Exelon Nuclear Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S-N-a Revision Number: 01 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 Bank JPM.
Revision 01 Minor Revisions for ILT 11-1 (2012-301) NRC Exam.
S-N-a Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
- IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
- IMF SCRLFVAD 0.0 (Inserts A SBLC Pump relief valve setpoint drift to 0.0 psig, so whichever pump is started first will not develop flow)
- IMF SCRLFVBD 0.0 (Inserts B SBLC Pump relief valve setpoint drift to 0.0 psig, so whichever pump is started first will not develop flow)
- IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF)
- 3. Setup the following Triggers:
- TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position)
- TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction)
- TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position)
- TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction)
DOCUMENT PREPARATION DOP 1100-02 hardcard.
S-N-a Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. The Unit Supervisor has authorized the use of Hard Cards.
INITIATING CUE
- 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-a Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Examinee should locate the hard card, then provide the included copy.
- 1. Place the SBLC INJECTION Turns the SBLC CONTROL keylock switch to INJECTION CONTROL the SYS 1 OR SYS 2 keylock switch to either the position. intermediate right OR _____ _____ _____
intermediate left position.
pilot light NOT lit.
NOTE:
The selected pump starts but does not develop flow (relief valve failure in the JPM setup).
- 3. Verifies applicable PUMP PUMP light on.
pilot light lit.
BEGIN ALTERNATE PATH
- 4. Verifies FLOW pilot light lit. FLOW light off (SBLC is NOT injecting).
- 5. SBLC SQUIB VLV CKT Annunciator 902-5 H-6 FAILURE annunciator alarms illuminated.
(902-5 H-6). _____ _____ _____
- 6. Places SBLC INJECTION Turns the SBLC CONTROL keylock switch to INJECTION CONTROL opposite position taken to in keylock switch to the step 1. opposite direction turned in _____ _____ _____
step 1.
- 7. Verifies opposite PUMP pilot Opposite PUMP light on.
light lit.
NOTE:
Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re-positioned.
S-N-a Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 8. Verifies RWCU valve Examinee recognizes that 2-1201-1 closed. valve 2-1201-1 valve did NOT close. _____ _____ _____
- 9. Closes RWCU valve Takes manual action for a 2-1201-1. failed automatic action and closes 2-1201-1 valve, by _____ _____ _____
placing c/s in the CLOSED position.
- 10. Verifies RWCU valve GREEN light illuminated.
2-1201-1A closed.
- 11. Verifies RWCU valve Examinee recognizes that 2-1201-2 closed. valve 2-1201-2 valve did NOT close. _____ _____ _____
- 12. Closes RWCU valve Takes manual action for a 2-1201-2. failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED _____ _____ _____
position.
- 13. Verifies RWCU valve GREEN light illuminated.
2-1201-3 closed.
- 14. Verifies RWCU valve RED light illuminated.
2-1201-7 closed.
- 15. Informs Unit Supervisor task Reports SBLC is injecting is complete. but the first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to _____ _____ _____
close automatically.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-a Page 6 of 8
Operators Name:
Job
Title:
Title:
SBLC - INJECTION WITH PUMP AND RWCU FAILURES Revision Number: 01 JPM Number: S-N-a Task Number and
Title:
211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 9 minutes Actual Time Used: minutes
References:
DOP 1100-02, rev 18 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-a Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. The Unit Supervisor has authorized the use of Hard Cards.
INITIATING CUE
- 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-a Page 8 of 8
Exelon Nuclear Job Performance Measure FW - ALTERNATE WATER INJECTION USING STANDBY COOLANT JPM Number: S-N-b Revision Number: 05 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for ILT 11-1 (2012-301) NRC Exam.
S-N-b Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to a shutdown IC.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Setup following Malfunctions and/or Remotes:
- S M RDPPATRP RDPPBTRP H31 H32 H33 H34 HPTBTRIP and place the mode switch to Shutdown.
- S R S19 (Condensate Demin Bypass) when required during procedure.
- R R S41 through S47 (Condensate Demin Isolations) when required during procedure.
DOCUMENT PREPARATION
- 1. Clean copy of DEOP 0500-03.
S-N-b Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A Reactor scram has occurred due to a large break in the containment.
- 3. RPV water level currently CANNOT be kept > -143".
- 4. ECCS systems are unable to raise reactor water level.
- 5. Main condenser water level is low.
INITIATING CUE
- 1. The Unit Supervisor has directed you to align Standby Coolant supply to the Main Condenser per DEOP 500-03, step.G.2.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-b Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the supplied copy of DEOP 0500-03.
- 1. Directs EO to open the Condensate Demins Service Unit Bypass Valve BYPASSED and AND isolate the Condensate ISOLATED. _____ _____ _____
Demins.
NOTE:
Direct the Sim Op to open the Service Unit Bypass Valve AND isolate the Condensate Demins.
CUE:
Inform examinee that Service Unit Bypass Valve is open AND the Condensate Demins are isolated.
- 2. Open MO 2-3403 LP HTR Places control switch to BYPASS. OPEN. Verifies:
RED light illuminated and _____ _____ _____
GREEN light extinguished.
- 3. Open MO 2-3203 HP HTR Places control switch to BYPASS. OPEN. Verifies:
RED light illuminated and _____ _____ _____
GREEN light extinguished.
- Line 1 Isolation valves Places control switch to CLOSE. Verifies:
- MO 2-3401A RED light illuminated and
- MO 2-3402A GREEN light extinguished. _____ _____ _____
- Line 2 Isolation Valves Places control switch to CLOSE. Verifies:
- MO 2-3401B RED light illuminated and
- MO 2-3402B GREEN light extinguished. _____ _____ _____
- Line 3 Isolation Valves Places control switch to CLOSE. Verifies:
- MO 2-3401C RED light illuminated and
- MO 2-3402C GREEN light extinguished. _____ _____ _____
S-N-b Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 5. Close HIGH PRESS HEATER FW ISOLATIONS:
- 2D1 Isolation Valves Places control switch to CLOSE. Verifies:
- MO 2-3202A RED light illuminated and
- MO 2-3204A GREEN light extinguished. _____ _____ _____
- 2D2 Isolation Valves Places control switch to CLOSE. Verifies:
- MO 2-3202B RED light illuminated and
- MO 2-3204B GREEN light extinguished. _____ _____ _____
- 2D3 Isolation Valves Places control switch to CLOSE. Verifies:
- MO 2-3202C RED light illuminated and
- MO 2-3204C GREEN light extinguished. _____ _____ _____
- 6. Open MO 2-3901 SW TO Places control switch to CONDR. OPEN. Verifies:
RED light illuminated and GREEN light extinguished. _____ _____ _____
- 7. Open MO 2-3902 SW TO Places control switch to CONDR. OPEN. Verifies:
RED light illuminated and GREEN light extinguished. _____ _____ _____
NOTE:
A change in condenser level will not be observable immediately.
JPM can be considered complete when MO 2-3901 and MO 2-3902 valves are open.
CUE:
Do NOT allow candidate to start additional Service Water pumps.
Inform candidate that another Operator will finish this task.
- 8. Reports to the Unit 2 Unit 2 Supervisor notified.
Supervisor that the task is complete. _____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-b Page 6 of 8
Operators Name:
Job
Title:
Title:
FW - ALTERNATE WATER INJECTION USING STANDBY COOLANT Revision Number: 05 JPM Number: S-N-b Task Number and
Title:
295L084, Inject into the RPV with alternate water systems.
K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes
References:
DEOP 0500-03, rev 20 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-b Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A Reactor scram has occurred due to a large break in the containment.
- 3. RPV water level currently CANNOT be kept > -143".
- 4. ECCS systems are unable to raise reactor water level.
- 5. Main condenser water level is low.
INITIATING CUE
- 1. The Unit Supervisor has directed you to align Standby Coolant supply to the Main Condenser per DEOP 500-03, step.G.2.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-b Page 8 of 8
Exelon Nuclear Job Performance Measure MAIN STEAM - UNISOLATE ONE LINE USING ALTERNATE METHOD JPM Number: S-N-c Revision Number: 01 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 Bank JPM.
Revision 01 Revised for ILT 11-1 (2012-301) NRC Exam.
S-N-c Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 16 (<50% power).
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Power needs to be low enough so that isolating one main steam line will NOT cause a Group 1 high flow isolation.
- 3. Close C Main Steam Line Isolation Valves:
- AO-2-203-1C
- AO-2-203-2C
- 4. Verify Main Steam Line drain valves closed:
- MO 2-220-1, 2, 3 & 4
- MO 2-220-90A, B, C & D
- 5. Place O.O.S. cards on Main Steam Line drain valves:
- 6. Insert following Malfunctions and/or Remotes:
- None.
