Other: ML110872079, ML11145A064, ML11256A057, ML11256A058, ML11256A059, ML12011A188, ML12086A081, ML12264A642, ML13029A497, ML13032A074, ML13063A071, ML13198A056, ML13253A163, ML16118A311, NOC-AE-12002780, Clarification of Information in Support of the Review of the License Renewal Application, NOC-AE-13002945, Update to License Renewal Application - Environmental Permits
|
MONTHYEARML1030102572010-10-25025 October 2010 Transmittal of License Renewal Application Project stage: Request ML1108720792011-04-0505 April 2011 Project Manager Change for the License Renewal of South Texas Project, Units 1 and 2 Project stage: Other ML11145A0642011-06-21021 June 2011 Plan for the Environmental Related Regulatory Audit Regarding the South Texas Project, Units 1 and 2, License Renewal Application Review Project stage: Other ML11193A0742011-07-0505 July 2011 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI NOC-AE-11002687, Response to Request for Additional Information for the South Texas Project License Renewal Application2011-07-0505 July 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application Project stage: Response to RAI ML11193A0162011-07-0505 July 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application Project stage: Response to RAI NOC-AE-11002691, Response to Request for Additional Information for the Review of the License Renewal Application2011-07-0505 July 2011 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML11201A0622011-08-0404 August 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application Project stage: RAI ML1123000162011-08-18018 August 2011 License Renewal - Errata in AMP RAI Package Project stage: RAI ML11214A2072011-08-18018 August 2011 RAI for the Review of the STP, License Renewal Application (TAC No. ME4938 and ME512) Project stage: RAI NOC-AE-11002711, Response to Request for Additional Information for License Renewal Application2011-08-23023 August 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI ML11250A0672011-08-23023 August 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI ML11256A0592011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, WR- 11, a Summary of Historic and Current (Past 5 Years) Total Dissolved Solids (Tds) Data for Groundwater Produced by STP Production Wells from the Deep Ch Project stage: Other ML11256A0562011-08-31031 August 2011 Transmittal of Documents to Support Review of the South Texas Project License Renewal Application Project stage: Request ML11256A0582011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, WR-5, TCEQ Id No. 1610103/1610051 (Operation of Public Potable Water System) Project stage: Other ML11256A0572011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, List of Transmitted Documents Including Copy of Each Document, Enclosure to NOC-AE-11002720 Project stage: Other ML1123601142011-09-0101 September 2011 Request for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: RAI ML11255A2112011-09-0606 September 2011 Response to Request for Additional Information for the License Renewal Application Project stage: Response to RAI NOC-AE-11002719, Response to Request for Additional Information for the License Renewal Application2011-09-0606 September 2011 Response to Request for Additional Information for the License Renewal Application Project stage: Response to RAI ML11259A0142011-09-12012 September 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI NOC-AE-11002723, Response to Requests for Additional Information for the License Renewal Application2011-09-12012 September 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI NOC-AE-11002734, Transmittal of Document to Support Review of the License Renewal Application2011-09-12012 September 2011 Transmittal of Document to Support Review of the License Renewal Application Project stage: Request ML11259A0312011-09-12012 September 2011 Transmittal of Document to Support Review of the License Renewal Application Project stage: Request ML11270A0602011-09-22022 September 2011 Response to Requests for Additional Information for License Renewal Application Project stage: Response to RAI ML11269A0022011-09-28028 September 2011 Requests for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: RAI ML11298A0852011-10-18018 October 2011 Response to Requests for Additional Information for License Renewal Application Project stage: Response to RAI NOC-AE-11002761, Clarification to Response to Request for Additional Information for License Renewal Application (TAC No. ME4938 & ME5122)2011-11-17017 November 2011 Clarification to Response to Request for Additional Information for License Renewal Application (TAC No. ME4938 & ME5122) Project stage: Response to RAI ML11333A0942011-11-17017 November 2011 Clarification to Response to Request for Additional Information for License Renewal Application (TAC No. ME4938 & ME5122) Project stage: Supplement ML12011A1882012-01-10010 January 2012 Clarification of Information in Support of the Review of the License Renewal Application Project stage: Other NOC-AE-12002780, Clarification of Information in Support of the Review of the License Renewal Application2012-01-10010 January 2012 Clarification of Information in Support of the Review of the License Renewal Application Project stage: Other NOC-AE-110027, Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA2012-01-19019 January 2012 Supplemental Response to Requests for Additional Information for the South Texas Project License Renewal Application - SAMA Project stage: Supplement NOC-AE-120027, Clarification to Supplemental Response to Request for Additional