MONTHYEARML0903604922009-01-29029 January 2009 R. E. Ginna Nuclear Power Plant - Relief Request No. 23: Fourth Interval ISI Program Category B-P Exams - 10 Year Class 1 Leakage Exam Project stage: Request ML0903501872009-02-0404 February 2009 Acceptance Review for Ginna Relief Request No. 23 Project stage: Acceptance Review ML0909000452009-04-0505 April 2009 Relief Request No. 23 on End-of-Interval System Pressure Test for Class 1 Components-R.E. Ginna Nuclear Power Plant Project stage: Other ML0912702592009-05-18018 May 2009 Relief Request No. 23 Fourth Interval ISI Program Category B-P Exams - 10 Year Class 1 Leakage Exam - R.E. Ginna Nuclear Power Plant Project stage: Other 2009-02-04
[Table View] |
Similar Documents at Ginna |
---|
Category:Code Relief or Alternative
MONTHYEARML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24045A2892024-02-14014 February 2024 R. E. Ginna Nuclear Power Plant Acceptance Review: IST Relief Request for B Auxiliary Feedwater Pump ML23073A3682023-03-16016 March 2023 Authorization and Safety Evaluation for Proposed Alternative I6R-10, Revision 0 Related to the Steam Generators, RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. ML21250A3822021-09-29029 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request I6R-06 Alternate Inspection for Reactor Vessel Internals ML21246A1062021-09-22022 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Alternative Request GR-03, Valve Position Verification Testing Extension Sixth 10-Year Inservice Testing Program Interval ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21117A0312021-04-26026 April 2021 Verbal Authorization by the NRC NRR for 10 CFR 50.55a Alternative Request Position Verification Testing Extension - Exelon Generation, R. E. Ginna Nuclear Power Plant ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20090D2912020-06-0202 June 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-02 for the Sixth 10-Year Inservice Inspection Interval (EPID L-2019-LLR-0071). Supersedes ML20056D559 ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations ML20055F8862020-03-13013 March 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-01 for the Sixth 10-Year Inservice Inspection Interval RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19205A4532019-08-0505 August 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives PR-01 and PR-02 for Sixth 10-Year Inservice Testing Program ML19205A3532019-08-0505 August 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives GR-01, VR-01, and VR-02 for the Sixth 10-Year Inservice Testing Program (EPID L-2018-LLR-0382; EPID L-2018-LLR-0383) ML19177A2182019-06-26026 June 2019 R. E. Ginna Nuclear Power Plant - Relief Request Associated with Snubber Inservice Testing Program for the Sixth Ten-Year Interval ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19100A0042019-04-22022 April 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request ISI-18 Regarding Fifth 10-Year Inservice Inspection Program Interval JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds ML18347B0362018-12-13013 December 2018 Relief Requests Associated with Sixth Ten-Year Lnservice Testing Interval JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 ML17297A5242017-11-0606 November 2017 R. E. Ginna - Request for Use of a Portion of a Later Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (CAC Nos. MG0079-MG0083; EPID L-2017-LLR-0061) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16138A0212016-05-19019 May 2016 Proposed Alternative to Use Code Case N-789 (CAC Nos. MF7018-MF7022) ML12264A5912012-09-18018 September 2012 Supplemental Information for Relief Request Number ISI-09 R. E. Ginna Nuclear Power Plant - Fifth Interval Inservice Inspection Program Proposed Alternative in Accordance with 10 CFR 50.55a (a)(3)(ii) Component Cooling Water 1 Inch Half-Cou ML12254A3782012-09-0606 September 2012 Relief Request Number ISI-09 - Fifth Interval Inservice Inspection Program Proposed Alternative in Accordance with 10 CFR 50.55a (a)(3)(ii) Component Cooling Water 1 Inch Half-Coupling Weld Leak ML12158A1152012-06-22022 June 2012 Inservice Inspections Program Relief Request Nos. ISI-02 and ISI-03 ML0920802292009-07-31031 July 2009 R. E. Ginna, Safety Evaluation for Relief Request No. 18, Reactor Vessel Weld Examination Extension ML0909000452009-04-0505 April 2009 Relief Request No. 23 on End-of-Interval System Pressure Test for Class 1 Components-R.E. Ginna Nuclear Power Plant ML0903501872009-02-0404 February 2009 Acceptance Review for Ginna Relief Request No. 23 ML0828800322008-10-0303 October 2008 Fourth Ten-Year Interval Inservice Inspection Program, Re-submittal of Relief Request Number 18 ML0617401562006-07-19019 July 2006 