2012 Dresden Nuclear Power Station Initial License Examination Proposed SRO Admin JPMs
ML12284A460
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/26/2012
From: Nelson J, David Reeser
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML11354A123 List:
References
Download: ML12284A460 (43)


Text

Exelon Nuclear Job Performance Measure Determine actions required for a security threat JPM Number: A-N-1-S Revision Number: 01 Date: 05/12 Developed By:

Instructor Date Approved By:

Training Department Date A-N-1-S Page 1 of 7

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Bank JPM Revision 01 Revised for ILT 11-1 (2012-301) NRC exam.

A-N-1-S Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS None HANDOUT PREPARATION Provide copies of:

  • DOA 0010-13, Security Threat
  • DOA 0010-18, Escalated Security Event / Hostile Force Intrusion A-N-1-S Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

  • You are the Unit 2 Supervisor.
  • Both Units are operating at rated conditions.
  • The Security Shift Leader just notified the Shift Manager that Security received a threatening phone call stating that an explosive device has been placed somewhere in the vicinity of the AEER that will detonate in 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

INITIATING CUE The Shift Manager has assigned you to Peer Check Security by performing a Threat Disposition per SY-AA-101-132 to determine if the threat is a Non-credible, Credible/Possible, or an Actual Threat.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

If a CRITICAL step has more than one part, then:

  • (filled bullet) indicates a CRITICAL part of the step.

o (open bullet) indicates a NON-CRITICAL part of the step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The time clock starts when the candidate acknowledges the initiating cue.

A-N-1-S Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT Note: Provide the operator with attached copies of:

  • DOA 0010-13
  • DOA 0010-18
  • Assess the threat. Assess threat as CREDIBLE/POSSIBLE per SY-AA-101-132 section 4.6.1.

Cue: When the threat has been assessed tell the examinee that, It is 45 minutes later and Security notifies you that an armed hostile force has been sighted inside the Protected Area Boundary.

The Shift Manager directs you to continue your peer check of Security and determine what plant manipulations, if any, need to be performed.

  • Reassess the threat. Assess threat as CREDIBLE/ACTUAL per SY-AA-101-132 section _____ _____ _____

4.6.1/4.7.1.

  • Determine the required Identifies actions in DOA plant actions. 0010-18, step D.4.

Cue: Acknowledges report of determination.

END JPM Stop Time:_________

A-N-1-S Page 5 of 7

Job Performance Measure (JPM)

Operators Name: ___________________________________

Job

Title:

SRO JPM

Title:

Determine actions required for a security threat JPM Number: A-N-1-S Revision Number: 00 Task Number and

Title:

295L012 Respond to a Security Threat K/A Number and Importance: 2.1.20 4.6/4.6 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: _______minutes

References:

SY-AA-101-132, Rev.019, Threat Assessment DOA 0010-13, Rev.004, Security Threat DOA 0010-18, Rev.029, Escalated Security Event / Hostile Force Intrusion EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-1-S Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

  • You are the Unit 2 Supervisor.
  • Both Units are operating at rated conditions.
  • The Security Shift Leader just notified the Shift Manager that Security received a threatening phone call stating that an explosive device has been placed somewhere in the vicinity of the AEER that will detonate in 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

INITIATING CUE The Shift Manager has assigned you to Peer Check Security by performing a Threat Disposition per SY-AA-101-132 to determine if the threat is a Non-credible, Credible/Possible or an Actual Threat.

A-N-1-S Page 7 of 7

Exelon Nuclear Job Performance Measure Initiate a Firewatch JPM Number: A-N-2-S Revision Number: 01 Date: 05/2012 Developed By:

Instructor Date Approved By:

Facility Representative Date A-N-2-S Page 1 of 10

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Bank JPM Revision 01 Revised for ILT 11-1 (2012-301) NRC Exam A-N-2-S Page 2 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Any IC to accommodate other JPMs.
2. This is a tabletop JPM utilizing simulator procedures.
3. Ensure a copy of the Fire Pre-Plans is available as a resource.

A-N-2-S Page 3 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the WEC Supervisor on midnights and are acting as the Fire Marshall Designee.
2. As part of a scheduled activity, the Maintenance Department must route hoses through the Unit 3 HPCI Room Door and the work will begin promptly at 1600.
3. The activity is being performed under WO 542874-02 and is scheduled for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
4. The next available number in the Fire Protection Impairment Barrier Permit Log is 12-31.
5. The cognizant Maintenance Supervisor is C. Block.
6. The following XL3 devices are inoperable: Zone 13 device 11 Zone 23 device 29 Zone 33 device 23 Zone 34 devices 4,5, and 29 Zone 43 device 30 INITIATING CUE
1. Authorize and initiate, as necessary, a firewatch IAW applicable procedure.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-S Page 4 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT Give the Student a copy of OP-MW-201-007 with the initiator section of Attachment 1 filled out.

Fills out Attachment 1 of OP-MW-201-007 as follows:

1. FIRE MARSHALL NO: Examinee uses number on cue sheet and enters 12-31 Section II
2. Determine Fire Zone. Determines and enters Fire Zone as 11.1.3. (May also specify 11.1.2)
3. Barrier Functional. Determines and marks Barrier is Non-Functional.
  • 4. Technical Requirement Determines TRM is applicable Manual? and identifies applicable sections as: 3.7.n. (may also specify A.1.1 and A.2.1) _____ _____ _____

CUE: If asked: Another SRO is looking at the LCO requirements.

6. Fire watch performed Designates Department by: responsible for firewatch.
7. Additional Marks NO or YES and put Compensatory some compensatory measures Measures Required? in the space provided.
8. Fire Detector Operability Marks NO.

Check Required?

A-N-2-S Page 5 of 10

Job Performance Measure (JPM)

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT

9. NEIL Notification Marks NO.

Required?

10. Fire Marshall Enters NONE or NA.

Instructions:

11. Restoration/Testing Enters Door closed and Requirements: latched or instructions that convey a similar concept.
  • 12. Fire Marshall Signs name and enters current (Designee) date.

Authorization:

Section III

13. Detection Zones As Marks NA or NO.

Indicated In Section II Operable:

14. Person Notified of Fire Examinee writes their name as Watch: person notified or Unit Supervisor.
  • 15. Shift Management Examinee signs their name as Authorization: Shift Management Authorization and enter current date and time. _____ _____ _____

Fills out Attachment 2 of OP-MW-201-007 as follows:

Section I

16. Reason for watch: Examinee enters U3 HPCI door blocked or description conveying that concept.
  • 17. TRM Section: Examinee enters 3.7.n.
18. Impairment/PBI No.: Examinee enters 12-31 A-N-2-S Page 6 of 10

Job Performance Measure (JPM)

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT

19. AR/WR No.: Examinee enters 542874-02
  • 20. Type of Fire Watch: Examinee marks Continuous
21. Location: Examinee marks:

Unit 3 Bldg RB (conveys Reactor Bldg)

Elev 476 (may indicate 476 6)

Row N _____ _____ _____

Col 46

22. Description of area to Examinee indicates U3 HPCI be inspected: room or something that conveys the Unit 3 HPCI room.
23. Required Start Examinee indicates 1600 Time/Date: and enters todays date.

Note: If examinee asks what time maintenance will be blocking the door, tell them 1600.

Section II

24. Responsible Examinee indicates MMD.

Department:

25. Responsible Supervisor: Examinee indicates C. Block.
26. Notification: Examinee indicates time and date the responsible person is notified (may leave blank until person notified).

Note: Examinee may tell examiner what time fire watch needs to start and enter current time and date.

A-N-2-S Page 7 of 10

Job Performance Measure (JPM)

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT Section IV

27. Location to be Examinee indicates U3 HPCI inspected: room or something that conveys the Unit 3 HPCI room.

Fire Protection Impairment Barrier Permit Log

28. FPI Log Number Examinee enters 12-31 Note: Examinee may not fill in Date/time until impairment actually occurs or time and date the paperwork was filled out.

END JPM Stop Time:_________

A-N-2-S Page 8 of 10

Job Performance Measure (JPM)

Operators Name: _______________________________ ____

Job

Title:

ROo SRO STAo SRO Certo JPM

Title:

Initiate a Firewatch JPM Number: A-N-b Revision Number: 00 Task Number and

Title:

299L019, Initiate / Terminate a firewatch.

