision making and design were documented, but the design Not sufficient - The decision making and procedures did not include a requirement design were documented, but the to prevent in-plane FEI and random design procedures did not include a vibration related wear under high requirement to evaluate the retainer localized thermal-hydraulic conditions. bars for potential FIV. The predominant There was no programmatic requirement safety culture aspect was determined to prevent in-plane FEI and random X to be H.2.(c) Work Documents because vibration, but MHI sought to make the there was no programmatic AVB design more conservative than requirement to influence the engineer.

previous designs so no safety culture The H.2.(c) safety culture aspect has the deficiency is found. A corrective action is associated corrective action to establish nevertheless provided to address this new the programmatic requirement to understanding based on the tube wear evaluate for the need for an FIV analysis observed at SONGS.

Aspect 7.

Facilities and Equipment Sufficient - The SG design section was provided with adequate facilities and other resources to conduct design review meetings and decision-making.

H.2(d)

Component 3. Work Control Aspect 8.

Work planning H.3(a)

Not applicable - Aspects 8 and 9 are not applicable because they address work in the plant and coordination of removal of safety systems during plant maintenance.

Aspect 9.

Work coordinationH.3(b)

Component 4. Work Practices Aspect 10.

Error prevention techniques H.4(a) Sufficient - Design activities were established in compliance with QA programs to prevent error and personnel followed appropriate procedures.

Aspect 11.

Procedure compliance Sufficient - MHIs corrective action program governed the design process. Additionally the design section decisions were made pursuant to decision making procedures.

H.4(b)

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (38/64) Non-Proprietary Safety Culture Area, Component, Aspect Root Cause 1 Root Cause 2 Contributing Cause 1 Contributing Cause 2 Contributing Cause 3 Aspect 12.

Supervision and management oversight Sufficient -MHIs SG design activities were Not sufficient - The need for a FIV H.4(c) reviewed and confirmed by the design X analysis of retainer bar was not section at design review and technical detected in the design review process.

review meetings.

Area 2. Problem Identification and Resolution (P)

Component 5. Corrective Action Program Aspect 13.

Risk-based identification Sufficient - MHIs corrective action program governed the design process.

threshold P.1(a)

Aspect 14.

Sufficient - MHIs corrective action program includes trend based assessments.

Trending program P.1(b)

Aspect 15.

Sufficient - MHIs corrective action program includes Root Cause and apparent cause assessments.

Cause evaluations P.1(c)

Aspect 16.

Sufficient - No unresolved corrective actions were at issue.

Corrective actions P.1(d)

Aspect 17.

Alternative processes Sufficient - MHI has alternative programs in addition to its regular reporting program.

P.1(e)

Component 6. Operating Experience Aspect 18.

Systematic process Sufficient - MHI investigated operating experience with U-bend tube degradation using INPO, NRC and NPE data bases, and communicated internally in a timely manner.

P.2(a)

Aspect 19.

Process changes P.2(b)

Sufficient - MHI conducted benchmarking and concluded that the SONGS RSG was designed to minimize the potential for tube wear by providing more support points with shorter spans in the U-bend region along with effective zero tube-to-AVB gaps during SG operation.

Component 7. Self- and Independent Assessments Aspect 20.

Nature of assessments Sufficient - MHI periodically and appropriately conducted self-assessments.

P.3(a)

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (39/64) Non-Proprietary Safety Culture Area, Component, Aspect Root Cause 1 Root Cause 2 Contributing Cause 1 Contributing Cause 2 Contributing Cause 3 Aspect 21.

Tracking and trending Sufficient - MHI periodically and appropriately conducted self-assessment.

P.3(b)

Aspect 22.

Coordination and Sufficient - MHI coordinated and communicated result from self-assessment to affect personnel and took appropriate corrective actions.

communication P.3(c)

Area 3. Safety Conscious Work Environment (S)

Component 8. Environment for Raising Concerns Aspect 23.

Free and open Sufficient - The SG design team and AVB design team encouraged discussions of safety issues and openly exchanged information on design alternatives information exchange S.1(a)

Aspect 24.

Alternate processes Sufficient - MHI has alternative programs for raising safety concerns in confidence.

S.1(b)

Component 9. Preventing, Detecting, and Mitigating Perceptions of Retaliation Aspect 25.

Sufficient - There were no claims of harassment by SG team members.

Training S.2(a)

Aspect 26.

Sufficient - There were no claims of retaliation by SG team members.

Investigation S.2(b)

Aspect 27.

Chilling effect S.2(c) Sufficient - MHI appropriately considers chilling effect. No disciplinary actions were taken.

Area 4. Other Safety Culture Components (O)

Component 10 .Accountability Aspect 28.

Alignment of safety and Sufficient - Accountability for SG design decisions was clearly understood within MHI.

rewards O.1(a)

Aspect 29.

Reinforcement O.1(b) Sufficient - Management reinforced safety standards.

Aspect 30.

Sufficient - MHI demonstrated safety focus, review of meeting minutes indicates focus of SG design team was to come up with design with appropriate margin which demonstrated focus on safety.

Safety focus O.1(c)

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

UES-20120254 Rev.0 (40/64) Non-Proprietary Safety Culture Area, Component, Aspect Root Cause 1 Root Cause 2 Contributing Cause 1 Contributing Cause 2 Contributing Cause 3 Component 11. Continuous learning environment Aspect 31.

Training and knowledge Sufficient - SG design team was trained on SG design continuously.

O.2(a)

Aspect 32.

Internal and external learning O.2(b) Sufficient - SG design team was trained on SG design continuously and transfer of knowledge was provided by internal experts, however the issue of effective AVB to contact force was not known within the industry so training could not be effective.

Component12. Organizational change management Aspect 33.

Organizational change Sufficient - MHI management used systematic process and evaluated of impacts of decisions when organization was changed.

management O.3 Component13. Safety policies Aspect 34.

Sufficient - MHI has appropriate policies which required reinforce to raise safety concern.

Raising concernsO.4(a)

Aspect 35.

Safety policy training Sufficient - MHI has appropriate policy training to raise individual safety concern.

O.4(b)

Aspect 36.

Decisions consistent Sufficient - Decisions related to SG design were consistent with MHI policies.

with safetypriorityO.4(c)

Aspect 37.

Top management Sufficient - Top management communicated need for safe SG design as issue of effective AVB to contact force was not known within the industry so management communication could not be effective.

commitment O.4(d)

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-1 UES-20120254 Rev.0 (41/64) Non-Proprietary (Legend)

Cause-effect analysis for the tube to tube wear  : Phenomenon Tube Failure A B  : B is underlying cause of A

Cause In-plane FEI*Note 1
Contributing Cause High localized TH condition Low Natural Frequency (in-plane)  : Root Cause High Velocity Inadequate support No AVB for Large bending in-plane direction in-plane radius of U-tube (insufficient tube to AVB contact force)

Localized high steam Large SG quality (void fraction)

Underestimated the velocity because Design element to inappropriate gap was assigned as avoid excessive vibration analysis input Insufficient action to decrease preload (contact force) steam quality (void fraction) Replacement from between AVB and tube OSG T/H condition was judged acceptable by FIV Other potential design changes analysis (SR<1 and no excessive wear) and considered to decrease steam dry out evaluation quality (void fraction) but they had unacceptable outcomes T/H analysis (FIT- III) did not indicate the necessity to reduce the high steam To maintain Satisfy design Insufficient Did not quality (void fraction) mechanical specification knowledge of the recognize relationship damping by the need for not to exceed between high sliding of tube contact force 7% ding steam quality (void along AVB to control indications with fraction) and in-plane FEI ECT *Note 3 in-plane FEI *Note 2

  • Note 1: Each SG on unit 3 had about 160 tubes with TTW. Only 2 tubes in one unit 2 SG had TTW. This difference was caused by MHI relied on the manufacturing and fabrication improvements performance of FIT-III implemented for unit 3. These improvements based on the past No previous resulted in lower tube to AVB contact force in Root Cause (1)

MHI SONGS RSG SG unit 3 SGs when compared to unit 2 SGs.

successful experiences Insufficient programmatic design did not consider experience in triangular tube requirement to assure effective *Note 2: At the time of design a narrow gap the phenomenon of showed need configuration SGs AVB contact force to prevent between the AVB and tube was believed to in-plane FEI because for in-plane Root Causes are defined as the basic reasons (e.g., hardware, in-plane fluid elastic achieve effective support condition.

contemporary knowledge FEI analysis process, or human performance) for a problem, which if instability and random and industry U-bend SG *Note 3: To consider identifying specific corrected, will prevent recurrence of that problem. vibration and subsequent wear Contributing Causes are defined as causes that by themselves operation experience did customer specification but also note that MHI under high localized would not create the problem but are important enough to be not indicate a need to evaluated and found such thermal-hydraulic conditions recognized as needing corrective action. Contributing Causes consider in-plane FEI specification/requirement acceptable based are sometimes referred to as causal factors. Causal factors are (steam quality (void fraction),

on experiences.

those actions, conditions, or events that directly or indirectly flow velocity and influence the outcome of a situation or problem. hydro-dynamic pressure).

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-1 UES-20120254 Rev.0 (42/64) Non-Proprietary Cause-effect analysis for the tube to AVB wear Tube to AVB wear (Legend)

Phenomenon Random vibration A B  : B is underlying cause of A
Cause High localized TH condition Inadequate support (insufficient tube to AVB contact force)
Contributing Cause
Root Cause High Velocity Localized high steam quality (void fraction)

Underestimated the velocity because inappropriate gap was assigned as Design element to avoid excessive preload vibration analysis input Insufficient action to decrease (contact force) between AVB and tube steam quality (void fraction)

T/H condition was judged Other potential design changes acceptable by FIV analysis (SR<1 considered to decrease steam and no excessive wear) and dry out quality (void fraction) but they evaluation had unacceptable outcomes To maintain Did not recognize Satisfy design T/H analysis (FIT- III)did not indicate Two inactive supports were mechanical damping need for contact specification not to the necessity to reduce the high steam deemed to be a sufficiently by the sliding of tube force to control exceed 7% ding quality (void fraction) conservative assumption for along AVB random vibration indications with ECT evaluation of vibration wear *Note 1 *Note 2 estimation even under high steam quality conditions MHI relied on the Root Cause (1) performance of FIT-III MHI SONGS RSG design did not Insufficient programmatic based on the past consider sufficient AVB contact force requirement to assure effective successful experiences to prevent the random vibration AVB contact force to prevent in triangular tube under high steam quality (void in-plane fluid elastic instability *Note 1: At the time of design a narrow configuration SGs fraction) condition because and random vibration and gap between the AVB and tube and low Root Causes are defined as the basic reasons (e.g., hardware, contemporary knowledge and subsequent wear under high contact force was believed to achieve process, or human performance) for a problem, which if industry U-bend SG operation corrected, will prevent recurrence of that problem. localized thermal-hydraulic effective support condition.

experience did not indicate a need Contributing Causes are defined as causes that by themselves conditions (steam quality (void to consider such phenomenon would not create the problem but are important enough to be fraction), flow velocity and *Note 2: To consider identifying specific

  • Note 1 recognized as needing corrective action. Contributing Causes hydro-dynamic pressure). customer specification but also note that are sometimes referred to as causal factors. Causal factors are MHI evaluated and found such those actions, conditions, or events that directly or indirectly specification/requirement acceptable influence the outcome of a situation or problem. based on experiences.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-1 UES-20120254 Rev.0 (43/64) Non-Proprietary Cause-effect analysis for the retainer bar to tube wear (Legend)

Retainer bar to tube wear

Phenomenon A B : B is underlying cause of A Random vibration
Cause
Root Cause Design allowed vibration Bar was exposed to turbulent flow The bar length was Bar was designed FIV analysis was not performed extended thinner Needs to capture larger Allowable space between No assessment of number of tubes tubes need for FIV analysis performed for retainer bar RSG design elements Senior engineer did not Based on past Previous designs did identify the need for FIV success, engineering not perform FIV for analysis during the design did not recognize the retainer bar verification review need to perform additional analysis Root Cause (2)

The design control process did not provide sufficient direction to assure that an evaluation of the need for an analysis of flow induced vibration Root Causes are defined as the basic reasons (e.g., hardware, of the retainer bar was performed and verified.

process, or human performance) for a problem, which if corrected, will prevent recurrence of that problem.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-2 UES-20120254 Rev.0 (44/64) Non-Proprietary Barrier analysis A barrier analysis for the SONGS RSGs was performed with respect to the items listed below.

Design Fabrication Post Installation testing/monitoring Post Operational Inspection The barrier analysis was developed to assess the barriers at each of the major stages of the steam generator replacement program. The two primary barriers assessed at each stage included training/ qualification of personnel and procedures. As shown in the Barrier analysis table, procedures and training / qualification were lacking for the three wear mechanisms evaluated (tube to tube, retainer bar to tube, and tube to AVB).

There were no issues identified with the fabrication process so there were no failed barriers. The results of the barrier analysis support the cause-effect analysis.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-2 UES-20120254 Rev.0 (45/64) Non-Proprietary Consequ Barrier Outcome Evaluation ence Tube to Design Training / In-plane FEI Not The design section procedure did not contain guidance on in-plane FEI. As a result, training programs did Tube Qualificati Effective not cover the phenomenon of in-plane FEI. This will be addressed with CA 1 in the Corrective action matrix.

wear on TH model FIV analysis Not Effective Procedures In-plane FEI Not Analyses were not performed because there was no consideration of this phenomenon mentioned in the Effective procedure. This will be addressed with CAPR 1 in the Corrective action matrix.

TH model Not FIT-III predicted a lower velocity due to use of inappropriate gap value. This will be addressed with CA 3 in FIV analysis Effective the Corrective action matrix.

Supervisio In-plane FEI Supervisors used same procedures and received the same training as design engineers.

n Every 3 months, an Executive Oversight Meeting was held. Deputy Head of MHI and Department Managers Not participated. However, there were no questions related to in-plane FEI because it was not considered under Effective MHI procedure or industry practice. This will be addressed with CAPR 1 and CA 1 in the Corrective action matrix.

TH model FIT-III output indicated higher steam quality (void fraction) than previous SG designs. However, the senior FIV analysis engineer did not consider the potential adverse effects of the higher steam quality (void fraction).

Potentially This will be addressed with CA 1in the Corrective action matrix.

Not Effective Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-2 UES-20120254 Rev.0 (46/64) Non-Proprietary Retainer Design Training Required Necessary analyses for each component were selected based on engineering judgment and past success.

Not Analyses Training was insufficient.

Effective to tube This will be addressed with CAPR2in the Corrective action matrix.

bar wear Procedures Required There was no requirement to confirm the consideration of a FIV analysis for changes made to a component Not Analyses in the flow stream.

Effective This will be addressed with CA 2in the Corrective action matrix.

Supervision Based on past successful experience, engineering did not recognize the need to perform additional analysis Not for the retainer bars. The senior engineer did not identify the need for FIV analysis during the design Effective verification review.

