Final Safety Analysis Report - Revised Enclosures 3 & 5 for TVA to NRC Letter Dated December 10, 2010
ML11262A277
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/15/2011
From: Stinson D
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11262A277 (32)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 September 15, 2011 10 CFR 50.4(b) 10 CFR 50.34(b)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391

Subject:

WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 - FINAL SAFETY ANALYSIS REPORT (FSAR) - REVISED ENCLOSURES 3 AND 5 FOR TVA TO NRC LETTER DATED DECEMBER 10, 2010

References:

1. TVA letter to NRC dated December 10, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 - Final Safety Analysis Report (FSAR) -

Response to Requests for Additional Information"

2. TVA Letter to NRC dated April 13, 2011, "Watts Bar Nuclear Plant (WBN) Unit 2 - Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information (RAIs) Related to FSAR Sections 9.2.1 and 9.2.2" The purpose of this letter is to provide revisions to Enclosures 3 and 5 previously provided in Reference 1, which addressed an NRC request for additional information (RAI). Enclosure 3 entitled, "Summary Heat Load and Flow Tables for RAI 9.2-CSS-4,"

had provided data for the Component Cooling System head loads and flows. entitled, "Summary Heat Load and Flow Tables for RAI 9.2.1-ERCW-3," had provided data for the Essential Raw Cooling Water (ERCW) System Train B heat loads and flows.

These revisions are necessary due to minor changes to flow allocations and the identification of errors recently found in the flows and heat loads while reviewing the basis calculations for these values. This condition was documented into TVA's corrective action program as Problem Evaluation Report (PER) 421509. Provided in the enclosure to this letter are the revised enclosures.

U. S. Nuclear Regulatory Commission Page 2 September 15, 2011 In addition, TVA provided in Reference 2 the proposed words and numbers that TVA would incorporate into a future FSAR amendment. However, the actual words and numbers incorporated as part of Amendment 106 (Al 06) were changed to reflect the corrections made to the Reference 2 enclosure numbers. FSAR A106 is being transmitted via separate correspondence.

There are no new commitments made in this letter. If you should have any questions, please contact Gordon Arent at (423) 365-2004.

I declare under the penalty of perjury that the foregoing is true and correct. Executed on the 15th of September, 2011.

Respectful, David Stinson Watts Bar Unit 2 Vice President

Enclosure:

Revised Enclosures 3 and 5 for TVA to NRC Letter dated December 10, 2010 cc (Enclosure):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

ENCLOSURE Revised Enclosures 3 and 5 for TVA to NRC Letter dated December 10, 2010 E-1

ENCLOSURE 3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 COMPONENT COOLING SYSTEM INDIVIDUAL LOADS (sheet I of 2)

Heat Load Equipment (KBTU/hr) Flow (gpm)

Containment Spray System Pump Oil Cooler 14.7 2.0 Centrifugal Charging Pump (CCP) Oil Cooler 66.8 28.0 Non-Regenerative Heat Exchanger (Startup) 13,100.0 1,000.0 Non-Regenerative Heat Exchanger (Power Generation) 6,400.0 640.0 Non-Regenerative Heat Exchanger (Hot Standby) 8,350.0 640.0 Non-Regenerative Heat Exchanger (Hot Shutdown) 2,530.0 640.0 Non-Regenerative Heat Exchanger (Cold Shutdown) 1,770.0 640.0 Non-Regenerative Heat Exchanger (All Others) 0.0 0.0 Excess Letdown Heat Exchanger 4,930.0 232.0 Seal Water Heat Exchanger (Startup w/ Offsite Power) 1,160.0 200.0 Seal Water Heat Exchanger (Refueling) 376.0 200.0 Seal Water Heat Exchanger (Power Generation) 1,880.0 200.0 Seal Water Heat Exchanger (Hot Shutdown) 517.0 200.0 Seal Water Heat Exchanger (Hot Standby) 517.0 200.0 Seal Water Heat Exchanger (LOCA-Safety Injection) 418.0 200.0 Seal Water Heat Exchanger (LOCA-Recirculation) 941.0 200.0 Seal Water Heat Exchanger (Cold Shutdown) 1,070.0 200.0 Reactor Coolant Pump Thermal Barrier (each) 439.1 40.0 Reactor Coolant Pump Upper Oil Cooler (each) 736.5 150.0 Reactor Coolant Pump Lower Oil Cooler (each) 24.4 5.0 RHR Pump Seal Water Cooler 100.0 10.0 E3 - 1

ENCLOSURE 3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 COMPONENT COOLING SYSTEM INDIVIDUAL LOADS (sheet 2 of 2)

Heat Load Equipment (KBTU/hr) Flow (gpm)

RHR Heat Exchanger (Startup) 19,600.0 5,000.0 RHR Heat Exchanger (Hot Shutdown)

  • 5,000.0 RHR Heat Exchanger (Cold Shutdown)
  • 5,000.0 RHR Heat Exchanger (Start of Refueling; Fuel in Vessel)
  • 5,000.0 RHR Heat Exchanger (LOCA-Recirculation)
  • 5,000.0 RHR Heat Exchanger (Other Modes)
  • 1300.0 Spent Fuel Pool Cooling Heat Exchanger (All Fuel Discharged
  • 3,000.0 into the SFP)

Safety Injection System Pump Oil Cooler (Unit 2 Only) 46.0 15.0 Sample System Heat Exchanger A 68.4 20.0 Sample System Heat Exchanger B 39.2 28.0 Sample System Heat Exchanger C (Unit 1 Only) 11.6 20.0 Hot Sample Chiller 75.9 22.0 Post Accident Sampling Coolers (Unit 1 Only) 252.0 10.0 Waste Gas Compressor 135.2 50.0 Radiation Monitor 0.0 6.0

  • The heat load for these components is dependent upon combined operating mode. It is accounted for in the overall CCS tables.

