ML090270066

From kanterella
Jump to navigation Jump to search
302 Final SRO Written Examination and References
ML090270066
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/10/2008
From:
- No Known Affiliation
To:
NRC/RGN-II
References
Download: ML090270066 (104)


Text

Final Submittal (Blue Paper)

FINAL SRO WRITTEN EXAMINATI*ON AND REFERENCES

ES-401 Site-Specific SRO Written Examination Form ES-401-8 Cover Sheet u.s. Nuclear Regulatory Commission Site-Specific SRO Written Examination Applicant Information Name:

Date: \, /'0 17..00~ Facility/Unit: 1>> ru f'\~W, L k ./ ,oS z..

Region: I D II ~ III D IV D Reactor Type: W D CE D BW D GE ~

Start Time: Finish Time:

Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination you must achieve a final grade of at least 80.00 percent overall, with 70.00 percent or better on the SRO-only items if given in conjunction with the RO exam; SRO-only exams given alone require a final grade of 80.00 percent to pass. You have 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to complete the combined examination, and 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> if you are only taking the SRO portion.

Applicant Certification All work done on this examination is my own. I have neither given nor received aid.

Applicant's Signature Results RO/SRO-Only/Total Examination Values __ / __ / __ Points Applicant's Scores __ / __ / __ Points Applicant's Grade __ / __ / __ Percent

Brunswick NRC SRO Exam November 2008 Name:

1. A C D 26. A B D 51. A C D 76. ABC
2. A B D 27. A C D 52. ABC 77. A B D
3. A C D 28. BCD 53. BCD 78. ABC
4. A B D 29. A B D 54. A C D 79. BCD
5. BCD 30. ABC 55. A C D 80. ABC
6. ABC 31. ABC. 56. ABC 81. BCD
7. BCD 32. ABC 57. A B D 82. A B D
8. ABC 33. A B D 58. ABC 83. BCD
9. BCD 34. BCD 59. BCD 84. BCD
10. ABC 35. A B D 60. BCD 85. A B D
11. ABC 36. A C D 61. A B D 86. A B D
12. BCD 37. A B D 62. BCD 87. ABC
13. A B D 38. BCD 63. ABC 88. BCD
14. A B D 39. A C D 64. A B D 89. A B D
15. A C D 40. A B D 65. BCD 90. A B D
16. A C D 41. ABC 66. A B D 91. A C D
17. A B D 42. ABC 67. A B D 92. A C D
18. BCD 43. A B D 68. ABC 93. A B D
19.
  • BCD 44.
  • BCD 69.
20. A B
  • D 45. BCD 70. A C D 95. BCD
21. A C D 46. A B D 71. A. C D 96. BCD
22. A B D 47. ABC 72. A C D 97. A B D
23. A B D 48. A B D 73. ABC 98. ABC
24. A B D 49. ABC 74. A C D 99. BCD
25. A C D 50. A B D 75. ABC 100. BCD
1. Which one of the following identifies the component manipulations that will raise CRD drive water header differential pressure indication at Panel P603?

A. throttle open Flow Control Valve C11-F002 or throttle open Drive Pressure Valve C11-PCV-F003 B. throttle open Flow Control Valve C11-F002 or throttle closed Drive Pressure Valve C11-PCV-F003 C. throttle closed Flow Control Valve C11-F002 or throttle open Drive Pressure Valve C11-PCV-F003 D. throttle closed Flow Control Valve C11-F002 or throttle closed Drive Pressure Valve C11-PCV-F003 Page 1 of 100

2. Unit Two is operating at rated pressure. While placing the 28 Recirculation Pump in service a complete failure of the #1 seal occurs.
  1. 1 seal cavity pressure is 1000 psig.

Which one of the following identifies the expected system indications for this failure?

A. #2 seal cavity pressure is 500 psig; PUMP 8 SEAL STAGING FLOW HI/LO annunciator in alarm

8. #2 seal cavity pressure is 500 psig; OUTER SEAL LEAKAGE FLOW DETECTION HI annunciator in alarm C. #2 seal cavity pressure is 1000 psig; PUMP 8 SEAL STAGING FLOW HI/LO annunciator in'alarm D. #2 seal cavity pressure is 1000 psig; OUTER SEAL LEAKAGE FLOW DETECTION HI annunciator in alarm Page 2 of 100
3. Given the following plant conditions on Unit One:

Reactor water level -25 inches Reactor pressure 55 psig Vessel Injection 4500 gpm from RHR (reference provided)

In accordance with 001-37.4, Reactor Vessel Control Procedure Basis Document, which one of the following identifies the current status of Adequate Core Cooling and the operational implications of these conditions?

A. Adequate Core Cooling is met; Clad temperatures are expected to remain between 1500° F and 1800° F.

B. Adequate Core Cooling is met; Clad temperatures are expected to remain ~1500° F C. Adequate Core Cooling is NOT met; Clad temperatures are expected to exceed 1800° F D. Adequate Core Cooling is NOT met; Clad temperatures are expected to remain ~1800° F Page 3 of 100

4. Which one of the following pumps is powered from 4KV E-Bus E2?

A. 1A RHR Pump B. 2C RHR Pump C. 10 RHR SW Booster Pump D. 2B RHR SW Booster Pump Page 4 of 100

5. During accident conditions, suppression pool level has dropped below -6.5 feet.

Which one of the following identifies the required action for HPCI, including the basis for the action, in accordance with PCCP and 001-37.8, Primary Containment Control Procedure Basis Document?

A. Terminate HPCI irrespective of adequate core cooling to prevent primary containment overpressurization.

B. Terminate HPCI irrespective of adequate core cooling to prevent exceeding Heat Capacity Temperature Limit.

C. Maintain HPCI operation if required to maintain adequate core cooling because core cooling takes priority over primary containment integrity.

D. Maintain HPCI operation if required to maintain adequate core cooling because the turbine exhaust flowrate is within the capacity of containment vent system.

Page 5 of 100

6. Unit Two plant conditions following an automatic initiation of ADS are as follows:

Reactor level -20 inches Reactor Pressure 400 psig and lowering Core Spray pumps 2A and 2B pumps running ADS SRV's 7 ADS valves OPEN with control switches in AUTO A dual unit loss of off-site power occurs and all DGs tie onto their respective E buses.

Which one of the following predicts how the ADS valves will respond during the loss of offsite power and subsequent re-energization of power to the E-busses?

A. remain open when the LOOP initially occurs; remain open after the E-Busses are re-energized.

B. close when the LOOP initially occurs; remain closed after the E-Busses are re-energized.

C. close when the LOOP initially occurs; re-open 83 seconds after the Core Spray pumps restart.

D. close when the LOOP initially occurs; re-open immediately after the Core Spray pumps restart.

Page 6 of 100

7. Following a DBA LOCA on Unit Two, plant conditions are as follows:

Reactor water level 55 inches and rising Reactor pressure 150 psig 0

Torus temperature 220 F Suppression Chamber pressure 10.5 psig Torus level -43 inches 2A Core Spray pump flow 5000 gpm 2B Core Spray pump flow 2000 gpm 2A RHR pump flow 8000 gpm 2B RHR pump flow 6000 gpm (reference provided)

Which one of the following identifies the ECCS pump(s) that is/are operating within the associated NPSH limit(s)?