This will be addressed with CA 2in the Corrective action matrix.

Tube to Design Training Contact force SG design training does not discuss contact force as a control mechanism to address vibration related wear Not under high under high steam quality (void fraction) condition.

Effective AVB wear steam quality This will be addressed with CA 1in the Corrective action matrix.

Procedur Contact force SG design procedures do not mention AVB contact force as a control mechanism to address vibration Not es under high related wear under high steam quality (void fraction) condition.

Effective steam quality This will be addressed with CAPR1in the Corrective action matrix.

Consequence all Fabrication The SGs were fabricated as intended. For unit 2 it was done using the normal fabrication process. For unit 3 Not it required divider plate failure repair. There were no causes identified associated with fabrication deviation applicable from the design.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-3 UES-20120254 Rev.0 (47/64) Non-Proprietary Change analysis For the SONGS RSGs, a change analysis was performed in two stages. The first stage compared the SONGS SG design to previous MHI SG designs for the triangular tube configuration. MHI had previously performed three steam generator designs using a triangular tube configuration. The second stage compared the SONGS RSGs to the previous SONGS SG design (Combustion Engineering type design). Only the most significant changes are included in this analysis.

The change analysis results are set out below.

(1) Differences between SONGS RSGs and previous MHI SG triangular design.--

The SONGS RSGs have:

circulation ratio maximum flow velocity average flow velocity P/D ratio out-of-plane FEI stability ratio Largest U bundle radius Specified AVB twist range of G-value (tube diameter, out-of-plane)

Highest steam quality (void fraction)

Thinnest and longest retainer bar nominal tube-to-AVB gap (0.002 cold / 0.000 hot) variation in tube-to-AVB gap (3 sigma: )

(2) Differences between SONGS RSGs and the previous SONGS OSG design. --

Increase in tube bundle heat transfer surface area (11%)

Increase in number of tubes (5%)

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-3 UES-20120254 Rev.0 (48/64) Non-Proprietary Removal of stay cylinder Change from lattice bars to trefoil broached tube support plates Change in tube support configuration in U region Change from CE to MHI moisture separators Power level / operating temperature / tube plugging margin (3) Identification of the changes from previous SG designs led to the recognition that the RSG design deserved close scrutiny. MHI considered the changes in the SONGS design from previous steam generator designs and compared the basic design parameters of the SONGs RSGs (e.g., heat transfer area, circulation ratio, steam pressure, etc.) with other steam generator designs. Further, as part of the development of the SONGS RSG design, MHI conducted a detailed comparison between its proposed AVB support for the tubes in the U-bend region and that of a comparison plant of similar design. A special AVB team was formed and included industry experts to conduct an extensive design review process in 2005 / 2006 to optimize the U-bend design and address the technical issues. The team concluded that the SONGS design was significantly more conservative than previous designs in addressing U-bend tube vibration and wear.

Also MHI and SCE recognized that the SONGS RSG steam quality (void fraction) was high and MHI performed feasibility studies of different methods to decrease it.

Several design adjustments were made to reduce the steam quality (void fraction) but the effects were small. Design measures to reduce the steam quality (void fraction) by a greater amount were considered, but these changes had unacceptable consequences and MHI and SCE agreed not to implement them. It was concluded that the final design was optimal based on the overall RSG design requirements and constraints. These included physical and other constraints on the RSG design in order to assure compliance with the provisions of 10 C.F.R. §50.59.

Thus, MHI did compare the SONGs RSG design with previous steam generator designs, and in particular did a detailed evaluation of different options of the AVB design taking into account other large steam generator designs.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-3 UES-20120254 Rev.0 (49/64) Non-Proprietary Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-3 UES-20120254 Rev.0 (50/64) Non-Proprietary Comparison between SONGS RSG Design and Previous MHI Designs Operating SCE RSG U2 SCE RSG Comparison Potential Evaluation Conditions U3 to other Cause MHI design Pressure (ata) 58.9

  • 1 Steam Flow 3.44E+06 (kg/h)

FW 228 Temperature

()

S/G Level 1612 (mm)*2 Circulation 3.3 the high steam quality (void fraction) with Ratio (-) *5 lower tube damping, which in combination with other factors can lead to tube vibration.

Maximum The high flow velocity provides the large dynamic pressure to the tube, which in Flow Velocity combination with other factors can lead to tube vibration.

(m/s) *5 Average Flow The high flow velocity provides the large dynamic pressure to the tube, which in velocity (m/s) combination with other factors can lead to tube vibration.

  • 5 P/D Ratio (-) 1.33 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-3 UES-20120254 Rev.0 (51/64) Non-Proprietary Operating SCE RSG U2 SCE RSG Comparison Potential Evaluation Conditions U3 to other Cause MHI design Stability Ratio stability ratio of out- of- plane FEI (highest) (-)

(Where) *5 U-bend Radius Largest The large bending radius gives (mm)

AVB Thickness (mm)

AVB width (mm)

AVB twist (mm)

G-Values (mm)

Nominal span between AVBs (mm)

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-3 UES-20120254 Rev.0 (52/64) Non-Proprietary Operating SCE RSG U2 SCE RSG Comparison Potential Evaluation Conditions U3 to other Cause MHI design Natural .

Frequency (Hz)

(tubes of Concern) *4 Steam Quality 0.9 Highest Y The high steam quality (void fraction) gives the low tube damping, which in (Void Fraction) (0.996) combination with other factors can lead to tube vibration.

(-) *5 AVB design *3 Solid type Retainer bar Thinnest Y The thinnest and longest retainer bar gives a low frequency, so FIV of retainer dimension bar may result.

Longest

  • 1 This parameter shows secondary pressure.
  • 2 The distance between the U-bend top to water level.
  • 3 This parameter shows RSG AVB.
  • 4 The lowest natural frequency of tube is provided
  • 5 Circulation ratio is obtained from SSPC code, and Max. flow vel., Avg. flow vel., stability ratio, and steam quality (void fraction) are obtained ATHOS code.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-3 UES-20120254 Rev.0 (53/64) Non-Proprietary Comparison between SONGS RSG and Previous SONGS (CE) SG (OSG) Design *1,2 Design Element OSG Specification RSG Specification Potenti Evaluation al Cause Number of 9350 9727 Tubes Channel Head Stay cylinder to support tubesheet, Thick welded structural and Tubesheet floating divider plate divider plate Configuration Tube Support Batwing assembly, diagonal and Floating structure consisting Configuration vertical strips with interlocking of 6 V-shaped anti-vibration (U-Bend Section) horizontal strips between tubes, bars (AVBs) with 12 support lattice bars attached to structural points, retaining bars, members (shroud) external to the bridges, and retainer bars tube bundle Tube Support Lattice bars (egg crates) positioned 7 trefoil broached tube Configuration by tie rods and wedge-welded to the support plates (TSPs)

(Straight Section) shroud after alignment with positioned by stay rods, tubesheet, shroud is active part of radial load path at all TSPs radial load path, 2-inch line contact on 2 sides, 1-inch line contact on 2 sides

  • 1 This analysis focused on mechanical differences because T/H conditions were expected to be similar.

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-4 UES-20120254 Rev.0 (54/64) Non-Proprietary RCA charter

Title:

Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station Management Sponsor:

Team:

Problem Statement:

(1) Requirement No Primary-to-Secondary Leakage due to Defects in any of the RSG Units for the duration of the Warranty Period. (per 17.2.3 of General T&C with EMS)

(2) Deviation Unit 3 SG-B (SCE SG088) experienced tube leakage during operation and failure of eight tubes during in-situ pressure testing. (Both due to Defects)

(3) Consequences (For MHI) 10CFR21 Report required Timeline and Deliverables:

RCA Team Assigned : March 23, 2012 Problem Statement committed : March 23, 2012 Prepare begun: March 26, 2012 DRAFT Cause-effect analysis : April13, 2012 DRAFT RCA Summary : July5, 2012 Review RCA Summary : July7, 2012 DRAFT RCA Report : July20, 2012 Review Revised RCA Summary : August30, 2012 Review RCA report: September 6 and 11, 2012 RCA Due Date: October12, 2012 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-5 UES-20120254 Rev.0 (55/64) Non-Proprietary Time line Design Procedure (BKA60-N01)

Time Line 2012 Rev.0, 5/31 (Replaced with 5BBB60-N01) 2011 Rev.18, 11/24 Rev.7, 3/12 2010 Rev.6, 1/15 Rev.17, 2/12 Rev.16, 2/5 2009 Rev.9, 8/29 Rev.5, 7/3 Rev.4, 7/3 Rev.5, 7/14 Rev.5, 6/11 Rev.4, 6/12 Rev.3, 4/4 Rev.8, 4/7 Rev.4, 3/21 Rev.4, 3/24 Rev.3, 3/14 Rev.2, 2/27 Rev.3, 2/29 2008 Rev.15, 12/21 Rev.14, 10/23 Rev.13, 10/19 Rev.12, 4/26 Rev.11, 4/12 Rev.2, 4/6 Rev.7, 2/27 2007 Rev.2, 1/19 Rev.6, 1/23 Rev.1, 8/22 Rev.1, 9/20 Rev.0, 4/26 Rev.3, 2/17 Rev.0, 2/17 Rev.2, 2/3 Rev.10, 1/26 2006 Rev.2, 1/19 Rev.1, 12/19 Rev.1, 11/25 Rev.1, 11/14 Rev.9, 10/17 Rev.8, 9/9 Rev.0, 9/30 Rev.0, 9/5 Rev.5, 10/21 Rev.7, 7/13 Rev.4, 9/29 Rev.6, 5/17 Rev.3, 6/24 Rev.2, 6/6 Rev.2, 4/29 Rev.1, 4/29 Rev.5, 2/7 Rev.0, 2/28 Rev.0, 3/9 2005 Rev.1, 1/7 Rev.0, 11/30 Rv.4, 10/22 Rev.3, 8/23 2004 Thermal and Design of Analytical Water Level Data for Design Design Hydraulic Anti-Vibration Report of Controllability Licensing Report for the Report of Parameters Bar AVB Analysis Support Tube Sheet Tube L5-04GA503 L5-04GA428 Assembly L5-04GA519 Analysis Region L5-04GA418 Superseded by L5-04GA419 L5-04GA511 L5-04GA401 L5-04GA510 Rev.1 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-5 UES-20120254 Rev.0 (56/64) Non-Proprietary Design Procedure (BKA60-N01)

Time Line 2012 Rev.0, 5/31 (Replaced with 5BBB60-N01) 2011 Rev.18, 11/24 2010 Rev.4, 1/25 Rev.17, 2/12 Rev.16, 2/5 2009 Rev.9, 9/25 Rev.3, 8/4 Rev.8, 8/20 Rev.7, 6/4 Rev.6, 4/4 Rev.7, 3/19 Rev.5, 2/29 Rev.2, 2/28 2008 Rev.15, 12/21 Rev.14, 10/23 Rev.13, 10/19 Rev.12, 4/26 Rev.11, 4/12 Rev.6, 4/2 Rev.5, 2/13 2007 Rev.4, 12/12 Rev.3, 11/17 Rev.4, 5/12 Rev.3, 4/19 Rev.2, 3/24 Rev.10, 1/26 2006 Rev.2, 1/19 Rev.1, 1/20 Rev.1, 11/11 Rev.0, 11/18 Rev.9, 10/17 Rev.4, 10/7 Rev.2, 10/5 Rev.8, 9/9 Rev.0, 9/30 Rev.1, 9/9 Rev.3, 9/7 Rev.1, 8/5 Rev.1, 8/12 Rev.7, 7/13 Rev.3, 7/29 Rev.0, 6/27 Rev.2, 6/14 Rev.0, 6/27 Rev.6, 5/17 Rev.2, 5/17 Rev.1, 3/9 Rev.1, 3/23 Rev.5, 2/7 Rev.0, 2/24 2005 Rev.0, 1/21 Rev.0, 1/19 Rv.4, 10/22 Rev.3, 8/23 2004 Material Material Material Design Basic Sizing Design of Qualification Selection Selection Selection Report of Calculation Tube Support Report of Report for Report for Report for Tube Support Report Plate AVB End Cap Anti-Vibration Heat Transfer Tube Support Plate and L5-04GA421 L5-04GA425 L5-04GA429 Bar Tubing Plate Stay Rod L5-04GA224 L5-04GA208 L5-04GA223 L5-04GA411 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-5 UES-20120254 Rev.0 (57/64) Non-Proprietary Design Procedure (BKA60-N01)

Time Line 2012 Rev.0, 5/31 (Replaced with 5BBB60-N01) 2011 Rev.18, 11/24 2010 Rev.17, 2/12 Rev.16, 2/5 2009 Rev.5, 11/12 Rev.4, 10/28 Rev.3, 8/29 Rev.2, 3/31 2008 Rev.1, 1/31 Rev.15, 12/21 Rev.14, 10/23 Rev.13, 10/19 Rev.0, 8/3 Rev.12, 4/26 Rev.11, 4/12 2007 Rev.2, 10/18 Rev.2, 10/18 Rev.2, 10/18 Rev.1, 8/22 Rev.1, 6/13 Rev.1, 6/13 Rev.1, 6/13 Rev.10, 1/26 2006 Rev.0, 11/11 Rev.0, 11/11 Rev.0, 11/11 Rev.0, 11/11 Rev.0, 11/11 Rev.0, 11/11 Rev.9, 10/17 Rev.8, 9/9 Rev.7, 7/13 Rev.6, 5/17 Rev.5, 2/7 2005 Rv.4, 10/22 Rev.3, 8/23 2004 Thermal and Anti-Vibration Anti-Vibration Anti-Vibration Anti-Vibration Anti-Vibration Anti-Vibration Hydraulic Bar Assembly Bar Assembly Bar Assembly Bar Assembly Bar Assembly Bar Assembly Parametric 1/9 2/9 3/9 4/9 5/9 6/9 Calculations L5-04FU111 L5-04FU112 L5-04FU113 L5-04FU114 L5-04FU115 L5-04FU116 L5-04GA510 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-5 UES-20120254 Rev.0 (58/64) Non-Proprietary Design Procedure (BKA60-N01)