E3 - 2

ENCLOSURE3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 CCS Train A Heat Loads and Flows with Offsite Power Available (sheet 1 of 2)

Unit I Operational Modes Hot Cold Initial Safety LOCA Hot Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Standby 1A (kBTU/hr) 60,910.1 30,300.1 49,376.7 56,860.1 46,046.0 22,520.6 28,955.6 28,487.1 Startup 1A (gpm) 10,413.0 4,821.0 6,821.0 9,041.0 8,401.0 4,831.0 6,051.0 4,821.0 2A (kBTU/hr) 63,675.4 44,075.4 80,498.5 63,675.4 63,675.4 44,075.4 80,498.5 44,075.4 2A (gpm) 7,393.0 7,393.0 10,393.0 7,393.0 7,393.0 7,393.0 10,393.0 7,393.0 1A (kBTU/hr) 44,087.0 30,300.1 49,376.7 40,037.0 46,046.0 22,520.6 28,955.6 11,664.0

=E PPower 1A (gpm) 7,413.0 4,821.0 6,821.0 6,041.0 8,401.0 4,831.0 6,051.0 1,821.0 2A (kBTU/hr) 30,288.5 13,465.4 30,288.5 30,288.5 13,465.4 13,465.4 30,288.5 30,288.5 0 2A (gpm) 4,801.0 1,801.0 4,801.0 4,801.0 1,801.0 1,801.0 4,801.0 4,801.0 1A (kBTU/hr) 80,510.1 30,300.1 93,560.1 74,396.0 22,520.6 28,487.1 a.

O Hot 1A (gpm) 10,413.0 4,821.0 9,041.0 8,401.0 4,831.0 4,821.0 N/A N/A

_ Shutdown 2A (kBTU/hr) 49,365.0 49,365.0 49,365.0 49,365.0 49,365.0 49,365.0

_ _ _ 2A (gpm) 6,801.0 6,801.0 6,801.0 6,801.0 6,801.0 6,801.0 1A (kBTU/hr) 80,510.1 30,300.1 49,376.7 56,860.1 74,396.0 22,520.6 28,955.6 28,487.1 Cold 1A (gpm) 10,413.0 4,821.0 6,821.0 9,041.0 8,401.0 4,831.0 6,051.0 4,821.0 Shutdown 2A (kBTU/hr) 40,025.4 40,025.4 93,548.5 76,725.4 40,025.4 40,025.4 93,548.4 40,025.4 2A (gpm) 6,021.0 6,021.0 9,021.0 6,021.0 6,021.0 6,021.0 9,021.0 6,021.0 E3 - 3

ENCLOSURE3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 CCS Train A Heat Loads and Flows with Offsite Power Available (sheet 2 of 2)

Unit I Operational Modes Hot Cold Initial Safety LOCA Hot Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Standby 1A (kBTU/hr) 63,687.0 13,477.0 49,376.7 40,037.0 46,046.0 5,697.5 28,955.6 11,664.0 Initial 1A (gpm) 7,413.0 1,821.0 6,821.0 6,041.0 8,401.0 1,831.0 6,051.0 1,821.0 Refueling 2A (kBTU/hr) 46,034.4 46,034.5 74,384.4 74,384.5 57,561.5 46,034.4 74,384.4 46,034.4 2A (gpm) 8,381.0 8,381.0 8,381.0 8,381.0 5,381.0 8,381.0 8,381.0 8,381.0 1A (kBTU/hr) 1A 44,087.0 30,300.1 49,376.7 40,037.0 46,046.0 11,664.0 0 Safety 1A (gpm) 7,413.0 4,821.0 6,821.0 6,041.0 8,401.0 1,821.0 Injection 2A (kBTU/hr) 22,268.6 5,445.5 22,268.6 22,268.6 5,445.5 22,268.6 0 2A (gpm) 4,801.0 1,801.0 4,801.0 4,801.0 1,801.0 4,801.0 1A (kBTU/hr) 80,510.1 30,300.1 93,560.1 74,396.0 28,487.1 O LOCA 1A (gpm) 10,413.0 4,821.0 9,041.0 8,401.0 4,821.0 N/A N/A N/A Recirc 2A (kBTU/hr) 28,703.7 28,703.6 28,703.7 28,703.7 28,703.6

-_ _ 2A (gpm) 6,021.0 6,021.0 6,021.0 6,021.0 6,021.0 1A (kBTU/hr) 44,087.0 30,300.1 49,376.7 40,037.0 46,046.0 22,520.6 28,955.6 28,487.1 Hot 1A (gpm) 7,413.0 4,821.0 6,821.0 6,041.0 8,401.0 4,831.0 6,051.0 4,821.0 Standby 2A (kBTU/hr) 28,475.5 11,652.4 28,475.5 28,475.5 11,652.4 11,652.4 28,475.5 11,652.4 2A (gpm) 4,801.0 1,801.0 4,801.0 4,801.0 1,801.0 1,801.0 4,801.0, 1,801.0 E3 - 4

ENCLOSURE 3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 CCS Train A Heat Loads and Flows with LOOP and Loss of Train B (sheet I of 2)

Unit 1 Operational Modes Hot Cold Initial Safety LOCA Hot Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Standby 1A (kBTU/hr) 1A (gpm)

Startup N/A N/A N/A N/A N/A N/A N/A N/A 2A (kBTU/hr) 2A (gpm) 1A (kBTU/hr) 0 1A (gpm)

Power N/A N/A N/A N/A N/A N/A N/A N/A 2A (kBTU/hr) o 2A (gpm)

0. 1A (kBTU/hr) 93,229.8 74,065.8 17,720.5 25,756.8 O Hot 1A (gpm) 9,401.0 9,401.0 4,411.0 4,401.0 N/A N/A N/A N/A

_ Shutdown 2A (kBTU/hr) 92,479.0 92,479.0 92,479.0 92,479.0 2A (gpm) 6,381.0 6,381.0 6,381.0 6,381.0 1A (kBTU/hr) 92,479.0 93,229.8 74,065.8 17,720.5 56,220.5 25,756.8 Cold 1A (gpm) N/A N/A 6,401.0 9,401.0 9,401.0 4,411.0 6,411.0 ____

4,401.0 Shutdown 2A (kBTU/hr) 93,229.8 76,406.8 76,406.8 76,406.8 93,229.9 76,406.8 2A (gpm) 9,381.0 6,381.0 6,381.0 6,381.0 9,381.0 6,381.0 E3 - 5

ENCLOSURE3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 CCS Train A Heat Loads and Flows with LOOP and Loss of Train B (sheet 2 of 2)