- 7. Setup the following Triggers:
- None.
DOCUMENT PREPARATION
- 1. Clean copy of DOP 0250-02.
S-N-c Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Following maintenance work on the AO 2-203-2C MSIV, the C Main Steam Line is ready to be unisolated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to unisolate the C Main Steam Line using the ALTERNATE method in accordance with DOP 0250-02, step G.6.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-c Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the supplied copy of DOP 0250-02.
- 1. Contacts Main Steam system Indicates he/she would call engineer for concurrence to the system engineer or ask unisolated the 2C Main Unit Supervisor.
Steam Line using the _____ _____ _____
alternate method.
CUE:
Inform the Examinee that the Main Steam system engineer has provided concurrence to unisolated the 2C Main Steam Line using the alternate method.
VLV.
- 3. Open MO 2-220-90C MSL RED light illuminated.
- 4. Wait a minimum of 5 minutes. 5 minutes elapsed OR verbal cue received.
CUE:
Inform examinee that 5 minutes has elapsed.
- 6. Wait a minimum of 30 30 minutes elapsed OR minutes. verbal cue received.
CUE:
Inform examinee that 30 minutes has elapsed.
S-N-c Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 8. Close MO 2-220-90C MSL GREEN light illuminated.
VLV.
- 10. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-c Page 6 of 8
Operators Name:
Job
Title:
Title:
MAIN STEAM - UNISOLATE ONE LINE USING ALTERNATE METHOD Revision Number: 01 JPM Number: S-N-c Task Number and
Title:
239L004 Unisolating, One Main Steam Line K/A Number and Importance: 239001.A4.01 4.2 / 4.0 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes
References:
DOP 0250-02, rev 12 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-c Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Following maintenance work on the AO 2-203-2C MSIV, the C Main Steam Line is ready to be unisolated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to unisolate the C Main Steam Line using the ALTERNATE method in accordance with DOP 0250-02, step G.6.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-c Page 8 of 8
Exelon Nuclear Job Performance Measure ISO COND - SHUTDOWN THE ISOLATION CONDENSER JPM Number: S-N-d Revision Number: 04 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 03 Bank JPM.
Revision 04 Revised for ILT 11-1 (2012-301) NRC Exam.
S-N-d Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify the Isolation Condenser is in its normal standby lineup.
- 3. Insert following Malfunctions and/or Remotes:
- imf icspdft 0.0 (drifts the Iso Cond Initiation setpoint to 0 psig so it initiates after a time delay)
- ior iclop74 1 (simulates 2-4399-74 CLEAN DEMIN VLV OPEN - open light on)
- ior iclcl74 0 (simulates 2-4399-74 CLEAN DEMIN VLV OPEN - closed light off)
- 4. After the Isolation Condenser initiates, delete the drift malfunction:
- dmf icspdft
- 5. Setup the following triggers:
- trgset 3 icdcl74_drw (activates trigger 3 when 2-4399-74 coontrol switch is taken to close)
- trg 3 dor iclcl74 (deletes the 2-4399-74 closed light override)
- trg 3 dor iclop74 (5) (deletes the 2-4399-74 open light override after 5 seconds)
- 6. Start the 2/3A Iso Cond MU Pump.
- 7. Acknowledge / Reset alarms.
DOCUMENT PREPARATION
- 1. Mark up a copy of DOP 1300-02.
S-N-d Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A pressure transient has occurred which resulted in the auto initiation of the Isolation Condenser.
- 3. The 2/3A Isolation Condenser MU Pump is being used to maintain Isolation Condenser level.
- 4. No additional Clean Demin pump(s) were started, due to initiation of the Isolation Condenser.
- 5. The transient is over and the Isolation Condenser operation is NO longer required.
INITIATING CUE
- 1. The Unit Supervisor has directed you to shutdown the Isolation Condenser per DOP 1300-02 Step G.13.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-d Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the supplied copy of DOP 1300-02.
- 1. Monitor RPV pressure, level, Verifies IC operation is and reactor power to verify IC NOT required for RPV operation is NOT required for pressure control. _____ _____ _____
RPV pressure control.
<1070 psig.
- 3. Identify that 902-4 A-15, ISOL Tile illuminated.
CONDR A/B INITIATION, is in alarm. _____ _____ _____
- 4. Reset the IC initiation signal Rotates ISOL CONDR at Panel 902-5 as follows: RESET switch to:
- Rotate ISOL CONDR
- CH B and releases _____ _____ _____
- Rotate ISOL CONDR RESET switch to CH B switch
- 5. Close/verify closed MO 2- Verifies MO 2-1301-3, RX 1301-3, RX INLET ISOL, by INLET ISOL closed, holding control switch to GREEN light illuminated, _____ _____ _____
CLOSE. RED light extinguished.
NOTE:
Resetting the IC isolation automatically causes MO 2-1301-3 to close.
- 6. Rotate RX INLET ISOL VLV Rotates RX INLET ISOL HAND/RESET switch to VLV HAND/RESET switch RESET. to RESET position.
- 7. Verify that MO 2-1301-10 Verifies MO 2-1301-10 COND FILL INLET valve is COND FILL INLET valve is closed. closed. GREEN light illuminated, RED light extinguished.
S-N-d Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 8. Verify that MO 2-4102 SERV Verifies MO 2-4102 SERV WTR VLV is closed. WTR VLV is closed, GREEN light illuminated, RED light extinguished.
- 9. Verify the MO 2-4399-74 Places the control switch CLEAN DEMIN VLV is for MO 2-4399-74 CLEAN closed. DEMIN VLV to CLOSE, GREEN light illuminated, RED light extinguished
- 10. Stop the 2/3A ISOL CNDR M- Stops the 2/3A ISOL U PP. CNDR M-U PP by taking the control switch to stop and releasing back to mid position.
CUE:
If candidate asks for the DIESEL FUEL DAY TANK level, inform them the tank level is 7/8 full.
If candidate asks to place Iso Cond in standby, inform them NOT to place the Iso Cond in standby.
- 11. Reports to the Unit 2 Unit 2 Supervisor notified.
Supervisor that the task is complete. _____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-d Page 6 of 8
Operators Name:
Job
Title:
Title:
ISO COND - SHUTDOWN THE ISOLATION CONDENSER Revision Number: 04 JPM Number: S-N-d Task Number and
Title:
207L002, Operate the Isolation Condenser following an automatic initiation.
K/A Number and Importance: 207000.A4.05 3.5 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes
References:
DOP 1300-02, rev 24 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-d Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A pressure transient has occurred which resulted in the auto initiation of the Isolation Condenser.
- 3. The 2/3A Isolation Condenser MU Pump is being used to maintain Isolation Condenser level.
- 4. No additional Clean Demin pump(s) were started, due to initiation of the Isolation Condenser.
- 5. The transient is over and the Isolation Condenser operation is NO longer required.
INITIATING CUE
- 1. The Unit Supervisor has directed you to shutdown the Isolation Condenser per DOP 1300-02 Step G.13.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-d Page 8 of 8
Exelon Nuclear Job Performance Measure TORUS - LOWER WATER LEVEL JPM Number: S-N-e Revision Number: 14 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 13 Bank JPM.
Revision 14 Revised for ILT 11-1 (2012-301) NRC Exam.
S-N-e Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to a full power IC.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Establish Torus Cooling in one loop with 1 LPCI pump and 1 CCSW pump running.
- 3. Insert following Malfunctions and/or Remotes:
- IRF LPVLV501 Open - These remotes need to be toggled prior to start of JPM.
DOCUMENT PREPARATION
- 1. Mark up a copy of DOP 1600-02.
S-N-e Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. U2 Torus water level is currently at +1" as indicated on LI 2-1602-3 on the 902-3 panel.
- 3. U2 Torus level has been verified locally per DOS 1600-02.
INITIATING CUE
- 1. The Unit Supervisor has directed you to begin lowering the U2 Torus level by pumping it to the U2 Main Condenser in accordance with DOP 1600-02 steps G.1.g through G.1. j
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-e Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the supplied copy of DOP 1600-02.
- 1. Verify that manual position Potentiometers are at zero.
control potentiometers for the following condensate makeup and reject valves are at zero:
- LCV 2-3304, EMERG _____ _____ _____
REJECT VLV
- 2. Place M-U/REJECT CONT Switch in MANUAL switch in the MANUAL position.
position. _____ _____ _____
- 3. Open AO 2-1599-61, Places control switch to TORUS/ HOTWELL ISOL OPEN: RED light VLV. illuminated, GREEN light _____ _____ _____
extinguished.
- 4. Open AO 2-1599-62, Places control switch to TORUS/ HOTWELL ISOL OPEN: RED light VLV. illuminated, GREEN light _____ _____ _____
extinguished.
- 5. Throttle open LCV 2-3301, Throttles open LCV 2-3301 NORMAL M-U VLV, until to achieve 100 to 300 gpm desired flow is achieved. as read on FR 2-3340-51, Condensate Makeup. _____ _____ _____
- 6. Closely monitor Torus and Monitors Torus and Hotwell levels. Hotwell levels for appropriate level changes.
S-N-e Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 7. Reports to the Unit 2 Unit 2 Supervisor notified.
Supervisor that the task is complete. _____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-e Page 6 of 8
Operators Name:
Job
Title:
Title:
TORUS - LOWER WATER LEVEL Revision Number: 14 JPM Number: S-N-e Task Number and
Title:
223L003, Lowering Torus Water Level During Normal Plant Operations K/A Number and Importance: 219000.A4.02 3.7 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 16 minutes Actual Time Used: minutes
References:
DOP 1600-02, rev 18 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-e Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. U2 Torus water level is currently at +1" as indicated on LI 2-1602-3 on the 902-3 panel.
- 3. U2 Torus level has been verified locally per DOS 1600-02.
INITIATING CUE
- 1. The Unit Supervisor has directed you to begin lowering the U2 Torus level by pumping it to the U2 Main Condenser in accordance with DOP 1600-02 steps G.1.g through G.1. j
- 2. Inform the Unit Supervisor when the task is complete.
S-N-e Page 8 of 8
Exelon Nuclear Job Performance Measure EDG - PERFORM SURVEILLANCE TESTING, WITH SCRAM JPM Number: S-N-f Revision Number: 04 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 03 Bank JPM.
Revision 04 Revised for ILT 11-1 (2012-301) NRC Exam.
S-N-f Page 2 of 9
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. U2 Diesel Generator should be started and loaded to Bus 24-1, per DOS 6600-01 up to and including step I.12. (inclusive).
- 3. Insert following Malfunctions and/or Remotes:
- IRF T02 = TRUE (Set Diesel Generator 2 droop to 55).
- 4. Acknowledge all applicable alarms (locally and on the 902-8 panel).
- 5. Setup the following remote functions set to triggers, for when directed by examinee:
- IRF T02 = FALSE (When directed by examinee to set droop to 5).
- IRF T20 = ACKNOWLEDGE (A few seconds after the droop has been set to 55 acknowledges U2 D/G Local Panel Trouble Alarms).
DOCUMENT PREPARATION
- 1. Marked up copy of DOS 6600-01, up to and including step I.14.
S-N-f Page 3 of 9
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. DOS 6600-01 is in progress on the Unit 2 Diesel Generator, which is currently paralleled and loaded to Bus 24-1.
- 3. The surveillance run will be completed in approximately 5 minutes.
- 4. The operator performing the surveillance in the control room had to leave for an urgent family emergency.
INITIATING CUE
- 1. The Unit Supervisor has directed you to review Sections F. and G. of DOS 6600-01 and then complete the procedure, starting at step I.15. to secure the Unit 2 Diesel Generator.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-f Page 4 of 9
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the supplied copy of DOS 6600-01.
- 1. Verifies Chemistry Asks if Chemistry Department has completed all Department has completed required samples per CY-DR- all required samples per _____ _____ _____
120-413. CY-DR-120-413.
CUE:
All required samples have been completed.
- 2. Verifies the fuel oil transfer Asks if the fuel oil transfer pump has recharged the day pump has recharged the tank at least once during the day tank at least once _____ _____ _____
engine run. during the engine run.
CUE:
The day tank level is in the normal band and has been recharged during the engine run.
- 3. Data Sheet 1A complete. Asks if Data Sheet complete.
CUE:
Data sheet 1A is complete.
- 4. Reduce U2 DG load Places the U2 DG Governor c/s to DECR to reduce load until less than _____ _____ _____
100 kW.
BEGIN ALTERNATE PATH CUE:
As soon as the examinee begins to reduce load, announce:
UNIT 2 HAS JUST SCRAMMED.
S-N-f Page 5 of 9
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 5. Proceed to Attachment A. Recognizes need to perform Attachment A.
- 6. Open circuit breaker U2 D/G Green light illuminated.
TO BUS 24-1 ACB.
- 7. Records time of Circuit Records time of Circuit Breaker opening. Breaker opening on attachment A. _____ _____ _____
NOTE:
If requested to set droop to 5, signal Sim Op to insert remote function (T02 = FALSE)
If requested to reset local annunciators, signal Sim Op to insert remote function (T20 =
ACKNOWLEDGE)
- 9. Reset annunciator D/G 2 C-1 Directs EO to reset local Droop not set on 5. annunciator C-1 on local panel A.
CUE:
The droop set at 5. Received local alarm and have acknowledged it.
- 10. Reset annunciator 902-8 A-7 Annunciator 902-8 A-7 U2 DIESEL GEN TROUBLE alarm tile extinguished.
alarm. _____ _____ _____
- 11. Adjust D/G frequency to 60 Adjusts frequency to 60 Hz Hz. with Governor Control switch. _____ _____ _____
- 12. Adjust the D/G voltage to Adjusts voltage to 4160 4160. volts with VOLTAGE REGULATOR control. _____ _____ _____
S-N-f Page 6 of 9
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 13. Verifies the applicable Fuel Directs EO to verify the Oil Transfer Pump circuit Unit 2 Diesel Oil Transfer breaker is closed. Pump circuit breaker, at _____ _____ _____
MCC 29-2 cubicle B-2, is closed.
CUE:
At MCC 29-2 cubicle B-2, the 2-5203 DIESEL OIL TRANSFER PUMP 2 circuit breaker is closed.
- 14. Informs Unit Supervisor that Examinee notifies the Unit the D/G is running following Supervisor.
the scram and the task is _____ _____ _____
complete.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-f Page 7 of 9
Operators Name:
Job
Title:
Title:
EDG - PERFORM SURVEILLANCE TESTING, WITH SCRAM Revision Number: 04 JPM Number: S-N-f Task Number and
Title:
264L009 Perform DG Surveillance Testing K/A Number and Importance: 264000.A4.05 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes
References:
DOS 6600-01, rev 119 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-f Page 8 of 9
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. DOS 6600-01 is in progress on the Unit 2 Diesel Generator, which is currently paralleled and loaded to Bus 24-1.
- 3. The surveillance run will be completed in approximately 5 minutes.
- 4. The operator performing the surveillance in the control room had to leave for an urgent family emergency.
INITIATING CUE
- 1. The Unit Supervisor has directed you to review Sections F. and G. of DOS 6600-01 and then complete the procedure, starting at step I.15. to secure the Unit 2 Diesel Generator.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-f Page 9 of 9
Exelon Nuclear Job Performance Measure NI - IRM DETECTOR TEST, WITH FAILURE TO MEET ACCEPTANCE CRITERIA JPM Number: S-N-g Revision Number: 00 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM developed for ILT 11-1 (2012-301) NRC Exam.
S-N-g Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Ensure the IRM detectors are at the Full-IN positions.
- 3. Place rod select power to on, and select any CRD.
- 4. Ensure annunciator 902-5 C-3, ROD OUT BLOCK, clear.
- 5. Ensure ROD OUT PERMIT light on at Panel 902-5 is illuminated.
- 7. Insert following Malfunctions and/or Remotes:
- ior rdl501w (2) off (Overrides the ROD OUT PERMIT light OFF)
- trg 3 "dor rdl501w" (Deletes the ROD OUT PERMIT light override)
- 8. Setup the following Triggers:
- trgset 2 "(.not. nilidin(2)) .and. (.not. rdl501w)" - (Trigger 2 Activates when IRM 12 IN light is OFF and the ROD OUT PERMIT light is OFF).
- trgset 3 "nidirby(2)" - (Trigger 3 Activates when IRM 12 is BYPASSED)
DOCUMENT PREPARATION Marked up copy of DOS 0700-04, to include prerequisites signed off.
S-N-g Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. The prerequisites for DOS 0700-04 have been verified and completed.
INITIATING CUE
- 1. The Unit Supervisor has directed you to perform IRM Detector Position Rod Block Functional Test, for IRM 12, per DOS 0700-04.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-g Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the supplied copy of DOS 0700-04.
- 2. Verify IRM 12 mode switch in Selector switch is in the OPERATE. OPERATE position.
- 3. Withdraw IRM 12 until Depress IRM CH 12 annunciator 902-5 C-3, ROD pushbutton until OUT light OUT BLOCK, is received. illuminates.
- 4. Verify ROD OUT PERMIT Light is extinguished.
light OFF at Panel 902-5.
- 5. Verify IRM DETECTOR Point in alarm.