Time Line 2012 Rev.0, 5/31 (Replaced with 5BBB60-N01) 2011 Rev.18, 11/24 2010 Rev.17, 2/12 Rev.16, 2/5 2009 2008 Rev.15, 12/21 Rev.14, 10/23 Rev.13, 10/19 Dimesion change of Rev.12, 4/26 Retainer Bar Rev.11, 4/12 Stress Engineer sign off Rev.9, 3/9 2007 Rev.8, 12/8 Rev.7, 12/5 Rev.6, 11/9 Rev.5, 10/18 Rev.4, 9/26 Rev.3, 9/4 Rev.3, 8/24 Rev.2, 6/13 Rev.3, 4/6 Rev.1, 2/28 Rev.2, 2/17 Rev.10, 1/26 2006 Rev.1, 1/19 Rev.1, 1/19 Rev.2, 12/2 Rev.0, 11/11 Rev.0, 11/11 Rev.0, 11/11 Rev.9, 10/17 Rev.8, 9/9 Rev.1, 8/12 Rev.7, 7/13 Rev.6, 5/17 Rev.0, 5/27 Rev.5, 2/7 2005 Rv.4, 10/22 Rev.3, 8/23 Rev.3, 8/10 Rev.3, 8/10 Rev.2, 7/24 Rev.2, 7/24 Rev.1, 6/8 Rev.1, 6/8 Rev.0, 2/15 Rev.0, 2/15 Rev.0, 2/15 2004 Anti-Vibration Anti-Vibration Anti-Vibration Tube Support General General General Bar Assembly Bar Assembly Bar Assembly Plate Assembly 1/3 Assembly 2/3 Assembly 3/3 7/9 8/9 9/9 Assembly 3/3 KAZ-04-0021 KAZ-04-0022 KAZ-04-0023 L5-04FU117 L5-04FU118 L5-04FU119 L5-04FU108 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-5 UES-20120254 Rev.0 (59/64) Non-Proprietary Design Rev.9, 9/27 Rev.3, 9/27 10/12 Procedure (BKA60-N01) Rev.8, 9/14 Rev.2, 8/31 Time Line Rev.7, 8/30 Rev.1, 7/27 Rev.5, 6/18 Rev.4, 6/20 Rev.6, 8/10 Rev.0, 7/4 Rev.4, 5/22 Rev.3, 5/11 Rev.5, 7/17 Rev.2, 4/5 Rev.4, 7/13 Rev.1, 3/16 Rev.3, 6/27 3/23 Rev.0, 2/13 Rev.2, 5/21 2012 Rev.1, 4/27 Rev.0, 3/30 Rev.0, 5/31 (Replaced w ith 5BBB60-N01) 2011 Rev.18, 11/24 2010 Rev.17, 2/12 Rev.16, 2/5 2009 2008 Rev.15, 12/21 Rev.3, 12/11 Rev.14, 10/23 Rev.13, 10/19 Rev.12, 4/26 Rev.11, 4/12 R.Violette, M.J.Pettigrew, and N.W.Mureithi

Fluidelastic Instability of an Array of Tubes Preferentially Flexible in the Flow Direction Subjected to Two-Phase 2007 Cross Flow

ASME Journal of Pressure Vessel Technology Vol.128 Feb.2006 10/2 9/11 Rev.9, 8/4 Rev.8, 6/16 6/2 Rev.7, 4/19 3/13 Rev.6, 2/13 Rev.10, 1/26 2006 Discussion about tube to AVB gap control Rev.5, 12/21 Rev.2, 12/7 12/5 Rev.9, 10/17 Rev.4, 10/21 10/17 Rev.8, 9/9 Rev.3, 9/26 V.P.Janzen, E.G.Hagberg, M.J.Pettigrew, 9/14 Rev.2, 8/22 and C.E..Taylor 8/17 Rev.7, 7/13 Fluidelastic instability and WorkRate 7/11 Rev.1, 6/8 Measurements of Steam-Generator Rev.6, 5/17 Rev.1, 5/17 UTubes in Air-Water CrossFlow 5/23 ASME Journal of Pressure Vessel Technology Vol.127 3/28 Rev.5, 2/7 Rev.0, 2/25 2/14 2005 Feb. 2005 Rv.4, 10/22 Rev.0, 10/15 JSME Guideline Fluid-elastic Vibration Evaluation of U-bend Tube in SGs

Rev.3, 8/23 M. K. Au-Yang, Mar. 2002

Flow-Induced Vibration of Power and Process Plant Components

Jul. 2001 2004 Replacement Evaluation of Retainer Bar Tube w ear of Validity of Use Activity period MHI/SCE Design Steam Tube Vibration Tube Wear Unit-3 RSG - of the FIT-III of the RCA team Review Meeting Generators L5-04GA504 Report Technical Results during for AVB Design Project L5-04GA561 Evaluation Design and Fabrication Execution Plan Report L5-04GA591 L5-04GB001 L5-04GA564 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-6 UES-20120254 Rev.0 (60/64) Non-Proprietary Interview list Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-6 UES-20120254 Rev.0 (61/64) Non-Proprietary Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-7 UES-20120254 Rev.0 (62/64) Non-Proprietary Reference documents

1. 5BB60-N06Rev.1 ASME Code Job Procedure for Preparation of Design Reports, 5/30/2012
2. 5BBB60-N01Rev.0 Procedure for Controlling of the Design Activities, 5/31/2011
3. KAS-20050202 Rev.1 FIT-III Code Description Note (Code Users Manual), 11/18/2005
4. L5-04GA504 Rev.5 Evaluation of Tube Vibration, 6/18/2012
5. L5-04GA588 draft Summary of Technical Evaluation
6. L5-04GA561 Rev.4 Retainer Bar Tube Wear Report, 6/20/2012
7. L5-04GA564 Rev.9 Tube wear of Unit-3 RSG - Technical Evaluation Report, 9/27/2012
8. L5-04GA591Rev.3 Validity of Use of the FIT-III Results during Design, 9/27/2012
9. L5-04GA428 Rev.5 Design of Anti-Vibration Bar, 7/3/2008
10. L5-04GA419 Rev.4 Analytical Report of AVB Assembly, 7/3/2008
11. L5-04GA519Rev.2 Water Level Controllability Analysis, 1/19/2007
12. L5-04GA511 Rev.9 Data for Licensing Support Analysis, 8/29/2008
13. L5-04GA401 Rev.7 Design Report for the Tube Sheet Region, 3/12/2010
14. L5-04GA418 Rev.5 Design Report of Tube, 7/14/2008
15. L5-04GA224 Rev.2 Material Selection Report for Anti-Vibration Bar, 1/19 2006
16. L5-04GA208 Rev.3 Material Selection Report for Heat Transfer Tubing,7/29/2005
17. L5-04GA223 Rev.1 Material Selection Report for Tube Support Plate, 9/9/2005
18. L5-04GA411 Rev.7 Design Report of Tube Support Plate and Stay Rod, 6/4/2008
19. L5-04GA421 Rev.4 Basic Sizing Calculation Report, 1/25/2010
20. L5-04GA425 Rev.9 Design of Tube Support Plate, 9/25/2008
21. L5-04GA429 Rev.4 Qualification Report of AVB End Cap, 5/12/2006 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-7 UES-20120254 Rev.0 (63/64) Non-Proprietary

22. L5-04GA510 Rev.5 Thermal and Hydraulic Parametric Calculations, 11/12/2008
23. L5-04FU111 Rev.2 Anti-Vibration Bar Assembly 1/9,10/18/2006
24. L5-04FU112 Rev.1 Anti-Vibration Bar Assembly 2/9, 8/22/2006
25. L5-04FU113 Rev.0 Anti-Vibration Bar Assembly 3/9, 11/11/2005
26. L5-04FU114 Rev.0 Anti-Vibration Bar Assembly 4/9, 11/11/2005
27. L5-04FU115 Rev.2 Anti-Vibration Bar Assembly 5/9, 10/18/2006
28. L5-04FU116 Rev.2 Anti-Vibration Bar Assembly 6/9, 10/18/2006
29. L5-04FU117 Rev.9 Anti-Vibration Bar Assembly 7/9, 3/9/2007
30. L5-04FU118 Rev.3 Anti-Vibration Bar Assembly 8/9, 4/6/2006
31. L5-04FU119 Rev.1 Anti-Vibration Bar Assembly 9/9, 1/19/2006
32. L5-04FU108 Rev.3 Tube Support Plate Assembly 3/3, 9/4/2006
33. KAZ-04-0021 Rev.3 General Assembly 1/3,8/10/2004
34. KAZ-04-0022 Rev.3 General Assembly 2/3, 8/10/2004
35. KAZ-04-0023 Rev.0 General Assembly 3/3, 2/15/2004
36. L5-04GB001 Rev.9 Replacement Steam Generators Project Execution Plan, 8/4/2006
37. SB-SO-FB-0003 Rev.7 Tubing and AVB Installation Procedure, 12/18/2007
38. SB-SO-FB-0004 Rev.10 AVB Structure Assembly Procedure, 7/30/2007
39. UGS-L5-050044 Rev.7 Anti-Vibration Bar Inspection Procedure (after assembling), 5/21/2007
40. UGS-L5-050045 Rev.10 Inspection Procedure for Tube and Anti-Vibration Bar Insertion, 11/2/2007
41. UGNR-SON2-RSG-067 Rev.7 Nonconformance Report (Unacceptable gaps between Tubes and AVBs for Unit-2A),9/21/2007
42. UGNR-SON2-RSG-075 Rev.1 Nonconformance Report (Unacceptable gaps between Tubes and AVBs for Unit-2B), 12/3/2007 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Attachment-7 UES-20120254 Rev.0 (64/64) Non-Proprietary

43. UGNR-SON3-RSG-024 Rev.1 Nonconformance Report for some Gaps between Tubes and AVBs are larger than the criterion, 4/24/2008
44. UGNR-SON3-RSG-030 Rev.0 Nonconformance Report for some Gaps between Tubes and AVBs are larger than the criterion,3/20/2008 Root Cause Analysis Report for tube wear identified in the Unit 2 and Unit 3 Steam Generators of San Onofre Nuclear Generating Station

Non-proprietary Version (1/68)

San Onofre Nuclear Generating Station, Units 2 & 3 REPLACEMENT STEAM GENERATORS Supplemental Technical Evaluation Report Purchase Order No. 4500024051 Specification No. SO23-617-01R3 CONTENT REMARKS ORDER No. DATE Nuclear Plant Component PURCHASER Designing Department DESCRIPTION

- PAGE ITEM No. REFERENCE Steam Generator Designing Section APPROVED BY FIGURE

- SHEET 2591012 Edison CHECKED BY 68 (MNES)

TOTAL PAGE 2000 DESIGNED BY DRAWN BY ISSUE DATE DWG. No. Rev.No.

PM(S) COPY Distribution L5-04GA588 0 1 1 MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (2/68)

Document No.L5-04GA588(0)

Revision History No. Revision Date Approved Checked Prepared 0 Initial issue See cover sheet MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (3/68)

Document No.L5-04GA588(0)

Contents

1. Introduction .............................................................................................................. 4
2. Wear Mechanism of Type 1 (Tube-to-tube wear) .................................................... 6 2.1 Tube Wear Indications of Type 1 (Tube-to-tube wear) .......................................... 6 2.2 Causes of Type 1 Tube Wear (Tube-to-Tube wear) ............................................ 12 2.3 FEI....................................................................................................................... 13 2.3.1 Conditions Necessary for FEI ....................................................................... 14 2.3.2 Critical Factor (K) for the SONGS RSGs ...................................................... 16 2.3.3 Natural Frequency / Support Conditions / Contact Force ............................. 17 2.3.4 Thermal Hydraulic Conditions and Tube Damping ....................................... 21 2.4 Conclusion .......................................................................................................... 28
3. Wear Mechanism of Type 2 (AVB wear) ................................................................ 29 3.1 Tube Wear Indications of Type 2 (AVB wear)...................................................... 29 3.2 Tube-to-AVB Wear Experience in Other Large CE-Plant RSGs ......................... 34 3.3 Causes of Type 2 Tube Wear (Tube-to-AVB wear) ............................................. 38 3.3.1 Evaluation of U-bend Support Conditions .................................................... 39 3.3.2 Secondary Side Thermal Hydraulic Conditions ............................................ 42 3.4 Out-of-plane FEI is not the cause of AVB wear ................................................... 43 3.5 Relationship between Random Vibration and In-plane FEI ................................ 47 3.6 Conclusion .......................................................................................................... 50
4. Design Approach ................................................................................................... 51 4.1 Design Approach (circa 2005-06)........................................................................ 51 4.1.1 General Design and Performance Requirements ......................................... 51 4.1.2 U-bend Design Approach for Vibration Control ............................................ 51 4.1.3 Evaluation of Design Changes to Reduce Void Fraction .............................. 56 4.2 U-bend Design Approach (circa 2012) ................................................................ 56 4.2.1 A New Paradigm ........................................................................................... 56 4.2.2 Assessment of the New Paradigm................................................................ 57 4.2.3 Design Implications of the New Paradigm .................................................... 58
5. References ............................................................................................................ 60 Appendix-1.................................................................................................................... 61 Appendix-2.................................................................................................................... 64 Appendix-3.................................................................................................................... 66 MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (4/68)

Document No.L5-04GA588(0)

Preface This Supplemental Technical Evaluation summarizes the information contained in the report Tube wear of Unit 3 RSG - Technical Evaluation Report (L5-04GA564 latest revision, Ref. 1) (TER) and supplements it with information taken from other MHI documents and the AREVA Operational Assessment and with further analysis. It is intended as a guide and introduction to the main findings of the TER as well as an explanation of key information from related documents.

1. Introduction On January 31, 2012, during the first cycle after steam generator replacement, San Onofre Nuclear Generating Station (SONGS) Unit 3 was shut down to investigate a steam generator tube leak. Steam generator tube inspections confirmed a small leak in one tube in one of the two steam generators. Further inspections of 100% of the steam generator tubes in both Unit 3 steam generators discovered unexpected wear, including tube-to-tube as well as tube-to-tube-support wear. At the time of the Unit 3 leak, SONGS Unit 2 had already completed one cycle of power operation (~22 months) and was in a refueling outage. Inspections of tubes in the Unit 2 steam generators revealed similar wear to that found in Unit 3.

The detailed inspections revealed tube wear in the tube free span sections, at anti-vibration bars (AVBs), at tube support plates (TSPs), and at retainer bars. These indications were labeled as follows:

(i) Type 1 (Tube-to-Tube Wear)

(ii) Type 2 (AVB wear without Tube-to-Tube wear)

(iii) Type 3 (TSP wear without Tube-to-Tube wear or AVB wear)

(iv) Type 4 (Retainer bar wear)

The cause of the first 3 types of tube wear is tube vibration. Type 4 tube wear is caused by vibration of the retainer bars.

The causes of tube vibration are (1) insufficient support for the tubes in the in-plane direction caused by small and uniform tube-to-AVB clearances, and (2) localized high thermal-hydraulic conditions in the SG secondary side. The mechanistic causes of the first three types of tube wear are described in detail in the TER (Ref. 1). The MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (5/68)

Document No.L5-04GA588(0) mechanistic causes of Type 4 wear (not discussed in this document) are described in the Retainer Bar Tube Wear Report (L5-04GA561 latest revision, Ref. 2).

The numbers of tubes for each type of tube wear in the Unit 2 and Unit 3 steam generators are listed in Table 1-1 and Table 1-2. These numbers are based on the MHI database (refer to Screening Criteria for Susceptibility to In-Plane Tube Motion (L5-04GA571 latest revision (Ref. 3), Appendix 3). The MHI database numbers differ from those of the SCE database as explained in TER Section 4.1 (Ref. 1).