Unit I Operational Modes Hot Cold Initial Safety LOCA Hot Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Standby 1A (kBTU/hr) 92,479.0 76,406.8 74,065.8 17,720.5 56,220.5 8,933.8 Initial 1A (gpm) N/A N/A____ 6,401.0 6,401.0 9,401.0 1,411.0 6,411.0 1,401.0 Refueling 2A (kBTU/hr) 74,065.8 74,065.8 57,242.8 57,242.8 74,065.8 74,065.8 2A (gpm) 9,381.0 9,381.0 6,381.0 9,381.0 9,381.0 9,381.0 1A (kBTU/hr) 92,479.0 76,406.8 74,065.8 8,933.8 o Safety 1A(gpm) 6,401.0 6,401.0 9,401.0 1,401.0 Injection 2A (kBTU/hr) 17,468.5 17,468.6 645.5 17,468.6 o 2A (gpm) 4,381.0 4,381.0 1,381.0 4,381.0 1A (kBTU/hr) 1- 93,229.8 74,065.8 25,756.8 O LOCA 1A (gpm) 9,401.0 9,401.0 4,401.0 C4 N/A N/A N/A N/A N/A

.Recirc 2A (kBTU/hr) 56,103.6 56,103.6 56,103.6

_ _ _ 2A (gpm) 6,381.0 6,381.0 6,381.0 1A (kBTU/hr) 92,479.0 93,229.8 74,065.8 17,720.5 56,220.5 25,756.8 Hot 1A (gpm) N/A N/A 6,401.0 9,401.0 9,401.0 4,411.0 6,411.0 ____

4,401.0 Standby 2A (kBTU/hr) 25,892.0 9,068.9 9,068.9 9,068.9 25,892.0 9,068.9 2A (gpm) 4,381.0 1,381.0 1,381.0 1,381.0 4,381.0 1,381.0 E3 - 6

ENCLOSURE 3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 CCS Train B Heat Loads and Flows with Offsite Power Available (sheet I of 3)

Unit I Operational Modes Hot Cold Initial Safety LOCA Hot Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Standby 1B (kBTU/hr) 19,766.8 66.8 44,799.4 36,866.8 28,516.8 227.5 27,627.5 66.8 2B (kBTU/hr) 166.8 19,766.0 166.8 166.8 166.8 19,766.0 166.8 19,766.0 Startup_____ B Total 19,933.6 19,832.8 44,966.2 37,033.6 28,683.6 19,993.5 27,794.3 19,832.8 1B (gpm) 5,061.0 1,361.0 5,061.0 5,061.0 5,061.0 1,361.0 5,061.0 1,361.0 2B (gpm) 1,355.0 5,055.0 1,355.0 1,355.0 1,355.0 5,055.0 1,355.0 5,055.0 B Total 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 l B (kBTU/hr) 19,766.8 66.8 44,799.4 36,866.8 28,516.8 227.5 27,627.5 66.8 216 (kBTU/hr) 66.8 66.8 66.8 66.8 66.8 66.8 66.8 66.8

-O B Total 19,833.6 133.6 44,866.2 36,933.6 28,583.6 294.3 27,694.3 133.6 Power 1B (gpm) 5,061.0 1,361.0 5,061.0 5,061.0 5,061.0 1,361.0 5,061.0 1,361.0 0.

O 26 (gpm) 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 CN B Total 6,416.0 2,716.0 6,416.0 6,416.0 6,416.0 2,716.0 6,416.0 2,716.0 1B (kBTU/hr) 166.8 66.8 166.8 166.8 227.5 66.8 26 (kBTU/hr) 44,799.4 44,799.4 44,799.4 44,799.4 44,799.4 44,799.4 Hot B Total 44,966.2 44,866.2 N/A 44,966.2 44,966.2 45,026.9 N/A 44,866.2 Shutdown 1B (gpm) 1,361.0 1,361.0 1,361.0 1,361.0 1,361.0 1,361.0 26 (gpm) 5,055.0 5,055.0 5,055.0 5,055.0 5,055.0 5,055.0 B Total 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 E3 - 7

ENCLOSURE3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 CCS Train B Heat Loads and Flows with Offsite Power Available (sheet 2 of 3)

Unit I Operational Modes Hot Cold Initial Safety LOCA Hot Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Standby 1B (kBTU/hr) 166.8 66.8 44,799.4 36,866.8 166.8 227.5 27,627.5 66.8 2B (kBTU/hr) 36,866.8 36,866.8 166.8 166.8 36,866.8 36,866.8 166.8 36,866.8 Cold B Total 37,033.6 36,933.6 44,966.2 37,033.6 37,033.6 37,094.3 27,794.3 36,933.6 Shutdown 1B (gpm) 1,361.0 1,361.0 5,061.0 5,061.0 1,361.0 1,361.0 5,061.0 1,361.0 2B (gpm) 5,055.0 5,055.0 1,355.0 1,355.0 5,055.0 5,055.0 1,355.0 5,055.0 B Total 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 1B (kBTU/hr) 166.8 66.8 44,799.4 36,866.8 28,516.8 227.5 27,627.5 66;8 2213 (kBTU/hr) 28,516.8 28,516.8 166.8 166.8 166.8 28,516.8 166.8 28,516.8 0

Initial B Total 28,683.6 28,583.6 44,966.2 37,033.6 28,683.6 28,744.3 27,794.3 28,583.6 Refueling 1B 1 (gpm) 1,361.0 1,361.0 5,061.0 5,061.0 5,061.0 1,361.0 5,061.0 1,361.0 O 28 (gpm) 5,055.0 5,055.0 1,355.0 1,355.0 1,355.0 5,055.0 1,355.0 5,055.0 B Total 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 1B (kBTU/hr) 19,766.8 66.8 44,799.4 36,866.8 28,516.8 66.8 28 (kBTU/hr) 227.5 227.5 227.5 227.5 227.5 227.5 Safety B Total 19,994.3 294.3 45,026.9 37,094.3 28,744.3 N/A N/A 294.3 Injection 18 (gpm) 5,061.0 1,361.0 5,061.0 5,061.0 5,061.0 1,361.0 28 (gpm) 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 B Total 6,416.0 2,716.0 6,416.0 6,416.0 6,416.0 2,716.0 E3 - 8

ENCLOSURE3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 CCS Train B Heat Loads and Flows with Offsite Power Available (sheet 3 of 3)

Unit I Operational Modes Hot Cold Initial Safety LOCA Hot Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Standby 1B (kBTU/hr) 166.8 66.8 166.8 166.8 66.8 2B (kBTU/hr) 27,627.5 27,627.5 27,627.5 27,627.5 27,627.5 LOCA B Total 27,794.3 27,694.3 N/A 27,794.3 27,794.3 N/A N/A 27,694.3 CD Recirc ecr 16 (gpm) 1,361.0 1,361.0 1,361.0 1,361.0 1,361.0 0

