Letter Sequence Request |
---|
|
Results
Other: CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report, ML11203A113, ML11207A053, ML11320A026, ML12086A311, ML12118A166, ML12125A028, ML12125A189, ML12137A298, ML12138A158, ML12153A378, ML12178A564, ML12185A077, ML12240A199, ML13037A106
|
MONTHYEARML11203A1132011-07-21021 July 2011 NRR E-mail Capture - Sequoyah 1 & 2 - LAR Regarding Areva Advanced W17 Htp Fuel (ME6538/6539) Project stage: Other ML11207A0532011-08-0909 August 2011 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel. Project stage: Other ML11269A0532011-10-14014 October 2011 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: RAI ML11320A0262011-12-27027 December 2011 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12025A0272012-02-0808 February 2012 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Areva Advance W17 High Thermal Performance Fuel (TAC Nos. ME6538 & ME6539) Project stage: RAI ML12088A1702012-03-23023 March 2012 Response to NRC Second Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12118A1652012-04-26026 April 2012 Response to NRC Third Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12118A1662012-04-26026 April 2012 ANP-2970Q1(NP), Revision 000, Htp Fuel Realistic Large Break LOCA Analysis, April 2012 (Non-Proprietary Version), Enclosure 2 Project stage: Other ML12125A0282012-05-0202 May 2012 NRR E-mail Capture - Sequoyah, Units 1 & 2 - Areva Advanced W17 Htp Fuel Transition Project stage: Other ML12086A3112012-05-0404 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539) Project stage: Other ML12137A2982012-05-15015 May 2012 ANP-2970Q2(NP), Rev 0, Sequoyah, Units 1 and 2 Htp Fuel Realistic Large Break LOCA Analysis Project stage: Other ML12137A2972012-05-15015 May 2012 Response to NRC Fourth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12153A3772012-05-24024 May 2012 Response to NRC Fifth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12138A1582012-05-29029 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 Thermal Performance Fuel Project stage: Other ML12125A1892012-05-29029 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12153A3782012-05-31031 May 2012 Enclosure 2, Sequoyah Nuclear Plant, Units 1 & 2 - ANP-3053 (Np), Revision 3, Sequoyah Htp Fuel Transition - NRC RAIs and Responses Project stage: Other ML1218500092012-06-26026 June 2012 Response to NRC Sixth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12178A5642012-07-0505 July 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539) Project stage: Other ML12185A0772012-07-0909 July 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12240A1992012-09-0606 September 2012 PI for Sequoyah 1 and 2- Permit Use of Advanced W17 Htp Fuel (TAC Nos. ME6538/6539) Project stage: Other ML12249A3942012-09-26026 September 2012 Issuance of Amendments to Revise the Technical Specification to Allow Use of Areva Advanced W17 High Thermal Performance Fuel (TS-SQN-2011-07) Project stage: Approval ML13037A1062013-01-31031 January 2013 10 CFR 50.46 - 30-Day Special Report for Sequoyah Nuclear Plant, Unit 2 Regarding Changes to the Calculated Peak Cladding Temperature Emergency Core Cooling System Evaluation Models Project stage: Other CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report2013-11-18018 November 2013 10 CFR 50.46 - Combined Annual and 30-Day Report Project stage: Other 2012-05-24
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification ML23292A0792023-10-19019 October 2023 Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 ML23285A0882023-10-12012 October 2023 Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23283A2792023-10-10010 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) ML23257A0062023-09-14014 September 2023 Enforcement Action EA-22-129 Inspection Postponement Request ML23254A2192023-09-11011 September 2023 Emergency Plan Implementing Procedure Revisions ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 ML23233A0122023-08-17017 August 2023 Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML23215A1572023-08-0303 August 2023 Enforcement Action EA-22-129 Inspection Readiness Notification CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-01-04
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 May 15, 2012 10 CFR 50.4 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
Response to NRC Fourth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of AREVA Advanced W17 HTP Fuel (TS-SQN-2011-07) (TAC Nos.