Table 1-1 Number of Tubes with Wear in SONGS Unit 2 SG 2A SG 2B Wear Type Total 2E-089 2E-088 Type 1 (TTW) 2 (note 2) 0 2 (note 2)

Type 2 (AVB wear) 802 595 1397 Type 3 (TSP wear) 53 137 190 Type 4 (RB wear) 4 2 6 Foreign Object 0 2 2 Total 861 736 1597 Notes:

1) Each tube is only counted once, with the priority given to Type 1 followed by Type 2, Type 3, Type 4 and Foreign Object.
2) The wear characteristics of these two tubes differ from the TTW tubes in Unit 3 in that they exhibit no wear at the top TSP and only contact each other at a single point.

Table 1-2 Number of Tubes with Wear in SONGS Unit 3 SG 3A SG 3B Wear Type Total 3E-089 3E-088 Type 1 (TTW) 165 161 326 Type 2 (AVB wear) 714 737 1451 Type 3 (TSP wear) 15 20 35 Type 4 (RB wear) 1 3 4 Foreign Object 0 0 0 Total 895 921 1816 Notes:

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (6/68)

Document No.L5-04GA588(0)

1) Each tube is only counted once with the priority given to Type 1 followed by Type 2, Type 3, and Type 4.
2. Wear Mechanism of Type 1 (Tube-to-tube wear) 2.1 Tube Wear Indications of Type 1 (Tube-to-tube wear)

The Type 1 wear pattern is found in the tube free-span sections between or crossing over the AVBs. Type 1 wear can be differentiated from Type 2 wear by its location on the circumference of the tube. Type 2 wear is located on the sides of the tube that are adjacent to the AVBs while Type 1 wear is located on the extrados or intrados of the tube (the top or bottom of the tube cross section). Type 1 and Type 2 wear can be distinguished from each other by rotating ECT.

Type 1 tube to tube wear occurs when there is tube in-plane motion (vibration) with a displacement (amplitude) greater than the distance between the tubes in the adjacent rows, resulting in tube-to-tube contact.1 These tubes also exhibit significant wear at the AVBs and TSPs in addition to the free-span wear. Tubes with Type 1 wear are shown in Fig. 2.1-1 (Unit 2) and Fig. 2.1-2 (Unit 3). These figures display the same data as shown in Fig.4.1.1-1 in the TER (Ref. 1).

The AREVA Operational Assessment (Ref. 4) at page 16 states:

Both steam generators in Unit 3 had more than 160 tubes with TTW indications in U-bends. The three most degraded tubes exhibited wear scars that were more than 28 inches long . . .. TTW scars are located on the extrados and intrados locations of U-bends. Wear scars on extrados locations of a given U-bend have matching wear scars on intrados locations of the neighboring row tube in the same column.

1 Some of the tubes with tube-tube wear did not experience large amplitude vibration but were impacted by tubes that did experience large amplitude vibration. Also the two tubes in Unit 2 with tube-to-tube wear had different wear characteristics than the Unit 3 tube-to-tube wear. Neither of the two Unit 2 tubes exhibits wear at the top TSP and neither exhibits free span wear on both the hotleg and coldleg sides of the U-bend (the free span wear indication is only on one side of the U-bend).

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (7/68)

Document No.L5-04GA588(0)

This pattern of wear reflects large amplitude displacement of the tubes in the in-plane direction. Those tubes with the large amplitude displacements also have significant wear at the top tube support plate (TSP 7) (See L5-04GA571 the latest revision (Ref. 3)),

which is consistent with large displacement of tubes in the in-plane direction without in-plane AVB support.

MITSUBISHI HEAVY INDUSTRIES, LTD.

2A-SG (Unit 2 E089)

Wear depth TTW 110%

TTW 1120%

TTW 2130%

MITSUBISHI HEAVY INDUSTRIES, LTD.

TTW 3140%

TTW >41%

Non-proprietary Version (8/68)

Document No.L5-04GA588(0)

Fig 2.1-1 (1/2) Unit 2 Tubes with TTW indications

2B-SG (Unit 2 E088)

Wear depth TTW 110%

TTW 1120%

TTW 2130%

TTW 3140%

TTW >41%

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (9/68)

Document No.L5-04GA588(0)

Fig 2.1-1 (2/2) Unit 2 Tubes with TTW indications

3A-SG (Unit 3 E089)

Row-141 Wear depth LEGEND Row-136 0%

Row-131 TTW 1110%

AVB 10%

Row-126 TTW 11 AVB 1120%

20%

TTW 21 AVB 2130%

30%

Row-121 TTW 31 AVB 3140%

40%

Row-116 TTW >>41%

AVB 41%

Row-111 Row-106 MITSUBISHI HEAVY INDUSTRIES, LTD.

Row-101 Row-96 Row-91 Row-86 Row-81 Row-76 Row-71 Row-66 Row-61 Row-56 Row-51 Row-46 Row-41 Non-proprietary Version Row-36 Row-31 Row-26 Row-21 Row-16 Row-11 (10/68)

Row-6 Row-1 176-Col 171-Col 166-Col 161-Col 156-Col 151-Col 146-Col 141-Col 136-Col 131-Col 126-Col 121-Col 116-Col 111-Col 106-Col 101-Col 96-Col 91-Col 86-Col 81-Col 76-Col 71-Col 66-Col 61-Col 56-Col 51-Col 46-Col 41-Col 36-Col 31-Col 26-Col 21-Col 16-Col 11-Col 6-Col 1-Col Document No.L5-04GA588(0)

Fig 2.1-2 (1/2) Unit 3 Tubes with TTW indications

3B-SG (Unit 3 E088)

Row-141 LEGEND Wear depth Row-136 0%

Row-131 TTW 1110%

AVB 10%

Row-126 TTW 11 AVB 1120%

20%

TTW 21 AVB 2130%

30%

Row-121 TTW 31 AVB 3140%

40%

Row-116 TTW >>41%

AVB 41%

Row-111 MITSUBISHI HEAVY INDUSTRIES, LTD.

Row-106 Row-101 Row-96 Row-91 Row-86 Row-81 Row-76 Row-71 Row-66 Row-61 Row-56 Row-51 Row-46 Non-proprietary Version Row-41 Row-36 Row-31 Row-26 Row-21 Row-16 (11/68)

Row-11 Row-6 Row-1 176-Col 171-Col 166-Col 161-Col 156-Col 151-Col 146-Col 141-Col 136-Col 131-Col 126-Col 121-Col 116-Col 111-Col 106-Col 101-Col 96-Col 91-Col 86-Col 81-Col 76-Col 71-Col 66-Col 61-Col 56-Col 51-Col 46-Col 41-Col 36-Col 31-Col 26-Col 21-Col 16-Col 11-Col 6-Col 1-Col Document No.L5-04GA588(0)

Fig 2.1-2 (2/2) Unit 3 Tubes with TTW indications

Non-proprietary Version (12/68)

Document No.L5-04GA588(0) 2.2 Causes of Type 1 Tube Wear (Tube-to-Tube wear)

As discussed above, most of the Type 1 wear (TTW) indications suggest that the wear is due to tube in-plane motion (vibration) with a displacement (amplitude) greater than the distance between the tubes in the adjacent rows, resulting in tube-to-tube contact. Tube in-plane motion can be caused by turbulence and fluid elastic instability (FEI). However, turbulence induced (random) vibration by itself is insufficient to produce displacements of this magnitude. Displacements as large as those associated with in-plane tube-to-tube contact can only be produced by fluid elastic vibration. Further, the contiguous grouping of the TTW tubes is another characteristic of fluid elastic instability as discussed further in Section 2.3.

As discussed in Sections 5 and 6.1 of the TER, in order for large in-plane displacements to occur two conditions are necessary. First, the tube needs to be unrestrained in the in-plane direction and second the environment must be conducive to FEI (velocity, density, damping, etc.). These causes are summarized in Fig.2.2-1. This figure shows the same mechanism as Fig.6.1-1 in the TER (Ref. 1).

The following Section provides an explanation of the nature of and conditions necessary for FEI and describes the characteristics of the SONGS RSGs that led to the occurrence of in-plane FEI in the RSGs.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (13/68)

Document No.L5-04GA588(0)

(max 0.9)

AVB Structure Tube between 2 flat AVBs AVB Design Assumes Out-of Plane Vibration Since out-of-plane FEI is more likely to happen compared to in-plane FEI, AVBs are placed at the sides of tube to prevent out-of-plane vibration 6 V-Shaped AVBs12 support points Tube to AVB Gap Number of AVB Support Points are confirmed to satisfy Zero Gap ASME FEI Requirements Controlled to be small Gap Designed and fabricated for effective Zero Gap between Tube AVB (To Prevent Out-of-and AVB in hot condition Plane Vibration)

Out-of-Plane Vibration Tubes In-Plane Vibration Two Phase Flow Fig. 2.2-1 Type 1 Wear (TTW) In-Plane Mechanism MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (14/68)

Document No.L5-04GA588(0) 2.3 FEI 2.3.1 Conditions Necessary for FEI In a tube array, a momentary displacement of one tube from its equilibrium position will alter the flow field and change the force balance on the neighboring tubes, causing them to change their positions in a coordinated manner. When the energy extracted from the flow by the tubes exceeds the energy dissipated by damping it produces fluid elastic vibration. The threshold for this instability is shown in Figure 2.3-1 below, where one axis (Y) of the graph is vibration amplitude and the other (X) is flow velocity. The curve shows that as flow velocity increases, vibration initially increases gradually. As velocity continues to increase, it will reach a point where the slope of the vibration line changes abruptly. The point on the curve where the slope changes is termed the critical velocity.

Figure 2.3-1 Relation between Vibration Amplitude and Flow Velocity The Critical Velocity is a function of the tubes natural frequency, damping, and the Critical Factor among other parameters shown in the equation below.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (15/68)

Document No.L5-04GA588(0) 1/ 2 Uc m K 0 2 fD o o D o Where, Uc  : Critical velocity f  : Tube natural frequency

Damping term K  : Critical factor Do  : Tube outside diameter m0  : Average tube mass per unit length o  : Density of fluid outside the tube This equation is based on work done by Dr. H. J. Connors, and the Critical Factor, K, is often referred to as Connors constant, but as discussed in Section 7.1 of L5-04GA567 (Ref. 5), the Critical Factor may vary.

The tube natural frequency is dependent on tube geometry and tube supporting conditions. The density of the fluid outside the tube depends on the secondary side fluid environment. The tube outside diameter and the average tube mass per unit length are set by the design.

For U-bend tubes in two phase flow, there are four sources of damping: structural damping, external fluid (two-phase) damping, viscous damping and squeeze film damping. For the SONGS RSG, the relevant sources are structural, external fluid and squeeze film damping. Damping is discussed in more detail in Section 2.3.4 below.

The Critical Factor is an experimentally determined value, which is a function of the tube pattern and the fluid environment. The Critical Factor varies for each tube as a function of void fraction and location of the tube within the U-bend (See Section 7.1 of L5-04GA567 the latest revision (Ref. 5)).

The tube natural frequency and the Critical Factor differ in the in-plane and out-of-plane directions. For the SONGS RSG tube geometry, based on experimental data, MHI estimates that the Critical Factor for in-plane FEI is at least 50% higher than the Critical Factor for out-of-plane FEI (See Section 2.3.2 below for details). The tube natural MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (16/68)

Document No.L5-04GA588(0) frequencies for the in-plane and out-of-plane directions depend on the number of supports. For U-bend SGs, when the number of supports are equal in both directions, the U-bend natural frequency out-of-plane is lower than the U-bend natural frequency in-plane (See Appendices 1 and 2 for details).

2.3.2 Critical Factor (K) for the SONGS RSGs The Critical Factor for in-plane FEI can be related to the Critical Factor for out-of plane FEI and the tube pattern pitch-to-diameter (P/D) ratio (this is discussed in more detail in Section 7.1.1.2 of MHIs Evaluation of Stability Ratio for Return to Service L5-04GA567 latest revision (Ref. 5)). Based on its analysis and test data, MHI has developed the following relationship reflected in the figure and table below.

Ki = k x Ko

Where, k  : Ratio of Critical Factor of In-plane FEI and Out-of-plane FEI Ki  : Best-estimate Critical Factor of In-plane FEI Ko  : Best-estimate Critical Factor of Out-of-plane FEI P/D Fluid Ratio of Note critical flow velocity

=Vc(In-plane)

/Vc(Out-of-plane) 1.5 Air- 2.7 Violette et al.

Water (2006) 1.37 Air 1.7 Khalvatti et al.

(2010) 1.2 Air 0.71 Nakamura et al.

(2012)

Fig.2.3.2-1 Critical Factor Ratio to P/D Relationship MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (17/68)

Document No.L5-04GA588(0)

This figure shows the relationship between the Critical Factor Ratio for in-plane /

out-of-plane FEI and the tube pitch-to-diameter ratio. The SONGS P/D ratio in most of the tube bundle is 1.33. However, in the U-bend, where the tubes are further apart due to straight-leg indexing, the P/D ratio increases to a maximum value at the top of the U-bend. Thus, from Figure 2.3.2-1 it can be seen that the Critical Factor for in-plane FEI is times as large as the Critical Factor for out-of-plane FEI for the SONGS tube pattern (or greater where tube indexing is present). This indicates that, given identical support conditions, the onset of out-of-plane FEI will occur much sooner than in-plane FEI.

2.3.3 Natural Frequency / Support Conditions / Contact Force As discussed above, tube natural frequency is dependent on tube geometry and tube supporting conditions. Following is an analysis of the supporting conditions associated with the Unit-3 TTW tubes.

The locations of the Unit 3 and Unit 2 TTW wear indications along the U-tube arc length are depicted in Fig. 2.3.3-1 taken from AREVAs SONGS U2C17 Steam Generator Operational Assessment for Tube-to-Tube Wear No. 51-9187230-000 (Ref. 4).

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (18/68)

Document No.L5-04GA588(0)

Fig. 2.3.3-1 Location of deepest wear along the length of each TTW wear scar From this figure it can be seen that the TTW indications are grouped at the 45/135 degree positions of the U-bend. This figure also identifies the theoretical tube-to-tube contact points associated with the first three natural frequency modes for in-plane tube vibration. The Mode-1 tube-to-tube contact points are also located at the 45/135 degree positions of the U-bend.

Fig. 2.3.3-2 is also taken from the AREVA Operational Assessment report (Ref. 4). This figure shows the large amplitude deformation of a U-bend tube in the first in-plane mode (i.e. Mode 1).

Fig.2.3.3-2 The large amplitude deformation of a U-tube in the first in-plane mode MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (19/68)

Document No.L5-04GA588(0)

In order for the tubes to touch in this in-plane mode shape, the tubes must be free of restraint at the 12 AVB intersections and only supported at the top TSP.