28 (gpm) 5,055.0 5,055.0 5,055.0 5,055.0 5,055.0 o B Total 6,416.0 6,416.0 6,416.0 6,416.0 6,416.0 1B (kBTU/hr) 19,766.8 66.8 44,799.4 36,866.8 28,516.8 227.5 27,627.5 66.8 O 26 (kBTU/hr) 66.8 66.8 66.8 66.8 66.8 66.8 66.8 66.8 Hot B Total 19,833.6 133.6 44,866.2 36,933.6 28,583.6 294.3 27,694.3 133.6 Standby 16 (gpm) 5,061.0 1,361.0 5,061.0 5,061.0 5,061.0 1,361.0 5,061.0 1,361.0 26 (gpm) 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 B Total 6,416.0 2,716.0 6,416.0 6,416.0 6,416.0 2,716.0 6,416.0 2,716.0 E3 - 9

ENCLOSURE3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 CCS Train B Heat Loads and Flows with LOOP and Loss of Train A (sheet I of 3)

Unit I Operational Modes Hot Cold Initial Safety LOCA Hot Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Standby 1 B (kBTU/hr) 2B (kBTU/hr)

B Total Startup N/A N/A N/A N/A N/A N/A N/A N/A 2B (gpm) 2B (gpm)

B Total 1 B (kBTU/hr) 0 2B (kBTU/hr) o B Total Power N/A N/A N/A N/A N/A N/A N/A N/A 1B (gpm) 0 2B (gpm)

B Total 1B (kBTU/hr) 73,701.9 57,001.9 362.6 201.9 2B (kBTU/hr) 89,432.0 89,432.0 89,432.0 89,432.0 Hot B Total N/A N/A N/A 163,133.9 146,433.9 89,794.6 N/A 89,633.9 Shutdown 1B (gpm) 5,111.0 5,111.0 1,411.0 1,411.0 2B (gpm) 5,055.0 5,055.0 5,055.0 5,055.0 B Total 10,166.0 10,166.0 6,466.0 6,466.0 E3 - 10

ENCLOSURE3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 CCS Train B Heat Loads and Flows with LOOP and Loss of Train A (sheet 2 of 3)

Unit I Operational Modes Hot Cold Initial Safety LOCA Hot Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Standby 1B (kBTU/hr) 89,567.1 73,701.9 57,001.9 362.6 55,162.6 201.9 2B (kBTU/hr) 73,566.8 73,566.8 73,566.8 73,566.8 73,566.8 73,566.8 Cold B Total N/A N/A 163,133.9 147,268.7 130,568.7 ____

73,929.4 128,729.4 73,768.7 Shutdown 1 B (gpm) 5,111.0 5,111.0 5,111.0 1,411.0 5,111.0 1,411.0 2B (gpm) 5,055.0 5,055.0 5,055.0 5,055.0 5,055.0 5,055.0 B Total 10,166.0 10,166.0 10,166.0 6,466.0 10,166.0 6,466.0 1B (kBTU/hr) 89,567.1 73,701.9 57,001.9 362.6 55,162.6 201.9 2B (kBTU/hr) 56,866.8 56,866.8 56,866.8 56,866.8 56,866.8 56,866.8 0 Initial B Total 146,433.9 130,568.7 113,868.7 57,229.4 112,029.4 57,068.7 N/A N/A Refueling 1B (gpm) 5,111.0 5,111.0 5,111.0 1,411.0 5,111.0 1,411.0 S2B (gpm) 5,055.0 5,055.0 5,055.0 5,055.0 5,055.0 5,055.0

  • B Total 10,166.0 10,166.0 10,166.0 6,466.0 10,166.0 6,466.0 1B (kBTU/hr) 89,567.1 73,701.9 57,001.9 201.9 2B (kBTU/hr) 227.5 227.5 227.5 227.5 Safety B Total N/A- N/A NAN/ 89,794.6 73,929.4 57,229.4 N/A

/ 429.4 Injection 1 B (gpm) 5,111.0 5,111.0 5,111.0 1,411.0 2B (gpm) 1,355.0 1,355.0 1,355.0 1,355.0 B Total 6,466.0 6,466.0 6,466.0 2,766.0 E3- 11

ENCLOSURE3 Summary Heat Load and Flow Tables for RAI 9.2 - CSS - 4.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 CCS Train B Heat Loads and Flows with LOOP and Loss of Train A (sheet 3 of 3)

Unit I Operational Modes Hot Cold Initial Safety LOCA Hot Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Standby 1 B (kBTU/hr) 65,351.9 57,001.9 201.9 2B (kBTU/hr) 55,027.5 55,027.5 55,027.5 LOCA B Total 120,379.4 112,029.4 55,229.4

.,a*0 Recirc 1B (gpm) N/A N/A N/A 5,111.0 5,111.0 N/A N/A 1,411.0 2B (gpm) 5,055.0 5,055.0 5,055.0 o B Total 10,166.0 10,166.0 6,466.0

,)

0.

1 B (kBTU/hr) 89,567.1 73,701.9 57,001.9 362.6 55,162.6 201.9 o 2B (kBTU/hr) 166.8 166.8 166.8 166.8 166.8 166.8 Hot B Total 89,733.9 73,868.7 57,168.7 529.4 55,329.4 368.7 Standby 1B (gpm) 5,111.0 5,111.0 5,111.0 1,411.0 5,111.0 1,411.0 2B (gpm) 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 1,355.0 B Total 6,466.0 6,466.0 6,466.0 2,766.0 6,466.0 2,766.0 E3 - 12

ENCLOSURE5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ESSENTIAL RAW COOLING WATER SYSTEM INDIVIDUAL LOADS (sheet I of 2)

Heat Load Flow Equipment (KBTUlhr) (gpm)

