Other: ML102150123, ML102150124, ML102150125, ML102150126, ML102150127, ML102150128, NRC-09-0022, Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification, NRC-10-0006, Drawing EDP-35621.B006, Rev. a, Document Schematic Diagram, 4160V Ess Buses 65E & 65F, Load Shedding Strings, NRC-10-0006, Drawing EDP-35621.B006, Rev. a, Document Schematic Diagram, 4160V Ess Buses 65E & 65F, Load Shedding Strings.
|
MONTHYEARNRC-09-0022, Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification2009-06-10010 June 2009 Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification Project stage: Other ML0919504402009-07-13013 July 2009 Proposed LAR to Revise Degraded Voltage Function Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification - ME1477 Project stage: Approval ML0920902312009-07-27027 July 2009 Email Fermi 2 LAR - Degraded Voltage Function - ME1477 Project stage: Approval ML0930702942009-09-16016 September 2009 Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification Project stage: Response to RAI ML0934900042009-12-14014 December 2009 E-mail to A. Hassoun and R. W. Johnson - LAR to Revise Degraded Voltage Function Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification Project stage: Approval ML1003506682010-02-24024 February 2010 RAI, Amendment Request to Revise the Degraded Voltage Function in the TS Table 3.3.8.1-1, ME1477 Project stage: RAI ML1021501232010-07-14014 July 2010 Design Calculation Cover Sheet, DC-0919 Vol 1 DCD 1, Rev. 0, Undervoltage Relays Setpoints Project stage: Other ML1021501262010-07-23023 July 2010 Drawing EDP-35621.B011, Rev. a, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Busses 65E & 13EC Project stage: Other NRC-10-0006, Drawing EDP-35621.B006, Rev. a, Document Schematic Diagram, 4160V Ess Buses 65E & 65F, Load Shedding Strings2010-07-23023 July 2010 Drawing EDP-35621.B006, Rev. a, Document Schematic Diagram, 4160V Ess Buses 65E & 65F, Load Shedding Strings Project stage: Other NRC-10-0006, Drawing EDP-35621.B006, Rev. a, Document Schematic Diagram, 4160V Ess Buses 65E & 65F, Load Shedding Strings.2010-07-23023 July 2010 Drawing EDP-35621.B006, Rev. a, Document Schematic Diagram, 4160V Ess Buses #65E & 65F, Load Shedding Strings. Project stage: Other ML1021501242010-07-23023 July 2010 Drawing EDP-35621.B009, Rev. a, Functional Logic Diagram, Operation of Power Line Feed & Tie Breakers, 4160V Buses 64B & 11EA Project stage: Other ML1021501252010-07-23023 July 2010 Drawing EDP-35621.B010, Rev. a, Functional Logic Diagram. Operation of Power Line Feed & Tie Breakers, 4160V Busses 64C & 12EB Project stage: Other ML1021501272010-07-23023 July 2010 Drawing EDP-35621.B012, Rev. a, Functional Logic Diagram, Operation of Power Line Feed & Tie Breaker 4160V Buses 65F & 14ED Project stage: Other ML1021501282010-07-23023 July 2010 Drawing EDP-35621.B005, Rev. a, Document Schematic Diagram, 4160V Ess Buses 64B & 64C - Load Shedding Strings Project stage: Other ML1021404292010-07-23023 July 2010 Response to Request for Additional Information Regarding the Proposed License Amendment to Revise the Degraded Voltage Function Requirements of Technical Specification Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification Project stage: Response to RAI ML1027701152010-09-27027 September 2010 Degraded Voltage Setpoint As-Found Values Project stage: Request NRC-10-0073, Transmittal of Revised Design Calculations for Setpoint Evaluation of Degraded Voltage Functions in Technical Specification Table 3.3.8.1-12010-10-0404 October 2010 Transmittal of Revised Design Calculations for Setpoint Evaluation of Degraded Voltage Functions in Technical Specification Table 3.3.8.1-1 Project stage: Request ML1027703822010-10-20020 October 2010 Issuance of Amendment to Revise Degraded Voltage Function to Reflect Modification Project stage: Approval 2010-10-20
[Table View] |
Similar Documents at Fermi |
|---|
|
Text
From:
Chawla, Mahesh Sent:
Monday, July 13, 2009 4:52 PM To:
Alan I Hassoun Cc:
James, Lois; Wilson, George; Goel, Vijay; Elliott, Robert; Lewin, Aron
Subject:
Fermi 2 - Proposed LAR to Revise Degraded Voltage Function Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification - ME1477 By letter dated June 10, 2009 (ADAMS Accession No. ML091680379), Detroit Edison submitted a license amendment for Fermi 2 Nuclear Power Plant (Fermi 2). The proposed amendment would revise the degraded voltage function requirements of Technical Specifications Table 3.3.8.1-1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me at (301) 415-8371.
Mahesh Chawla Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
Fermi 2 - Proposed LAR to Revise Degraded Voltage Function Requirements of TS Table 3.3.8.1-1 to Reflect Undervoltage Backfit Modification - ME1477 Sent Date: 7/13/2009 4:45:59 PM Received Date: 7/13/2009 4:52:00 PM From: Chawla, Mahesh
Created By: Mahesh.Chawla@nrc.gov Recipients:
hassouna@dteenergy.com (Alan I Hassoun)
Tracking Status: None Lois.James@nrc.gov (James, Lois)
Tracking Status: None George.Wilson@nrc.gov (Wilson, George)
Tracking Status: None Vijay.Goel@nrc.gov (Goel, Vijay)
Tracking Status: None Robert.Elliott@nrc.gov (Elliott, Robert)
Tracking Status: None Aron.Lewin@nrc.gov (Lewin, Aron)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 11557 7/13/2009 Options Expiration Date: