MONTHYEARML11203A1132011-07-21021 July 2011 NRR E-mail Capture - Sequoyah 1 & 2 - LAR Regarding Areva Advanced W17 Htp Fuel (ME6538/6539) Project stage: Other ML11207A0532011-08-0909 August 2011 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel. Project stage: Other ML11269A0532011-10-14014 October 2011 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: RAI ML11320A0262011-12-27027 December 2011 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12025A0272012-02-0808 February 2012 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Areva Advance W17 High Thermal Performance Fuel (TAC Nos. ME6538 & ME6539) Project stage: RAI ML12088A1702012-03-23023 March 2012 Response to NRC Second Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12118A1652012-04-26026 April 2012 Response to NRC Third Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12118A1662012-04-26026 April 2012 ANP-2970Q1(NP), Revision 000, Htp Fuel Realistic Large Break LOCA Analysis, April 2012 (Non-Proprietary Version), Enclosure 2 Project stage: Other ML12125A0282012-05-0202 May 2012 NRR E-mail Capture - Sequoyah, Units 1 & 2 - Areva Advanced W17 Htp Fuel Transition Project stage: Other ML12086A3112012-05-0404 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539) Project stage: Other ML12137A2982012-05-15015 May 2012 ANP-2970Q2(NP), Rev 0, Sequoyah, Units 1 and 2 Htp Fuel Realistic Large Break LOCA Analysis Project stage: Other ML12137A2972012-05-15015 May 2012 Response to NRC Fourth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12153A3772012-05-24024 May 2012 Response to NRC Fifth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12138A1582012-05-29029 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 Thermal Performance Fuel Project stage: Other ML12125A1892012-05-29029 May 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12153A3782012-05-31031 May 2012 Enclosure 2, Sequoyah Nuclear Plant, Units 1 & 2 - ANP-3053 (Np), Revision 3, Sequoyah Htp Fuel Transition - NRC RAIs and Responses Project stage: Other ML1218500092012-06-26026 June 2012 Response to NRC Sixth Request for Additional Information Regarding Application to Modify Technical Specifications for Use of Areva Advanced W17 Htp Fuel (TS-SQN-2011-07) Project stage: Request ML12178A5642012-07-0505 July 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539) Project stage: Other ML12185A0772012-07-0909 July 2012 Request for Withholding Proprietary Information from Public Disclosure Regarding Use of Areva Advanced W17 High Thermal Performance Fuel Project stage: Other ML12240A1992012-09-0606 September 2012 PI for Sequoyah 1 and 2- Permit Use of Advanced W17 Htp Fuel (TAC Nos. ME6538/6539) Project stage: Other ML12249A3942012-09-26026 September 2012 Issuance of Amendments to Revise the Technical Specification to Allow Use of Areva Advanced W17 High Thermal Performance Fuel (TS-SQN-2011-07) Project stage: Approval ML13037A1062013-01-31031 January 2013 10 CFR 50.46 - 30-Day Special Report for Sequoyah Nuclear Plant, Unit 2 Regarding Changes to the Calculated Peak Cladding Temperature Emergency Core Cooling System Evaluation Models Project stage: Other CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report2013-11-18018 November 2013 10 CFR 50.46 - Combined Annual and 30-Day Report Project stage: Other 2012-05-24
[Table View] |
|
---|
Category:Letter
MONTHYEARML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 2024-09-08
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 April 26, 2012 10 CFR 50.4 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
Response to NRC Third Request for Additional Information Regarding Application to Modify Technical Specifications for Use of AREVA Advanced W17 HTP Fuel (TS-SQN-2011-07) (TAC Nos.