Motor Driven Pump 0.0 445.0 Turbine Driven Pump 0.0 780.0 Electric Board Room A/C 2,496.0 370.0 Main Control Room A/C 2,496.0 293.0 Shutdown Board Room A/C 2,971.0 560.0 Aux Control Air Compressor 60.5 3.5 Comp Cooling Heat Exchanger 0.0 Variable Surge Tank 0.0 Variable Containment Spray Heat Exchanger 116,400.0 5,200.0 Cooling Water Pump negligible 6.0 Prelube Pump 0.0 0.8 Screen Wash Pump Prelube 0.0 10.0 Strainer (Backwash/Flush) 0.0 N/A Ice Machine Package ChIr (Flood Mode Only) 3,000.0 220.0 RCP Motor Cooler 880.7 110.0 RCP Thermal Barrier (Flood Mode Only) 0.0 40.0 RHR Heat Exchanger (Flood Mode Only) 37,400.0 5,000.0 Station Air Compressor A, B, C (Aftercoolers) 173.1 12.4 Station Air Compressor D 368.1 96.3 Diesel Generator Hxs 7,125.0 1,300.0 Spent Fuel Pool Heat Exchanger (Flood Mode Only) 11,940.0 3,000.0 Gross Failed Fuel Detector 0.0 14.0 Hot Sample Chiller (Flood Mode Only) 60.0 20.0 Sample Heat Exchanger A (Flood Mode Only) 0.0 20.0 Sample Heat Exchanger B (Flood Mode Only) 0.0 28.0 E5 - 1

ENCLOSURE5-Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ESSENTIAL RAW COOLING WATER SYSTEM INDIVIDUAL LOADS (sheet 2 of 2)

Heat Load Flow Equipment (KBTUIhr) (gpm)

Sample Heat Exchanger C (Flood Mode Only) 0.0 20.0 Titration Room (Flood Mode Only) 60.0 145.0 AFW & BATP Space Cooler 298.0 60.0 AFW & CCS Pump Space Cooler 592.6 102.0 Containment Spray Pump Room Cooler 163.2 28.0 CVCS CCP Room Cooler 123.0 25.0 CVCS RCP Room Cooler 57.5 12.0 EGTS Room Cooler 49.0 10.0 RB Instrument Room Water Chiller 105.0 30.0 Penetration Room Cooler 1 (Unit 1) 59.5 12.0 Penetration Room Cooler 1 (Unit 2) 56.5 12.0 Penetration Room Cooler 2 (El 713) Unit 1 & 2 52.5 11.0 Penetration Room Cooler 3 (El 737) Unit 1 & 2 58.0 12.0 Pipe Chase Cooler 72.0 15.0 RHR Pump Room Cooler 92.5 19.0 SFPCS & TBBP Space Cooler 141.5 29.0 SIS Pump Room Cooler 105.0 22.0 Control Rod Drive Mechanism Cooler 1,934.4 124.0 Lower Containment Vent Cooler 2,262.4 306.0 Upper Containment Vent Cooler 210.8 23.0 Station Air Compressors A, B, C (Cylinder) 205.7 16.5 E5 - 2

ENCLOSURE5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train A Heat Loads and Flows with Offsite Power Available (sheet 1 of 4)

Unit I Operational Modes Hot Cold Initial Safety LOCA Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc CCS A (kBTU/hr) 60,910 30,300 49,377 56,860 46,046 22,521 28,956 28,487 CCS B (kBTU/hr) 63,675 44,075 80,499 63,675 63,675 44,075 80,499 44,075 Other (kBTU/hr) 29,387 29,387 28,506 23,756 23,756 59,078 165,064 29,387 Total Load 153,972 103,762 158,382 144,291 133,477 125,674 274,519 101,949 Startup CCS A (gpm) 5,850 3,330 6,650 6,200 4,560 1,810 2,900 3,190 (U

CCS B (gpm) 5,850 5,850 5,850 5,850 5,850 5,850 5,850 5,850 0

Other (gpm) 4,148 4,148 4,038 3,680 3,680 6,740 10,842 4,148

.2 0 Total Flow 15,848 13,328 16,538 15,730 14,090 14,400 19,592 13,188 CCS A (kBTU/hr) 44,087 30,300 49,377 40,037 46,046 22,521 28,956 11,664 00.

.64 CCS B (kBTU/hr) 30,289 13,465 30,289 30,289 13,465 13,465 30,289 30,289 Other (kBTU/hr) 29,436 29,436 28,555 23,805 23,805 59,127 165,113 29,436 Total Load 103,812 73,201 108,221 94,131 83,316 95,113 224,358 71,389 Power CCS A (gpm) 5,850 3,330 6,650 6,200 4,560 1,810 2,900 3,190 CCS B (gpm) 3,330 3,330 3,330 3,330 3,330 3,330 3,330 3,330 Other (gpm) 4,158 4,158 4,048 3,690 3,690 6,750 10,852 4,158 Total Flow 13,338! 10,818 14,028 13,2201 11,5801 11,8901 17,082 10,678 E5 - 3

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train A Heat Loads and Flows with Offsite Power Available (sheet 2 of 4)

Unit I Operational Modes Op MModee CCS CTi Train Startup tShutdown Power Hot Cold Shutdown Initial Refueling Safety Injection LOCA Recirc Hot Standby H

CCS A (kBTU/hr) 80,510 30,300 93,560 74,396 22,521 28,487 CCS B (kBTU/hr) 49,365 49,365 49,365 49,365 49,365 49,365 Other (kBTU/hr) 28,555 28,555 22,925 22,925 58,246 28,555 Hot Total Load 158,430 108,220 165,850 146,686 130,132 106,407 N/A N/A Shutdown CCS A (gpm) 5,850 3,330 6,200 4,560 1,810 3,190 CCS B (gpm) 6,650 6,650 6,650 6,650 6,650 6,650 0

Other (gpm) 4,048 4,048 3,580 3,580 6,640 4,048 Total Flow 16,548 14,028 16,430 14,790 15,100 13,888 CD CL CCS A (kBTU/hr) 80,510 30,300 49,377 56,860 74,396 22,521 28,956 28,487 0.