Information for the South Texas Project License Renewal Application - SAMA2012-02-16016 February 2012 Clarification to Supplemental Response to Request for Additional Information for the South Texas Project License Renewal Application - SAMA Project stage: Supplement ML12047A2852012-02-29029 February 2012 January 17, 2012, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission & STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project License Renewal Project stage: RAI ML12017A1282012-02-29029 February 2012 RAI for the Review of the STP LRA Project stage: RAI NOC-AE-12002818, Response to Requests for Additional Information for the Review of the South Texas Project License Renewal Application2012-03-12012 March 2012 Response to Requests for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML12079A0142012-03-12012 March 2012 Response to Requests for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML11290A2262012-03-19019 March 2012 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application Project stage: Approval ML12128A0612012-05-0404 May 2012 NRR E-mail Capture - NEPA Consultation - Waterborne Outbreak Project stage: Request ML12142A0022012-05-18018 May 2012 NRR E-mail Capture - Environmental Permit Updated Status Project stage: Request ML12171A4832012-08-10010 August 2012 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application Project stage: Approval ML11153A0822012-11-14014 November 2012 Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by STP Nuclear Operating Company for Renewal of the Operating License for South Texas Project, Units 1 and 2 Project stage: Approval ML12086A0812012-11-14014 November 2012 Environmental Impact Statement Scoping Process Summary Report for South Texas Project, Units 1 and 2 Project stage: Other ML12264A6422012-11-14014 November 2012 STP Scoping Report_Paula Cooper Project stage: Other ML12324A0492012-11-30030 November 2012 NUREG-1437 Supp 48 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding South Texas Project, Units 1 and 2 (Draft for Comment) Project stage: Draft Other ML12339A2652012-12-0505 December 2012 Notice of Availability of the Draft Plant-Specific Supplement 48 to the GEIS for License Renewal of Nuclear Plants Regarding South Texas Project, Units 1 and 2, Project stage: Draft Other ML12195A0852012-12-0505 December 2012 Notice of Availability of the Draft Plant-Specific Supplement 48 to the GEIS for License Renewal of Nuclear Plants Regarding South Texas Project, Units 1 and 2, Project stage: Draft Other ML13029A7552013-01-15015 January 2013 Transcript of South Texas Project License Renewal Public Meeting: Afternoon Session, January 15, 2013, Pages 1-34 Project stage: Meeting ML13029A4972013-01-15015 January 2013 Slides - Preliminary Site-Specific Results of the Environmental Review for South Texas Project License Renewal Project stage: Other NOC-AE-13002945, Update to License Renewal Application - Environmental Permits2013-01-21021 January 2013 Update to License Renewal Application - Environmental Permits Project stage: Other ML13032A0742013-01-21021 January 2013 Update to License Renewal Application - Environmental Permits Project stage: Other 2011-09-06
[Table View] |
Text
dLM11"/
Nuclear Operating Company South Texas Project Electric Generatin$ Station PO Box 289 Wadsworth. Texas 77483
-v-November 17, 2011 NOC-AE-1 1002761 10CFR54 STI: 33052689 File: G25 U.S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2746 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Clarification to Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC No. ME4938 and ME5122))
References:
- 1. STPNOC Letter dated October 25, 2010, from G. T. Powell to NRC Document Control Desk, "License Renewal Application" (NOC-AE-1 0002607) (ML103010257)
- 2. STPNOC Letter dated September 6, 2011 from G. T. Powell to NRC Document Control Desk, "Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC Nos. ME4938 and ME5122)"
(NOC-AE-1 1002719) (ML11255A211)
By Reference 1, STP Nuclear Operating Company (STPNOC) submitted the License Renewal Application (LRA) for South Texas Project (STP) Units 1 and 2. This letter provides additional information to the response to NRC request for additional information RAI HP-1 (Reference 2).
There are no regulatory commitments in this letter.
Should you have any questions regarding this letter, please contact either Arden Aldridge, STP License Renewal Project Lead, at (361) 972-8243 or Ken Taplett, STP License Renewal Project regulatory point-of-contact, at (361) 972-8416.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on 11I /L/W Date Senior Vice President, Technical Support & Oversight KJT
Enclosure:
Clarification to STPNOC Response to Requests for Additional Information
NOC-AE-1 1002761 Page 2 cc:
(paper copy)
(electronic copy)
Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 612 East Lamar Blvd, Suite 400 Arlington, Texas 76011-4125 Balwant K. Singal Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8B1) 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 John W. Daily License Renewal Project Manager (Safety)
U.S. Nuclear Regulatory Commission One White Flint North (MS 011-Fl)
Washington, DC 20555-0001 Tam Tran License Renewal Project Manager (Environmental)
U. S. Nuclear Regulatory Commission One White Flint North (MS O11F01)
Washington, DC 20555-0001 A. H. Gutterman, Esquire Kathryn M. Sutton, Esquire Morgan, Lewis & Bockius, LLP John Ragan Catherine Callaway Jim von Suskil NRG South Texas LP Kevin Polio Richard Pena City Public Service Peter Nemeth Crain Caton & James, P.C.