For the reasons stated in the discussion of the Critical Factor in Section 2.3.2 above, out-of-plane FEI will occur at a lower velocity threshold than in-plane FEI when the support conditions are the same for both directions. Also, as discussed in Appendices 1 and 2, out-of-plane FEI will occur at a lower velocity threshold than in-plane FEI, when the support conditions are the same for both directions, because the tube out-of-plane natural frequency is lower than tube in-plane frequency. Therefore, since out-of-plane FEI did not occur, the tube out-of-plane support must be effective (as intended by the designers).

The absence of out-of-plane FEI and the presence of in-plane FEI can only happen when all or most of the 24 tube-to-AVB intersections (AVB on both sides of a tube with 12 locations) have gaps small enough to be effective in the out-of-plane direction and lack sufficient contact forces to be effective in the in-plane direction. As shown in Appendix 2, the critical velocity threshold for in-plane FEI will occur before that for out-of-plane FEI if the number of active supports against in-plane FEI becomes sufficiently smaller than the number needed to prevent out-of-plane FEI.

MHI performed a comprehensive statistical evaluation of the tube-to-AVB contact forces based on manufacturing data and concluded that the Unit 2 contact forces are approximately double that of the Unit 3 RSGs (See Section 5.2.3 of the TER (Ref. 1)).

This offers an explanation of why almost all of the TTW indications were in the Unit 3 RSGs.

The difference in the contact forces between the Unit 2 and Unit 3 RSGs is mainly associated with better control of the AVB and tube fabrication dimensions in the Unit 3 RSGs. As discussed in Section 5.2.3 of the TER (Ref. 1), a pressing force was used on the Unit 3 AVBs to reduce the twist and flatness, while a pressing force was used for the Unit 2 AVBs. Additional evidence that the Unit 3 AVB dimensions were more uniform and that the tube-to-AVB contact forces were smaller is that the Unit 2 RSGs had more ding signals than the Unit 3 RSGs. Ding signals are evidence of tiny marks on the tube outer surface caused by interference between AVBs and tubes.

Almost all of the Unit 2 ding signals were at the AVB nose regions.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (20/68)

Document No.L5-04GA588(0)

Fig. 2.3.3-3 lists the variations in the tube and AVB dimensions for the Unit 2 and Unit 3 RSGs and the resulting difference in the tube-to-AVB contact forces based on these dimensional differences. This figure displays the same data as Figure 5.2-1 in the TER (Ref. 1).

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (21/68)

Document No.L5-04GA588(0)

Manufacturing Tolerances AVB thickness Tube G-value AVB twist Tube Flatness Tube pitch (True position of land) AVB Flatness Fig.2.3.3-3 Contact Force Simulation with Manufacturing Tolerances MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (22/68)

Document No.L5-04GA588(0) 2.3.4 Thermal Hydraulic Conditions and Tube Damping The U-bend region is where all of the steam produced by the steam generator exits and the top of the U-bend has the greatest concentration of steam. This region with the greatest concentration of steam is also where most of the tube wear is located. Steam quality is defined as the ratio of the mass of steam divided by the total mass of a mixture of steam and water in a given space (or, the percentage of vapor mass in a saturated mixture). Void fraction is based on volume rather than mass. Therefore, void fraction is the ratio of the total volume occupied by steam divided by the total volume occupied by water and steam in a given space (or, the percentage of vapor volume in a saturated mixture).

Fig. 2.3.4-1 shows the results of the three-dimensional thermal hydraulic analysis of SONGS Unit 2 and 3 SGs. This analysis was performed after the discovery of the tube wear, using the ATHOS computer code developed by EPRI. The highest void fraction is located in the U-bend region, where the maximum value is estimated by ATHOS to be 99.6% (0.4% of the volume is occupied by saturated liquid water). The highest void fraction calculated using ATHOS for prior MHI-designed SGs is 98%. The higher void fraction is a result of a large and tightly packed tube bundle and the relatively high heat flux in the upper hot leg side of the tube bundle.

The Unit 2 and Unit 3 RSGs have identical operating conditions and the displayed thermal hydraulic results are applicable for all four SONGS RSGs.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (23/68)

Document No.L5-04GA588(0)

Fig.2.3.4-1 Thermal Hydraulic Analysis Results for the Unit 2 and Unit 3 SGs MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (25/68)

Document No.L5-04GA588(0)

The two-phase fluid (water and steam) in the high void fraction has low density and high velocity. It is also the location of the lowest tube damping. The increase of the velocity (v) is a larger effect than the reduction in density (), so the hydrodynamic pressure (proportional to v2) is largest in the high void fraction region. The hydrodynamic pressure is a measure of the energy imparted to the structure by the flow field, and damping is a measure of how easily the structure can dissipate this energy.

Flow forces and damping vary along the length of each tube. Fig. 2.3.4-3 shows the average of the variation in the void fraction along individual tubes in the U-bend region.

A comparison between Fig. 2.3.4-3 and the tube-to-tube wear indications shown in Figs.

2.1-1 and 2.1-2 shows that the tubes with TTW generally pass through the region with the highest average void fraction.

Fig.2.3.4-3 Average Void Fraction along Individual Tubes in the U-bend Region MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (26/68)

Document No.L5-04GA588(0)

Fig. 2.3.4-4 shows the correlation between void fraction and steam quality with the percentage of tubes at different levels of void fraction and steam quality that have Type 1 wear. The 328 tubes that had Type 1 wear fall within the region of steam quality of to and void faction of to 0.996. However, less than of the Unit 3 tubes in this region of high steam quality and high void fraction have Type 1 wear. Fig.

2.3.4-4 displays the same data as shown in Fig. 5.1-2 in the TER (Ref. 1). The TER (Ref.

1) also discusses the relationship between high velocity and Type 1 wear for which the correlation is not as strong.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Percentage of Tube Wear (%)

0 10 20 30 40 50 60 70 80 90 100

<= 0.970 0.970 < , <= 0.971 0.971 < , <= 0.972 0.972 < , <= 0.973 0.973 < , <= 0.974 3B Wear (TTW) 3A Wear (TTW) 2B Wear (TTW) 2A Wear (TTW) 0.974 < , <= 0.975 0.975 < , <= 0.976 0.976 < , <= 0.977 0.977 < , <= 0.978 0.978 < , <= 0.979 0.979 < , <= 0.980 0.980 < , <= 0.981 with wear and void fraction (steam quality) 0.981 < , <= 0.982 0.982 < , <= 0.983 0.983 < , <= 0.984 Strong correlation between the number of tubes 0.984 < , <= 0.985 0.985 < , <= 0.986 0.986 < , <= 0.987 MITSUBISHI HEAVY INDUSTRIES, LTD.

0.987 < , <= 0.988 Maximum Void Fraction of Tube 0.988 < , <= 0.989 0.989 < , <= 0.990 Wear indication on tubes which 0.990 < , <= 0.991 (27/68) 0.991 < , <= 0.992 0.992 < , <= 0.993 0.993 < , <= 0.994 Non-proprietary Version 0.994 < , <= 0.995 are located in the region where 0.995 < , <= 0.996 0.996 <

Document No.L5-04GA588(0)

Fig.2.3.4-4 Correlation between Type 1 Wear (TTW) and Void Fraction (Steam Quality) max void fraction exceeds 0.993

Non-proprietary Version (28/68)

Document No.L5-04GA588(0) 2.4 Conclusion The TTW indications show that almost all of the TTW tubes experienced large displacement flow induced vibration. The locations of the TTW indications are well correlated with the first in-plane mode of U-bend vibration, indicating that none of the tube-to-AVB supports were active in the in-plane direction. The only known flow induced vibration mechanism capable of producing such large tube displacements, and in a contiguous group like that of the Unit 3 RSGs, is fluid elastic excitation. Since out-of-plane FEI did not occur instead of in-plane FEI, it is concluded that the out-of-plane support conditions for the TTW tubes were active (as designed). This leads to the conclusion that the tube-to-AVB intersections of the TTW tubes had small and uniform gaps and that the tube-to-AVB contact forces were too small to prevent in-plane tube displacement.

All of the TTW tubes are located in the region of highest average void fraction, where velocities are highest and damping is lowest. Both Unit 2 and Unit 3 have the same thermal hydraulic conditions. The tube-to-AVB contact forces in the Unit 3 RSGs are smaller by a factor of two than those of the Unit 2 RSGs. Almost all of the TTW tubes were found in the Unit 3 RSGs. The difference in the contact forces explains this large difference between the two units.

MHI concludes that the SONGS U-bend design prevented out-of-plane FEI as intended; but that some level of tube-to-AVB contact force is required to prevent in-plane FEI at the SONGS secondary thermal-hydraulic conditions.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (29/68)

Document No.L5-04GA588(0)

3. Wear Mechanism of Type 2 (AVB wear) 3.1 Tube Wear Indications of Type 2 (AVB wear)

Tubes with Type 2 (AVB wear) indications are characterized by wear at the tube-to-AVB intersections with no free-span wear indications. They are produced primarily by U-bend tube vibration without any contribution from straight leg vibration although there are a few TSP wear indications on some of them. The locations of the tubes with wear indications at the tube-to-AVB intersections, including Type 2 wear, are shown in Fig.

3.1-1 (Unit 2) and Fig. 3.1-2 (Unit 3). The same data is shown on Fig 4.1.1-2 of the TER (Ref.1).

MITSUBISHI HEAVY INDUSTRIES, LTD.

2A-SG (Unit 2 E089)

Type 4 (RB wear)

Wear depth Type 4 (RB wear) 1 10%

11 20%

21 30%

MITSUBISHI HEAVY INDUSTRIES, LTD.

31 40%

> 41%

Non-proprietary Version (30/68)

Document No.L5-04GA588(0)

Fig 3.1-1 (1/2) All Unit 2 U-bend tube indications (Type 1 TTW, Type 2 Tube-to-AVB and Type 4 Retainer Bar to Tube)

2B-SG (Unit 2 E088)

Wear depth Type 4 (RB wear) 1 10%

11 20%

21 30%

31 40%

> 41%

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (31/68)

Fig 3.1-1 (2/2) All Unit 2 U-bend tube indications Document No.L5-04GA588(0)

(Type 1 TTW, Type 2 Tube-to-AVB and Type 4 Retainer Bar to Tube)

3A-SG (Unit 3 E089)

Row-141 LEGEND Wear depth Row-136 0%

1 110%

AVB 10%

Row-131 Type 4 (RB wear) 11 Row-126 AVB 1120%

20%

21 AVB 2130%

30%

Row-121 31 AVB 3140%

40%

Row-116

> 41%

AVB > 41%

Row-111 Row-106 MITSUBISHI HEAVY INDUSTRIES, LTD.

Row-101 Row-96 Row-91 Row-86 Row-81 Row-76 Row-71 Row-66 Row-61 Row-56 Row-51 Row-46 Row-41 Row-36 Non-proprietary Version Row-31 Row-26 Row-21 Row-16 Row-11 Row-6 (32/68)

Row-1 176-Col 171-Col 166-Col 161-Col 156-Col 151-Col 146-Col 141-Col 136-Col 131-Col 126-Col 121-Col 116-Col 111-Col 106-Col 101-Col 96-Col 91-Col 86-Col 81-Col 76-Col 71-Col 66-Col 61-Col 56-Col 51-Col 46-Col 41-Col 36-Col 31-Col 26-Col 21-Col 16-Col 11-Col 6-Col 1-Col Document No.L5-04GA588(0)

Fig 3.1-2 (1/2) All Unit 3 U-bend tube indications (Type 1 TTW, Type 2 Tube-to-AVB and Type 4 Retainer Bar to Tube)

3B-SG (Unit 3 E088)

Row-141 LEGEND Wear depth Row-136 0%

Row-131 Type 4 (RB wear) 1 110%

AVB 10%

Row-126 Type 4 (RB wear) 11 AVB 1120%

20%

21 AVB 2130%

30%

Row-121 31 AVB 3140%

40%

Row-116

> 41%

AVB > 41%

Row-111 Row-106 MITSUBISHI HEAVY INDUSTRIES, LTD.

Row-101 Row-96 Row-91 Row-86 Row-81 Row-76 Row-71 Row-66 Row-61 Row-56 Row-51 Row-46 Row-41 Row-36 Non-proprietary Version Row-31 Row-26 Row-21 Row-16 Row-11 Row-6 (33/68)

Row-1 176-Col 171-Col 166-Col 161-Col 156-Col 151-Col 146-Col 141-Col 136-Col 131-Col 126-Col 121-Col 116-Col 111-Col 106-Col 101-Col 96-Col 91-Col 86-Col 81-Col 76-Col 71-Col 66-Col 61-Col 56-Col 51-Col 46-Col 41-Col 36-Col 31-Col 26-Col 21-Col 16-Col 11-Col 6-Col 1-Col Fig 3.1-2 (2/2) All Unit 2 U-bend tube indications Document No.L5-04GA588(0)

(Type 1 TTW, Type 2 Tube-to-AVB and Type 4 Retainer Bar to Tube)

Non-proprietary Version (34/68)

Document No.L5-04GA588(0) 3.2 Tube-to-AVB Wear Experience in Other Large CE-Plant RSGs Tube wear patterns similar to those observed at SONGS were reported at the Plant-A large U-bend steam generators that were replacements for CE manufactured OSGs (See NRC ADAMS ML11270A015 and ML093230226). The Plant-A steam generators were designed by another vendor. They are slightly smaller than the SONGS steam generators but have U-bend tubes, flat bar AVBs, and BEC type TSPs, that are similar to the SONGS RSGs, except SONGS features a 12 AVB design and Plant-A has an 8 AVB design.

(a) SONGS (12AVB design) (b) Plant-A (8 AVB design)

Fig.3.2.1-1 Comparison between 12 and 8 AVB Design The Plant-A inspection results show a wear pattern with many tubes in the center of the U-bend that have tube-to-AVB wear similar to that found in the SONGS steam generators. Figure 3.2.1-2 shows the tubes with tube-to-AVB wear identified at Plant-A during the first inspection following installation of the RSGs and Figure 3.2.1-3 shows the tubes with tube-to-AVB wear identified at Plant-A during the second cycle inspection.

Note that the locations of the Plant-A indications are very similar to those for SONGS shown in Figs. 3.1-1 and 3.1-2.

Figure 3.2.1-4 compares the total number of tube-to-AVB wear indications for Plant-A, SONGS Unit 2, and SONGS Unit 3 as a function of time and Figure 3.2.1-5 shows the average wear depths for the three plants (six RSGs) as a function of time. As can be seen from these figures, the total number of indications and average wear depth at Plant-A are comparable to that at SONGS.

Figure 3.2.1-5 suggests that the tube-to-AVB wear depths at Plant-A have reached a plateau. The reason for such a plateau is unclear. It may be indicative of the type of tube vibration mechanism or an effect of the support condition. But it is clear that the number of tubes with tube-to-AVB wear at Plant-A is growing (refer to Fig. 3.2.1-2 and 3.2.1-3).

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (35/68)

Document No.L5-04GA588(0)

(a) 2A-SG (b) 2B-SG Fig.3.2.1-2 Plant-A Tubes with AVB Indications at first inspection (based on information from NRC ADAMS ML11270A015 and ML093230226)

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (36/68)

Document No.L5-04GA588(0)

(a) 2A-SG (b) 2B-SG Fig.3.2.1-3 Plant-A Tubes with AVB Indications at second inspection (based on information from NRC ADAMS ML11270A015 and ML093230226)

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (37/68)

Document No.L5-04GA588(0)

Plant-A #A Plant-A #B b

Fig.3.2.1-4 Total Tube-to-AVB Wear Indications (based on information from NRC ADAMS ML11270A015 and ML093230226)

Plant-A #A Plant-A #B Fig.3.2.1-5 Average Tube-to-AVB Wear Rate (based on information from NRC ADAMS ML11270A015 and ML093230226)

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (38/68)

Document No.L5-04GA588(0) 3.3 Causes of Type 2 Tube Wear (Tube-to-AVB wear)

The cause of the Type 2 wear is turbulence induced (random) tube vibration. The following discussion explains the basis for this conclusion.

Fig. 3.3-1 (this figure is similar to Fig. 6.2-1 in the TER (Ref. 1)) provides a summary of the basis for establishing the cause of the Type-2 (tube-to-AVB) wear. Extensive inspections, including visual, eddy current, and ultrasonic methods, indicate that the tube-to-AVB gaps are small at each of the wear sites. This indicates that there are small clearances. Such conditions are sufficient to prevent out-of-plane FEI but not sufficient to prevent turbulence induced (random) vibration and wear.

The Type-2 wear indications are in the region of high void fraction and dynamic pressure. Referring to Fig. 2.3.4-3 of the previous section, it can be seen that the area of the U-bend occupied by the high average void fraction (values above where the max value is ) is very similar to the Type-2 wear map in Figs. 3.1-1 and 3.1-2.

As shown in the figure at the upper left corner of Fig.3.3-2, insufficient contact force has an adverse effect on tube wear caused by random tube vibration up to the point where the contact force is sufficient to prevent tube lift-off from (or sliding along) the AVB. The amount of contact force necessary to prevent random vibration is a function of the thermal-hydraulic condition. As the void fraction (steam quality) increases, the amount of contact force necessary to prevent random vibration increases. This is because the higher void fraction (steam quality) results in lower external fluid damping and a reduction in the liquid film damping (squeeze film damping).

A comparison of Fig. 2.3.4-3 showing the average void fraction and the figures on the bottom of Fig. 2.3.3-3 showing Unit 2 and Unit 3 contact forces indicates that the tubes in the area of average high void fraction also generally have low contact forces, which generally correspond as well to the Type 2 wear maps in Figs. 3.1-1 and 3.1-2. The turbulence induced (random) tube vibration associated with the small gaps and small contact forces combined with the lower tube damping in the high void fraction regions is sufficient to produce the observed wear.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (39/68)

Document No.L5-04GA588(0)

Visual, ECT and UT Inspections

- Small gaps confirmed; eliminates out-of-plane FEI

- Wear is local, no in-plane vibration evidence In an area of high turbulence

- Small gaps confirmed

- Low contact force Fig.3.3-1 Type 2 Wear (AVB wear) Mechanism MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (40/68)

Document No.L5-04GA588(0)

Wear depth rate High Void Fraction Required Contact Force to prevent tube random vibration Low Void Fraction Contact force Fig.3.3-2 Contact force sufficient to prevent random tube vibration MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (41/68)

Document No.L5-04GA588(0) 3.3.1 Evaluation of U-bend Support Conditions The SONGS SG tube bundles were conservatively designed for U-bend support with effective zero gaps in the hot condition and featured 12 AVBs to provide additional support margin. Based on visual inspections and ECT gap measurements, no significant gaps between the tubes and AVBs are present leading to the conclusion that the tubes were well supported. Despite the gap control and additional support provided by the 12 AVB design, an unexpected amount of Type 2 wear was been experienced in the SONGS RSGs.

While the number of tubes with Type 2 wear is very similar for Unit 2 and Unit 3 (Compare Table 1-1 and Table 1-2), Unit 2 has operated approximately twice as long as Unit 3. As a result, as shown in Fig. 3.2.1-5. the wear rate in Unit 3 is faster than that for Unit 2. An explanation for this difference is found in the manufacturing assessment which concluded that the tube to AVB contact forces in Unit 3 were less than half than those in Unit 2. (See Section 2.3.3 above.)

The increased Unit 3 tube wear is attributable to a different contact force distribution between the tubes and AVBs. When the contact force is sufficiently high to prevent random tube vibration, the tube-to-AVB wear becomes negligible. The magnitude of the contact force that prevents random tube vibration is a function of the void fraction, with a higher contact force being needed in the regions of higher void fraction (steam quality).

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (42/68)

Document No.L5-04GA588(0) 3.3.2 Secondary Side Thermal Hydraulic Conditions Figure 3.3.2-1 (this Fig. displays the same data as Fig. 5.1-4 in the TER (Ref. 1)) shows a strong correlation between void fraction (steam quality) and the percentage of tubes at different levels of void fraction and steam quality that have Type 2 wear. Of the 38,908 tubes in the Unit 2 and 3 RSGs, 2,848 tubes had Type 2 wear and of those tubes 2,702 fall within the region of a maximum steam quality equal to or greater than and a void faction equal to or greater than . In addition, the tubes with Type 2 wear indications typically have high cross flow velocity as shown in Fig. 3.3.2-2 (this Fig.

displays the same data as Fig. 5.1-5 in the TER (Ref. 1)).

Consequently, it is concluded that the thermal-hydraulic conditions in the SG secondary side, particularly the high void fraction (steam quality) and high flow velocity, are associated with the Type 2 wear. The amount of contact force necessary to prevent random vibration is a function of the thermal-hydraulic condition. As the void fraction (steam quality) increases, the amount of contact force necessary to prevent random vibration increases. This is because the higher void fraction (steam quality) results in lower external fluid damping and a reduction in the liquid film damping (squeeze film damping). Thus, tubes in the region of highest void fraction are most susceptible to this mechanism.

This correlation to high void fraction area is also supported by the tube-to-AVB wear observed at the Plant A RSGs. As with the SONGS RSGs, the great majority of the tube-to-AVB wear occurred in the center column region where the void fraction is high.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (43/68)

Document No.L5-04GA588(0)

Fig.3.3.2-1 Correlation between Type 2 Wear (AVB wear) and Void Fraction (Steam Quality)

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (44/68)

Document No.L5-04GA588(0)

Fig.3.3.2-2 Correlation between Type 2 Wear (AVB Wear) and Flow Velocity MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (45/68)

Document No.L5-04GA588(0) 3.4 Out-of-plane FEI is not the cause of AVB wear MHI evaluated the potential for out-of-plane FEI to cause Type 2 wear and has concluded for three reasons that out-of-plane FEI did not occur.

First, gap measurements were made in Unit 2 and Unit 3 RSGs. These included ultrasonic gap measurements and over 117,000 eddy current gap measurements (See AREVA Operating Assessment (Ref. 4)). The gap measurements show no excessive gaps between the tubes and AVBs. For most tubes the average of the 24 tube to AVB gap measurements is less than 0.003. Visual inspections of the AVB and tube intersections (see TER Section 4.2 and Appendix 7 (Ref. 1) also revealed that (i) the gaps between the tubes and AVBs are small without any large gaps, (ii) the AVBs appeared to be straight without detectable abnormalities, (iii) there were no abnormalities in the orientation between the AVBs and the tubes, and (iv) there were no abnormalities in the AVB positions or end cap to retaining bar welds.

Second, research literature shows that gaps significantly larger than the SONGS RSG AVB-to-tube gaps are required for out-of-plane FEI to occur. Based on the research report by Weaver (Ref. 6), no out-of-plane FEI in the U-bend tube bundle with AVBs occurred when the symmetric tube-to-AVB gaps were 0.3 mm (12 mils), while out-of-plane FEI occurred when the symmetric gaps were 0.51 mm (20 mils). From the research by Yang (Ref. 7), no out-of-plane FEI occurs even when the tube-to-AVB gap was 1.5 mm (60 mils). These research results indicate that out-of-plane FEI will not occur when the gaps on each side of the tube are smaller than 20 mils.

Third, MHI has performed wear calculations using IVHET assuming random vibration force to reproduce the observed wear at SONGS (see TER, Appendix 10 (Ref. 1),

Section 7.2). The wear simulations assumed that some of the supports were active (in contact with the AVB by sufficient contact force) and that other supports were inactive, some with very small tube-to-support clearances and some with very small (or zero) contact forces. In the latter (inactive) support condition, the tube can interact with the support (i.e. repeatedly impacting it) and cause turbulence induced (random) wear. In the analysis, the inactive supports were assumed to have symmetric gaps between the tube and AVB. Many wear depth simulations were evaluated by varying the number of inactive supports.

The calculated wear depths assuming random vibration are consistent with the actual measurement results of tube wear. Fig. 3.4-1 shows the results for a single tube-to-AVB intersection with large wear assuming different numbers of inactive supports with impact.

This figure shows that assuming 8 consecutive AVB support points are inactive (but with impact), the calculated random wear depth is similar to the observed wear (see Fig.

3.4-1). These wear simulations show that with the small clearances at the inactive MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (46/68)

Document No.L5-04GA588(0) supports, random vibration is sufficient to reproduce the observed wear.

Fig.3.4-1 Wear Analysis Results for Type 2 AVB Wear at Tube R106 C78 of Unit 2A SG (2E089)

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (47/68)

Document No.L5-04GA588(0) 3.5 Relationship between Random Vibration and In-plane FEI MHI has analyzed whether random vibration was a precursor to the in-plane FEI that was observed in Unit 3. Two possible scenarios were considered.

Scenario #1: In-plane FEI in Unit 3 had no precursor Scenario #2: Wear from random vibration progresses to the point of loss of in-plane support, followed by the onset of in-plane FEI The first scenario is more likely supported based on the investigation below (See Fig.3.5-1 and Fig.3.5-2):

1) While the number of tubes with tube-to-AVB wear without in-plane TTW is greatest at the top of the tube bundle, the number of TTW tubes with tube-to-AVB wear is almost uniformly distributed along the different AVB intersections. (See Fig. 3.5-1.)

If random vibration wear were a precursor for in-plane FEI TTW, then the pattern of AVB wear for TTW tubes should resemble the tube-to-AVB wear pattern (i.e. be concentrated at the top of the tube bundle). However, this is not observed for tubes with TTW.

2) While the tube-to-AVB wear depth for tubes without in-plane TTW is greatest at the top of the tube bundle, the tube-to-AVB wear depths for tubes with in-plane TTW is almost uniformly distributed along the AVB intersections. (See Fig. 3.5-2.) If random vibration wear were a precursor for in-plane FEI wear, then the AVB wear for the tubes with in-plane FEI would be greatest at the top of the U-bends. But for TTW tubes, the average wear depth is almost the same in all AVB support locations and there is no tendency to concentrate at the top of the tube bundle.
3) The average 10% of AVB wear depth in Unit 2 and Unit 3 excluding TTW tubes is almost the same. (See Fig. 3.5-2.) Therefore, if random vibration were a precursor to in-plane FEI one would expect to see a similar number of tubes with tube-to-tube wear in the two RSG units. However, Unit 2 only has 2 tubes with TTW.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (48/68)

Document No.L5-04GA588(0)

B06 B07 B05 B08 B04 B09 B03 B10 B02 B11 B01 B12 07H 07C NumberAVB TTW of TTW Tube with AVB wear 200 No. of AVB Wear 150

100 50 0

B01 B02 B03 B04 B05 B06 B07 B08 B09 B10 B11 B12 2A TTW 0 0 0 0 2 2 2 1 0 1 0 0 2B TTW 0 0 0 0 0 0 0 0 0 0 0 0 3A TTW 119 127 133 153 151 147 135 146 132 95 69 87 3B TTW 105 125 129 135 133 122 120 133 139 129 123 115 Number AVBof Tube to AVB Wear Tubes (excluding TTW tubes)

AVBTTW 600 500 No. of AVB Wear

400 300 200 100 0

B01 B02 B03 B04 B05 B06 B07 B08 B09 B10 B11 B12 2A AVB 5 11 85 185 362 520 544 497 273 85 14 2 2B AVB 1 3 40 127 266 333 361 324 191 102 8 2 3A AVB 5 13 77 222 301 380 346 265 169 57 10 3 3B AVB 3 25 137 222 312 408 369 252 167 132 16 3 Figure 3.5-1 AVB Tube Wear Number Comparison MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (49/68)

Document No.L5-04GA588(0)

B06 B07 B05 B08 B04 B09 B03 B10 B02 B11 B01 B12 07H 07C Avg. Wear TTW Depth % TTW at AVB Contact Points AVB/

/

Tube Wear Depth (%)

20.00 15.00 10.00 5.00 0.00 B01 B02 B03 B04 B05 B06 B07 B08 B09 B10 B11 B12 2A TTW 0.00 0.00 0.00 0.00 15.0 6.50 9.00 9.00 0.00 3.50 0.00 0.00 2B TTW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3A TTW 9.05 9.69 9.81 13.9 13.2 11.2 10.3 11.4 9.48 6.58 4.47 6.51 3B TTW 9.55 11.8 12.7 13.0 11.9 10.7 9.86 11.4 12.0 10.9 10.3 12.0 Avg.AVB/TTW AVB AVB Wear Depth % (excluding TTW tubes)

Tubes Wear Depth (%)

10.00

/

8.00 6.00 4.00 2.00 0.00 B01 B02 B03 B04 B05 B06 B07 B08 B09 B10 B11 B12 2A AVB 0.04 0.09 0.75 1.92 4.27 6.60 7.24 6.32 3.25 0.93 0.13 0.01 2B AVB 0.01 0.04 0.53 1.80 4.66 6.19 6.29 5.58 3.36 1.48 0.10 0.02 3A AVB 0.07 0.18 1.07 2.98 3.94 5.18 4.41 3.32 2.16 0.72 0.10 0.03 3B AVB 0.04 0.31 1.95 3.24 4.27 5.79 4.88 3.26 2.21 1.64 0.19 0.04 Figure 3.5-2 Tube Wear Depth Comparison MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (50/68)

Document No.L5-04GA588(0) 3.6 Conclusion MHI concludes that under the secondary thermal-hydraulic conditions such as in the SONGS SGs, certain tube-to-AVB minimum contact force is required to prevent tubes from vibrating and eventually causing wear at AVB intersections.