CCS B (kBTU/hr) 40,025 40,025 93,549 76,725 40,025 40,025 93,548 40,025 Other (kBTU/hr) 23,805 23,805 22,925 18,175 18,175 53,497 159,483 23,805 Cold Total Load 144,340 94,130 165,851 151,760 132,596 116,043 281,987 92,317 Shutdown CCS A (gpm) 5,850 3,330 6,650 6,200 4,560 1,810 2,900 3,190 CCS B (gpm) 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 Other (gpm) 3,690 3,690 3,580 3,222 3,222 6,282 10,384 3,690 Total Flow 15,740 13,220 16,430 15,622 13,982 14,292 19,4841 13,080 E5 - 4

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train A Heat Loads and Flows with Offsite Power Available (sheet 3 of 4)

Unit I Operational Modes Hot Cold Initial Safety LOCA HoStnb Op Mode CCS Train Startup Power Ho.od Iiia aey LC Hot Standby Shutdown Shutdown Refueling Injection Recirc CCS A (kBTU/hr) 63,687 13,477 49,377 40,037 46,046 5,698 28,956 11,664 CCS B (kBTU/hr) 46,034 46,035 74,384 74,385 57,562 46,034 74,384 46,034 Other (kBTU/hr) 23,805 23,805 22,925 18,175 18,175 53,497 159,483 23,805 Initial Total Load 133,526 83,317 146,686 132,597 121,783 105,229 262,823 81,503 Refueling CCS A (gpm) 5,850 3,330 6,650 6,200 4,560 1,810 2,900 3,190 W

0 CCS B (gpm) 4,560 4,560 4,560 4,560 4,560 4,560 4,560 4,560 Other (gpm) 3,690 3,690 3,580 3,222 3,222 6,282 10,384 3,690 0

Total Flow 14,100 11,580 14,790 13,982 12,342 12,652 17,844 11,440 CCS A (kBTU/hr) 44,087 30,300 49,377 40,037 46,046 11,664 0.

0m CCS B (kBTU/hr) 22,269 5,446 22,269 22,269 5,446 22,269 Other (kBTU/hr) 30,191 30,191 29,310 24,561 24,561 30,191 Total Load 96,547 65,937 100,956 86,867 76,053 64,124 Safety Injection N/A N/A CCS A (gpm) 5,850 3,330 6,650 6,200 4,560 3,190 CCS B (gpm) 1,810 1,810 1,810 1,810 1,810 1,810 Other (gpm) 6,750 6,750 6,640 6,282 6,282 6,750 Total Flow 14,410 11,890 15,100 14,292 12,652 11,750 E5 - 5

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Wafts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train A Heat Loads and Flows with Offsite Power Available (sheet 4 of 4)

Unit I Operational Modes Hot Cold Initial Safety LOCA Op Mode CCS Train Startup Power Shutdown Shutdown Refueling Injection Recirc Hot Standby CCS A (kBTU/hr) 80,510 30,300 93,560 74,396 28,487 CCS B (kBTU/hr) 28,704 28,704 28,704 28,704 28,704 Other (kBTU/hr) 136,177 136,177 130,547 130,547 136,177 LOCA Total Load 245,391 195,181 252,811 233,647 193,368 ReicN/A N/A N/A Recirc CCS A (gpm) 5,850 3,330 6,200 4,560 3,190 U)

U) CCS B (gpm) 2,900 2,900 2,900 2,900 2,900 0

Other (gpm) 10,852 10,852 10,384 10,384 10,852 0 Total Flow 19,602 17,082 19,484 17,844 16,942 (U

4-CCS A (kBTU/hr) 44,087 30,300 49,377 40,037 46,046 22,521 28,956 28,487 0.

N CCS B (kBTU/hr) 28,476 11,652 28,476 28,476 11,652 11,652 28,476 11,652 4-Other (kBTU/hr) 29,436 29,436 28,555 23,805 23,805 59,127 165,113 29,436

  • ----- JL Total Load 101,999 71,388 106,408 92,318 81,503 93,300 222,545 69,575 Hnmt T2nlllIIII tf*I Hot J CCS A (gpm) 5,850 3,330 6,650 6,200 4,560 1,810 2,900 3,190 CCS B (gpm) 3,190 3,190 3,190 3,190 3,190 3,190 3,190 3,190 Other (gpm) 4,158 4,158 4,048 3,690 3,690 6,750 10,852 4,158 Total Flow 13,198 10,678 13,888 13,080 11,440 11,750 16,942 10,538 E5 - 6

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train A Heat Loads and Flows with LOOP and Loss of Train B (sheet I of 4)

V Unit I Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS A (kBTU/hr)

CCS B (kBTU/hr)

Other (kBTU/hr)

Total Load Startup N/A N/A N/A N/A N/A N/A N/A N/A CCS A (gpm) 0 CCS B (gpm) 2 Other (gpm) 0 Total Flow 0

r-CCS A (kBTU/hr) 0.

0 CCS B (kBTU/hr)

N Other (kBTU/hr)

Total Load Power N/A N/A N/A N/A N/A N/A N/A N/A CCS A (gpm)

CCS B (gpm)

Other (gpm)

Total Flow I I. I & L L A. 1. L .1 E5 - 7

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train A Heat Loads and Flows with LOOP and Loss of Train B (sheet 2 of 4)

Unit I Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS A (kBTU/hr) 93,230 74,066 17,721 25,757 CCS B (kBTU/hr) 92,479 92,479 92,479 92,479 Other (kBTU/hr) 51,648 51,648 55,517 55,517 Total Load Hot ShtonN/A 237,357 218,193 165,716 173,752 N/A N/A N/A Shutdown CCS A (gpm) 5,650 5,000 1,430 2,740

4) CCS B (gpm) 6,900 6,900 6,900 6,900 0

Other (gpm) 6,828 6,828 7,068 7,076 0 Total Flow 19,378 18,728 15,398 16,716 CL CCS A (kBTU/hr) 92,479 93,230 74,066 17,721 56,221 25,757 0.

04 CCS B (kBTU/hr) 93,230 76,407 76,407 76,407 93,230 76,407 Other (kBTU/hr) 51,648 47,779 47,779 51,648 159,817 51,648 Total Load 237,357 217,416 198,252 145,775 309,267 153,811 Cold N/A N/A Shutdown CCS A (gpm) 6,900 5,650 5,000 1,430 4,400 2,740 CCS B (gpm) 5,850 5,850 5,850 5,850 5,850 5,850 Other (gpm) 6,828 6,580 6,580 6,820 11,188 6,828 Total Flow 19,578 18,080 17,430 14,100 21,438 15,418 E5 - 8

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train A Heat Loads and Flows with LOOP and Loss of Train B (sheet 3 of 4)

Unit I Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS A (kBTU/hr) 92,479 76,407 74,066 17,721 56,221 8,934 CCS B (kBTU/hr) 74,066 74,066 57,243 57,243 74,066 74,066 Other (kBTU/hr) 51,648 47,779 47,779 51,648 159,817 51,648 Initial Total Load 218,193 198,252 179,088 126,611 290,103 134,647 N/A N/A _____

