MONTHYEARML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24045A2892024-02-14014 February 2024 R. E. Ginna Nuclear Power Plant Acceptance Review: IST Relief Request for B Auxiliary Feedwater Pump ML23073A3682023-03-16016 March 2023 Authorization and Safety Evaluation for Proposed Alternative I6R-10, Revision 0 Related to the Steam Generators, RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. ML21250A3822021-09-29029 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request I6R-06 Alternate Inspection for Reactor Vessel Internals ML21246A1062021-09-22022 September 2021 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Alternative Request GR-03, Valve Position Verification Testing Extension Sixth 10-Year Inservice Testing Program Interval ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21117A0312021-04-26026 April 2021 Verbal Authorization by the NRC NRR for 10 CFR 50.55a Alternative Request Position Verification Testing Extension - Exelon Generation, R. E. Ginna Nuclear Power Plant ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20090D2912020-06-0202 June 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-02 for the Sixth 10-Year Inservice Inspection Interval (EPID L-2019-LLR-0071). Supersedes ML20056D559 ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations ML20055F8862020-03-13013 March 2020 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-01 for the Sixth 10-Year Inservice Inspection Interval RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19205A4532019-08-0505 August 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives PR-01 and PR-02 for Sixth 10-Year Inservice Testing Program ML19205A3532019-08-0505 August 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives GR-01, VR-01, and VR-02 for the Sixth 10-Year Inservice Testing Program (EPID L-2018-LLR-0382; EPID L-2018-LLR-0383) ML19177A2182019-06-26026 June 2019 R. E. Ginna Nuclear Power Plant - Relief Request Associated with Snubber Inservice Testing Program for the Sixth Ten-Year Interval ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19100A0042019-04-22022 April 2019 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request ISI-18 Regarding Fifth 10-Year Inservice Inspection Program Interval JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds ML18347B0362018-12-13013 December 2018 Relief Requests Associated with Sixth Ten-Year Lnservice Testing Interval JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 ML17297A5242017-11-0606 November 2017 R. E. Ginna - Request for Use of a Portion of a Later Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (CAC Nos. MG0079-MG0083; EPID L-2017-LLR-0061) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16138A0212016-05-19019 May 2016 Proposed Alternative to Use Code Case N-789 (CAC Nos. MF7018-MF7022) ML12264A5912012-09-18018 September 2012 Supplemental Information for Relief Request Number ISI-09 R. E. Ginna Nuclear Power Plant - Fifth Interval Inservice Inspection Program Proposed Alternative in Accordance with 10 CFR 50.55a (a)(3)(ii) Component Cooling Water 1 Inch Half-Cou ML12254A3782012-09-0606 September 2012 Relief Request Number ISI-09 - Fifth Interval Inservice Inspection Program Proposed Alternative in Accordance with 10 CFR 50.55a (a)(3)(ii) Component Cooling Water 1 Inch Half-Coupling Weld Leak ML12158A1152012-06-22022 June 2012 Inservice Inspections Program Relief Request Nos. ISI-02 and ISI-03 ML0920802292009-07-31031 July 2009 R. E. Ginna, Safety Evaluation for Relief Request No. 18, Reactor Vessel Weld Examination Extension ML0909000452009-04-0505 April 2009 Relief Request No. 23 on End-of-Interval System Pressure Test for Class 1 Components-R.E. Ginna Nuclear Power Plant ML0903501872009-02-0404 February 2009 Acceptance Review for Ginna Relief Request No. 23 ML0828800322008-10-0303 October 2008 Fourth Ten-Year Interval Inservice Inspection Program, Re-submittal of Relief Request Number 18 ML0617401562006-07-19019 July 2006 Relief Request No. PR-3 Regarding Testing of Auxiliary Feedwater Pumps ML0612805002006-05-0101 May 2006 R. E. Ginna Response to Request for Additional Information Regarding Relief Request PR-3 ML0507300162005-04-12012 April 2005 R. E. Ginna, Relief, Request 17 for the Fourth 10-Year Interval of the Inservice Inspection Program, MC5406 ML0435601532004-12-15015 December 2004 Fourth Ten-Year Interval in Service Inspection Program Submittal of Relief Request Number 17 Related to Appendix Viii, Supplement 10, PDI Program Alternative Requirements R. E. Ginna Nuclear Power Plant ML0424507782004-10-19019 October 2004 R. E. Ginna Nuclear Power Plant Relief Requests VR-1, VR-2 and VR-13 for the Fourth 10-Year Interval of the Pump and Valve Inservice Testing Program ML0330401202003-11-21021 November 2003 R. E. Ginna Nuclear Power Plant, Relief Request Review, Inservice Testing Program Relief Requests VR-4 and VR-8 ML0329603222003-10-20020 October 2003 Submittal of Relief Request VR-4 Related to the Requirements of 10CFR50.55a(f), Inservice Testing Requirements. ML0304202642003-02-10010 February 2003 R. E. Ginna Nuclear Power Plant, Relief, Inservice Testing Program Relief Request PR-2, MB7232 ML0314205202003-01-0909 January 2003 Enclosure - R.E. Ginna, Inservice Testing Program Relief Request PR-2 2024-07-23
[Table view] Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report 2024-09-25
[Table view] |
Text
Joseph E. Pacher R.E. Ginna Nuclear Power Plant, LLC Manager, Nuclear Engineering Services 1503 Lake Road Ontario, New York 14519-9364 585.771.5208 585.771.3392 Fax joseph.pacher@constellation.com 0Constellation Energy° Nuclear Generation Group October 3, 2008 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
R.E. Ginna Nuclear Power Plant Docket No. 50-244 Fourth Ten-Year Interval Inservice Inspection Program Re-submittal of Relief Request Number 18
Reference:
(1) Letter from J. Pacher, Ginna LLC, to NRC Document Control Desk,
Subject:
Fourth Ten-Year Interval Inservice Inspection Program Submittal of Relief Request Numbers 18, 19, 20, and 21, dated May 10, 2008.
(2) Letter from D. Pickett, NRC, to J. Carlin, Ginna LLC,
Subject:
R.E. Ginna Nuclear Power Plant - Acceptance Review Regarding Fourth Ten-Year Interval Inservice Inspection Program Submittal of Relief Request Numbers 18, 19, 20, and 21 (TAC NOS. MD8732 - MD8735), dated June 18, 2008.
(3) Letter from J. Pacher, Ginna LLC, to NRC Document Control Desk,
Subject:
Fourth Ten-Year Interval Inservice Inspection Program Withdrawal of Relief Request Number 18 and Re-submittal of Relief Request Number 19, dated June 23, 2008.
(4) Letter from Ho K. Nieh, NRC, to Gordon Bischoff, WOG, regarding Final Safety Evaluation for PWROG Topical Report WCAP- 16168-NP, Revision 2, (TAC NO. MC9768), dated May 8, 2008.
In Reference 1, R.E. Ginna Nuclear Power Plant, LLC (Ginna LLC) submitted four proposed code relief requests associated with the Fourth Ten-Year Interval Inservice Inspection Program. Based on conversations with the NRC staff on June 11, 2008 (as documented in Reference 2), Relief Request Number 18 was withdrawn (Reference 3). This letter provides the re-submittal of that relief request.
The NRC approved WCAP- 16168-NP-A, Revision 2, "Risk-Informed Extension of The Reactor Vessel In-Service Inspection Interval," in Reference 4. This WCAP provides for extension of the inservice inspection interval for certain pressure retaining welds in the reactor vessel from 10 to 20 years. Ginna LLC proposes to implement this extended inservice inspection interval for the R.E. Ginna Nuclear Power Plant. The plant specific information identified by Reference 4 as needed to support this request is provided in Attachment 1. Ginna LLC has concluded that the proposed alternative provides an acceptable level of quality and safety. The relief is requested under the provisions of I OCFR 50.55a(a)(3)(i). A 97 Ioo-Oc NC
As required by Reference 4, and under separate cover, Ginna LLC is requesting an amendment to the R.E.
Ginna license that will require that the information and analyses requested in the final rule for 10 CFR 50.61 a, Section (e) or, prior to issuance, the proposed rule (72 FR 56275) for 10 CFR 50.61 a, Section (e) be submitted within one year of completing each of the ASME Code,Section XI, Category B-A and B-D reactor vessel weld inspections.
No new commitments are being made in this letter.
Ginna LLC requests NRC approval of the attached relief request by April 3, 2009 to support planning for the fall 2009 refueling outage.
Should you have questions regarding this matter, please contact David F. Wilson (585) 771-5219.
Xry truly yours, oeph E. Pacher
Attachment:
RELIEF REQUEST NO. 18 cc: S. J. Collins, NRC D. V. Pickett, NRC Ginna Resident Inspector, NRC RELIEF REQUEST NO. 18 R.E. Ginna Nuclear Power Plant - Fourth Interval ISI Program Reactor Vessel Inservice Inspection Interval Extension
RELIEF REQUEST NO. 18 R.E. Ginna Nuclear Power Plant - Fourth Interval ISI Program Reactor Vessel Inservice Inspection Interval Extension Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(i)
-Alternative Provides Acceptable Level of Quality and Safety-
- 1. ASME Code Component(s) Affected The affected component is the R.E. Ginna reactor vessel, specifically the following American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code Section XI (Reference 1) examination categories and item numbers covering examinations of the reactor vessel (RV). These examination categories and item numbers are from IWB-2500 and Table IWB-2500-1 of the ASME BPV, Code Section XI.
Examination Category Item No. Description B-A B 1.11 Circumferential Shell Welds B-A B 1.30 Shell-to-Flange Weld B-D B3.90 Nozzle-to-Vessel Welds B-D B3. 100 Nozzle Inner Radius Areas (Throughout this request the above examination categories are referred to as "the subject examinations" and the ASME BPV Code,Section XI, is referred to as "the Code.")
2. Applicable Code Edition and Addenda
ASME Code Section XI, "Rules and Inservice Inspection of Nuclear Power Plant Components," 1995 Edition with the 1996 Addenda.
3. Applicable Code Requirement
PWB-2412, Inspection Program B, requires volumetric examination of essentially 100% of reactor pressure vessel, pressure retaining welds identified in Table IWB-2500-1 once each ten year interval. The-R. E. Ginna fourth inspection interval is scheduled to end on or before December 31, 2009.
4. Reason for Request
Relief Request Number 18, which is being submitted along with Relief Request Numbers 19, 20 and 21, deals with the Reactor Vessel Inservice Inspection Interval extension to allow the subject examinations to be performed at the same time along with other reactor vessel related examinations during the 2011 outage and the next exam, if applicable, to be performed in 2031.
An alternative is requested from the requirements of IWA-2412, Inspection Program B, that volumetric examination of essentially 100% of reactor pressure vessel retaining welds, Examination Categories B-A and B-D welds, be performed once each ten-year interval. Extension of the inspection interval for Examination Category B-A and B-D welds from 10 years to up to 20 years will result in a reduction in personnel radiation exposure and examination costs.
Page I of 5
RELIEF REQUEST NO. 18 R.E. Ginna Nuclear Power Plant - Fourth Interval ISI Program Reactor Vessel Inservice Inspection Interval Extension
- 5. Proposed Alternative and Basis for Use R.E. Ginna Nuclear Power Plant proposes to defer the ASME Code required volumetric examination of the Reactor Pressure Vessel full penetration retaining Category B-A and B-D welds for the fourth inservice inspection until 2011 and to perform the inservice inspection on a twenty-year inspection interval, instead of the currently required ten-year inspection interval. Therefore, the fifth inservice inspection is proposed to be performed in 2031. These dates are consistent with the information provided to the Staff in PWR Owners Group letter OG-06-356 (Reference 2).
