ML12284A470

From kanterella
Jump to navigation Jump to search
2012 Dresden Nuclear Power Station Initial License Examination Proposed In-Plant JPMs
ML12284A470
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/26/2012
From: Nelson J, David Reeser
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML11354A123 List:
References
Download: ML12284A470 (25)


Text

Exelon Nuclear Job Performance Measure CRD - CROSSTIE FOR ALTERNATE INJECTION JPM Number: S-N-i Revision Number: 07 Date: 02/12 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 06 Bank JPM.

Revision 07 Revised for ILT 11-1 (2012-301) NRC Exam.

S-N-i Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this is an in-plant JPM.

DOCUMENT PREPARATION

1. Clean copy of DEOP 0500-03.

S-N-i Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 has been manually scrammed following a loss of Feedwater.
3. The 2B CRD pump is OOS AND the 2A pump has tripped AND CANNOT be restarted.
4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown.
5. The 3A CRD pump is OOS.
6. The 3B CRD pump is running.

INITIATING CUE

1. The Unit Supervisor has directed you to IMMEDIATELY perform the in-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500-03 steps G.6.a-g.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-i Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DEOP 0500-03.

1. Verify the Unit 3 CRD system Establishes parameters of current and communication with the cooling flow. Unit 3 control room. _____ _____ _____

CUE:

.Report the following parameters: 3B CRD Pump current of 25 amps and cooling flow of 45 gpm.

NOTE:

.CRD system key is required to open locked valves. Do NOT allow examinee to check out key.

2. Verify 3-0301-1B CRD PMP Verifies 3-0301-1B rising DISCH VLV is OPEN. stem full out AND/OR handwheel is full CCW. _____ _____ _____

CUE:

The component is in the condition you described.

  • 3. Closes 3-0399-604, U3 CRD Rotates 3-0399-604 PMP DISCH HDR MIN FLOW handwheel CW until THROTTLING VLV. handwheel is full CW. _____ _____ _____

CUE:

The component is in the condition you described.

  • 4. Open 2/3-0301-163 U2 & U3 Rotates 2/3-0301-163 CRD SYS CROSSTIE VLV. handwheel CCW until handwheel is full CCW. _____ _____ _____

S-N-i Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

The component is in the condition you described.

5. Throttle open 2/3-0301-162 Adjusts 2/3-0301-162 U2 & U3 CRD SYS handwheel CCW in small CROSSTIE VLV while increments, while _____ _____ _____

maintaining CRD pp current maintaining

<39 amps and CRD Suction communication other pressure >18 Hg vacuum. Operators to ensure amps and suction pressure stay within limits.

CUE:

  • 2/3-0301-162 handwheel is full CCW.
  • Unit 3 CRD system cooling water flow is 45 gpm.
  • Unit 2 CRD system cooling water flow is 44 gpm.
  • 3B CRD pump current is 35 amps.
  • 3B CRD pump suction pressure is 5 Hg vacuum.

NOTE:

The above cues are intended to inform the examinee that the 2/3-0301-162 handwheel is full open and all parameters are within band.

6. Reports to the Unit Unit Supervisor notified.

Supervisor that the task is complete. _____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-i Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

CRD - CROSSTIE FOR ALTERNATE INJECTION Revision Number: 07 JPM Number: S-N-i Task Number and

Title:

295L092, Crosstie CRD systems for alternate injection.

K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

DEOP 0500-03, rev 20 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-i Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 has been manually scrammed following a loss of Feedwater.
3. The 2B CRD pump is OOS AND the 2A pump has tripped AND CANNOT be restarted.
4. HPCI was started AND returned Reactor water level to +15" before an oil leak developed requiring HPCI to be shutdown.
5. The 3A CRD pump is OOS.
6. The 3B CRD pump is running.

INITIATING CUE

1. The Unit Supervisor has directed you to IMMEDIATELY perform the in-plant manipulations to crosstie Unit 2 to the Unit 3 CRD pump discharge header for Unit 2 RPV injection in accordance with DEOP 0500-03 steps G.6.a-g.
2. Inform the Unit Supervisor when the task is complete.

S-N-i Page 8 of 8

Exelon Nuclear Job Performance Measure ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE JPM Number: S-N-j Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.

S-N-j Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this is an in-plant JPM.

DOCUMENT PREPARATION

1. Clean copy of DSSP 0100-CR, attachment I.

S-N-j Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Smoke in the Control Room has led to a Control Room Evacuation.
3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.

INITIATING CUE

1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-j Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DSSP 0100-CR, attachment I.

CB-1 key is required for entry into the Iso Cond makeup pump building.

The candidate may choose to start either engine.

  • 1. Place the REMOTE-OFF- Switch at panel 2223-126A RUN toggle switch for either or B, placed in RUN.

engine in RUN.

CUE:

The component is in the condition you described.

2. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is checked.

CUE:

The engine has started and is running.

NOTE:

The indicator is an LCD display that scrolls through the parameters, (only while the engine is running).

3. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display.

are NOT exceeded:

  • Oil Pressure
  • Water Temperature
  • RPM BEGIN ALTERNATE PATH CUE:

Provide the following engine parameter values:

  • Oil pressure: 55 psi
  • Water Temperature 215oF
4. Recognizes that water > 205oF.

temperature has exceeded the high limit. _____ _____ _____

S-N-j Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 5. Stops running engine by Switch at panel 2223-126A placing the REMOTE-OFF- or B, placed in OFF.

RUN toggle switch to OFF. _____ _____ _____

CUE:

The component is in the condition you described.

  • 6. Starts the opposite IC Switch at panel 2223-126A Makeup Pump, than was or B, placed in RUN.

originally started. _____ _____ _____

CUE:

The component is in the condition you described.

7. Verify engine starts and Engine RPM indicator on comes up to stable speed. panel 2223-126A or B is checked.

CUE:

The engine has started and is running.

8. Monitor the following engine Checks the parameters on parameters to ensure limits the LCD display.

are NOT exceeded:

  • Oil Pressure
  • Water Temperature

Provide the following engine parameter values:

  • Oil pressure: 59 psi
  • Water Temperature 185oF
9. Notifies SM/U2 US that an Iso Notifies appropriate Cond Makeup Pump is in individual.

operation.

S-N-j Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT CUE:

Inform the candidate that another Operator will perform monitoring duties.

10. Reports to the SM/U2 US SM/U2 US notified.

that the task is complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-j Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

ISO COND - LOCAL MAKEUP PUMP OPERATION, WITH COOLING WATER FAILURE Revision Number: 00 JPM Number: S-N-j Task Number and

Title:

207N020, Start Isolation Condenser Makeup Pump.

K/A Number and Importance: 207000.A2.05 4.0 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

DSSP 0100-CR, rev 43 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-j Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Smoke in the Control Room has led to a Control Room Evacuation.
3. The Unit 2 Isolation Condenser is in service and makeup to the shell side is required.
4. The 2-4399-74, CLEAN DEMIN VLV, valve is open.

INITIATING CUE

1. The Unit Supervisor has directed you to start an Isolation Condenser Makeup Pump in accordance with DSSP 0100-CR Attachment I.
2. Inform the Unit Supervisor when the task is complete.

S-N-j Page 9 of 9

Exelon Nuclear Job Performance Measure INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY JPM Number: S-N-k Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.

S-N-k Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this is an in-plant JPM.

DOCUMENT PREPARATION

1. Clean copy of DOP 4700-03.

S-N-k Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Both units are operating at near rated power.
3. The Unit 2A Instrument Air compressor is O.O.S.
4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand.
5. The Unit 3C Instrument Air compressor is operating but is isolated from both units.

INITIATING CUE

1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700-03, step g.9.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-k Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the supplied copy of DOP 4700-03.

1. Candidate may call control Contacts control room.

room and ask if the 3C IAC is in operation, with air dryers _____ _____ _____

valved in.

CUE:

The 3C Instrument Air Compressor is running, the air dryers are valved in, but the compressor is isolated from both units headers.

2. Verify closed 3-4799-501A, Valve handwheel is in the 3C IAC DISCH TO U 3 INST full CW position.

AIR HEADER ISOL VLV. _____ _____ _____

CUE:

The component is in the condition you described.

  • 3. Close 2/3-4799-424, U2/U3 X Valve handwheel is in the TIE SV. full CW position.

CUE:

The component is in the condition you described.

  • 4. Open 2/3-4799-425, 3C IAC Valve handwheel is in the TO U2 AIR SYS X TIE SV. full CCW position.

CUE:

The component is in the condition you described.

  • 5. Open 2-47350-500, U2 INST Valve handwheel is in the AIR SYS XTIE FROM THE full CCW position.

U3 INST AIR SYS. _____ _____ _____

CUE:

The component is in the condition you described.

S-N-k Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 6. Open 2-47350-329, U2 INST Valve handwheel is in the AIR HDR ISOL VLV. full CCW position.

CUE:

The component is in the condition you described.

7. Reports to the Unit 2 Unit 2 Supervisor notified.

Supervisor that the task is complete. _____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-k Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

INST AIR - CROSS CONNECT 3C IAC TO UNIT 2 ONLY Revision Number: 00 JPM Number: S-N-k Task Number and

Title:

278N011, Crosstie the Unit 2 and Unit 3 Instrument Air systems.

K/A Number and Importance: 300000.G.2.1.30 4.4 / 4.0 Suggested Testing Environment: In-plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes

References:

DOP 4700-03, rev 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-k Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Both units are operating at near rated power.
3. The Unit 2A Instrument Air compressor is O.O.S.
4. The Unit 2B Instrument Air compressor is having difficulty keeping up with the Unit 2 Instrument Air demand.
5. The Unit 3C Instrument Air compressor is operating but is isolated from both units.

INITIATING CUE

1. The Unit Supervisor has directed you to align the Unit 3C Instrument Air compressor to Unit 2 only, per DOP 4700-03, step g.9.
2. Inform the Unit Supervisor when the task is complete.

S-N-k Page 8 of 8