Relief Request No. PR-3 Regarding Testing of Auxiliary Feedwater Pumps ML0612805002006-05-0101 May 2006 R. E. Ginna Response to Request for Additional Information Regarding Relief Request PR-3 ML0507300162005-04-12012 April 2005 R. E. Ginna, Relief, Request 17 for the Fourth 10-Year Interval of the Inservice Inspection Program, MC5406 ML0435601532004-12-15015 December 2004 Fourth Ten-Year Interval in Service Inspection Program Submittal of Relief Request Number 17 Related to Appendix Viii, Supplement 10, PDI Program Alternative Requirements R. E. Ginna Nuclear Power Plant ML0424507782004-10-19019 October 2004 R. E. Ginna Nuclear Power Plant Relief Requests VR-1, VR-2 and VR-13 for the Fourth 10-Year Interval of the Pump and Valve Inservice Testing Program ML0330401202003-11-21021 November 2003 R. E. Ginna Nuclear Power Plant, Relief Request Review, Inservice Testing Program Relief Requests VR-4 and VR-8 ML0329603222003-10-20020 October 2003 Submittal of Relief Request VR-4 Related to the Requirements of 10CFR50.55a(f), Inservice Testing Requirements. ML0304202642003-02-10010 February 2003 R. E. Ginna Nuclear Power Plant, Relief, Inservice Testing Program Relief Request PR-2, MB7232 ML0314205202003-01-0909 January 2003 Enclosure - R.E. Ginna, Inservice Testing Program Relief Request PR-2 2024-07-23
[Table view] Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] Category:Safety Evaluation
MONTHYEARML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23073A3682023-03-16016 March 2023 Authorization and Safety Evaluation for Proposed Alternative I6R-10, Revision 0 Related to the Steam Generators, ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22094A1072022-06-22022 June 2022 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 151 Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22119A0942022-06-21021 June 2022 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 150 Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21250A3822021-09-29029 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request I6R-06 Alternate Inspection for Reactor Vessel Internals ML21246A1062021-09-22022 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Alternative Request GR-03, Valve Position Verification Testing Extension Sixth 10-Year Inservice Testing Program Interval ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21175A0012021-07-27027 July 2021 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 145 Regarding Technical Specifications Change to Make a One-Time Exception to the Steam Generator Tube Inspection Requirements ML21166A1682021-06-25025 June 2021 ML20353A1262021-03-11011 March 2021 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 144 Implementation of WCAP-14333 and WCAP-15376, TSTF-411-A, and TSTF-418-A to Revise Reactor Trip and Engineered Safety Feature Actuation System Instrumentation ML21039A6362021-02-17017 February 2021 R. E. Ginna - Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20090D2912020-06-0202 June 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-02 for the Sixth 10-Year Inservice Inspection Interval (EPID L-2019-LLR-0071). Supersedes ML20056D559 ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20057E0912020-04-0303 April 2020 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 139 Add a One-Time Note for Use of Alternative Residual Heat Removal Method ML20056D5592020-03-13013 March 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-02 for the Sixth 10-Year Inservice Inspection Interval ML20055F8862020-03-13013 March 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-01 for the Sixth 10-Year Inservice Inspection Interval ML19325D8242019-12-23023 December 2019 R. E. Ginna Nuclear Power Plant Issuance of Amendment No. 136 to Revise Technical Specification 5.5.15, Containment Leakage Rate Testing Program, to Extend Containment Integrated Leak Rate Test Frequency ML19318E0802019-12-0202 December 2019 R. E. Ginna Nuclear Power Plant - Safety Evaluation of Alternative Request SR-1 Related to Snubber Program Aligned with Sixth 10-Year Inservice Testing Interval Program ML19252A2462019-10-29029 October 2019 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 134 to Revise the Emergency Response Organization Staffing Requirements ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19205A4532019-08-0505 August 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives PR-01 and PR-02 for Sixth 10-Year Inservice Testing Program ML19205A3532019-08-0505 August 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives GR-01, VR-01, and VR-02 for the Sixth 10-Year Inservice Testing Program (EPID L-2018-LLR-0382; EPID L-2018-LLR-0383) ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19100A0042019-04-22022 