POSITION computer point, point ID C020 is in alarm. _____ _____ _____
- 6. Insert IRM 12 to Full-IN Depress IRM CH 12 position. pushbutton until IN light illuminates. _____ _____ _____
- 7. Verify Annunciator 902-5 C-3, Annunciator is ROD OUT BLOCK, clears. extinguished.
BEGIN ALTERNATE PATH
- 8. Verify ROD OUT PERMIT Recognizes that the ROD light ON at Panel 902-5. OUT PERMIT light does NOT illuminate. _____ _____ _____
- 9. Notifies the Unit Supervisor Notifies Unit Supervisor.
that the ROD OUT PERMIT light did not come on when _____ _____ _____
completing testing on IRM 12.
S-N-g Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
NOTE:
ROD OUT PERMIT light will illuminate when IRM 12 is BYPASSED.
- 11. May inform Unit Supervisor of May inform Unit Tech Spec implications for Supervisor.
operable instruments. _____ _____ _____
CUE:
Inform candidate that another Operator will finish this task.
- 12. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-g Page 6 of 8
Operators Name:
Job
Title:
Title:
NI - IRM DETECTOR TEST, WITH FAILURE TO MEET ACCEPTANCE CRITERIA Revision Number: 00 JPM Number: S-N-g Task Number and
Title:
21504LP004, Perform IRM rod block functional test for at least one IRM channel.
K/A Number and Importance: 215003.A4.06 3.0 / 2.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes
References:
DOS 0700-04, rev 15 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-g Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. The prerequisites for DOS 0700-04 have been verified and completed.
INITIATING CUE
- 1. The Unit Supervisor has directed you to perform IRM Detector Position Rod Block Functional Test, for IRM 11 and IRM 12, per DOS 0700-04.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-g Page 8 of 8
Exelon Nuclear Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S-N-h Revision Number: 03 Date: 02/12 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 02 Bank JPM.
Revision 03 Revised for ILT 11-1 (2012-301) NRC Exam.
S-N-h Page 2 of 11
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with Rx Bldg Vent operating normally.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Place the 2/3A SBGT train control switch in STBY.
- 4. Verify the following fans operating:
- 2A RX BLDG VENT FAN
- 2B RX BLDG VENT FAN
- 2A RX BLDG EXH FAN
- 2B RX BLDG EXH FAN
- 5. Insert following EXPERT commands:
- irf cirbvall lifted (Prevents Secondary Containment Isolation on U2)
- trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START)
- imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal)
- imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan).
- imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan).
- imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan).
- imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan).
DOCUMENT PREPARATION Markup a copy of DOP 7500-01.
S-N-h Page 3 of 11
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
- 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
- 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
INITIATING CUE
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-h Page 4 of 11
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the provided copy of DOP 7500-01.
- 1. Place the 2/3A SBGT Places the 2/3A SBGT SELECT switch to A PRI SELECT switch to the A position. PRI position. _____ _____ _____
- 2. Place the 2/3B SBGT Places the 2/3B SBGT SELECT switch to B STBY SELECT switch to the B position. STBY position. _____ _____ _____
- 3. Verify the 2/3A and B AIR Both GREEN lights HEATERs are OFF. illuminated.
- 4. Verify the 2/3A and B Fans Both GREEN lights are OFF. illuminated.
- 5. Verify annunciators 923-5 A-6 Both annunciator tiles and 923-5 B-6 are NOT in extinguished.
alarm. _____ _____ _____
TORUS PURGE FAN control TORUS PURGE FAN switch to the PULL-TO-LOCK control switch to the PTL _____ _____ _____
(PTL) position. position.
TORUS PURGE FAN control TORUS PURGE FAN switch to the PTL position. control switch to the PTL _____ _____ _____
position.
TORUS PURGE FAN control TORUS PURGE FAN switch to the PTL position. control switch to the PTL _____ _____ _____
position.
TORUS PURGE FAN control TORUS PURGE FAN switch to the PTL position. control switch to the PTL _____ _____ _____
position.
S-N-h Page 5 of 11
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
NOTE:
When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds.
The resulting Secondary Containment Isolation fails and the operator should complete the isolation.
- 12. Records the Start Time on Records the Start Time on Operator Aid. Operator Aid.
- 13. Verifies the 2/3A SBGT train Begins verifying the 2/3A initiated properly. SBGT train operating properly. _____ _____ _____
BEGIN ALTERNATE PATH NOTE:
The examinee should recognize the Secondary Containment Isolation did NOT occur, and perform the Limitations and Actions.