A. 2B CS Pump ONLY B. All CS and RHR pumps C. 2A CS and 2B CS ONLY D. 2B CS, 2A RHR and 2B RHR ONLY Page 7 of 100

8. Which one of the following methods is available to determine level in the SLC Tank following a loss of all air systems?

A. Direct the AD to valve in the local sight glass to obtain the level.

B. Have the AD read the level gauge on the local instrument rack.

C. Use the indication on the Level/Power Control ERFIS Screen.

D. Direct the AD to measure the distance from the surface of the liquid to the top of the SLC Tank.

Page 8 of 100

9. OPT-01.1.6, Reactor Protection System Manual Scram Test, is in progress. The Reactor Scram System A pushbutton has been depressed.

Which one of the following choices completes the statement below?

The alarm(s) that will occur is/are _

The RPS channel(s) that is/are de-energized is/are _

A. REACTOR MANUAL SCRAM SYS A only A3 only B. REACTOR MANUAL SCRAM SYS A only A1, A2 and A3 C. REACTOR MANUAL SCRAM SYS A and REACTOR AUTO SCRAM SYS A A3 only D. REACTOR MANUAL SCRAM SYS A and REACTOR AUTO SCRAM SYS A A1, A2 and A3 Page 9 of 100

10. Which one of the following identifies the parameter that provides a direct input into the RPS logic (Le., does not actuate a turbine trip logic first)?

A. Control Valve Position LVDT B. EHC Low Header Discharge Pressure C. ETS (Emergency Trip System) Pressure D. RETS (Relayed Emergency Trip Supply) Pressure Page 10 of 100

11. TIP traces are in progress with all TIP drawer Mode Switches in Auto.

.A small steam leak in containment causes drywell pressure to rise to 2.7 psig.

Which one of the following predicts the final TIP ball valve position indication(s) and also identifies all available location(s) for verifying their"position?

A. Red light indication illuminated on the Back Panel P607 ONLY.

B. White Valve Light illuminated on each TIP drawer at Back Panel P607 ONLY.

c. Red light indication illuminated on both the P601 Panel and the Back Panel P607.

D. Green light indication illuminated on the P601 Panel and a white Valye Light illuminated on each TIP drawer at Back Panel P607.

Page 11 of 100

12. Unit One is commencing a startup with all SRM's fully inserted and reading approximately 1 x 105 cps. The IRM's are reading the following:

IRMA 20 on Range 1 IRME 21 on Range 1 IRMB 28 on Range 1 IRM F 19 on Range 1 IRMC 21 on Range 2 IRMG 23 on Range 2 IRMD 25 on Range 1 IRMH 20 on Range 1 The operator takes the range switch for IRM B from Range 1 to Range 3.

Which one of the following identifies the status of the IRM B downscale white light at P601 and also identifies the annunciator alarm(s) status for this condition?

A. White light illuminated; ROD OUT BLOCK alarm only.

B. White light illuminated; Both ROD OUT BLOCK and REACTOR AUTO SCRAM SYS B alarms.

C. White light extinguished; ROD OUT BLOCK alarm only.

D. White light extinguished; Both ROD OUT BLOCK and REACTOR AUTO SCRAM SYS B alarms.

Page 12 of 100

13. A reactor startup is in progress following a mid cycle forced outage in accordance with OGP-02, Approach to Criticality and Pressurization of the Reactor.

The operator notes the following SRM readings:

SRM Channel A 6.0 x 105 cps SRM Channel B 1.0 x 105 cps SRM Channel C 7.0 x 1'04 cps SRM Channel D 8.0 x 104 cps AlllRMs are on Range 4.

Which one of the following alarms will occur?

A. ROD OUT BLOCK Alarm only B. SRM UPSCALE / INOP Alarm only C. SRM UPSCALE / INOP and ROD OUT BLOCK Alarms D. ROD OUT BLOCK and NEUTRON MON SYS TRIP Alarms Page 13 of 100

14. Unit Two is operating at 1OOo~ rated power.

Which one of the following plant transients will cause the APRM aDA displays to automatically shift to the stability screen?

A. FW-V120, FW Htrs 4 & 5 Byp Vlv, is inadvertantly opened B. Control Rod drifting into the core C. "A" Recirculation Pump Trip D. Inadvertant HPCI injection Page 14 of 100

15. Unit Two is at rated power when a faulty CST level instrument initiates a false low CST level input to the RCIC logic. RCIC SUCT XFER CST LO LVL annunciator is received.

Which one of the following identifies the correct RCIC system suction valves response?

Suppression Pool Suction Valves, E51-F029 and E51-F031, _

CST Suction Valve, E51-F01 0, - - - - - - - -

A. immediately auto open; begins to close when both suppression pool suction valves are not full closed.

B. immediately auto open; begins to close after both suppression pool suction valves are full open.

C. begin to open when CST suction valve is not full open; immediately auto closes.

D. begin to open only after the CST suction valve is full closed; immediatley auto closes.

Page 15 of 100

16. Following a small steam line break in the drywell, plant conditions are as follows:

Drywell Pressure 20.8 psig Drywell Average Air Temp. 292 F 0

Torus Pressure 19.0 psig Reactor Pressure 675 psig Reactor Water Level 100 inches HPCI System Unavailable RCIC System Started at LL2 and injecting Which one of the following identifies the current status of the ADS Initiation Timer and what operator action must be taken in accordance with Pcep?

ADS Initiation Timer started; Before Drywell Average Air temperature reaches 300 F, 0 A. has; Drywell Spray is required B. has not; Drywell Spray is required C. has; Emergency Depressurization is required D. has not; Emergency Depressurization is required Page 16 of 100

17. Unit Two is operating at full power.

28 RHR and 28 RHR SW pumps have been placed in Suppression Pool Cooling to lower torus temperature.

A subsequent LOCA causes reactor water level to drop rapidly.

Plant conditions are as follows:

Drywell Pressure 18.1 psig Torus Pressure 13.7 psig Reactor Pressure 885 psig Reactor water level 36 inches E11-F0488 Closed Which one of the following describes the effect these conditions will have on the status of Suppression Pool Cooling?

A. 28 RHR and 28 RHR SW pumps remain running E11-F0488 will auto open

8. 28 RHR and 28 RHR SW pumps remain running E11-F0488 will remain closed C. ONLY the 28 RHR SW Pump will trip E11-F0488 will auto open D. ONLY the 28 RHR SW Pump will trip E11-F0488 will remain closed Page 17 of 100
18. During an ATWS, circuit alterations are performed per EOP-SEP-10, Circuit Alteration Procedure, to prevent a Group I Isolation from occurring.

Which one of the following Group I Isolation signals is defeated by this circuit alteration and how is the alteration physically accomplished?

A. Low Reactor Water Level; Installing jumpers B. Low Condenser Vacuum; Installing jumpers C. Low Reactor Water Level; Bypass Switch D. Low Condenser Vacuum; Bypass Switch Page 18 of 100

19. Unit One is performing OGP-02, Approach to Criticality and Pressurization of the Reactor, with the following plant conditions:

MSIVs are open Inboard Drain Isolation valve, B21-F016, is open Outboard Drain Isolation valve, B21-F019, is open Which one of the following identifies the plant response to opening the feeder breaker to 1A RPS MG set?

A. The AC solenoids on the Inboard MSIVs and the DC solenoids on the Outboard MSIVs de-energize. The B21-F016 closes.

B. The AC solenoids on the Inboard MSIVs and the DC solenoids on the Outboard MSIVs de-energize. The B21-F019 closes.

C. The DC solenoids on the Inboard MSIVs and the AC solenoids on the Outboard MSIVs de-energize. The B21-F016 closes.

D. The DC solenoids on the Inboard MSIVs and the AC solenoids on the Outboard MSIVs de-energize. The B21-F019 closes.

Page 19 of 100

20. On Unit Two, the SRO directs the RO to place drywell sprays in service per OEOP-01-SEP-02, Drywell Spray Procedure.

During the execution of SEP-02, SW-V111, Conv SW to Vital Header Vlv, trips on magnetics and remains in the full closed position.

Which one of the following describes the impact this failure will have on RHR/Drywell Spray system and also identifies the required operator actions in accordance with SEP-02?

A. loss of cooling water to RHR Room Coolers only; Open SW-V117, Nuc SW to Vital Header Vlv.

B. loss of cooling water to RHR Room Coolers only; Open SW-V118, Vital Header Crosstie Vlv.

C. loss of cooling water to RHR Room Coolers and RHR Pump Seal Coolers; Open SW-V117, Nuc SW to Vital Header Vlv.

D. loss of cooling water to RHR Room Coolers and RHR Pump Seal Coolers; Open SW-V118, Vital Header Crosstie Vlv.

Page 20 of 100

21. Following a dual unit Loss Of Offsite Power, which one of the following is the first makeup source to be used for filling the fuel pool in accordance with OAOP-38.0, Loss

'of Fuel Pool Cooling?

A. Demin water header stations B. Fire Protection Hose Stations C. Condensate transfer pumps D. Emergency Diesel Makeup Pump via hoses Page 21 of 100

22. A reactor scram has occurred with the following plant conditions:

Reactor Pressure 1100 psig Drywell Pressure 2.5 psig EHC Pumps Tripped Which one of the following systems is available and allowed for use in accordance with RVCP to stabilize pressure below 1050 psig?

A. HPCI B. RCIC C. Main Steam Line Drains D. Main Turbine Bypass Valves Page 22 of 100

23. Which one of the following describes the effect that a loss of E8 will have on the Unit Two Safety Relief Valve (SRV) system?

A. Inability to manually operate SRV's from the RTGB B. Inability to manually operate SRV's from the RSDP

c. Loss of SRV position indication on the RTGB D. Loss of SRV position indication on the RSDP Page 23 of 100
24. Unit Two is in power ascension following a refueling outage.

Reactor power is currently 22%.

The generator has been synchronized with the grid.

Load Limit is set to 110 %

GP-04, Increasing Turbine Load to Rated Power, directs increasing turbine Load Set to 100 % .

(reference provided)

If the RO adjusts Turbine Load Set to 90%, which one of the following predicts how the plant will respond as reactor power is raised?

A. When turbine load exceeds 90%, reactor pressure will increase and cause a reactor scram.

B. When reactor power reaches 100 % then turbine load will be 100%.

C. When turbine load exceeds 90%, bypass valves will open to control turbine inlet pressure.

D. When turbine load reaches 90%, bypass valves will open causing a Group I Isolation.

Page 24 of 100

25. With Unit Two operated at rated power, the 2A Feedwater Heater level reaches the Hi Hi Level setpoint due to a failed Feedwater Heater level control valve.

Which one of the following choices completes the statement below?

The Moisture Removal Valves will open to drain the extraction steam lines to the

______ and final feedwater temperature to the reactor will _

A. Condenser; Increase B. Condenser; Decrease C. Heater Drain Deaerator; Increase D. Heater Drain Deaerator; Decrease Page 25 of 100

26. Reactor pressurization is in progress per OGP-02, Approach to Criticality and Pressurization of the Reactor.

The feedwater system is aligned as follows:

RFP A is in Service RFP A Recirc Valve (FW-FV-V46) is open Reactor Pressure is 400 psig SULCV (FW-LV-3269) in Auto Feedwater Heater 4A and 4B inlet isolation valves are closed FW-FV-177, Feedwater Recirc Valve, throttled open with 0.5 Mlbm/hr.

Which one of the following choices predicts the automatic response of the SULCV and also completes the caution statement in accordance with GP-02?

If the operator throttles FW-FV-177 in the open direction, the SULCV will automatically throttle in the direction. Opening the FW-FV-177 more than the

_ _ _ _ _ may cause feedwater line depressurization and loss of flow to the reactor vessel.

A. open RFP A Recirc Valve B. closed RFP A Recirc Valve C. open SULCV D. closed SULCV Page 26 of 100

27. Unit Two is operating at rated power with the following containment parameters:

Drywell Pressure 0.8 psig Torus Pressure 1.2 psig Torus venting is placed in service per 20P-1 0, Standby Gas Treatment System Operating Procedure.

Which one of the following identifies the SBGT alignment and also identifies how containment pressure will initially respond as the torus is being vented?

A. Align flow through both SBGT trains; Drywell Pressure will lower at the same rate as Torus Pressure.

B. Align flow through both SBGT trains; Drywell Pressure will remain steady.

c. Align flow through one SBGT train only; Drywell Pressure will lower at the same rate as Torus Pressure.

D. Align flow through one SBGT train only; Drywell Pressure will remain steady.

Page 27 of 100

28. Unit Two is operating at rated power with UPS in its normal alignment. Subsequently, offsite power is lost. DG3 and DG4 are unavailable. No electrical buses have been cross-tied.

Which one of the following choices completes the statements below?

The UPS Primary Inverter is currently being fed from DC Switchboard _

If the Primary Inverter fails, _

A.2A.

UPS loads will be de-energized.

8. 28.

UPS loads will be de-energized.

C.2A.

UPS will auto transfer to an alternate source.

D.28.

UPS will auto transfer to an alternate source.

Page 28 of 100

29. Unit One is operating at full power with the following plant conditions:

Suppression Pool 96° F due to HPCI Surveillance RHR B Loop in SPC (B/D pumps running)

RHRSW BLoop in service (B/D pumps running)

A Loss of Offsite Power (LOOP) occurs on both Units and DG2 fails to start.

Which one of the following identifies the impact of the LOOP on the 1-E11-F024B and the 1D RHR Pump and also identifies the required action in accordance with OAOP-36.1, Loss of any 4160V Buses or 480V E-Buses, to support EOP actions?

A. 1-E11-F024B Valve only has lost power.

Crosstie E2 to E4.

B. 1-E11-F024B Valve only has lost power.

. Crosstie E1 to E2.

C. 1-E11-F024B Valve and the 1D RHR pump have lost power.

Crosstie E2 to E4.

D. 1-E11-F024B Valve and the 1D RHR pump have lost power.

Crosstie E1 to E2.

Page 29 of 100

30. Unit Two is operating at 300/0 reactor power when a complete loss of the Vital UPS System occurs.

Which one of the following describes how this loss will affect RFPT operation?

A. RTGB trip pushbutton function is lost.

B. overspeed trip circuit will lose power causing RFPT Trip.

C. vibration instrumentation will lose power causing RFPT Trip.

D. RFPT woodward control trip circuits will be powered from their redundant power supplies.

Page 30 of 100

31. Which one of the following choices completes the statements below regarding how a total loss of UPS will affect the Digital Feedwater Level Control System Controllers.

Level Setpoint adjustment is _

Level Setdown occur following a reactor scram.

A. available; will B. available; will not C. not available; will D. not available; will not Page 31 of 100

32. Which one of the following is the power supply to the Outboard MSIV's DC solenoids on Unit One?

A. Div 1 Switchboard 21A.

B. Div 2 Switchboard 22B.

C. Div 1 Switchboard 1A.

D. Div 2 Switchboard 1B.

Page 32 of 100

33. Unit Two experiences a Loss of Off-Site Power (LOOP) with DG4 under clearance.

Which one of the following predicts the NSW and CSW pump response when the DG3 ties to bus E3?

A. NSW pump 2A and CSW pump 2A start immediately.

B. NSW pump 2A and CSW pump 2A start after a 5 second time delay.

C. NSW pump 2A starts immediately and CSW pump 2A does not start.

D. NSW pump 2A starts after a 5 second time delay and CSW pump 2A does not start.

Page 33 of 100

34. Unit Two is operating at rated power with the A SJAE train in service at Full Load.

A clearance tagging error results in the closure of the SJE-V15, Recombiner Preheater Steam Supply Valve followed by the following alarm:

RECOMBINER INLET TEMPERATURE LOW Which one of the following describes the effect these conditions will have on Main Condenser vacuum and downstream Hydrogen concentrations?

Main Condenser vacuum will - - - - - - -

Hydrogen concentrations will _

A. remain steady; increase B. remain steady; decrease C. degrade; increase D. degrade; decrease Page 34 of 100

35. Which one of the following identifies the power supplies for the Electric Driven Fire Pump?

The normal power supply is from:

A. E2, with an automatic transfer to E4 on loss of power B. E4, with an automatic transfer to E2 on loss of power

c. E2, must be manually transfered to E4 on loss of power D. E4, must be manually transfered to E2 on loss of power Page 35 of 100
36. A plant transient and subsequent safety relief valve malfunction results in reactor steam dome pressure reaching 1300 psig.

Which one of the following choices completes the following statements?

Reactor vessel design pressure been exceeded.

Tech Spec 2.1.2, Reactor Coolant System Pressure Safety Limit been exceeded.

A. has; has B. has; has not C. has not; has D. has not; has not Page 36 of 100

37. Unit Two is operating at 19% power with the turbine on the turning gear when the following indications are observed:

SJAE Trains Both in half load AOG System Outlet Flow 80 scfm and slowly rising Condenser Vacuum Slowly lowering Steam Seal header pressure o psig Which one of the following identifies the required operator action in acordance with OAOP-37, Low Condenser Vacuum?

A. Place B SJAE in full load B. Start the mechanical vacuum pump C. Throttle open MVD-S2, Steam Seal Bypass Valve D. Throttle open the SJAE Condensate Recirculation Valve, CO-FV-49 Page 37 of 100

38. A LOGA occurs on Unit One concurrent with a LOOP on both Units.

A DG3 lockout occurs due to a protective relay actuation.

Which one of the following is the response of the Unit One Low Pressure EGGS systems?

There will be injection from of Gore Spray.

There will be injection from two RHR pumps in _

A. both loops only one loop B. only one loop only one loop G. both loops both loops D. only one loop both loops Page 38 of 100

39. Which one of the following is the effect of a loss of the 24 VDC power supply located in RPS Analog Trip Cabinet A1?

A. A1 remains energized from B1 B. A1 remains energizes from A2 C. A1 loses power and trip functions occur D. A1 loses power and trip functions do not occur Page 39 of 100

40. Which one of the following identifies the reason that the Turbine Bypass Valves will open following a main turbine trip from full power?

A. Prevent overspeeding of the main turbine during the coastdown.

B. Prevent over pressurization of the MSR cross-over piping.

c. Prevent over pressurization of the reactor vessel.

D. Prevent rupture of the LP Turbine rupture discs.

Page 40 of 100

41. Which one of the following Scram Immediate Operator actions has a different setpoint between Unit One and Unit Two?

A. Tripping of the main turbine.

B. Tripping of the first feed pump.

C. Master level controller setpoint setdown.

D. Placing the reactor mode switch to Shutdown.

Page 41 of 100

42. Unit One was operating at full power when a scram ocurred due to a loss of drywell cooling with the following plant conditions.

Reactor water level 155 inches (slowly 10werit'1g)

Drywell pressure 2.1 psig (slowly rising)

High Level Trip A Amber light extinguished High Level Trip B Amber light illuminated High Level Trip C Amber light illuminated Which one of the following is the status of the reactor feed pumps and HPCI system?

The Reactor feed pump turbines:

A. are running and HPCI is injecting to the vessel.

B. are tripped, but HPCI is still injecting to the vessel.

C. are running, but HPCI is tripped.

D. and HPCI are both tripped.

Page 42 of 100

43. Unit One is at rated power when a scram signal is received.

Reactor water level drops and RWCU isolates.

Which one of the following level indicators, if any, was indicating on scale and available for use when RWCU isolated?

A. Fuel Zone (N036/N037) instruments only B. Wide range (N026A/B) instruments only C. Both Fuel Zone (N036/N037) and Wide Range (N026A/B) instruments D. Neither Fuel Zone (N036/N037) nor Wide Range (N026A/B) instruments were available.

Page 43 of 100

44. Unit Two was operating at 100 % power when a steam line break caused drywell pressure to rise.

Which one of the following identifies the norrmal temperature relationship between compensated and uncompensated level instrument legs and also identifies the level instruments that will first be affected as drywell temperature rises due to the steam leak?

A. The compensated lev~1 instrument legs are at a higher temperature than the uncompensated legs, the compensated level instrument legs will boil first.

B. The uncompensated level instrument legs are at a higher temperature than the compensated legs, the uncompensated level instrument legs will boil first.

C. Both instrument legs are at the same temperature. The compensated level instrument legs will boil first.

D. Both instrument legs are at the same temperature. The uncompensated level instrument legs will boil first.

Page 44 of 100

45. A turbine trip and reactor scram occurs on Unit One. The following indications are on the full core display:

Green Lights Lit 136 rods Red lights Lit one rod Which one of the following choices completes the statements below?

RWM Shutdown Confirmation Screen will display _

The reactor - - - remain shutdown under all conditions without boron.

A. Shutdown: NO will B. Shutdown: NO will not C. Shutdown: YES will D. Shutdown: YES will not Page 45 of 100

46. While reducing reactor pressure to place Shutdown Cooling in service in accordance with OAOP-32.0, Plant Shutdown from Outside Control Room, the following reactor pressure readings were recorded at the indicated times:

1200 1000 psig 1300 425 psig 1400 100 psig 1500 25 psig (reference provided)

Which one of the following choices completes the following statement?