April 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request ISI-18 Regarding Fifth 10-Year Inservice Inspection Program Interval ML18309A3012018-11-15015 November 2018 R. E. Ginna - Issuance of Amendment Nos. 327, 305, 232, 173, and 133, Respectively, Eliminating the Nuclear Advisory Committee Requirements ML18213A3692018-11-13013 November 2018 Issuance of Amendment No. 132 Revise Technical Specifications 3.3.1, Reactor Trip System Instrumentation, and 3.3.2, Engineered Safety Feature Actuation System Instrumentation ML18295A6302018-10-31031 October 2018 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 131 Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF 547, Clarification of Rod Position Requirements ML18214A1762018-08-31031 August 2018 Issuance of Amendment No. 130, Revise Technical Specification Surveillance Requirement 3.8.4.3, DC (Direct Current) Sources - Modes 1, 2, 3, and 4 ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18190A4722018-07-12012 July 2018 R.E Ginna - Correction to Amendment No. 127 Related to Request to Delete a Modification Associated with the Risk-Informed, Performance Based Fire Protection Program in Accordance with 10 CFR 50.48(c) (CAC No. MF9948; EPID L-2017-LLA-0253) ML18137A6142018-06-26026 June 2018 Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station; and R. E. Ginna Nuclear Power Plant - Issuance of Amendments Revising Emergency Action Level Schemes 2024-07-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Hay 5, 2009 Mr. John Carlin Vice President RE. Ginna Nuclear Power Plant RE. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519-9364 SUB"IECT: RELIEF REQUEST NO. 23 RE: FOURTH INTERVAL lSI PROGRAM CATEGORY B-P EXAMS -10 YEAR CLASS 1 LEAKAGE EXAM - RE. GINNA NUCLEAR POWER PLANT (TAC NO. ME0456)
Dear Mr. Carlin:
By letter dated January 29,2009, RE. Ginna Nuclear Power Plant, LLC (the licensee),
submitted Relief Request No. 23 relating to system pressure tests applicable to the R E. Ginna Nuclear Power Plant (Ginna) for the fourth 10-year inservice inspection (lSI) interval. The relief request pertains to the boundary subject to test pressurization during performance of a system leakage test conducted at or near the end of the inspection interval. In lieu of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) requirement to include all Class 1 pressure retaining components within the test boundary, the licensee has proposed an alternative to pressurize up to the inboard isolation valve which would exclude a small segment of the Class 1 pressure boundary from attaining test pressure.
The Nuclear Regulatory Commission staff finds that the licensee's proposed alternative provides reasonable assurance of structural integrity and is, therefore, acceptable. Based on the information provided in Relief Request No. 23, the staff concludes in the enclosed safety evaluation that the licensee's compliance to the lSI Code of Record would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Therefore, pursuant to Title 10 of the Code of Federal Regulations, 50.55a(a)(3)(ii), the staff authorizes the lSI program alternative proposed in Relief Request No. 23 for the fourth 10-year lSI interval for the Ginna Nuclear Power Plant.
Please contact Douglas Pickett at 301-415-1364 or Douglas.Pickett@nrc.gov if you have any questions.
Sincerely,
,/....-"1 1 /" "--"
( .. 11C-Y~~
//J,"g: Boska, Acting Chief
('"Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl: Distribution via ListServ
\.~p.R REGV(
.;:,v "t>>: UNITED STATES
~ O~
~ .L NUCLEAR REGULATORY COMMISSION I (')
<l' 0 I 3: WASHINGTON, D.C. 20555-0001
<II ~
~ ,;;
'</ ~
1-/) ~O
- SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION INSERVICE INSPECTION PROGRAM RELIEF REQUEST NO. 23 RE. GINNA NUCLEAR POWER PLANT, LLC RE. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244
1.0 INTRODUCTION
By letter dated January 29, 2009, Agencywide Document Management System Accession No. ML090360492, RE. Ginna Nuclear Power Plant, LLC (the licensee), submitted Relief Request No. 23 relating to system pressure tests applicable to the RE. Ginna Nuclear Power Plant (Ginna) for the fourth 1O-year inservice inspection (lSI) interval. The relief request pertains to the boundary subject to test pressurization during performance of a system leakage test conducted at or near the end of inspection interval. In lieu of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) requirement to pressurize all Class 1 pressure retaining components within the system boundary, the licensee has proposed an alternative to pressurize up to the inboard isolation valve which would exclude a small segment of the Class 1 pressure boundary from attaining Code-required test pressure.