Refueling CCS A (gpm) 6,900 5,650 5,000 1,430 4,400 2,740 U) 10 CCS B (gpm) 5,000 5,000 5,000 5,000 5,000 5,000 0

Other (gpm) 6,828 6,580 6,580 6,820 11,188 6,828 C

Total Flow 18,728 1 17,230 16,580 13,250 20,588 14,568 a--

0. CCS A (kBTU/hr) 92,479 76,407 74,066 8,934 0Og~ CCS B (kBTU/hr) 17,469 17,469 646 17,469 Other (kBTU/hr) 55,517 51,648 51,648 55,517 Safety Total Load 165,464 145,523 126,359 81,919 N/A N/A N/A N/A Injection CCS A (gpm) 6,900 5,650 5,000 2,740 CCS B (gpm) 1,430 1,430 1,430 1,430 Other (gpm) 7,068 6,820 6,820 7,068 Total Flow 15,398 13,900 13,250 11,238

-~ A A A A A A I A I E5 - 9

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train A Heat Loads and Flows with LOOP and Loss of Train B (sheet 4 of 4)

Y Unit I Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS A (kBTU/hr) 93,230 74,066 25,757 CCS B (kBTU/hr) 56,104 56,104 56,104 Other (kBTU/hr) 159,817 159,817 163,685 LOCA Total Load 309,150 289,986 245,546 ReicN/A N/A N/A N/A N/A Recirc CCS A (gpm) 5,650 5,000 2,740 CCS B (gpm) 4,400 4,400 4,400 V Other (gpm) 11,188 11,188 11,436 0

Total Flow 21,238 20,588 18,576 0 CCS A (kBTU/hr) 92,479 93,230 74,066 17,721 56,221 25,757 00.

CCS B (kBTU/hr) 25,892 9,069 9,069 9,069 25,892 9,069 C,'

Other (kBTU/hr) 55,517 51,648 51,648 55,517 163,685 55,517 Hot Total Load 173,888 153,947 134,783 82,306 245,798 90,342 N/A N/A Standby CCS A (gpm) 6,900 5,650 5,000 1,430 4,400 2,740 CCS B (gpm) 2,740 2,740 2,740 2,740 2,740 2,740 Other (gpm) 7,076 6,828 6,828 7,068 11,436 7,076 Total Flow 16,716 15,218 14,568 11,238 18,576 12,556 I & I L L L _______ _______ L £ .1 E5 - 10

ENCLOSURE5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train B Heat Loads and Flows with Offsite Power Available (sheet I of 3)

Unit 1 Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS C (kBTU/hr) 19,934 19,833 44,966 37,034 28,684 19,994 27,794 19,833 Other (kBTU/hr) 29,444 29,444 29,444 23,814 23,814 59,136 165,121 29,444 Total Load 49,378 49,277 74,410 60,848 52,498 79,130 192,915 49,277 Startup_____CCS C (gpm) 1,630 1,620 6,000 3,870 3,220 1,630 2,630 1,620 Other (gpm) 3,977 3,977 3,855 3,497 3,497 6,557 10,659 3,977 Total Flow 5,607 5,597 9,855 7,367 6,717 8,187 13,289 5,597 W

CD V

CCS C (kBTU/hr) 19,834 134 44,866 36,934 28,584 294 27,694 134 Other (kBTU/hr) 29,493 29,493 29,493 23,863 23,863 59,185 165,170 29,493 Total Load 49,327 29,627 74,359 60,797 52,447 59,479 192,864 29,627 Power 0 CCS C (gpm) 1,620 48 6,000 3,860 4,040 24 2,620 28 Other (gpm) 3,987 3,987 3,865 3,507 3,507 6,567 10,669 3,987 Total Flow 5,607 4,035 9,865 7,367 7,547 6,591 13,289 4,015 CCS C (kBTU/hr) 44,966 44,866 44,966 44,966 45,027 44,866 Other (kBTU/hr) 28,555 28,555 22,925 22,925 58,246 28,555 Hot Total Load 73,521 73,421 67,891 67,891 103,273 73,421 Shutdown N/A N/A CCS C (gpm) 6,000 6,000 6,000 6,000 6,000 6,000 Other (gpm) 3,877 3,877 3,397 3,397 6,457 3,877 Total Flow 9,877 9,877 9,397 9,397 12,457 9,877

-& I. I. 1. £ £ .1 £ I E5- 11

ENCLOSURE5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train B Heat Loads and Flows with Offsite Power Available (sheet 2 of 3)

Unit I Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS C (kBTU/hr) 37,034 36,934 44,966 37,034 37,034 37,094 27,794 36,934 Other (kBTU/hr) 23,805 23,805 23,805 18,175 18,175 53,497 159,483 23,805 Cold Total Load 60,839 60,739 68,771 55,209 55,209 90,591 187,277 60,739 Shutdown CCS C (gpm) 3,870 3,860 6,000 3,870 3,220 3,870 2,630 3,860 Other (gpm) 3,519 3,519 3,397 3,039 3,039 6,099 10,201 3,519 Total Flow 7,389 7,379 9,397 6,909 6,259 9,969 12,831 7,379 a) 0 CCS C (kBTU/hr) 28,684 28,584 44,966 37,034 28,684 28,744 27,794 28,584 Other (kBTU/hr) 23,805 23,805 23,805 18,175 18,175 53,497 159,483 23,805 0 Initial Total Load 52,489 52,389 68,771 55,209 46,859 82,241 187,277 52,389 Refueling CCS C (gpm) 3,220 3,210 6,000 3,870 3,220 3,220 2,630 3,210 CL

00. Other (gpm) 3,519 3,519 3,397 3,039 3,039 6,099 10,201 3,519 N-Total Flow 6,739 6,729 9,397 6,909 6,259 9,319 12,831 6,729 CCS C (kBTU/hr) 19,994 294 45,027 37,094 28,744 294 Other (kBTU/hr) 30,191 30,191 30,191 24,561 24,561 30,191 Safety Total Load 50,185 30,485 75,218 61,655 53,305 30,485 N/A N/A Injection CCS C (gpm) 1,630 60 6,000 3,910 3,220 86 Other (gpm) 6,579 6,579 6,457 6,099 6,099 6,579 Total Flow 8,209 6,639 12,457 10,009 9,319 6,665

& &~-& __________ £ __________ A E5 - 12

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train B Heat Loads and Flows with Offsite Power Available (sheet 3 of 3)