K/A Number and Importance: 2.1.8; 3.4 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: oSimulator oPlant oControl Room Testing Method: o Simulate Faulted: o Yes No Perform Alternate Path: o Yes No Time Critical: oYes No Estimated Time to Complete: 23 minutes Actual Time Used: _______minutes

References:

OP-MW-201-007 Rev. 007 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? oYes oNo The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: oSatisfactory oUnsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

A-N-2-S Page 9 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the WEC Supervisor on midnights and are acting as the Fire Marshall Designee.
2. As part of a scheduled activity, the Maintenance Department must route hoses through the Unit 3 HPCI Room Door and the work will begin promptly at 1600.
3. The activity is being performed under WO 542874-02 and is scheduled for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
4. The next available number in the Fire Protection Impairment Barrier Permit Log is 12-31.
5. The cognizant Maintenance Supervisor is C. Block.
6. The following XL3 devices are inoperable: Zone 13 device 11 Zone 23 device 29 Zone 33 device 23 Zone 34 devices 4,5, and 29 Zone 43 device 30 INITIATING CUE
1. Authorize and initiate, as necessary, a firewatch IAW applicable procedure.

A-N-2-S Page 10 of 10

Exelon Nuclear Job Performance Measure REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS JPM Number: A-N-3-S Revision Number: 01 Date: 03/12 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified for ILT 09-1 Cert Exam.

Revision 01 Revised for ILT 11-1 (2012-301) NRC Exam.

A-N-3-S Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of Appendix A.

A-N-3-S Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. Unit 2 is operating at rated conditions.
3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.

INITIATING CUE

1. Complete the Unit Supervisor review of Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG and identify any Tech Spec requirements.
2. Correct any discrepancies noted (if any).

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-S Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of Appendix A.

If asked, leak check is in progress and/or Drywell samples and CAM results are trending up.

  • 1. Verifies Calculated Floor Drain Determines Floor Drain Leakage is correct. leakage for SAT 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> should be 4.70 gpm. _____ _____ _____
  • 2. Verifies Calculated Floor Drain Determines Floor Drain Leakage is correct. TOTAL leakage for SAT 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> should be 12.98 gpm.

NOTE:

If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given.

  • 3. Verifies Calculated Floor Drain Determines Floor Drain Leakage is correct. leakage for FRI 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> should be 5.20 gpm (TS). _____ _____ _____
  • >5 gpm unidentified leakage for FRI 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.

Recognizes in Cond A & B.

5. Reports discrepancies. Examinee reports discrepancies noted.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-S Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS Revision Number: 01 JPM Number: A-N- 3-S Task Number and

Title:

29900LK108, Discuss the Unit Supervisors responsibilities for plant operation.

K/A Number and Importance: Generic.2.2.40 3.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

Appendix A, rev 128 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-3-S Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. Unit 2 is operating at rated conditions.
3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 ,

AND 3 REACTOR COOLANT LEAKAGE LOG.

INITIATING CUE

1. Complete the Unit Supervisor review of Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG and identify any Tech Spec requirements.
2. Correct any discrepancies noted (if any).

A-N-3-S Page 7 of 7

Exelon Nuclear Job Performance Measure SELECT PERSONNEL FOR RADIATION WORK JPM Number: A-N-4-S Revision Number: 04 Date: 03/12 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 02 Bank JPM.

Revision 03 Bank JPM.

Revision 04 Revised for ILT 11-1 (2012-301) NRC Exam A-N-4-S Page 2 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Markup a copy of an RWP and survey map for the Unit 3 RWCU Pump Room.

A-N-4-S Page 3 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the WEC Supervisor and will be briefing EOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five EOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than 10004555.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five EOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP 10004555 Today To Date Bill 10 mrem 1400 mrem Lenny 60 mrem 1700 mrem Jerry 0 mrem 1750 mrem Scott 10 mrem 1950 mrem Harry 40 mrem 1850 mrem

4. The total expected stay time for each EO will be 45 minutes. Based on past job history, it will breakdown as follows:
  • 30 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room. DETERMINE which EO(s) CAN and which EO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

A-N-4-S Page 4 of 10

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-S Page 5 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of the RWP and survey map of the RWCU pump room and the copy of RP-AA-203.

The following steps may be performed in any order.

1. Reviews Survey Maps to Reviews the survey maps determine area dose rates. and determines area dose rates to be 50 mr/hr for the first group of 2 valves and _____ _____ _____

160 mr/hr for the remaining valve.

