Other: CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report, ML11203A113, ML11207A053, ML11320A026, ML12086A311, ML12118A166, ML12125A028, ML12125A189, ML12137A298, ML12138A158, ML12153A378, ML12178A564, ML12185A077, ML12240A199, ML13037A106
|
MONTHYEARML11203A1132011-07-21021 July 2011 NRR E-mail Capture - Sequoyah 1 & 2 - LAR Regarding Areva Advanced W17 Htp Fuel (ME6538/6539) Project stage: Other ML11207A0532011-08-0909 August 2011 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel. Project stage: Other ML11269A0532011-10-14014 October 2011 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: RAI ML11320A0262011-12-27027 December 2011 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12025A0272012-02-0808 February 2012 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Areva Advance W17 High Thermal Performance Fuel (TAC Nos. ME6538 & ME6539) Project stage: RAI ML12088A1702012-03-23023 March 2012 Response to NRC Second Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12118A1652012-04-26026 April 2012 Response to NRC Third Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12118A1662012-04-26026 April 2012 ANP-2970Q1(NP), Revision 000, Htp Fuel Realistic Large Break LOCA Analysis, April 2012 (Non-Proprietary Version), Enclosure 2 Project stage: Other ML12125A0282012-05-0202 May 2012 NRR E-mail Capture - Sequoyah, Units 1 & 2 - Areva Advanced W17 Htp Fuel Transition Project stage: Other ML12086A3112012-05-0404 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539) Project stage: Other ML12137A2982012-05-15015 May 2012 ANP-2970Q2(NP), Rev 0, Sequoyah, Units 1 and 2 Htp Fuel Realistic Large Break LOCA Analysis Project stage: Other ML12137A2972012-05-15015 May 2012 Response to NRC Fourth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12153A3772012-05-24024 May 2012 Response to NRC Fifth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12138A1582012-05-29029 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 Thermal Performance Fuel Project stage: Other ML12125A1892012-05-29029 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12153A3782012-05-31031 May 2012 Enclosure 2, Sequoyah Nuclear Plant, Units 1 & 2 - ANP-3053 (Np), Revision 3, Sequoyah Htp Fuel Transition - NRC RAIs and Responses Project stage: Other ML1218500092012-06-26026 June 2012 Response to NRC Sixth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12178A5642012-07-0505 July 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539) Project stage: Other ML12185A0772012-07-0909 July 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12240A1992012-09-0606 September 2012 PI for Sequoyah 1 and 2- Permit Use of Advanced W17 Htp Fuel (TAC Nos. ME6538/6539) Project stage: Other ML12249A3942012-09-26026 September 2012 Issuance of Amendments to Revise the Technical Specification to Allow Use of Areva Advanced W17 High Thermal Performance Fuel (TS-SQN-2011-07) Project stage: Approval ML13037A1062013-01-31031 January 2013 10 CFR 50.46 - 30-Day Special Report for Sequoyah Nuclear Plant, Unit 2 Regarding Changes to the Calculated Peak Cladding Temperature Emergency Core Cooling System Evaluation Models Project stage: Other CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report2013-11-18018 November 2013 10 CFR 50.46 - Combined Annual and 30-Day Report Project stage: Other 2012-05-24
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification ML23292A0792023-10-19019 October 2023 Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 ML23285A0882023-10-12012 October 2023 Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23283A2792023-10-10010 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) ML23257A0062023-09-14014 September 2023 Enforcement Action EA-22-129 Inspection Postponement Request ML23254A2192023-09-11011 September 2023 Emergency Plan Implementing Procedure Revisions ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 ML23233A0122023-08-17017 August 2023 Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML23215A1572023-08-0303 August 2023 Enforcement Action EA-22-129 Inspection Readiness Notification CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-01-04
[Table view] Category:Proprietary Information Review
MONTHYEARML22020A3932022-02-18018 February 2022 Request for Withholding Information from Public Disclosure (EPID L-2020-LA-0004) ML21245A1822022-02-15015 February 2022 SDR 16-01, Revision 3 Request for Withholding Information from Public Disclosure (EPID L-2020-LA-0004) ML21251A2422021-09-14014 September 2021 Request for Withholding Information from Public Disclosure ML21196A0112021-08-0606 August 2021 Request for Withholding Information from Public Disclosure (EPID L-2020-LA-0004) ML20343A1182021-01-12012 January 2021 Request for Withholding Information from Public Disclosure ML20304A1872020-11-10010 November 2020 Request for Withholding Information from Public Disclosure ML20141L7672020-05-28028 May 2020 Request for Withholding Information from Public Disclosure ML14121A1792014-05-28028 May 2014 Request for Withholding Information from Public Disclosure for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) ML12240A1992012-09-0606 September 2012 PI for Sequoyah 1 and 2- Permit Use of Advanced W17 Htp Fuel (TAC Nos. ME6538/6539) ML12185A0772012-07-0909 July 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel ML12125A1892012-05-29029 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel ML12086A3112012-05-0404 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539) ML11320A0262011-12-27027 December 2011 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel ML11214A2052011-08-16016 August 2011 Plants, Units 1 & 2 - Request for Withholding Proprietary Information from Public Disclosure Regarding 