The reactor cooldown rate specified in OAOP-32.0:

A. has not been exceeded B. was exceeded between 1200 and 1300

c. was exceeded between 1300 and 1400 D. was exceeded between 1400 and 1500 Page 46 of 100
47. Unit Two is operating at rated power when the TCC-TV-607, MG Set Oil Cooler 2A Temperature Control Valve, fails to the closed position.

Which one of the following describes how this loss of cooling will affect the Recirculation MG Sets?

When the high lube oil temperature in the fluid drive reaches:

0 A. 190 F the scoop tube will lock and the drive motor breaker remains closed .

0 B. 190 F the drive motor breaker will trip and the scoop tube will lock.

0 C. 210 F the scoop tube will lock and the drive motor breaker remains closed.

0 D. 210 F the drive motor breaker will trip and the scoop tube will lock.

Page 47 of 100

48. Which one of the following identifies the signal(s) that will initiate the Backup Nitrogen System, including the reason for the Backup Nitrogen System?

A. Low Reactor Building Instrument Air header or Core Spray LOCA signal.

Ensures operability of ADS valves and Inboard MSIV's.

B. Core Spray LOCA signal ONLY.

Ensures operability of ADS valves and Inboard MSIV's.

C. Low Reactor Building Instrument Air header or Core Spray LOCA signal.

Ensures operability of ADS valves and the Hardened Wetwell Vent Valves.

D. Core Spray LOCA signal ONLY. .

Ensures operability of ADS valves and the Hardened Wetwell Vent Valves.

Page 48 of 100

49. Unit One shutdown is in progress with the following plant conditions:

RWCU is in service.

Recirc Pump B is running.

SDC A Loop has been lost.

Feed and bleed has been established.

0 Reactor Coolant Temperature is 190 F and lowering slowly.

Given this condition in progress, which one of the following identifies the PREFERRED indication to use to determine vessel metal temperature response in accordance with 1PT-01.7, Heatup/Cooldown Monitoring, including the reason?

A. Bottom head metal temperature; metal temperature response leads the coolant temperature response during a cooldown.

B. Bottom head metal temperature; coolant temperature response leads the metal temperature response during a cooldown.

C. Bottom drain coolant temperature; metal temperature response leads the coolant temperature response during a cooldown.

D. Bottom drain coolant temperature; coolant temperature response leads the metal temperature response during a cooldown.

Page 49 of 100

50. Which one of the following is the primary containment pressure limit and the required action before this limit is reached in accordance with PCCP?

A. 62 psig Vent primary containment irrespective of offsite release rate B. 62 psig Vent primary containment only if offsite release rate do not exceed aDCM limits C. 70 psig Vent primary containment irrespective of offsite release rate D. 70 psig Vent primary containment only if offsite release rate do not exceed aDCM limits Page 50 of 100

51. Unit Two is operating at rated power with EHC Pressure Regulator B out of service.

Pressure Regulator A output fails low.

(Reference provided)

Which one of the following identifies how reactor pressure will respond and also identifies the availability of the bypass valves following the reactor scram?

A. Reactor pressure will decrease and a scram will occur on a Group I Isolation.

Bypass valves are not available using the Bypass Valve Jack.

B. Reactor pressure will increase and a scram will occur on high pressure.

Bypass valves will still be available using the Bypass Valve Jack.

C. Reactor pressure will decrease and a scram will occur on a Group I Isolation.

Bypass valves will still be available using the Bypass Valve Jack.

D. Reactor pressure will increase and a scram will occur on high pressure.

Bypass valves are not available using the Bypass Valve Jack.

Page 51 of 100

52. Unit One failed to scram with the following plant conditions:

Reactor Power 3%

RPV Water Level -55 inches (N036)

RPV Pressure 800 psig 0

Suppression Pool 115 F Which one of the following actions, if any, is required to open suppression pool cooling valves (E 11-F024 and E11-F028)?

A. Place the Think Switch to Manual only.

B. No overrides are necessary.

c. Place the Think Switch to Manual first and then bypass the 2/3rd core height interlock.

D. Bypass the 2/3rd core height interlock first and then place the Think Switch to Manual.

Page 52 of 100

53. Unit Two is operating at power with a leaking SRV. The ERFIS indication for the Suppression Pool Temperature has just turned RED.

Which one of the following identifies the temperature when ERFIS first turns RED and also identifies which procedure that must be entered?

0 A. 95 F PCCP B. 105 0 F PCCP 0

C. 95 F OAOP-14.0, Abnormal Primary Containment Conditions 0

D. 105 F OAOP-14.0, Abnormal Primary Containment Conditions Page 53 of 100

0

54. Conditions on Unit Two have degraded to where the Drywell Air Temperature is 340 F.

Which one of the following identifies the components whose enviromental qualification is affected by this temperature in accordance with 001-37.8, Primary Containment Control Procedure Basis Document?

A. Inboard MSIV solenoids B. SRV solenoids C. Torus to Drywell Vacuum Breakers D. CAG 4409 and 4410 Hydrogen Analyzers Page 54 of 100

55. Which one of the following is the suppression pool level when a manual reactor scram is first required including the required action in accordance with PCCP?

A. -5.5 feet Anticipation of Emergency Depressurization is required.

B. -5.5 feet Emergency Depressurization is required

c. -6.5 feet Anticipation of Emergency Depressurization is required.

D. -6.5 feet Emergency Depressurization is required Page 55 of 100

56. During a low reactor water level emergency on Unit One, the Reactor Vessel Control Procedure directs the operator to enter the Steam Cooling Procedure.

Which one of the following describes the reason Steam Cooling Procedure is performed?

The Steam Cooling Procedure utilizes steam cooling heat transfer _

injection to maximize the time peak clad temperatures in the uncovered portion of the core do not exceed of.

A. with 1500 B. with 1800 C. without 1500 D. without 1800 Page 56 of 100

57. Which one of the following statements identifies the reason scep directs emergency depressurization based on temperature in accordance with 001-37.9, Secondary Containment Control Procedure Basis Document?

The reason the emergency depressurization is performed due to secondary containment temperature is to:

A. preserve personnel access into the reactor building.

B. ensure ODCM site boundary dose limits are not exceeded.

C. prevent damage to equipment required for safe shutdown.

D. prevent an unmonitored release.

Page 57 of 100

58. During the execution of emergency operating procedures, the operator has restarted Reactor Building HVAC per OEOP-01-SEP-04, Reactor Building HVAC Restart Procedure.

Which one of the following subsequent conditions would cause the Reactor Building Supply and Exhaust Isolation Dampers to reclose?

A. Reactor water level lowers below LL2.

B. Drywell pressure rises above 1.7 psig.

C. PROCESS OFF-GAS VENT PIPE RAD HI-HI alarm is received.

D. REACTOR BUILDING VENT EXHAUST TEMP HI alarm is received.

Page 58 of 100

59. The unit is in an ATWS with the following conditions:

SLC Tank 30% and lowering Reactor Water Level Being maintained 60 to 90 inches Reactor Power APRMs downscale Which one of the following choices completes the statement below in accordance with LPC?