ME6538 and ME6539)
References:
- 1. Letter from TVA to NRC, "Application to Modify Technical Specifications for Use of AREVA Advanced W17 HTP Fuel (TS-SQN-2011-07)," dated June 17, 2011
- 2. Letter from TVA to NRC, "Response to NRC Request for Supplemental Information Regarding Application to Modify Technical Specifications for Use of AREVA Advanced W17 HTP Fuel (TS-SQN-2011-07)," dated July 27, 2011
- 3. Letter from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2 -
Request for Additional Information Regarding the Propopsed [sic]
Technical Specification Changes to Allow Use of AREVA Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539)," dated October 14, 2011
- 4. Letter from TVA to NRC, "Response to NRC Request for Additional Information Regarding Application to Modify Technical Specifications for Use of AREVA Advanced W1 7 HTP Fuel (TS-SQN-2011-07)," dated November 14, 2011 Prin~tedon recycled paper
U.S. Nuclear Regulatory Commission Page 2 April 26, 2012
- 5. Letter from NRC to TVA, "Sequoyah Nuclear Plant, Units 1 and 2 -
Request for Additional Information Regarding the Propopsed [sic]
Technical Specification Changes to Allow Use of AREVA Advanced W17 High Thermal Performance Fuel (TAC Nos. ME6538 and ME6539), dated February 8, 2012
- 6. Letter from TVA to NRC, "Response to NRC Second Request for Additional Information Regarding Application to Modify Technical Specifications for Use of AREVA Advanced W1 7 HTP Fuel (TS-SQN-2011-07)," dated March 23, 2012
- 7. Electronic Mail from NRC to TVA, "LAR for TAC ME6538/6539 (Sequoyah 1 & 2 - Use of AREVA Advanced W17 HTP Fuel)," dated April 4, 2012 The purpose of this letter is to provide additional information as agreed in a telephone conference call held on April 9, 2012, between Tennessee Valley Authority (TVA) and Nuclear Regulatory Commission (NRC) representatives.
By letter dated June 17, 2011 (Reference 1), TVA submitted a request for amendment to the Technical Specifications (TSs) for Sequoyah Nuclear Plant (SQN), Units 1 and
- 2. The amendment request proposed to allow use of AREVA Advanced W17 High Thermal Performance (HTP) fuel at SQN. In a letter dated July 27, 2011 (Reference 2), TVA provided supplemental information requested by the NRC on July 21, 2011, in a telephone call between TVA and NRC representatives. By letter dated October 14, 2011 (Reference 3), the NRC forwarded a request for additional information (RAI) regarding the proposed changes to the TSs. TVA provided the response to the NRC's RAI in a letter dated November 14, 2011 (Reference 4). A second RAI regarding the proposed TS changes was forwarded to TVA in a letter dated February 8, 2012 (Reference 5). TVA provided the response to the second RAI in a letter dated March 23, 2012 (Reference 6).
On April 4, 2012, the NRC transmitted a third RAI by electronic mail (email) (Reference
- 7) involving the Loss of Coolant Accident (LOCA) analyses supporting the proposed use of AREVA Advanced W17 HTP fuel at SQN. Following a telephone conference call between TVA and NRC representatives held on April 9, 2012, TVA agreed to provide an analysis of the effects of fuel clad swelling, rupture, and relocation, and also provide a discussion of the cause of the apparent negative trend of the post-LOCA reactor vessel downcomer liquid level transient, with confirmation that this trend does not continue. contains TVA's responses to the RAI provided in the Reference 7 email correspondence, an assessment of an error discovered in the S-RELAP5 form of the Sleicher-Rouse correlation, and includes information provided by AREVA NP Inc.
(AREVA NP) which they consider to be proprietary in nature, pursuant to 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (a)(4). It is requested that this information be withheld from public disclosure. Enclosure 2 provides a redacted version of Enclosure 1, which is suitable for public disclosure.
U.S. Nuclear Regulatory Commission Page 3 April 26, 2012 Enclosure 3 to this letter contains the affidavit supporting the request for withholding the information from public disclosure. No other changes have been made to the previous submittals regarding the proposed TS amendment to allow use of AREVA Advanced W17 HTP fuel at SQN.
There are no regulatory commitments associated with this submittal. Please address any questions regarding this request to Clyde Mackaman at 423-751-2834.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the 2 6 th day of April, 2012.
JRes ully'
/./.Shea pMAnager, Corporate Nuclear Licensing
Enclosures:
- 1. ANP-2970Q1 (P), Revision 000, Sequoyah Units 1 and 2 HTP Fuel Realistic Large Break LOCA Analysis, April 2012 (Proprietary Version)
- 2. ANP-2970Q1(NP), Revision 000, Sequoyah Units 1 and 2 HTP Fuel Realistic Large Break LOCA Analysis, April 2012 (Non-Proprietary Version)
- 3. AREVA NP Affidavit cc (Enclosures):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant Director, Division of Radiological Health - Tennessee State Department of Environment and Conservation