10 CFR 5046 Annual Report (TAC ME5168 & ME5169) ML11207A0532011-08-0909 August 2011 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel. ML11154A0932011-06-28028 June 2011 Request for Withholding Proprietary Information from Public Disclosure Related to Generic Letter 2004-02 ML1015905562010-06-0909 June 2010 Request for Withholding Proprietary Information from Public Disclosure Related to Generic Letter 2004-02 ML0914701812009-06-22022 June 2009 Withholding from Public Disclosure, Attachment 3 to Enclosure of the 05/21/2009 Application, Application of W* Alternate Repair Criteria to Sequoyah Unit 2 Cold Leg Tubes. ML0820406072008-08-0808 August 2008 Areva Np, Inc. Request for Withholding Information Regarding Sequoyah Nuclear Plant, Unit 1, from Public Disclosure ML0812802552008-05-21021 May 2008 Areva Np, Inc., Request for Withholding Information Regarding Sequoyah, Unit 2, from Public Disclosure ML0812701582008-05-21021 May 2008 Withholding from Public Disclosure, SG-CDME-07-21-P, Revision 0, Examination of a Steam Generator Tube Removed from Sequoyah Unit 2 (Proprietary), Dated September 2007 ML0726400062007-09-28028 September 2007 Request for Withholding Information from Public Disclosure ML0508104752004-03-30030 March 2004 Withholding from Public Disclosure, LTR-CDME-04-147, Rev. 1, Operation of W* Alternate Repair Criteria to Sequoyah Unit 2 (Tac No. MC5212) ML19261A1961988-11-0404 November 1988 Application for Withholding Proprietary Information from Public Disclosure Regarding Leak Before Break Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for Sequoyah Units 1 and 2 2022-02-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2011 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE REGARDING USE OF AREVA ADVANCED W17 HIGH THERMAL PERFORMANCE FUEL (TAC NOS. ME6538 AND ME6539)
Dear Mr. Krich:
By letter dated June 17, 2011, the Tennessee Valley Authority (the licensee) submitted a license amendment to modify the Technical Specifications for use of AREVA advanced W17 high thermal performance (HTP) fuel for the Sequoyah Nuclear Plant, Units 1 and 2. The licensee requested that AREVA NP Incorporated (AREVA NP) proprietary information included in Attachments 5, 6, and 7 be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390. Affidavits dated June 8, 2011, May 12, 2011, and March 28, 2011, corresponding to Attachments 5,6, and 7, respectively, executed by Gayle F. Elliott of AREVA NP, and included as Attachment 11 to the licensee's letter dated June 17, 2011, were provided requesting that information contained in the following documents be withheld from public disclosure pursuant to 10 CFR 2.390:
Attachment 5 to a letter dated June 17, 2011 - ANP-2986(P), Revision 2, Sequoyah HTP Fuel Transition, June 2011.
Attachment 6 to a letter dated June 17, 2011 - ANP-2971 (P), Revision 1, Sequoyah Units 1 and 2 HTP Fuel S-RELAP5 Small Break LOCA Analysis, May 2011.
Attachment 7 to a letter dated June 17, 2011 - ANP-2970(P), Revision 0, Sequoyah Units 1 and 2 HTP Fuel Realistic Large Break LOCA Analysis, April 2011.
Nonproprietary copies of the above documents, which were included in the licensee's letter dated June 17, 2011, as Attachments 8, 9, and 10, have been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library in the Agencywide Documents Access and Management System. These documents are entitled:
"ANP-2986(NP), Revision 2, Sequoyah HTP Fuel Transition, June 2011," "ANP-2971 (NP),
Revision 1, Sequoyah Units 1 and 2 HTP Fuel S-RELAP5 Small Break LOCA Analysis, May 2011," and "ANP-2970(NP), Revision 0, Sequoyah Units 1 and 2 HTP Fuel Realistic Large Break LOCA Analysis, April 2011," respectively.
R. Krich -2 The affidavits stated that the submitted information in Attachments 5, 6, and 7 should be considered exempt from mandatory public disclosure for the reasons specified in the following paragraphs 6(b) and 6(c) for Attachment 5, and paragraphs 6(b), 6(c), and 6(e) for Attachments 6 and 7:
6(b) Use of the information by a competitor would permit the competitor to significantly reduce its expenditures, in time or resources, to design, produce, or market a similar product or service.
6(c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA NP.
6(e) The information is vital to a competitive advantage held by AREVA NP, would be helpful to competitors to AREVA NP, and would likely cause substantial harm to the competitive position of AREVA NP.
We have reviewed the licensee's letter dated June 17, 2011, and the attached material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the attachments 5, 6, and 7 of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
R. Krich -3 If you have any questions regarding this matter. I may be reached at 301-415-1564.
Sincerely.
~~~.~
Siva P. Lingam. Project Manager Plant licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328 cc: Ms. Gayle F. Elliott. Manager Product Licensing AREVA NP Inc.
3315 Old Forge Road Lynchburg. VA 24501 Additional Distribution via Listserv
R. Krich - 3 If you have any questions regarding this matter, I may be reached at 301-415-1564.
Sincerely, IRA!
Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328 cc: Ms. Gayle F. Elliott, Manager Product Licensing AREVA NP Inc.
3315 Old Forge Road Lynchburg, VA 24501 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrLACSoJa RidsNrrPMSequoyah RidsNrrDorlDpr RidsOgcMailCenter RidsAcrsAcnw_MailCTR RidsNrrDssSnpb RidsNrrDssSrxb RidsRgn2MailCenter ADAMS Accession No' ML11207A053 OFFICE LPL2-2/PM LPL2-2/LA N RR/DSS/SRXB/BC NAME SLingam CSoia AUlses DATE 07/28111 07/27/11 07/29/11 OFFICE NRRIDSS/SNPB/BC LPL2-2/BC LPL2-2/PM NAME AMendiola DBroaddus SLingam DATE 07/28/11 08/09/11 08/09/11 OFFICIAL RECORD COpy