NOTE:

The following calculations should be made:

2 valve clearance projected dose = 0.50 hr x 50 mr/hr = 25 mrem 1 valve clearance projected dose = 0.25 hr x 160 mr/hr = 40 mrem Total projected dose for the job = 40 mrem + 30 mrem = 65 mrem

  • 2. Calculates that the projected Determines the EOs will dose that will be received for receive 25 mrem on the the task is 65 mrem. first 2 valves and 40 on the next 1. _____ _____ _____

CUE:

IF the candidate inquires whether or not any of the EOs has received permission to exceed any dose limits, respond: None of the Equipment Operators have received permission to exceed any limits.

NOTE:

The following steps may be performed in any order.

  • 3. Determines that Bill CAN Bills total RWP dose and perform the job because no Annual dose will remain limits will be exceeded. below the limits.

A-N-4-S Page 6 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 4. Determines that Lenny Lennys total dose on RWP CAN NOT perform the job 10004555 would be because he would exceed the 125 mrem.

80 mrem dose alarm on RWP _____ _____ _____

10004555.

  • 5. Determines that Jerry CAN Jerrys total RWP dose perform the job because no and Annual dose will limits will be exceeded. remain below the limits. _____ _____ _____
  • 6. Determines that Scott Scotts total Annual dose CAN NOT perform the job would be 2015 mrem.

because he would exceed the _____ _____ _____

2000 mrem Exelon Annual limit.

  • 7. Determines that Harry Harrys total dose on RWP CAN NOT perform the job 10004555 would be because he would exceed the 105 mrem.

80 mrem dose alarm on RWP _____ _____ _____

10004555.

END JPM Stop Time:_________

A-N-4-S Page 7 of 10

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

SELECT PERSONEL FOR RADIATION WORK Revision Number: 04 JPM Number: A-N-4-S Task Number and

Title:

29900LK119, Discuss the items to be considered prior to work authorization K/A Number and Importance: Generic.2.3.4 3.2 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

RP-AA-203, rev 03 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-S Page 8 of 10

Job Performance Measure (JPM)

KEY EVALUATOR: The candidate must determine that dose for the task will be 65 mrem and determine that only two EO can receive the dose, necessary to complete the task. They are Bill and Jerry. See the table below for projected job dose, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> total dose on RWP 10004555, and total Annual TEDE dose for each Operator.

Calculation:

2 valves clearance (at RWCU Aux Pump) projected dose = 0.50 hr x 50 mr/hr =

25 mrem 1 valve clearance (at A RWCU Pump) projected dose = 0.25 hr x 160 mr/hr = 40 mrem 25 mrem + 40 mrem = 65 mrem projected job dose for clearance order hanging DDE dose Annual TEDE Projected dose on Projected Annual TEDE Name received on RWP dose as of RWP 10004555 (including all dose from 10004555 today Midnight To Date for the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

(10 + 65 =) (1400 + 65 =)

Bill 10 mrem 1400 mrem 75 mrem 1465 mrem (60 + 65 =) (1700 + 65 =)

Lenny 60 mrem 1700 mrem 125 mrem 1815 mrem (0 + 65 =) (1200 + 65 =)

Jerry 0 mrem 1750 mrem 65 mrem 1465 mrem (10 + 65 =) (1950 + 65 =)

Scott 10 mrem 1950 mrem 75 mrem 2015 mrem (40 + 65 =) (1850 + 65 =)

Harry 40 mrem 1850 mrem 105 mrem 1915 mrem The bolded values in the table exceed the applicable Company, RWP, or 10CFR limit.

A-N-4-S Page 9 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the WEC Supervisor and will be briefing EOs to perform a Clearance Order First Hang in the Unit 3 RWCU Pump Room under RWP 10004555.
2. Five EOs are available this shift.
  • None of the five have received dose at any location other than Dresden Station.
  • None of the five have received dose since midnight on any RWPs other than 10004555.
3. The Radiation Protection Department has provided the attached Survey map, and the following dose history for the five EOs to assist you in your planning:

DDE dose received on Annual TEDE dose Name RWP 10004555 Today To Date Bill 10 mrem 1400 mrem Lenny 60 mrem 1700 mrem Jerry 0 mrem 1750 mrem Scott 10 mrem 1950 mrem Harry 40 mrem 1850 mrem

4. The total expected stay time for each EO will be 45 minutes. Based on past job history, it will breakdown as follows:
  • 30 minutes total in the area near the following two valves:

3-1201-138 RWCU Aux Pump Suction (at RWCU Aux Pump) 3-1201-139 RWCU Aux Pump Discharge (at RWCU Aux Pump)

  • 15 minutes total in the area near the following one valve:

3-1201-128A A RWCU Pump Suction (at A RWCU Pump)

INITIATING CUE

1. CALCULATE the expected dose for the work in RWCU Pump Room.

DETERMINE which EO(s) CAN and which EO(s) CAN NOT be assigned to perform the task. EXPLAIN the basis for your determination.