The examinee may close the Isolation Dampers first, and then come back and verify the Fans trip. In that case, ALL fans will be tripped.
- 14. Verifies trip of 2A RX BLDG GREEN and AMBER lights VENT FAN. illuminated.
- 15. Verifies trip of 2B RX BLDG GREEN and AMBER lights VENT FAN. illuminated.
- 16. Verifies trip of 2C RX BLDG Determines 2C RX BLDG VENT FAN. VENT FAN is running. (Or not running if examinee closed dampers first) _____ _____ _____
If running, trips 2C RX BLDG VENT FAN.
S-N-h Page 6 of 11
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 17. Verifies trip of 2A RX BLDG GREEN and AMBER lights EXH FAN. illuminated.
- 18. Verifies trip of 2B RX BLDG GREEN and AMBER lights EXH FAN. illuminated.
- 19. Verifies trip of 2C RX BLDG Determines 2C RX BLDG EXH FAN. EXH FAN is running. (Or not running if examinee closed dampers first)
If running, trips 2C RX BLDG VENT FAN. _____ _____ _____
- 20. Verifies trip of 3A RX BLDG GREEN and AMBER lights VENT FAN. illuminated.
- 21. Verifies trip of 3B RX BLDG GREEN and AMBER lights VENT FAN. illuminated.
- 22. Verifies trip of 3C RX BLDG GREEN and AMBER lights VENT FAN. illuminated.
- 23. Verifies trip of 3A RX BLDG GREEN and AMBER lights EXH FAN. illuminated.
- 24. Verifies trip of 3B RX BLDG GREEN and AMBER lights EXH FAN. illuminated.
- 25. Verifies trip of 3C RX BLDG GREEN and AMBER lights EXH FAN. illuminated.
S-N-h Page 7 of 11
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 26. Verifies 2A INLET DAMPER Determines 2A & 2B AO 2-5741A closed. INLET DAMPERs AO 2-5741A & B are NOT closed Verifies 2B INLET DAMPER (GREEN lights AO 2-5741B closed.
illuminated).
Places control switch 2A &
2B RX BLDG VENT INLET ISOL DAM 2-5741A & 2-5741B to the CLOSE position.
Determines 2A & 2B INLET DAMPERs AO 2- _____ _____ _____
5741A & B went closed (RED lights illuminated).
- 27. Verifies 2A OUTLET Determines 2A & 2B DAMPER AO 2-5742A OUTLET DAMPERs AO 2-closed. 5742A & B are NOT closed (GREEN lights Verifies 2B OUTLET illuminated).
DAMPER AO 2-5742B closed. Places control switch 2A &
2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position.
Determines 2A & 2B OUTLET DAMPERs AO 3- _____ _____ _____
5742A & B went closed (RED lights illuminated).
- 28. Verifies 3A INLET DAMPER RED light illuminated.
AO 3-5741A closed.
- 29. Verifies 3B INLET DAMPER RED light illuminated.
AO 3-5741B closed.
- 30. Verifies 3A OUTLET RED light illuminated.
DAMPER AO 3-5742A closed. _____ _____ _____
S-N-h Page 8 of 11
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 31. Verifies 3B OUTLET RED light illuminated.
DAMPER AO 3-5742B closed. _____ _____ _____
- 32. Verifies trip of 2A D/W & Condition met from Torus Purge Fan. previous steps in the procedure. _____ _____ _____
- 33. Verifies trip of 2B D/W & Condition met from Torus Purge Fan. previous steps in the procedure. _____ _____ _____
- 34. Verifies trip of 3A D/W & Condition met from Torus Purge Fan. previous steps in the procedure. _____ _____ _____
- 35. Verifies trip of 3B D/W & Condition met from Torus Purge Fan. previous steps in the procedure. _____ _____ _____
- 36. Notifies US of Secondary Examinee notifies the Unit Containment Isolation Failure Supervisor.
and successful manual _____ _____ _____
completion of the isolation.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-h Page 9 of 11
Operators Name:
Job
Title:
Title:
SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE Revision Number: 03 JPM Number: S-N-h Task Number and
Title:
261L002, Start the SBGT system.
K/A Number and Importance: 261000.A2.13 3.4 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes
References:
DOP 7500-01, rev 32 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-h Page 10 of 11
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
- 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
- 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
INITIATING CUE
- 2. Inform the Unit Supervisor when the task is complete.