2012 DRESDEN NUCLEAR POWER STATION INITIAL EXAMINATION PROPOSED EXAM FILES
r
£i r;r t
Exelon Generation Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450-9765 June 22, 2012 SVPLTR: #12-0035 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road Lisle, IL 60532-4352 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 Docket l\\Ios. 50-237 and 50-249
Subject:
Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials, which Dresden Nuclear Power Station is submitting in support of the initial license exam scheduled for the weeks of August 06,2012 through August 17,2012, at the Dresden Nuclear Power Station.
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.
These examination materials have been developed in accordance with NUREG-1021.
"Operator Licensing Examination Standards," Revision 9, Supplement 1. Please note that reference materials are attached to each individual examination question or item.
Some minor modifications have been made to the Integrated Examination Outline with regards to the operational scenarios in order to improve balance and content. These changes improve examination quality and are in compliance with NUREG-1 021, Revision 9, Supplement 1, "Operator Licensing Examination Standards."
Some modifications or adjustments to the examination material may be required due to procedural changes.
In accordance with NUREG-1021, Revision 9, Supplement 1, Section ES-201, please ensure that these materials are withheld from public disclosure until after the examinations are complete.
Should you have any questions concerning this letter, please contact Mr. Hal Dodd at 815-416-2800. For questions concerning examination materials, please contact Mr. Jeff Nelson at 815-416-4089.
C0:t~
David M. Czufin Site Vice President Dresden Nuclear Power Station
Enclosures:
(Hand delivered to Chief Examiner Region III)
RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:
Operating Test Quality Checklist (Form ES-301-3)
Simulator Scenario Quality Checklist (Form ES-301-4)
Transient and Event Checklist (Form ES-301-S)
Competencies Checklist (Form ES-301-6)
Written Exam Quality Checklist (Form ES-401-6)
Examination Security Agreements (Form ES-201-3)
Administrative Topics Outline (Form ES-301-1)
Control Room/In-Plant Systems Outline (Form ES-301-2)
BWR Examination Outline (Forms ES-401-1)
Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401-3)
Record of Rejected KlAs (Form ES-401-4)
Scenario Outlines (Form ES-D-1) cc:
(without enclosures)
Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector - Dresden Nuclear Power Station
bcc:
(without enclosures)
VP Licensing and Regulatory Affairs Director, Licensing - Midwest Regional Operating Group Training Director - Dresden Nuclear Power Station Operations Director - Dresden Nuclear Power Station Shift Operations Superintendent - Dresden Nuclear Power Station Operations Training Supervisor - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Document Control Desk Licensing Licensing Manager - Dresden and Quad Cities Dresden Nuclear Licensing Administrator HR Manager, Dresden SVP Numerical File - SVPLTR #12-0035 Dresden Station Project Manager, NRR