In accordance with 10 CFR 50.55a(a)(3)(i), the proposed alternate inspection interval, which provides an acceptable level of quality and safety, is requested on the basis that the current inspection interval can be extended based on a negligible change in risk by satisfying the risk criteria specified in Regulatory Guide 1.174 (Reference 3).
The methodology used to demonstrate the acceptability of extending the fourth and fifth inspection intervals for Category B-A and B-D welds based on a negligible change in risk is contained in the latest revision of WCAP-16168-NP-A (Reference 4). This methodology was used to develop a pilot plant analysis for Westinghouse, Combustion Engineering, and Babcock and Wilcox reactor vessel designs and is an extension of the work that was performed as part of the Nuclear Regulatory Commission Pressurized Thermal Shock (PTS) Risk Re-Evaluation (NUREG-1874, Reference 5). The critical parameters for demonstrating that this pilot plant analysis is applicable on a plant specific basis, as identified in the latest revision of WCAP-16 168-NP, are identified in Table 1. By demonstrating that each plant specific parameter is bounded by the corresponding pilot plant parameter, the application of the methodology to the R.E. Ginna reactor vessel is acceptable as shown in Table 1 below.
Table 1 Critical Parameters for Application of Bounding Analysis Additional Evaluation Parameter Pilot Plant Basis Plant Specific Basis Required?
Dominant Pressurized Thermal NRC PTS Risk Study Ginna is bounded by No Shock (PTS) Transients in the NRC (Reference 5) PTS Generalization PTS Risk Study are applicable Study (Reference 6)
Through Wall Cracking Frequency 1.76E-08 Events per year 7.47E- 12 Events per No (Reference 4) year (Calculated per Reference 5)
Frequency and Severity of Design 7 heatup/cooldowns per year Ginna is bounded by No Basis Transients (Reference 4) 7 heatup/cooldowns per year Cladding Layers (Single/Multiple) Single Layer (Reference 4) Single Layer No Page 2 Of 5
RELIEF REQUEST NO. 18 R.E. Ginna Nuclear Power Plant - Fourth Interval ISI Program Reactor Vessel Inservice Inspection Interval Extension Additional information relative to R.E. Ginna reactor vessel inspections is provided in Table 2. This information confirms that satisfactory examinations have been performed on the R.E. Ginna reactor vessel.
Table 2 Additional Information Pertaining to Reactor Vessel Inspection Inspection methodology: Category B-A welds: ASME Section XI Appendix VIII (Reference 1)
Category B-D welds: Regulatory Guide 1.150 (Reference 7)
Information is for most recent inservice inspection performed in 1999.
Number of past inspections: A minimum of 3 inspections have been performed to date on each Category B-A and B-D weld.
Number of indications found: Zero reportable indications have been found to date. Any recordable indications have been acceptable per ASME Section XI IWB-3500. One recordable indication is in the inner 1/8' of the vessel inside diameter in the beltline region. The indication has a depth of 0.22", length of 1.54" and is 0.38" subsurface. This indication is acceptable per the flaw acceptance criteria in the proposed voluntary PTS Rule, 10 CFR 50.61 a (Reference 8).
Proposed inspection schedule for Reactor Pressure Vessel Examination Category B-A and B-D inspections balance of plant life: are currently scheduled for the 2009 outage within the Fourth Interval Inservice Inspection Program. These examinations for the Fourth Interval Inservice Inspection Program are proposed to be performed in the 2011 outage. The following examinations, if applicable, are proposed to be performed in 2031.
Page 3 of 5
RELIEF REQUEST NO. 18 R.E. Ginna Nuclear Power Plant - Fourth Interval ISI Program Reactor Vessel Inservice Inspection Interval Extension The information in Table 3 is identified in WCAP-16168-NP-A, Revision 2, as additional information to be provided relative to the Through-Wall Cracking Frequency (TWCF) calculation for R.E. Ginna Nuclear Power Plant.