C. Mele City of Austin Richard A. Ratliff Alice Rogers Texas Department of State Health Services Balwant K. Singal John W. Daily Tam Tran U. S. Nuclear Regulatory Commission
Enclosure NOC-AE-1 1002761 Page 1 of 2 SOUTH TEXAS PROJECT LICENSE RENEWAL APPLICATION CLARIFICATION TO STPNOC RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION Changes to the STPNOC response to the following request for additional information is provided in line-in/line-out format.
Human Health NRC RAI HP-1:
Issue:
The applicant's evaluation identified five locations where the transmission lines exceeded the National Electrical Safety Code (NESC) recommended standard of 5 milliamperes for electric shock concern. However, the environmental report (ER) does not contain a discussion of any mitigation measures being considered for the locations where the electric shock potential exceeds the NESC standard.
Background:
As required by Title 10 of the Code of Federal Regulations (10 CFR) 51.53(c)(3)(ii)(H), Section 4.13 of the STP ER contains an evaluation of the acute shock potential from the transmission lines within the scope of license renewal. The applicant's evaluation identified five locations where the transmission lines exceeded the NESC recommended standard of 5 milliamperes.
For these transmission lines, the applicant's ER concluded "... that electric shock is of MODERATE significance, because 1) there are few exceedances of the NESC standard, 2) the exceedances are a small percentage of the standard, 3) the locations of the exceedances are very remote or on private property, and 4) the transmission service providers have not received any complaints about induced-current shock.
Accordingly, no mitigation measures are required."
Hence, the ER does not contain a discussion of any mitigation measures being considered for the locations where the electric shock potential exceeds the NESC standard.
10 CFR 51.53(c)(3)(iii) states that the ER "... must contain a consideration of alternatives for reducing adverse impacts, as required by 10 CFR 51.45(c), for all Category 2 license renewal issues... " 10 CFR 51.45(c) states, "The environmental report must include an analysis that considers and balances the environmental effects of the proposed action, the environmental impacts of alternatives to the proposed action, and alternatives available for reducing or avoiding adverse environmental effects."
Requested Information:
Please provide additional information related to alternatives available for reducing or avoiding adverse environmental effects from those transmission lines that exceed the NESC standard.
Enclosure NOC-AE-1 1002761 Page 2 of 2 STPNOC response:
Potential mitigation measures for reducing or avoiding adverse environmental effects from those transmission lines that exceed the NESC standard could include:
re-examining the induced current calculations for the selected spans, raising the towers at the affected road-transmission line intersections, rephasing the double-circuit lines, and/or placing caution signs under the lines.
STPNOC re-examined the induced current calculations that support Table 4.13-1 in the Environmental Report. The Transmission Service Providers (TSPs) provided revised sags at 120 degrees for selected spans and the induced current was recalculated. In addition, one TSP calculation is based on more recent engineering data. The re-examination resulted in the Hillje line location and one Skyline location on a low traffic road being verified to be < 5 milliampere (ma). The two Hill Country locations and the remaining Skyline location still exceed the 5 ma standard.
The configuration of two Hill country locations and the remaining Skyline location have changed since the Final Environmental Statement for the construction permit, referenced in the Environmental Report, Section 3.1.3. STP no longer connects directly with the Skyline or Hill Country substations. A substation was constructed at Elm Creek. From STP the original Hill Country and Skyline transmission lines are looped into the Elm Creek substation before proceeding to the Hill Country and Skyline substations. (Reference UFSAR Figure 8.2-4) These STIR lines arc Fe configured and now stop at Elm Creek Substation.
No mitigation is required as stated in the Environmental Report, Section 4.13:
STPNOC's assessment under 10 CFR 51 concludes that electric shock is of MODERATE significance, because 1) there are few exceedances of the NESC standard, 2) the exceedances are a small percentage of the standard, 3) the locations of the exceedances are very remote or on private property, 4) the transmission service providers have not received any complaints about induced-current shock. Accordingly, no mitigation measures are required.
This position is further supported by: (1) the two Hill Country lines and the one Skyline line where the 5 milliampere standard is exceeded are beyond the Elm Creek substation and are no longer connected to STP; and (2) all STP transmission lines will continue to be in service after the STP facility is decommissioned. The Proposed Action to renew the operating licenses for STP Units 1 and 2 has no effect on transmission lines directly connected to the STP switchyard.
Therefore, under NEPA, the Proposed Action does not need further analysis.