The licensee proposes to conduct a visual examination during the leakage test that would include all components within the system boundary. The relief request pertains to portions of the safety injection (SI) system, shutdown cooling system, and drain lines in the reactor coolant system (RCS).
The Nuclear Regulatory Commission (NRC) staff has evaluated the licensee's request for relief pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(a)(3)(ii) and concluded that compliance with the requirement in the Code of Record would result in hardship without a compensating increase in the level of quality and safety.
2.0 REGULATORY REQUIREMENTS 10 CFR 50.55a(g) requires that lSI of ASME Code Class 1, 2, and 3 components be performed in accordance with Section XI of the ASME Code and applicable addenda, except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i).
According to 10 CFR 50.55a(a)(3), alternatives to the requirements of paragraph 50.55a(g) may be used, when authorized by the NRC, if an applicant demonstrates that the proposed alternatives would provide an acceptable level of quality and safety or if the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Enclosure
-2 Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1,2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, "Rules for Inservice Inspection (lSI) of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that lSI of components and system pressure tests conducted during the first 1O-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval subject to the limitations and modifications listed in paragraph (b) of this section. The lSI Code of Record for the fourth 10-year interval at Ginna is the 1995 Edition of the ASME Code,Section XI with the 1996 Addenda.
3.0 TECHNICAL EVALUATION
System/Component(s) for Which Relief is Requested Examination Category Item No. Description B-P B15.50 Piping - Pressure retaining boundary B15.70 Valves - Pressure retaining boundary ASME Code Requirements Table IWB-2500-1, Examination Category B-P, Item Numbers B15.50 (Piping) and B15.70 (Valves) requires that a system leakage test be conducted once each 10-year inspection interval in accordance with the requirements of IWB-5222. The pressure retaining boundary during the system leakage test conducted at or near the end of each inspection interval shall extend to all Class 1 components within the system boundary.
Licensee's Request for Relief Relief is requested from the specific ASME Code,Section XI, Subparagraph IWB-5222(b) requirement to extend the pressure boundary to all Class 1 pressure retaining components during the system leakage tests conducted at or near the end of inspection interval. The segment of Class 1 piping between the inboard isolation valve and the outboard isolation valve/closure device including the valves and components in the system boundary will be visually examined for evidence of past leakage and/or leakage during the system leakage test conducted with the isolation valves in the position required for normal reactor startup.
Licensee's Basis for Requesting Relief (as stated in Relief Request No. 23)
Pressurization of components above their normal alignment at normal operating temperature and pressure in order to detect leakage during the VT-2 visual examination is not necessary. Piping with two isolation valves/closure devises is designed to operate with the first isolation valve closed. Piping between the inboard isolation valve and the outboard isolation valve/closure device during normal operating pressure and temperature is normally pressurized, but at a lower pressure.
-3 The temperatures and pressures present in Class 1 components during a system leakage test at a pressure associated with normal system operation is sufficient to qualify as a System Pressure Test. The pressure boundary integrity of these components is validated and documented using identical VT-2 visual examination requirements each refueling outage. The requested relief will apply VT-2 inspections of the Class 1 boundary beyond the first isolation valves at a stabilized pressure based on seat leakage from the first isolation valve.
Ginna LLC performs other surveillance (i.e. Local Leakage Rate Tests, Contaminated Leakage Rate Tests, Pressure Isolation Check Valve Leak Tests and Inservice Leak Rate Tests) to monitor these components for leakage.
Leakage is identified using normal operating temperatures and pressure conditions. In addition to leakage testing, boric acid inspections performed during refueling outages will also identify leakage from these components.
The following specific lines are included in the request for relief.
(a) Double Isolation Valve Segments including Gates, Checks, and Globes of the RCS.