Hot Shutdown Boron Injection Weight been injected and RPV water level

_ _ _ _ required to be raised at this tank level.

A. has is B. has is not C. has not is D. has not is not Page 59 of 100

60. Unit Two is operating under accident conditions with the following plant conditions due to a steam leak on HPCI:

Reactor Water Level -20 inches Reactor Pressure 900 psig Injection sources available HPClonly Offsite Release Alert declared 0

HPCI Room Temperatures 140 F 0

Suppression Pool Temperature 130 F Which one of the following identifies the required HPCI operation action in accordance with RRCP and also identifies the reason for taking the action?

A. HPCI should be left running It is required to be operated by the EOP's B. HPCI should be isolated It should have isolated on room high temperature C. HPCI should be left running Steam leak detection was overridden per RVCP D. HPCI should be isolated To prevent damage to the HPCI pump due to high suppression pool temperatures Page 60 of 100

61. During normal full power operation of Unit Two the following alarms and indications are noted:

SERVICE AIR PRESS LOW alarm Sealed In RB INSTR AIR RECEIVER 2A PRESS LOW Not in Alarm RB INSTR AIR RECEIVER 2B PRESS LOW Not in Alarm Instrument Air header pressure 100 psig Service Air header pressure 100 psig Which one of the following actions is required in accordance with OAOP-20, Pneumatic System Failures?

A. Start SBGT.

B. Close the manual Noninterruptible Isolation Valves.

C. Close the Service Air isolation valves, PV-706-1 and PV-706-2.

D. Close the Reactor Building Isolation Dampers.

Page 61 of 100

62. Which one of the following identifies the exact location of the RBCCW liquid process radiation detector (D12-RM-K606) and the function(s) it provides?

A. RBCCW pump suction header; alarm function only B. RBCCW pump suction header; alarm and isolation function C. Upstream of RCC-V28, Drywell Cooling Water Header Isolation Valve; alarm function only D. Upstream of RCC-V28, Drywell Cooling Water Header Isolation Valve; alarm and isolation function Page 62 of 100

63. The SS has determined that the control room personnel must don SCBAs (Scott AP50) due to sr:noke in the control room from a plant fire on site.

Which one of the following is an indication that a SCBA is low on air?

A. Air regulator bypass valve fails open.

B. Air regulator bypass valve fails closed.

C. Audible high pitched beep emitting from face piece.

D. Vibralert alarm in the regulator that vibrates the face piece.

Page 63 of 100

64. Generator MVARs are indicating 0 MVARs.

Which one of the following identifies the actions required to restore MVARs to the limits specified in OP-27, Generator and Excitation System Operating Procedure?

Coordinate with the Load Dispatcher to either:

A. Raise the auto voltage regulator or place a capacitor bank in service B. Lower the auto voltage regulator or place a capacitor bank in service C. Raise the auto voltage regulator or remove a capacitor bank from service D. Lower the auto voltage regulator or remove a capacitor bank from service Page 64 of 100

65. A grid disturbance occurs with the following Unit Two plant parameters:

Generator Load 980 MWe Generator Reactive Load 160 MVARs, out Generator Gas Pressure 50 psig (Reference provided)

Which one of the following identifies all of the available options that will place the Unit within the Estimated Capability Curve?

A. Raise Gas Pressure or lower MWe.

B. Raise Gas Pressure or raise MVARs.

C. Raise Gas Pressure only.

D. Lower MWe only.

Page 65 of 100

66. Which one of the following identifies two activities when two-handed operations are allowed, without prior SCO approval, in accordance 001-01.02, Shift Routines and Operating Practices? .

A. Continuous rod movement Inserting a manual scram.

B. Dual purge fan start is desired for primary containment ventilation for personnel entry Placing RHR in suppression pool cooling.

c. Synchronizing the DG to its bus Continuous rod movement.

D. Dual purge fan start is desired for primary containment ventilation for personnel entry Inserting a manual scram.

Page 66 of 100

67. Initial reactor power is at 80%.

Which one of the following identifies two situations that require a PA announcement in accordance with OAP-50, Site Command, Control, and Communications Procedure, or 001-01.02, Shift Routines and Operating Practices?

A. Placing Hydrogen Water Chemistry in service Fire in the Service Water Building B. Power reduction to 76%

Fire in the DG2 cell C. AOP-22, Grid Instability entry Starting 2B Condensate Pump D. Power increase to 90%

Opening the Reactor Feed Pump recirc valve Page 67 of 100

68. While reviewing Display 820, Powerplex Heat Sal/Core Man Results, the Reactor Operator notes that one of the Feedwater flow values is cyan (blue).

Which one of the following identifies the meaning of this color coding in accordance with 001-72, Plant Process Computer System Operating System?

The process parameter:

A. is displaying bad data.

S. is displaying expired data.

C. is exceeding a high alarm limit.

D. has a substitute value inserted.

Page 68 of 100

69. An ATWS has occurred on Unit One with the following plant conditions:

Reactor Water Level 130 inches (stable)

Injection Systems CRD Reactor Power APRM downscale lights are illuminated Control Rods 19 rods failed to insert SRVs All closed Suppression Pool Temp. 92° F Which one of the following choices completes the statement below in accordance with LPC?

Reactor Recirculation pumps required to be tripped and the SLC Pumps

_ _ _ _ required to be started.

A. are not are not B. are not are C. are are not D. are are Page 69 of 100

70. Given the following alarm criteria:

a trip setpoint that is important to reactor safety, or a condition requiring prompt action by the operator, or a condition that requires additional manning at the control panels Which one of the following identifies the annunciator window designation for this criteria in accordance with 001-01.08, Control of Equipment and System Status?

A. Red backgro.und with blue bar B. Red Background with red bar C. Red Background with yellow bar D. Amber background with yellow bar Page 70 of 100

71. Which one of the following identifies the Unit differences for the CREV system control and indications at the RTGB?

A. Unit One has indication and controls Unit Two has no indication or control B. Unit One has indication only Unit Two has indication and controls C. Unit One has no indication or control Unit Two has indication and controls D. Unit One has indication and controls Unit Two has indication only Page 71 of 100

72. Considering a 31 day surveillance frequency, which one of the following is last day that the surveillance can be performed and still meet the requirements of Technical Specifications?

The last day the surveillance must be performed by is within of the previous performance of the surveillance.

A. 32 days B. 38 days C. 45 days D. 62 days Page 72 of 100

73. During performance of 201-03.02, Control Operator Daily Surveillance Report, the following SJAE Off-Gas Radiation Monitor readings are recorded:

D12-RM-K601A 110 mr/hr D12-RM-K601 B 50 mr/hr A local survey instrument positioned at the alternate channel check survey point for SJAE Radiation Monitor BReads 80 mr/hr.

(reference provided)

Which one of the following characterizes this deviation and also identifies the required action, if any, in accordance with 201-03.02.

A. The deviation is conservative The channel check criteria is met and no other actions are required.

B. The deviation is conservative Initiate a W/R to evaluate the deviation.

c. The deviation is non-conservative Declare SJAE Radiation Monitor A inoperable.

D. The deviation is non-conservative Declare SJAE Radiation Monitor B inoperable.

Page 73 of 100

74. A valve lineup is to be performed in an area that has the following conditions:

0 Area temperature 115 F Area radiation 40 mr/hr Independent verification of this valve lineup is expected to take 0.5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

Which one of the following choices completes the statement below in accordance with OPS-NGGC-1303, Independent Verification?

Independent verification of this lineup, based on the above conditions, may be waived because of - - - - -

A. both extreme temperature and excessive dose B. excessive dose only C. extreme temperature only D. either extreme temperature or excessive dose Page 74 of 100

75. Which one of the following requires Health Physics Window notification prior to starting the evolution in accordance with 10P-14.0, Reactor Water Cleanup System Operating Procedure?

A. RWCU Reject Operation For Vessel Chemistry to radwaste B. Precoat of a RWCU filter C. Backwash of a RWCU filter only D. Transfer of the Backwash Receiving Tank to radwaste only Page 75 of 100

76. Unit Two is at rated power with the following plant conditions:

All control rods are OPERABLE Rod select power is OFF Control rod 10-27 scrams ROD DRIFT alarm is received Which one of the following identifies the status of the ROD OUT BLOCK annunciator and also identifies the procedure that contains the action for the operator to reduce core flow to 65 Mlbs/hr?

A. ROD OUT BLOCK Annunciator is alarming; 2APP-A-05, 3-2 ROD DRIFT.

B. ROD OUT BLOCK Annunciator is alarming; OAOP-02.0, Control Rod Malfunction/Misposition.

C. ROD OUT BLOCK Annunciator is NOT alarming; 2APP-A-05, 3-2 ROD DRIFT.

D. ROD OUT BLOCK Annunciator is NOT alarming; OAOP-02.0, Control Rod Malfunction/Misposition.

Page 76 of 100

77. During a LOCA with a LOOP the following plant conditions exist:

2B RHR pump Injecting and operating at its NPSH Limit 2B CS pump Injecting and approaching its NPSH Limits All other ECCS Pumps Unavailable Reactor Water Level 2/3 core height and steady Which one of the following is the consequence of continued RHR operation outside its NPSH limit in accordance with 001-37.4, Reactor Vessel Control Procedure Basis Document, and also identifies the required procedure to maintain adequate core cooling in accordance with RVCP?

A. Long term operation is expected to cause RHR pump damage; Line up CS to the CST per OP-18, Core Spray System Operating Procedure.

B. Immediate RHR pump damage.is expected to occur; Line up Alternate Coolant Injection per OEOP-01-LEP-01.

C. Long term operation is expected to cause RHR pump damage; Line up Alternate Coolant Injection per OEOP-01-LEP-01.

D. Immediate RHR pump damage is expected to occur; Line up CS to the CST per OP-18, Core Spray System Operating Procedure.

Page 77 of 100

78. Unit Two is operating at rated power.

While performing OPT-07.2.4A, Core Spray Loop A Operability, Core Spray Room Cooler A fails to start when Core Spray Pump A is started.

The Reactor Building AO reports that the Room Cooler breaker has tripped on thermal overload.

Which one of the following choices completes the statements below per OAP-13, Plant Equipment Control, and 001-01.08, Control of Equipment and System Status?

The breaker - - - - allowed to be reset once.

The room cooler required for Core Spray Loop A operability.

A. is is NOT B. is is C. is NOT is NOT D. is NOT is Page 78 of 100

79. The unit is operating at full power when the following plant conditions occur:

Load Reject Signal has occurred Line 31 (Whiteville Line) PCBs red lights are lit Line 31 (Whiteville Line) white VOLT lights are not lit All other line PCBs green lights are lit 230 KV BUS 1A BUS POT UNDERVOLTAGE is in alarm 230 KV BUS 1B BUS POT UNDERVOLTAGE is in alarm Which one of the following identifies the initial RPS trip signal and the procedure which contains the guidance to trip the Whiteville Line PCBs?

A. Control Valve Fast Closure; OAOP-36.1, Loss of Any 4160V Buses or 480V E-Buses.

B. Stop Valve Closure; OAOP-36.1, Loss of Any 4160V Buses or 480V E-Buses.

C. Control Valve Fast Closure; OAOP-22, Grid Instability.

D. Stop Valve Closure; OAOP-22, Grid Instability.

Page 79 of 100

80. A steam line break in primary containment has caused a reactor scram. Twelve control rods are not full in. Reactor water level was 150 inches when erratic level indication was observed on all available level indications during depressurization.

Which one of the following predicts the response of the available level indication as the reactor depressurizes and also identifies the required procedures when reactor water level cannot be determined?

Level indication will eventually fail _

The SCQ is required to _

A. downscale; completely exit LPC flowchart and enter RxFP flowchart for power, pressure and level control.

B. downscale; execute only the power leg of the LPC flowchart and the RxFP flowchart concurrently.

C. upscale; completely exit LPC flowchart and enter RxFP flowchart for power, pressure and level control.

D. upscale; execute only the power leg of the LPC flowchart and the RxFP flowchart concurrently.

Page 80 of 100

81. Unit Two is operating at full power when a loss of DC distribution panel 4B occurs.

Which one of the following identifies the effect this will have on the RCIC system and what action is required to be taken per Tech Spec 3.5.3, RCIC System?

RCIC is for injection from the RTGB; Examine logs or other information, to determine if the HPCI system is out of service, HPCI Operability PT required to be performed.

A. unavailable is not B. unavailable is C. available is not D. available is Page 81 of 100

82. The following sequence of events have occurred:

1130 Offsite power is lost to both units.

1130 All EDGs start and tie to their associated E-Buses.

1135 DG3 trips on low lube oil pressure 1145 DG4 trips on differential overcurrent 1200 E1 is crosstied to E3 1205 Current Time (reference provided)

Which one of the following identifies the highest emergency classification reached during the event AND the maximum amount of time allowed to make initial notification to State and local governments once formal declaration of the event is made?

A. Alert; 15 minutes B. Alert; 30 minutes C. Site Area Emergency; 15 minutes D. Site Area Emergency; 30 minutes Page 82 of 100

83. During normal full power operation I&C has requested removing annunciator card AOG SYSTEM DISCH RAD HIGH from service for trouble shooting of the annunciator.

This annuciator is listed on 001-01.08, Control of Equipment and System Status, Attachment 11, Technical Specification/TRM/ODCM Identified Annunciators.

The trouble shooting activity will take place early in the shift and last 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Which one of the following identifies whether ODCM Radioactive Gaseous Effluent Monitoring Instrumentation 7.3.2 action statement entry is required and also identifies whether 001-01.08, Attachment 10, Annunciator Removal From Service Form, is required to be completed for this activity?

A. action statement entry is required; Attachment 10 must be completed.

B. action statement entry is required; Attachment 10 is not required.

C. action statement entry is not required; Attachment 10 must be completed.

D. action statement entry is not required; Attachment 10 is not required.

Page 83 of 100

84. During power operation the 1A Recirc pump has been removed from service due to a failed recirc pump seal.

Core Flow Recorder B21-R613 indicates 38 Mlb/hr core flow Process computer point WTCF indicates 40.5 Mlb/hr core flow Which one of the following choices completes the following statements correctly?