According to the manufacturing dimensional tolerance analysis, the average contact force in the Unit 3 SGs was found to be smaller than the average contact force in the Unit 2 SGs, as shown in Fig. 2.3.3-3. Therefore, it is concluded that the contact forces of Unit 3 were more likely to be insufficient to prevent turbulence induced (random) vibration of tubes and the Unit 3 SGs were more susceptible to turbulence induced (random) vibration, as shown in Figs. 3.2.1-4 and 3.2.1-5.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (51/68)

Document No.L5-04GA588(0)

4. Design Approach 4.1 Design Approach (circa 2005-06) 4.1.1 General Design and Performance Requirements In September 2004, MHI was awarded a contract to replace SCEs OSGs at SONGS Units 2 and 3. The general design requirements, performance requirements, and design criteria for the SONGS RSGs were set forth in SCEs Certified Design Specification (CDS), SO23-617-01 (Ref. 8). Significant features of the CDS were the intended use of the provisions of 10 C.F.R. §50.59 to minimize the impact of the RSGs on the existing plant licensing basis (CDS 3.6.1) and the requirement to closely match the dimensions and function of the OSGs (CDS 3.9.1). These features meant that the RSGs needed to be as close as possible to the existing steam generators in form, fit, and function (CDS 3.6.1.1).

While the overall RSG had to fit within the size, weight, and volume limits related to those of the OSG, the tube bundle heat transfer area was to be maximized (CDS 3.8.1.1).

The CDS specified Alloy 690TT tube material (CDS 3.9.3.8), which has a thermal conductivity that is approximately 10% less than that of the OSG tube material. In addition, the number of tubes had to be increased by 8% to accommodate future tube plugging (CDS 3.9.1). These factors led to the increase of the tube bundle heat transfer surface area from 105,000ft2 (OSG) to 116,100 ft2 (an 11% increase), an increase in the number of tubes from 9,350 (OSG) to 9,727 (RSG), and to the RSG tube bundle being taller than that of the OSG.

4.1.2 U-bend Design Approach for Vibration Control Minimizing tube wear resulting from vibration was a high priority in the design of the SONGS RSGs. The design approach used to prevent flow induced tube vibration has two main elements. The first is to establish the required distance between tube supports (the tube span) and the second is to establish the minimum practical tube-to-support clearance. In general these design elements have been established and proven in earlier operating SGs.

Tube Span: The purpose of supporting a tube at multiple locations along its length is to increase the tube natural frequency. The design basis for such spacing is that the first mode of the supported tube be greater than the anticipated forcing frequency. In U-tube steam generators with 3/4 diameter tubes, the typical span in the straight legs is -

. A shorter span is typically applied to the arc length of the U-tube with the largest MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (52/68)

Document No.L5-04GA588(0) bend radius. In the case of the SONGS RSGs, the straight leg tube support span is and the maximum U-bend span is less than half that of the straight leg spans (<

everywhere).

Tube-to-Support Clearance: The reason for maintaining clearance between the tube and its supports (both tube support plates and AVBs) is to permit the tube to move freely in the axial direction, while restraining it in the lateral direction. Freedom to move in the axial direction is needed to assemble the tube bundle and also allows the tubes to expand due to increased temperature and pressure during operation without binding.

The general goal is to design and assemble the tube bundle with the smallest possible clearances between the tubes and the supports without imposing compressive forces on the tubes. In tube support plates the minimum clearance is typically between and . For U-bend supports (AVBs) the clearance is typically controlled to an average gap of 0.005 with allowances for larger gaps on the bundle sides.

The effect of decreasing the tube-to-support clearance is to increase the probability that the tube is contacting the support (on one side), which is believed to provide the best fully supported condition. Small clearances also tend to dampen vibratory tube displacements when they happen. The SONGS tube-to-AVB clearances were controlled to a nominal of 0.002" in the cold condition, with a smaller dimensional variation than that achieved by MHI on prior SGs. The gap variations in Unit 3 were smaller than those of Unit 2, reflecting the improvement in precision gained during the manufacturing process.

At the time of the SONGS RSG design, these were the design elements used to prevent tube vibration. The AVB tube support concept had been validated by multiple experiments and by years of operating SG experience. It was based on the evidence that placing AVBs between tube columns to prevent out-of-plane tube vibration also prevented tube vibration in the in-plane direction.

As stated above, the design choices available to the designer and fabricator are limited to tube span and tube-to-support clearance. The flow conditions are largely a function of the plant power level, operating conditions, and SG size limitations.

The Role of Analysis: A variety of analyses are performed during the design process to estimate the tube vibration and wear characteristics of the design.

These analyses include a performance calculation that determines the flow resistances throughout the SG recirculation path (downcomer, bundle, primary moisture separators, recirculating pool) and calculates the circulation ratio. Then there is a 3D tube bundle thermal / hydraulic analysis that uses the circulation ratio as a boundary condition. This is the code that produces fluid velocities and densities throughout the tube bundle. Such MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (53/68)

Document No.L5-04GA588(0) codes are typically single fluid codes and are not capable of modeling the trajectories of water and steam separately. So, they are rough approximations of the actual flow behavior. Next are the post-processors that organize the output from the flow model.

Sometimes at this stage flow multipliers are added to account for geometric features not modeled (for instance, sometimes the flow peaking effects of the AVBs is added at this stage).

Next is a vibration analysis program that uses the output from the flow analysis post processor and the assumed tube support conditions to calculate tube response. This program is used to analyze each of the various U-tube geometries that are found within the U-bend. This analysis calculates tube displacements at the supports for fluid elastic vibration, turbulence excitation, and vortex shedding. Generally, in the U-bend the dominant mechanism is fluid elastic vibration with turbulent excitation providing a smaller contribution. Vortex shedding is not applicable in the two-phase U-bend region.

All analysis is directed toward the tube out-of-plane response.

Once the tube motions are established, a wear analysis program is used to determine material loss over time. This calculation needs the inputs of tube travel distance and tube-to-support contact (normal) force, plus a wear coefficient to determine wear volume, which is converted to tube wall wear depth. The normal forces (and motions) come from the out-of-plane response to fluid elastic forces. The sliding distance in the in-plane direction comes from the cross flow turbulence forces. Gap elements in the tube model quantify the normal force time history and sliding time history at the tube support points. The tube-to-support wear coefficient is a function of temperature, pressure, water chemistry, steam-to-water ratio, material form, surface hardness, and is taken from prototypic tests of materials in SG environments. This calculation considers both impact wear and sliding wear. A central premise of the analysis is that tube wear and impact forces are proportional to the size of the tube-to-AVB gap. Therefore, minimization of tube wear is the natural result of minimizing the tube-to-support clearances.

The suite of codes used by each vendor to perform tube wear calculations are developed as a set and are generally calibrated against experimental data or field experience so that together they produce results that are reasonably similar to what has been observed in operating SGs and experiments. However, they are only an approximation, so conservatisms are often included throughout the process.

SCE / MHI AVB Design Team:

In mid-2005 a joint SCE / MHI AVB Design Team was formed for the purpose of minimizing the potential for tube vibration and wear in the SONGS RSGs. For the first six months, video meetings were scheduled every two weeks and technical or design review meetings were held on a two month cycle. The AVB Design Team generated MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (54/68)

Document No.L5-04GA588(0) many action items and answered many questions, several of which dealt with high void fraction and how to minimize it. This process continued through the end of 2006.

The AVB team investigated instances of U-bend tube degradation using the INPO, NPE (Nuclear Power Experience), and NRC databases and studied whatever could be found describing the design of other similarly large SGs.

The SONGS RSG design was compared to the design for another large RSG that was operating at another CE-type plant. The RSGs for the comparison plant had reported 22 tubes with U-bend wear after the third operating cycle (July 2005). The end product was a design for the SONGS RSGs with more AVB supports and shorter spans in the U-bend region than the comparison plant, along with effective zero tube-to-AVB gaps during operation. The resulting tube vibration potential was judged to be ~70% that of the comparison plant.

The tube bundle design specifically focused on preventing out-of-plane tube vibration.

Industry practice and experience dictated that controlling out-of-plane vibration would preclude in-plane vibration. Reflecting this industry practice, the Japan Society of Mechanical Engineers Guideline for Fluid-elastic Vibration Evaluation of U-bend Tubes in Steam Generators (Ref. 9) states that in-plane vibration does not need to be considered if out-of-plane vibration is controlled. (See Appendix 1.)

An important experiment studying FEI in U-bends (Ref. 6) by Weaver and Schneider states that The effect of flat bar supports with small clearance is to act as apparent nodal points for flow-induced tube response. They not only prevented the out-of-plane mode as expected but also the in-plane modes. No in-plane instabilities were observed, even when the flow velocity was increased to three times that expected to cause instability in the apparently unsupported first in-plane mode. Weaver and Schneider also increased the clearances between flat bar supports and U-tubes, but were not able to produce in-plane instability.

The NRC, in its Augmented Inspection Team (AIT) report (Ref. 12), recognized this existing industry practice, noting that Traditional design of anti-vibration bar systems have not considered in-plane fluid forces since it was accepted that the rigidity and dampening strength of the tube in this direction preclude it. This event at SONGS is the first US operating fleet experience of in-plane fluid-elastic stability, sufficient to cause tube-to-tube contact and wear in the U-bend region. AIT at page 49.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (55/68)

Document No.L5-04GA588(0)

In February 2005 a paper was published (Ref. 10) that described an experiment of a small U-bend with a single flat bar support at the apex of the U-tubes. It reports that the experimenters were able to generate both out-of-plane FEI and in-plane FEI. However, U-tube FEI in the in-plane direction has never been observed in the U-tube SGs before its occurrence in the SONGS SGs. The textbook by M. K. Au-Yang (Ref. 11), states that In-plane modes have never been observed to be unstable even though the computed fluid-elastic stability margins are well below 1 (the fluid-elastic stability margin, FSM, is the inverse of the stability ratio).

The AVB Design Team included an independent U-bend tube vibration expert who explained that rapid tube wear is driven more by fluid elastic vibration than by turbulence, so the effectiveness of the tube supports is very important. In the analytical evaluation, considering the possibility of missing supports is a way of assuring the design has margin against fluid elastic vibration. This is the reason that the MHI vibration analysis included an evaluation of inactive (missing) supports to demonstrate margin against FEI.

Tube and AVB Fabrication and U-bend Assembly During the fabrication and assembly of the SONGS RSGs, many steps were taken to achieve the essentially effective zero gap, parallelism and uniformity of the U-bend assembly specified by the CDS2 and believed to be critical based on existing industry practice and experience to minimize tube vibration.

Reducing the tube-to-AVB gaps has the potential to increase the contact force and reduce tube damping. Tube mechanical damping, which is present when there are small gaps, is particularly important to inhibit FEI when the void fraction is high and fluid damping is low. The AVB Design Team decided on an AVB gap design basis with the most uniform gaps achievable and as near zero without excessive preload. So the variation of tube-to-AVB gap sizes was minimized to avoid an increase of contact force (preload) by increasing the nominal AVB thickness, reducing the AVB thickness tolerance, reducing the allowable value for twist, and decreasing the tolerance for the tube G-value (diameter).

Manufacturing mockups were used to quantify, improve, and qualify the tube-to-retaining bar welding process. Improvements in the manufacturing processes for the SONGS RSGs included the use of metal spacers during retaining bar welding, changing of SG orientation during welding, reduction of weld size to minimize deformation, measurement of every 10 column pitch, and measurement of outer 2

Revision 3 of the CDS, to which the SONGS RSGs were designed and fabricated, specified an effective zero tube-to-flat bar gap, gap uniformity and parallelism of the tube bundle in the out-of-plane direction . . . CDS 3.10.3.5.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (56/68)

Document No.L5-04GA588(0) peripheral gaps.

Based on experience gained in the fabrication of the Unit 2 RSGs, additional precision was incorporated into the fabrication of the Unit 3 RSGs to more effectively implement the effective zero gap, uniformity and parallelism of the U-bend assembly. (See TER at section 5.2.3 and section 2.3.3 above.)

4.1.3 Evaluation of Design Changes to Reduce Void Fraction In the May 2005 Design Review meeting, MHI presented an RSG performance calculation showing high projected void fraction. It was decided that MHI would perform a parametric analysis to determine how the void fraction could be reduced while maintaining the other design requirements.

Over the next five months, MHI evaluated alternative design modifications to increase the RSG circulation ratio (and thereby reduce the maximum void fraction). The design alternatives included a larger downcomer, larger TSP flow area, and removing one TSP.

None of these alternatives had a large enough effect on the maximum void fraction to justify such a significant change.

However, the net result of the effort was to select the 2V x 3 AVB design from among several competing AVB configurations, which had a smaller pressure loss than the competing concepts, but the reduction in maximum void fraction was negligible. The 2V x 3 AVB design provided significant design margin for minimizing tube vibration.

In October 2005 the AVB Design Team agreed that the RSG design was optimized for the SONGS application. At the time of shipment of the SONGS RSGs it was believed that they had greater margin against U-bend tube vibration and wear than other similar SGs.

4.2 U-bend Design Approach (circa 2012) 4.2.1 A New Paradigm The forced outage of Unit 3 and the subsequent discovery of thousands of U-bend tube wear indications in both Unit 2 and Unit 3 after such a short operating period was wholly unexpected. Such an outcome should have been prevented by the conservative design and the precision manufacture.

The inspection data revealed two significant, heretofore, unexpected conditions. The first condition was the Unit 3 tubes with in-plane FEI, whose in-plane flow induced displacements were large enough to produce tube-to-tube contact (and wear). As stated, in-plane FEI is a new SG tube degradation phenomenon that prior to SONGS had never MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (57/68)

Document No.L5-04GA588(0) been observed in U-tube steam generators.

The second condition was the appearance of thousands of tube-to-AVB wear indications in just one operating cycle. A similar condition had appeared in the replacement SGs for another CE plant (Plant A) subsequent to the design and fabrication of the SONGS RSGs. After the first operating cycle, Plant A had 5,668 wear indications compared to SONGS Unit-2 with 4,341 (a full operating cycle) and SONGS Unit-3 with 3,894 (a partial operating cycle) (see Fig. 3.2.1-4). The tube degradation experienced at both Plant A and SONGS is inconsistent with prior operating SG experience and design expectations.

The identification of the unexpected tube degradation led to an extensive evaluation as to the causes the degradation and the questioning of the original design assumptions..

4.2.2 Assessment of the New Paradigm Based on the numerous technical reports prepared by MHI and others, summarized in this report, it is clear that in-plane FEI occurred in the Unit-3 RSGs. The primary evidence of in-plane FEI discussed in Section 2 includes the following:

1. The tubes in adjacent rows (same column) have matching wear scars on the intrados and extrados, which are roughly at the 45o (hot leg side) and 135o (cold leg side) locations. This correlates with the displacement shape of the 1st in-plane vibration mode (mode-1) of the U-tubes.
2. The TTW tubes exhibit deep wear at the top TSP, which confirms that the tubes were experiencing large-amplitude, mode-1 in-plane vibration.
3. There are some victim tubes on the periphery of the TTW population that were struck by tubes with in-plane FEI. These tubes can be identified by the absence of top-TSP wear.