These piping segments are between an inboard isolation valve and an outboard isolation valve in the system boundary that provides double isolation of the RCS.
The isolation valves associated with double valve isolation segments are located inside containment. For a list of specific components see Attachment 1, Group A of the licensee's Relief Request dated January 29, 2009.
(b) Vent, Drain, and Test Connection Double Isolation Segments of the RCS These are segments of piping between an inboard isolation valve and an outboard isolation closure device in the system boundaries that provides double-isolation to the RCS. The inboard isolation valves associated with vents, drains and test connection segments are located inside containment. For a list of specific components see Attachment 1, Group B of the licensee's Relief Request dated January 29, 2009.
In pressurizing the piping segments including the valves to the ASME Code-required test pressure, the licensee would be subject to hardship or unusual difficulty without a compensating increase in the level of quality and safety as stated by the licensee below:
- Special valve lineups and/or the use of temporary high pressure hoses/piping containing RCS pressure required for these tests add unnecessary challenges to the system configuration.
- The associated components and piping are located inside containment. Tests performed inside the radiologically restricted area increases the total exposure to plant personnel while modifying and restoring system lineups, as well as contamination of test equipment.
- Use of single valve isolation from systems with lower design pressure could result in over-pressurization of these systems and damage to permanent plant equipment.
- 4
- Pressurization of some double valve isolation pipe segments would require the use of temporary high pressure hoses/piping containing RCS pressure or hydrostatic test pressure hoses. These hoses would run throughout containment and is a significant personnel safety hazard should they burst and may also damage permanent plant equipment. Hoses on the floors are also a tripping hazard for all workers in containment.
- Use of a single closure device past the first isolation valve is a significant personnel safety hazard and may damage permanent plant equipment.
- Leakage past isolation valves to the RCS during special tests could affect the RCS boron concentration and complicate the task of maintaining homogeneous boron concentrations.
Licensee's Proposed Alternative The licensee proposes an alternative method for the pressurization boundary for specified Class 1 piping. The proposed method will leave the barriers intact for the visual examination rather than opening or bypassing the first isolation barrier prior to the examination. This modified approach will result in significant personnel exposure savings as well as minimizing the risk of personnel injury or contamination associated with opening or bypassing these normally closed isolation devices. Since these pressure tests are performed at the end of refueling outage, elimination of the requirement to open or bypass these isolation devices will also minimize the impact on the outage duration.
The segments of Class 1 piping between the inboard isolation valve and outboard isolation valve/closure device including the valves/closure devices and components in the system boundary will be visually examined (VT-2) for evidence of past leakage and/or leakage during the system leakage test conducted with the isolation valves/closure devices in the position required for normal reactor start up.
4.0 STAFF EVALUATION The Code of Record, 1995 Edition to the ASME Code with the 1996 Addenda,Section XI, Table IWB-2500-1, Category B-P, Item numbers B15.50 (Piping) and B15.70 (Valves) requires system leakage test of Class 1 pressure retaining piping and valves once per 1O-year interval conducted at or near the end of each inspection interval. The system leakage test is required to be performed at a test pressure not less than the nominal operating pressure of the RCS corresponding to 100% rated reactor power and shall include all Class 1 components. within the RCS boundary.
In Relief Request No. 23, the licensee proposed an alternative to the boundary subject to test pressurization. The line configuration, as outlined, provides double-isolation of the RCS. Under normal plant operating conditions, the subject pipe segments would see RCS temperature and pressure only if leakage through an inboard isolation valve occurs. As requested in Relief Request No. 23, with the inboard isolation valve closed during the system leakage test, the segment of piping between an inboard and an outboard isolation valve would not get pressurized to the required test pressure during a system leakage test. In order to perform the ASME Code-required test, it would be necessary to manually open each inboard isolation valve to pressurize the corresponding pipe segment. Pressurization by this method would preclude double valve isolation of the RCS and the NRC staff concurs that this may cause safety
-5 concerns for the personnel performing the examination. The subject isolation valves are located inside the containment, and the NRC staff also concurs that any manual actuation (opening and closing) of these valves would expose plant personnel to undue radiation exposure during modification and restoration of system lineups. Alternatively, the line segments between the isolation valves could be separately pressurized to the required test pressure by a hydrostatic pump but there are no test connections between the isolation valves to attach a pump.