A-N-4-S Page 10 of 10

Exelon Nuclear Job Performance Measure INITIATE AN EMERGENCY PA ANNOUNCEMENT FOR A GENERAL EMERGENCY EAL CAUSED BY A SECURITY EVENT JPM Number: A-N-5-S Revision Number: 00 Date: 04/12 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM for ILT 11-1 (2012-301) NRC Exam.

A-N-5-S Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Blank copy of EP-AA-112-F-09.

A-N-5-S Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. This is a time critical JPM.
2. You are the STA.
3. Unit 2 is operating at near rated power.
4. Unit 3 is operating at near rated power and had just completed power ascension from a refuel outage that ended 5 days ago.
5. A security event has occurred.
6. A hostile force has taken control of the Spent Fuel Pool cooling systems on Unit 3.
7. The Security Department has notified the Control Room that personnel movement is discouraged.
8. The Shift Manager has just declared a GENERAL EMERGENCY.
9. The Station Emergency Alarm system is NOT available.

INITIATING CUES

1. The Shift Manager has directed you to make an Emergency Public Address Announcement for the above event, per EP-AA-112-F-09.
2. Notify the Shift Manager when you have completed this task.

A-N-5-S Page 4 of 9

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-5-S Page 5 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of EP-AA-112-F-09.

Start time _______ (begins when Examinee acknowledges task).

1. Examinee refers to correct Per step 1, refers to section of the procedure. section 5.
  • 2. Examinee proceeds to the Locates public address public Address microphone microphone and keys the located at center desk in the microphone. _____ _____ _____

Control Room.

  • 3. Examinee must decide to Announces over the public make the correct address microphone:

announcement per step 5.D of the following message:

Attention Station Attention Station personnel. A General personnel. A General Emergency has been Emergency has been declared due to a declared due to a Security Security Event. All Event. All personnel personnel remain in _____ _____ _____

remain in present location present location until until further notice. further notice.

NOTE:

The portion of the announcement that declares: due to a Security Event may be substituted with anything that conveys a similar message.

A-N-5-S Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 4. Examinee must make same Announces over the public announcement a second address microphone, a time: second time:

Attention Station Attention Station personnel. A General personnel. A General Emergency has been Emergency has been declared due to a Security declared due to a Event. All personnel Security Event. All remain in present location personnel remain in _____ _____ _____

until further notice. present location until further notice.

NOTE:

The portion of the announcement that declares: due to a Security Event may be substituted with anything that conveys a similar message.

NOTE:

Stop time _______ (ends when Examinee has completed the SECOND announcement).

5. Notifies Shift Manager task is Signs APPROVED BY complete. section.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-5-S Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

INITIATE AN EMERGENCY PA ANNOUNCEMENT FOR A GENERAL EMERGENCY EAL CAUSED BY A SECURITY EVENT Revision Number: 00 JPM Number: A-N-5-S Task Number and

Title:

29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.

K/A Number and Importance: Generic.2.4.43 3.2 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

EP-AA-112-F-09, Rev C EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-5-S Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. This is a time critical JPM.
2. You are the STA.
3. Unit 2 is operating at near rated power.
4. Unit 3 is operating at near rated power and had just completed power ascension from a refuel outage that ended 5 days ago.
5. A security event has occurred.
6. A hostile force has taken control of the Spent Fuel Pool cooling systems on Unit 3.
7. The Security Department has notified the Control Room that personnel movement is discouraged.
8. The Shift Manager has just declared a GENERAL EMERGENCY.
9. The Station Emergency Alarm system is NOT available.

INITIATING CUES

1. The Shift Manager has directed you to make an Emergency Public Address Announcement for the above event, per EP-AA-112-F-09.
2. Notify the Shift Manager when you have completed this task.

A-N-5-S Page 9 of 9