Table 3 Details of Through-Wall Cracking Frequency (TWCF) Calculation Inputs Reactor Coolant System Temperature, TRCs[°F]: 544.2 Twa,1 (inches): 6.50 Fluence [1019 Region/Component Material Cu Ni P Mn Un-Irradiated Ntn/ 2 Description [wt%] [wt%] [wt%] [wt%] RTNDT(U) [OF] E>1 MeV]
I Inter./Lower Circ. Weld Linde 80 .250 .560 .012 1.35 -4.8 5.42 2 Nozzle/Inter. Circ Weld Linde 80 .230 .590 .021 1.35 10.0 0.516 3 Nozzle Forging A508-2 .070 .680 .010 .700 30.0 0.516 4 Lower forging A508-2 .050 .690 .010 .700 40.0 5.42 5 Intermediate Forging A508-2 .070 .690 .010 .700 20.0 5.42 Outputs Methodology Used to Calculate AT30: NUREG-1874 Region # Fluence [1019 * (flux)
(From RTMAX-XX [R] Neutron/cm 2 , [Neutrons/ A3 AT 3 0 TWCF 95 _xx Above) E>1 MeV] cm /sec] Fl Forging - FO 4 562.00 5.42 2.86E+10 62.31 7.63E-14 Circumferential Weld - CW 1 684.80 5.42 2.86E+10 229.91 3.40E- 12 TWCF95-TOTAL (aAwTWCF 95-AW + CCPLTWCF 95.PL + xcwTWCF 95-cw + CCFOTWCF 95 -FO): 7.47E-12 The methodology used to demonstrate the acceptability of extending the Reactor Pressure Vessel, Category B-A and B-D welds, is based on a negligible change in risk as contained in the latest revision of WCAP-16168-NP-A (Reference 4). By demonstrating that each plant specific parameter is bounded by the corresponding pilot plant parameter, the application of the methodology to the R.E. Ginna reactor vessel is acceptable as shown in the Tables above. WCAP-16168-NP-A was developed to decrease the frequency of examinations from once every ten years to once every twenty years.
- 6. Duration of Proposed Alternative This request is applicable to the R. E. Ginna Inservice Inspection Program for the remainder of the renewed licensed lifetime of the Reactor Pressure Vessel for the examination categories B-A and B-D welds.
Page 4 of 5
RELIEF REQUEST NO. 18 R.E. Ginna Nuclear Power Plant - Fourth Interval ISI Program Reactor Vessel Inservice Inspection Interval Extension
- 7. References
- 1. ASME Boiler and Pressure Vessel Code,Section XI, 1995 Edition with the 1996 Addenda, American Society of Mechanical Engineers, New York.
- 2. F. P. Schiffley to U. S. NRC, PWR Owners' Group Letter, OG-06-356, "Plan for Plant Specific Implementation of Extended Inservice Inspection Interval per WCAP-16168-NP, Revision 1, "Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval." MUHP 5097-99, Task 2059, "October 31, 2006.
- 3. NRC Regulatory Guide 1.174, Revision 1, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,"
November 2002.
- 4. WCAP-16168-NP-A, Revision 2, "Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval," June 2008
- 5. NUREG- 1874, "Recommended Screening Limits for Pressurized Thermal Shock," March, 2007.
- 6. NRC Letter Report, "Generalization of Plant-Specific Pressurized Thermal Shock (PTS) Risk Results to Additional Plants," December 14, 2004.
- 7. NRC Regulatory Guide 1.150, Revision 1, "Ultrasonic Testing of Reactor Vessel Welds During Preservice and Inservice Examinations," February 1983.
- 8. SECY-07-0104, "Proposed Rulemaking - Alternate Fracture Toughness Requirements for Protection against Pressurized Thermal Shock," June 25, 2007, Enclosure 1.
Page 5 of 5