The NRC staff concludes that compliance with the Code requirement would result in hardship without a compensating increase in the level of quality and safety. The licensee has proposed an alternative to visually examine (VT-2) for leaks in the isolated portion of the subject segments of piping with the inboard and outboard isolation valves in the normally closed position which would indicate any evidence of past leakage during the operating cycle as well as any active leakage during the system leakage test if the inboard isolation valve leaks. The staff believes that the licensee's proposed alternative will provide reasonable assurance of structural integrity for the RCS drain lines and the piping segments between an inboard and an outboard isolation valve while maintaining personnel radiation exposure as low as reasonably achievable.
Furthermore, the staff notes that there is no known degradation mechanism, such as intergranular stress-corrosion cracking, primary water stress-corrosion cracking, or thermal fatigue that is likely to affect the welds in the subject segments.
5.0 CONCLUSION
The NRC staff concludes that test pressurization during the system leakage test of the Class 1 pressure retaining components within the system boundary of RCS drain lines and piping segments between an inboard and an outboard isolation valve as required by the Code of Record would result in hardship to the licensee without a compensating increase in the level of quality and safety. The staff further concludes that the licensee's proposed alternative in Relief Request 23 provides a reasonable assurance of structural integrity for the subject piping segments.
Therefore, pursuant to 10 CFR 50.55a(a)(3)(ii), the proposed alternative in Relief Request 23 is authorized for the third 10-year lSI interval at Ginna. All other requirements of the ASME Code,Section XI for which relief has not been specifically requested remain applicable, including a third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Jennifer Gall Date: May 5,2009
Mr. John Carlin Vice President RE. Ginna Nuclear Power Plant RE. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519-9364 SUB..IECT: RELIEF REQUEST NO. 23 RE: FOURTH INTERVAL lSI PROGRAM CATEGORY B-P EXAMS - 10 YEAR CLASS 1 LEAKAGE EXAM - RE. GINNA NUCLEAR POWER PLANT (TAC NO. ME0456)
Dear Mr. Carlin:
By letter dated January 29,2009, RE. Ginna Nuclear Power Plant, LLC (the licensee),
submitted Relief Request No. 23 relating to system pressure tests applicable to the RE. Ginna Nuclear Power Plant (Ginna) for the fourth 10-year inservice inspection (lSI) interval. The relief request pertains to the boundary subject to test pressurization during performance of a system leakage test conducted at or near the end of the inspection interval. In lieu of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) requirement to include all Class 1 pressure retaining components within the test boundary, the licensee has proposed an alternative to pressurize up to the inboard isolation valve which would exclude a small segment of the Class 1 pressure boundary from attaining test pressure.
.J"he Nuclear Regulatory Commission staff finds that the licensee's proposed alternative provides reasonable assurance of structural integrity and is, therefore, acceptable. Based on the information provided in Relief Request No. 23, the staff concludes in the enclosed safety evaluation that the licensee's compliance to the lSI Code of Record would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Therefore, pursuant to Title 10 of the Code of Federal Regulations, 50.55a(a)(3)(ii), the staff authorizes the lSI program alternative proposed in Relief Request No. 23 for the fourth 10-year lSI interval for the Ginna Nuclear Power Plant.
Please contact Douglas Pickett at 301-415-1364 or Douglas.Pickett@nrc.gov if you have any questions.
Sincerely, IRA!
John Boska, Acting Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl: Distribution via ListServ Distribution:
PUBLIC LPLI-1 rlf Ridsl\lrrDciCsgb RidsNrrDorlLpl1-1 RidsNrrPMDPickett RidsNrrLASLittle RidsOgcMailCenter RidsRegion1 MailCenter RidsAcrsAcnw&mMailCenter GDentel, R1 ADAMS Accession No.: ML090900045 OFFICE LPLI-1/GE LPLI-1/PM LPLI-1/LA DCI/CSGB(A) OGC LPLI-1/BC(A)
NAME JGal1 DPickett SLittie MGavrilas MSmith JBoska DATE 04/07/09 4123109 04 I 21 109 4/27/09 4/29/09 5/05/09 OFFICIAL RECORD COpy