Extensive evaluations by MHI indicate that the in-plane FEI was caused by insufficient contact forces between the tubes and the AVBs to restrain movement of the tubes in the in-plane direction under high localized thermal hydraulic conditions. The in-plane vibration associated with the wear observed in the Unit 3 RSGs could only have occurred if essentially all of the AVB supports were inactive in the in-plane direction. The Unit 3 tube-to-AVB contact forces on the TTW tubes that were the result of the precise U-bend assembly process are so low that they do not restrain the tubes in the in-plane direction.

Based on the analysis, the lack of sufficient contact force to restrain the in-plane MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (58/68)

Document No.L5-04GA588(0) movement of the tubes is the primary cause of the in-plane FEI tube wear observed at SONGS. The high localized thermal hydraulic conditions of the SONGS RSGs are also an important factor, in that tube-to-tube wear was only observed on tubes in areas of high void fraction (steam quality). However, thermal hydraulics are not the controlling factor. SONGS Unit 2 and Unit 3 have identical thermal hydraulic conditions and virtually all of the TTW tubes were found in Unit 3. The explanation for this difference is that the contact forces in Unit 2 are approximately double those in Unit 3. Also, while the TTW was only found in the high void fraction regions of Unit 3, less than of tubes in the high void fraction region exhibited TTW. Furthermore, analyses using ATHOS instead of FIT-III still indicate the tubes are stable assuming no inactive supports but with lower bound damping.

The numerous technical reports prepared by MHI and others, summarized in this report also evaluated the unexpected tube-to-AVB wear observed in the Unit 2 and Unit 3 RSGs. The evaluation has led to the conclusion that the thousands of premature tube-to-AVB wear indications are caused by the presence of thousands of small tube-to-AVB gaps with insufficient contact force in the presence of high void fraction.

The number of Unit 2 indications and their wear rates are less than that of Unit 3. This is consistent with the fact that the Unit 2 RSGs have higher tube-to-AVB contact forces than the Unit 3 RSGs.

4.2.3 Design Implications of the New Paradigm Study of the recently collected data has led to a re-evaluation of the original design basis for the SONGS RSGs. Several preliminary conclusions have been drawn for developing a design that is resistant to vibration:

1. The effective zero gap design concept is effective against out-of-plane FEI but for the AVB supports to be active and provide restraint in the in-plane direction requires sufficient tube-to-AVB contact force to generate friction that inhibits in-plane tube displacement. Therefore, the zero gap assembly definition should have included a requirement for small, uniform contact forces (preloads).
2. The magnitude of the required contact force increases in regions of high void fraction (steam quality). Tubes in the high void fraction (steam quality) region of the tube bundle U-bend are more susceptible to in-plane FEI and random vibration because the higher void fraction (steam quality) reduces the external fluid damping and the liquid film damping (squeeze film damping). Therefore it is important to assure that upper bound thermal hydraulic values (void fraction, steam quality, flow velocities, damping, etc.) are assumed in the analysis of the design.
3. If small, uniform contact forces are incorporated, the design basis no longer needs to assume inactive supports and the number of supports does not need to be MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (59/68)

Document No.L5-04GA588(0) greater than what is needed to prevent out-of-plane FEI (i.e. four sets of AVBs instead of six would be sufficient).

The tube degradation experience also has implications for evaluating the sufficiency of the design to prevent wear from turbulence induced (random) vibration. In the absence of out-of-plane FEI and in-plane FEI, the next most powerful tube vibration mechanism is turbulence induced (random) vibration. Given the small gaps and small contact forces, it is a reasonable conclusion that the turbulent flow conditions are sufficient to produce tube-to-AVB impact wear. However, evaluation of the wear data has led to the conclusion that different assumptions need to be made in evaluating wear from random vibration, at least under the conditions present in the SONGS RSGs. To explain the wear rate observed at SONGS using conventional methods, it is necessary (1) to assume consecutive supports with small clearances and/or small contact forces that permit tube-to-AVB impacting to occur within the gap; (2) to replace the fretting wear coefficients, typically used, with impact wear coefficients that are significantly larger; and (3) to use the random excitation forcing function that is based on recent MHI internal two-phase flow test data (Ref. 14). Sample wear calculations using the impact wear coefficient, plus the assumption that tubes have small gaps and/or contact forces at several consecutive AVB locations match the reported wear rates using a turbulence induced (random) vibration assumption (see Appendix-3 and Section 3.4).

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (60/68)

Document No.L5-04GA588(0)

5. References

[1] MHI report, Tube wear of Unit-3 RSG - Technical Evaluation Report, L5-04GA564 the latest revision

[2] MHI report, Retainer Bar Tube Wear Report, L5-04GA561 the latest revision

[3] MHI report, Screening Criteria for Susceptibility to In-Plane Tube Motion, L5-04GA571 the latest revision

[4] AREVA report, SONGS U2C17 Steam Generator Operational Assessment for Tube-to-Tube Wear, 51-9187230

[5] MHI report, Evaluation of Stability Ratio for Return to Service, L5-04GA567 the latest revision

[6] Journal of Engineering for Power, Vol. 105, pp. 775-781, The Effect of Flat Bar Supports on the Crossflow Induced Response of Heat Exchanger U-Tubes, D. S.

Weaver, W. Schneider, October 1983

[7] Transactions of the ASME, Vol.120, pp. 138-142, Flow-induced wear in steam generator tubes-Prediction versus operational experience, Au-Yang, M. K, 1998

[8] SCE document, Certified Design Specification of SONGS Unit 2&3 RSGs, SO23-617-01 revision 3

[9] JSME, S016-2002, Guideline for Fluid-elastic Vibration Evaluation of U-bend Tube in SG, March 2002

[10] ASME, Fluidelastic Instability and Work-Rate Measurements of Steam-Generator U-Tubes in Air-Water Cross-Flow, V.P.Janzen, E.G.Hagberg, M.J.Pettigrew, C.E.Taylor. February 2005

[11] ASME Press, New York, Flow Induced Vibration in Power and Process Plant Components, Au-Yang, M. K

[12] NRC Augmented Inspection Team Report, SAN ONOFRE NUCLEAR GENERATING STATION, 05000361/2012007 and 05000362/2012007.

[13] EPRI technical report, Steam Generator Vibration and Wear Prediction, TR-103202, March 1998

[14] MHI report, Steam Generator Tube Wear Test Data Set, WJS17906, March 2011

[15] MHI report, Experimental Study on Impact/Fretting Wear Evaluation of S/G Tube and Tube-Support, 2507637A, June 1987 MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (61/68)

Document No.L5-04GA588(0)

Appendix-1 Definition of active support condition for FEI and random vibration 1.1 Understanding of active support at the time of design Based on accepted industry understanding and practice at the time of design an active support condition for out-of-plane FEI was considered to be active (meaning that the support prevented tube displacement) for in-plane FEI and for random vibration.

Analytically an active support was achieved by adding a pinned support condition to the tube that prevented tube displacement in the out-of-plane and in-plane directions while allowing the tube to rotate.

With active pin support conditions, out-of-plane FEI will occur before in-plane FEI because tube U-bend natural frequency in the out-of-plane direction is lower than that in the in-plane direction. It is reasonable to expect that the active pinned support condition is a valid assumption for both the out-of-plane and in-plane directions, because the resulting contact forces between tubes and AVBs will also produce in-plane tube restraint due to friction. This expectation was supported by the field experience at the time of the design of the SONGS RSGs. At the time of design, MHI investigated the field experience of U-bend tube degradation using the INPO, NRC and NPE databases, and found no tube wear in prior operating U-tube SGs caused by in-plane FEI.

Based on this accepted industry understanding, the JSME Guideline for Fluid-elastic Vibration Evaluation of U-bend Tube in SGs states that in-plane FEI does not need to be considered if out-of-plane FEI is controlled. The JSME guideline (Ref. 9) shows the following examples of a comparison of tube U-bend natural frequency in the out-of-plane and in-plane direction.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (62/68)

Document No.L5-04GA588(0)

Fig. A1-1 Example of evaluation of tube U-bend natural frequency with AVBs Thus, based on accepted industry understanding and practice at the time of design, the effective zero gap design incorporated into the SONGS RSGs was considered to be effective with respect to out-of-plane FEI as well as in-plane FEI and random vibration.

1.2 Post SONGS tube wear understanding of active support Based on the investigation and analysis of the tube wear in the SONGS RSGs, MHI has now determined that:

The effective zero gap design concept is effective against out-of-plane FEI and analytically can be represented by a pinned support that is active in the out-of-plane direction.

The conditions necessary for a pinned support to be active in the in-plane direction requires sufficient tube-to-AVB contact force to generate friction that inhibits in-plane tube displacement A sufficient level of contact force between tube and AVB is necessary for the support to be active in the in-plane direction. The magnitude of the required contact force increases in regions of high void fraction (steam quality).Tubes in the high void fraction (steam quality) region of the tube bundle U-bend are MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (63/68)

Document No.L5-04GA588(0) more susceptible to in-plane FEI and random vibration because the higher void fraction (steam quality) results in lower external fluid damping and a reduction in the liquid film damping (squeeze film damping), plus higher fluid velocities.

High void fraction is an important (but not controlling) factor in the occurrence of in-plane FEI and impact wear due to turbulence induced (random) vibration.

1.3 Summary The discussion above is summarized in Table A1.3-1.

Table A1.3-1 Active or Inactive as to design concept of effective zero gap At design stage Post SONGS tube wear Out-of-plane FEI Active Active In-plane FEI Active (*Note) Inactive (insufficient contact forces)

Random Active Inactive (small gap and/or small vibration contact forces at AVB intersections)

(*Note) At the time of design an active support condition for out-of-plane FEI was also considered to be active for in-plane FEI, based on accepted industry understanding and practice.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (64/68)

Document No.L5-04GA588(0)

Appendix-2 Effect of support conditions on FEI out-of-plane and in-plane Critical Velocity The critical velocity for FEI (out-of-plane or in-plane) depends on the support condition, namely the number of active supports (in both the in-plane and out-of-plane directions).

In U-bend SGs, if the number of active supports against out-of-plane FEI is identical to the number of active supports against in-plane FEI, the critical velocity for out-of-plane FEI is always lower than what is required to produce in-plane FEI because the natural frequency of out-of-plane FEI is lower than that of in-plane FEI. Therefore out-of-plane FEI will occur before in-plane FEI.

However, based on the investigation and analysis of the tube wear at SONGS, MHI concludes that the meaning of active is different with respect to out-of-plane FEI and in-plane FEI as follows:

Active condition against out-of-plane FEI: Narrow gap that is small enough to produce tube-to-AVB contact and mechanical damping (contact force is not necessary)

Active condition against in-plane FEI: Tube-to-AVB contact force sufficient to produce friction that inhibits in-plane tube displacement is required Based on the investigation of the tube wear at SONGS, MHI concludes that the number of active supports against out-of-plane FEI is not identical to the number of active supports against in-plane FEI.

In the case of the SONGS RSGs, the number of active supports against out-of-plane FEI is considered to be the same as designed because narrow or effective zero gaps are confirmed by ECT measurements and visual inspection at tube-to-AVB intersections along representative tubes with wear. On the other hand, for tubes that exhibited tube-to-tube (Type-1) wear, the number of active supports against in-plane FEI is reduced because the contact force is not sufficient.

If the number of active supports that prevent in-plane FEI becomes sufficiently less than the number of supports that prevent out-of-plane FEI, the critical velocity of in-plane FEI becomes lower than that of out-of-plane FEI.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (65/68)

Document No.L5-04GA588(0)

Fig. A2-1 Correlation between Number of inactive supports and Critical velocity MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (66/68)

Document No.L5-04GA588(0)

Appendix-3 Tube Wear Analysis Evolution The tube wear analysis that was performed at the time of design concluded that the wear levels over 40 years would be negligible. At that time, MHI considered that effective zero gap (and low contact force) would provide active support conditions against tube vibration and FEI. The assumed support conditions for the tube wear analysis were as follows:

Nine (9) active pinned supports in the out-of-plane direction but unrestrained (free) in the in-plane direction Two (2) consecutive inactive supports but with a symmetric mil gap between the tube and AVB A third inactive consecutive support with the AVB contacting the tube on one side where the fretting wear depth was calculated, which was larger than that at the two other inactive supports Based on the investigation and analysis of the actual tube wear at SONGS, MHI concludes that a sufficiently large contact force is necessary to produce active support conditions against random tube vibration and that the required contact force is dependent on the void fraction (steam quality). It is concluded that the support conditions assumed during the design stage led to an underprediction of the actual wear rate.

By increasing the number of inactive supports (but with small clearances or small contact forces sufficient to permit tube-to-AVB impacting to occur) to 8, using the impact wear coefficient instead of the fretting wear coefficient, and using the random excitation force based on recent MHI internal two-phase (steam and water) flow experiments (Ref.

14) instead of single flow test data (Ref. 13), the tube wear analysis simulates the observed wear depth for the tube-to-AVB intersections with the largest wear.

MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (67/68)

Document No.L5-04GA588(0)

Table A3-1 Comparison of Tube Wear Analysis (At the time of design / Post-SONGS tube wear mechanistic cause evaluation)

At the time of Post-SONGS tube wear mechanistic design cause evaluation The purpose of To calculate wear To calculate wear due to random analysis due to FEI and vibration in both the in-plane and random vibration in out-of-plane directions the out-of-plane direction Support condition 2 (symmetric 10- 8*1 (symmetric 2 8*1 (symmetric 2 mil (Number of mil gaps in mil gaps in the gaps in the consecutive inactive out-of-plane out-of-plane out-of-plane supports) direction plus free direction plus direction plus free in-plane) free in-plane) in-plane)

Random excitation Single phase Two phase (steam/water) flow test data force basis (water) flow test (Ref. 14) data (Ref. 13,)

Thermal-hydraulic code FIT-III*2 ATHOS FIT-III*3 Fretting wear Impact wear Impact wear value:

value: value:

Wear coefficient ratio Gap between tube and Contact with one Gap variation Gap variation AVB side (Constant) according to according to wear wear progression progression Wear after 2 years Approx. Approx. Approx.

operation Note: *1) Wear at AVB locations at the top of the bundle is assumed under the condition 8 AVBs inactive for random vibration. Other AVB locations closer to TSP have fewer inactive AVBs and wear would be less.

  • 2) Inappropriate definition (not consistent with ASME Section III Appendix-N) of the gap between tubes was used to obtain the gap velocity.
  • 3) Appropriate definition (consistent with ASME Section III Appendix-N) of the gap between tubes was used to obtain the gap velocity.
  • 4) A fretting wear coefficient based on MHI internal test results (Ref. 15) was used to evaluate the wear depth of the tube at the point in contact with the AVB, because the work rate at this contacted point was much larger than the work MITSUBISHI HEAVY INDUSTRIES, LTD.

Non-proprietary Version (68/68)

Document No.L5-04GA588(0) rates at the other 2 inactive support points.

  • 5) An impact wear coefficient based on AECL test results was used to match the impact wear that can occur when the tube-to-AVB clearances and/or the contact forces are very small.