ME6538 and ME6539)
References:
- 1. Letter from TVA to NRC, "Application to Modify Technical Specifications for Use of AREVA Advanced W1 7 HTP Fuel (TS-SQN-2011-07)," dated June 17, 2011
- 2. Letter from TVA to NRC, "Response to NRC Request for Supplemental Information Regarding Application to Modify Technical Specifications for Use of AREVA Advanced W1 7 HTP Fuel (TS-SQN-2011-07)," dated July 27, 2011
- 3. Letter from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2 -
Request for Additional Information Regarding the Propopsed [sic]
Technical Specification Changes to Allow Use of AREVA Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539)," dated October 14, 2011
- 4. Letter from TVA to NRC, "Response to NRC Request for Additional Information Regarding Application to Modify Technical Specifications for Use of AREVA Advanced W1 7 HTP Fuel (TS-SQN-2011-07)," dated November 14, 2011 on recycled Printed paper
U.S. Nuclear Regulatory Commission Page 2 May 15, 2012
- 5. Letter from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2 -
Request for Additional Information Regarding the Proposed [sic]
Technical Specification Changes to Allow Use of AREVA Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539), dated February 8, 2012
- 6. Letter from TVA to NRC, "Response to NRC Second Request for Additional Information Regarding Application to Modify Technical Specifications for Use of AREVA Advanced W1 7 HTP Fuel (TS-SQN-2011-07)," dated March 23, 2012
- 7. Electronic Mail from NRC to TVA, "LAR for TAC ME6538/6539 (Sequoyah 1 & 2 - Use of AREVA Advanced W17 HTP Fuel)," dated April 4, 2012
- 8. Letter from TVA to NRC, "Response to NRC Third Request for Additional Information Regarding Application to Modify Technical Specifications for Use of AREVA Advanced W1 7 HTP Fuel (TS-SQN-2011-07) (TAC Nos. ME6538 and ME6539)," dated April 26, 2012
- 9. Electronic Mail from NRC to TVA, "Sequoyah, Units 1 & 2 - AREVA W17 HTP Fuel Transition (TAC Nos. ME6538 and ME6539)," dated May 2, 2012 The purpose of this letter is to provide a response to the Nuclear Regulatory Commission (NRC) request for additional information (RAI) transmitted to the Tennessee Valley Authority (TVA) by electronic mail (email) on May 2, 2012 (Reference 9) regarding the proposed Technical Specification (TS) changes for Sequoyah Nuclear Plant (SQN), Units 1 and 2, allowing use of AREVA Advanced W1 7 High Thermal Performance (HTP) fuel.
By letter dated June 17, 2011 (Reference 1), TVA submitted a request to the NRC for amendment to the TSs for SQN, Units 1 and 2. The amendment request proposed to allow use of AREVA Advanced W17 HTP fuel at SQN. In a letter dated July 27, 2011 (Reference 2), TVA provided supplemental information requested by the NRC on July 21, 2011, in a telephone call between TVA and NRC representatives. By letter dated October 14, 2011 (Reference 3), the NRC forwarded the first RAI regarding the proposed changes to the TSs. TVA provided the response to this first RAI in a letter dated November 14, 2011 (Reference 4). A second RAI regarding the proposed TS changes was forwarded to TVA in a letter dated February 8, 2012 (Reference. 5). TVA provided the response to the second RAI in a letter dated March 23, 2012 (Reference 6).
On April 4, 2012, the NRC transmitted a third RAI by email (Reference 7) involving the Loss of Coolant Accident (LOCA) analyses supporting the proposed use of AREVA Advanced W17 HTP fuel at SQN. Following a telephone conference call between TVA and NRC representatives held on April 9, 2012, TVA agreed to provide an analysis of
U.S. Nuclear Regulatory Commission Page 3 May 15, 2012 the effects of fuel clad swelling, rupture, and relocation, and also provide a discussion of the cause of the apparent negative trend of the post-LOCA reactor vessel downcomer liquid level transient, with confirmation that this trend does not continue.
TVA provided the requested analysis and confirmation in a letter dated April 26, 2012 (Reference 8). The NRC transmitted a fourth RAI regarding the proposed use of AREVA Advanced W17 HTP fuel at SQN in an email dated May 2, 2012 (Reference 9). to this letter contains TVA's responses to the RAI transmitted in the Reference 9 email correspondence. These responses include information provided by AREVA NP Inc. (AREVA NP) which they consider to be proprietary in nature, pursuant to 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (a)(4). It is requested that this information be withheld from public disclosure. provides a redacted version of Enclosure 1 that is suitable for public disclosure. to this letter contains the affidavit supporting the request for withholding the information from public disclosure. No other changes have been made to the previous submittals regarding the proposed TS amendment to allow use of AREVA Advanced W17 HTP fuel at SQN.
There are no regulatory commitments associated with this submittal. Please address any questions regarding this request to Clyde Mackaman at 423-751-2834.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1 5 th day of May, 2012.
Resp ully, J. . hea" ger, Corporate Nuclear Licensing
Enclosures:
- 1. ANP-2970Q2(P), Revision 000, Sequoyah Units 1 and 2 HTP Fuel Realistic Large Break LOCA Analysis, May 2012 (Proprietary Version)
- 2. ANP-2970Q2(NP), Revision 000, Sequoyah Units 1 and 2 HTP Fuel Realistic Large Break LOCA Analysis, May 2012 (Non-Proprietary Version)
- 3. AREVA NP Affidavit cc (Enclosures):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant Director, Division of Radiological Health - Tennessee State Department of Environment and Conservation