Unit 1 Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS C (kBTU/hr) 27,794 27,694 27,794 27,794 27,694 Other (kBTU/hr) 136,177 136,177 130,547 130,547 136,177 LOCA SN/A Total Load 163,971 163,871 158,341 158,341 N/A N/A 163,871 D Recirc CCS C (gpm) 2,630 2,620 2,630 2,630 2,620 Other (gpm) 10,681 10,681 10,201 10,201 10,681 o Total Flow 13,311 13,301 12,831 12,831 13,301 CCS C (kBTU/hr) 19,834 134 44,866 36,934 28,584 294 27,694 134 O Other (kBTU/hr) 29,493 29,493 29,493 23,863 23,863 59,185 165,170 29,493 Hot Total Load 49,327 29,627 74,359 60,797 52,447 59,479 192,864 29,627 Standby CCS C (gpm) 1,620 28 6,000 3,890 4,040 24 3,150 28 Other (gpm) 3,987 3,987 3,865 3,507 3,507 6,567 10,669 3,987 I

Total Flow 5,607 4,015 9,865 7,397 7,547 6,591 13,819 4,015 E5 - 13

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train B Heat Loads and Flows with LOOP and Loss of Train A (sheet 1 of 4)

Unit 1 Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS A (kBTU/hr)

CCS C (kBTU/hr)

Other (kBTU/hr)

Total Load Startup N/A N/A N/A N/A N/A N/A N/A N/A CCS A (gpm)

U) 0" V CCS C (gpm) 0 Other (gpm)

Total Flow I-

0. CCS A (kBTU/hr) 0 CCS C (kBTU/hr)

C.I Other (kBTU/hr)

Total Load Power N/A N/A N/A N/A N/A N/A N/A N/A CCS A (gpm)

CCS C (gpm)

Other (gpm)

Total Flow

a. a. a. a. a. a. a E5 - 14

ENCLOSURE5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train B Heat Loads and Flows with LOOP and Loss of Train A (sheet 2 of 4)

Unit I Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS A (kBTU/hr) 16,823 16,823 16,823 16,823 CCS C (kBTU/hr) 163,134 146,434 89,795 89,634 Other (kBTU/hr) 51,705 51,705 55,574 55,574 Total Load Hot ShtonN/A 231,662 214,962 162,192 162,031 N/A N/A N/A Shutdown CCS A (gpm) 1,340 1,340 1i,340 1,340 U)

CCS C (gpm) 10,700 10,700 9,500 9,750 Other (gpm) 6,828 6,828 7,068 7,088 (0

Total Flow 18,868 18,868 17,908 18,178 (0

CCS A (kBTU/hr) 16,823 16,823 16,823 16,823 16,823 16,823 0 CCS C (kBTU/hr) 163,134 147,269 130,569 73,929 128,729 73,769 6,~

Other (kBTU/hr) 51,705 47,837 47,837 51,705 159,874 51,705 Total Load 231,662 211,928 195,228 142,458 305,427 142,297 Cold N/A N/A Shutdown CCS A (gpm) 1,340 1,340 1,340 1,340 1,340 1,340 CCS C (gpm) 10,700 10,000 10,600 6,030 8,800 6,020 Other (gpm) 6,828 6,580 6,580 6,820 11,188 6,840 Total Flow 18,868 17,920 18,520 14,190 21,328 14,200 E5 - 15

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train B Heat Loads and Flows with LOOP and Loss of Train A (sheet 3 of 4)

Unit I Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS A (kBTU/hr) 16,823 16,823 16,823 16,823 16,823 16,823 CCS C (kBTU/hr) 146,434 130,569 113,869 57,229 112,029 57,069 Other (kBTU/hr) 51,705 47,837 47,837 51,705 159,874 51,705 Initial Total Load 214,962 195,228 178,528 125,758 288,727 125,597 N/A N/A _____

Refueling CCS A (gpm) 1,340 1,340 1,340 1,340 1,340 1,340 "o

CCS C (gpm) 10,700 10,600 10,300 6,300.0 8,800 6,850 0

Other (gpm) 6,828 6,580 6,580 6,820 11,188 6,840 0 Total Flow 18,868 18,520 18,220 14,460 21,328 15,030 C

CCS A (kBTU/hr) 16,823 16,823 16,823 16,823 0.

CCS C (kBTU/hr) 89,795 73,929 57,229 429 N

Other (kBTU/hr) 55,574 51,705 51,705 55,574 Total Load 162,192 142,458 125,758 72,827 Safety N/A N/A N/A N/A Injection CCS A (gpm) 1,340 1,340 1,340 1,340 CCS C (gpm) 9,500 6,030 6,030 120 Other (gpm) 7,068 6,820 6,820 7,080 Total Flow 17,908 14,190 14,460 8,540 a a a a -

E5 - 16

ENCLOSURE 5 Summary Heat Load and Flow Tables for RAI 9.2.1 - ERCW - 3.

Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 ERCW Train B Heat Loads and Flows with LOOP and Loss of Train A (sheet 4 of 4)

Unit I Operational Modes ERCW Loads and Hot Cold Initial Safety LOCA Hot Op Mode Flows Startup Power Shutdown Shutdown Refueling Injection Recirc Standby CCS A (kBTU/hr) 16,823 16,823 16,823 CCS C (kBTU/hr) 120,379 112,029 55,229 Other (kBTU/hr) 159,874 159,874 163,743 LOCA Total Load 297,077 288,727 235,795 Recirc N/A N/A N/A N/A N/A CCS A (gpm) 1,340 1,340 1,340 U)

CCS C (gpm) 7,125 7,125 4,500 0

Other (gpm) 11,188 11,188 11,448 0 Total Flow 19,653 19,653 17,288 CCS A (kBTU/hr) 16,823 16,823 16,823 16,823 16,823 16,823 0.

CCS C (kBTU/hr) 89,734 73,869 57,169 529 55,329 369 CM, Other (kBTU/hr) 55,574 51,705 51,705 55,574 163,743 55,574 Hot Total Load 162,131 142,397 125,697 72,927 235,895 72,766 Standby N/A N/A CCS A (gpm) 1,340 1,340 1,340 1,340 1,340 1,340 CCS C (gpm) 9,750 6,020 6,850 110 4,510 75 Other (gpm) 7,076 6,828 6,828 7,068 11,436 7,088 Total Flow 18,166 14,188 15,018 8,518 17,286 8,503 E5 - 17