Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23073A36816 March 2023Authorization and Safety Evaluation for Proposed Alternative I6R-10, Revision 0 Related to the Steam Generators,
RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.20 September 2022Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.Non-Destructive Examination
Scaffolding
ML21250A38229 September 2021R. E. Ginna Nuclear Power Plant - Issuance of Relief Request I6R-06 Alternate Inspection for Reactor Vessel InternalsSafe Shutdown Earthquake
Operating Basis Earthquake
Incorporated by reference
Earthquake
Flow Induced Vibration
ML21246A10622 September 2021R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Alternative Request GR-03, Valve Position Verification Testing Extension Sixth 10-Year Inservice Testing Program IntervalIncorporated by reference
Grace period
ML21230A2063 September 2021Proposed Alternative to Use ASME OM Code Case OMN-28Incorporated by reference
ML21216A2205 August 2021Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining BoltingCoatings
Nondestructive Examination
Incorporated by reference
ML21117A03126 April 2021Verbal Authorization by the NRC NRR for 10 CFR 50.55a Alternative Request Position Verification Testing Extension - Exelon Generation, R. E. Ginna Nuclear Power PlantIncorporated by reference
ML20269A20030 September 2020Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117Incorporated by reference
ML20188A2646 July 2020Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional InformationIncorporated by reference
ML20090D2912 June 2020R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-02 for the Sixth 10-Year Inservice Inspection Interval (EPID L-2019-LLR-0071). Supersedes ML20056D559
ML20113F04130 April 2020Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19)Incorporated by reference
Pandemic
Coronavirus
COVID-19
ML20099D95517 April 2020Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive ExaminationsNon-Destructive Examination
Incorporated by reference
ML20055F88613 March 2020R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-01 for the Sixth 10-Year Inservice Inspection IntervalBoric Acid
RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)28 February 2020Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)Power-Operated Valves
ML19269C53427 September 2019Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination TechniquesIncorporated by reference
ML19205A4535 August 2019R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives PR-01 and PR-02 for Sixth 10-Year Inservice Testing ProgramIncorporated by reference
ML19205A3535 August 2019R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternatives GR-01, VR-01, and VR-02 for the Sixth 10-Year Inservice Testing Program (EPID L-2018-LLR-0382; EPID L-2018-LLR-0383)Stroke time
Incorporated by reference
Surveillance Frequency Control Program
ML19177A21826 June 2019R. E. Ginna Nuclear Power Plant - Relief Request Associated with Snubber Inservice Testing Program for the Sixth Ten-Year Interval
ML19161A2574 June 2019BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019Incorporated by reference
ML19100A00422 April 2019R. E. Ginna Nuclear Power Plant - Issuance of Relief Request ISI-18 Regarding Fifth 10-Year Inservice Inspection Program IntervalProbabilistic Risk Assessment
JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds15 February 2019Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping WeldsDissimilar Metal Weld
ML18347B03613 December 2018Relief Requests Associated with Sixth Ten-Year Lnservice Testing IntervalStroke time
Surveillance Frequency Control Program
JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-88030 May 2018Proposed Alternative to Utilize Code Cases N-878 and N-880Nondestructive Examination
JAFP-18-0052, Proposed Alternative to Utilize Code Case N-87930 May 2018Proposed Alternative to Utilize Code Case N-879Nondestructive Examination
ML17297A5246 November 2017R. E. Ginna - Request for Use of a Portion of a Later Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (CAC Nos. MG0079-MG0083; EPID L-2017-LLR-0061)Incorporated by reference
ML17170A01326 June 2017Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548)
ML16230A2376 September 2016Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322)Incorporated by reference
Through-Wall Leak
ML16138A02119 May 2016Proposed Alternative to Use Code Case N-789 (CAC Nos. MF7018-MF7022)Liquid penetrant
ML12264A59118 September 2012Supplemental Information for Relief Request Number ISI-09 R. E. Ginna Nuclear Power Plant - Fifth Interval Inservice Inspection Program Proposed Alternative in Accordance with 10 CFR 50.55a (a)(3)(ii) Component Cooling Water 1 Inch Half-CouVT-2
ML12254A3786 September 2012Relief Request Number ISI-09 - Fifth Interval Inservice Inspection Program Proposed Alternative in Accordance with 10 CFR 50.55a (a)(3)(ii) Component Cooling Water 1 Inch Half-Coupling Weld LeakTime to boil
Hydrostatic
Temporary Modification
Dissimilar Metal Weld
ML12158A11522 June 2012Inservice Inspections Program Relief Request Nos. ISI-02 and ISI-03Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
DM weld
ML09208022931 July 2009R. E. Ginna, Safety Evaluation for Relief Request No. 18, Reactor Vessel Weld Examination ExtensionProbabilistic Risk Assessment
Incorporated by reference
ML0909000455 April 2009Relief Request No. 23 on End-of-Interval System Pressure Test for Class 1 Components-R.E. Ginna Nuclear Power PlantBoric Acid
Hydrostatic
VT-2
Incorporated by reference
ML0903501874 February 2009Acceptance Review for Ginna Relief Request No. 23
ML0828800323 October 2008Fourth Ten-Year Interval Inservice Inspection Program, Re-submittal of Relief Request Number 18Probabilistic Risk Assessment
ML06174015619 July 2006Relief Request No. PR-3 Regarding Testing of Auxiliary Feedwater PumpsIncorporated by reference
ML0612805001 May 2006R. E. Ginna Response to Request for Additional Information Regarding Relief Request PR-3
ML05073001612 April 2005R. E. Ginna, Relief, Request 17 for the Fourth 10-Year Interval of the Inservice Inspection Program, MC5406Non-Destructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML04356015315 December 2004Fourth Ten-Year Interval in Service Inspection Program Submittal of Relief Request Number 17 Related to Appendix Viii, Supplement 10, PDI Program Alternative Requirements R. E. Ginna Nuclear Power PlantDissimilar Metal Weld
ML04245077819 October 2004R. E. Ginna Nuclear Power Plant Relief Requests VR-1, VR-2 and VR-13 for the Fourth 10-Year Interval of the Pump and Valve Inservice Testing ProgramIncorporated by reference
ML03304012021 November 2003R. E. Ginna Nuclear Power Plant, Relief Request Review, Inservice Testing Program Relief Requests VR-4 and VR-8Incorporated by reference
ML03296032220 October 2003Submittal of Relief Request VR-4 Related to the Requirements of 10CFR50.55a(f), Inservice Testing Requirements.Incorporated by reference
Cold shutdown justification
ML03042026410 February 2003R. E. Ginna Nuclear Power Plant, Relief, Inservice Testing Program Relief Request PR-2, MB7232Incorporated by reference
ML0314205209 January 2003Enclosure - R.E. Ginna, Inservice Testing Program Relief Request PR-2Incorporated by reference