For the given conditions, the most accurate total core flow indication is _

In order for the requirements of LCO 3.4.1 Recirculation Loops Operating to be met, and no shutdown action statements to be entered, the appropriate Single Loop Operating Limits must be applied within hours.

A. 40.5 Mlb/hr 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

B. 40.5 Mlb/hr 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

C. 38 Mlb/hr 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

D. 38 Mlb/hr 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Page 84 of 100

85. Unit Two is operating at rated power when the following alarms are received:

DG-4 CTl POWER SUPPLY lOST DG-4 lO START AIR PRESS DG4/E4 ESS lOSS OF NORM POWER DG-2 CTl POWER SUPPLY lOST Subsequently, DG4 control power was transferred to its alternate DC source.

Which one of the following identifies the DC panel that was lost and the impact on the operability of DG4 in accordance with lCO 3.8.1 , AC Sources Operating and lCO 3.8.7, Distribution Systems - Operating?

A. 125V DC Distribution Panel 1B; DG4 is operable on its alternate source for up to 7 days.

B. 125V DC Distribution Panel 1B; DG4 must be declared inoperable the entire time it is on its alternate source.

C. 125V DC Distribution Panel 2B; DG4 is operable on its alternate source for up to 7 days.

D. 125V DC Distribution Panel 2B; DG4 must be declared inoperable the entire time it is on its alternate source.

Page 85 of 100

86. Unit One is operating at 100 % power with the following conditions:

All control rods and control rod scram accumulators are operable All control rod scram times are within TS Limits Subsequently, one control rod scram accumulator has depressurized and cannot be repaired for two days.

Which one of the following identifies the required actions in accordance with Tech Spec 3.1.5, Control Rod Scram Accumulators?

The affected control rod must be declared:

A. slow only.

B. inoperable only.

C. either slow or inoperable.

D. both slow and inoperable.

Page 86 of 100

87. During accident conditions on Unit Two the following plant conditions are:

IRMs On scale / range 4 and lowering Period meter -80 seconds Control Rods 15 rods not full in Current Reactor Pressure 850 psig and lowering Peak Reactor Pressure 1145 psig SRVG Red light lit All other SRVs Green lights lit All SRV Switches In Auto/Close (reference provided)

Which one of the following is the status of the SRV's and what is the highest emergency action level classification that is required to be declared in accordance with OPEP-02.1, Initial Emergency Actions?

A. Only 7 SRV's memory lights are lit.

Alert B. Only 7 SRV's memory lights are lit.

Unusual Event

c. 8 SRV's memory lights are lit.

Alert D. 8 SRV's memory lights are lit.

Unusual Event Page 87 of 100

88. With Unit Two operating at full power, an inadvertent initiation of Core Spray A occurs and cannot be reset.

Which one of the following identifies the status of the RBCCW system and also identifies the procedure that contains the guidance for restoring RBCCW system cooling?

A. SW-V106, RBCCW HXS SW INLET VLV, has shut; OAOP-18, Nuclear Service Water System Failure.

B. SW-V106, RBCCW HXS SW INLET VLV, has shut; OAOP-19, Conventional Service Water System Failure.

C. All RBCCW pumps have tripped; OAOP-18, Nuclear Service Water System Failure.

D. All RBCCW pumps have tripped; OAOP-19, Conventional Service Water System Failure.

Page 88 of 100

89. Unit One is at full power when all offsite power was lost. The following is the status of the Emergency Diesel Generators:

DG1 Locked out on fault DG2 Running and loaded DG3 Running and loaded DG4* Running and loaded Which one of the following identifies the required action to re-establish the CRD system per OAOP-36.1, Loss of Any 4160V Buses or 480V E-Buses, and also identifies the procedure that contains the step for placing the CRD Flow .Control, C11-FC-R600, in manual with manual potentiometer at minimum setting?

A. The 1A CRD Pump must be started; 10P-08, Control Rod Hydraulic System Operating Procedure.

B. The 1A CRD Pump must be started; OAOP-02, Control Rod Malfunction/Misposition.

C. The 1B CRD Pump must be started; 10P-08, Control Rod Hydraulic System Operating Procedure.

D. The 1B CRD Pump must be started; OAOP-02, Control Rod Malfunction/Misposition.

Page 89 of 100

90. A fuel bundle was dropped in the spent fuel pool and OAOP-5.0, Radioactive Spills, High Radiation, and Airborne Activity, has been entered.

The following alarms are received:

AREA RAD REFUEL FLOOR HIGH (UA-03 3-7)

PROCESS RX BLDG VENT RAD HI (UA-03 4-5)

RX BLDG ROOF VENT RAD HIGH (UA-03 2-3)

Which one of the following predicts the plant response and also identifies the required procedure implementation?

A. Secondary Containment has automatically isolated; Execute OAOP-5.0 and RRCP concurrently.

B. Secondary Containment has automatically isolated; Execute RRCP and Exit OAOP-5.0.

C. Secondary Containment has NOT automatically isolated; Execute OAOP-5.0 and RRCP concurrently.

D. Secondary Containment has NOT automatically isolated; Execute RRCP and Exit OAOP-5.0.

Page 90 of 100

91. An event on Unit One has resulted in the following plant conditions:

Reactor pressure: 1000 psig Reactor Water Level 120 inches Control Rods All unknown APRMs Downscale Drywell pressure: 3 psig Supp. Pool pressure: 2 psig Supp. Pool water temp: 150 F0 Supp. Pool water level: -4 feet (Reference Provided)

Which one of the following identifies the status of the Heat Capacity Temperature Limit (HCTL) and also identifies the required procedure for reactor pressure control?

A. HCTL has been exceeded; RVCP pressure control leg.

B. HCTL has been exceeded; LPC pressure control leg.

C. HCTL has NOT been exceeded; RVCP pressure control leg.

D. HCTL has NOT been exceeded; LPC pressure control leg.

Page 91 of 100

92. OMST-PCIS21Q, PCIS Rx Water LL2 and LL3 Div I Trip Unit Chan Cal and Func Test, was performed and the following is the as left trip setpoint data:

Instrument Calibration Current B21-LT-N024A-1-1 11.59 mAdc B21-LT-N024A-1-2 7.40 mAdc B21-LT-N025A-1-1 11.64 mAdc B21-LT-N025A-1-2 7.43 mAdc (Reference provided)

Based on the above information which one of the following is the status of the Div I trip system and the required action?

A. LL2 function is inoperable.

Enter TS 3.3.6.1 Condition A only.

B. LL2 function is inoperable.

Enter TS 3.3.6.1 Condition A and Condition B.

C. LL3 function is inoperable.

Enter TS 3.3.6.1 Condition A only.

D. LL3 function is inoperable.

Enter TS 3.3.6.1 Condition A and Condition B.

Page 92 of 100

93. Unit Two has a line break with the following annunciators in alarm:

SOUTH CS RM FLOOD LEVEL HI SOUTH RHR RM FLOOD LEVEL HI SOUTH CS RM FLOOD LEVEL HI-HI SOUTH RHR RM FLOOD LEVEL HI-HI Which one of the following identifies the leak location and also identifies whether or not the Technical Specifications (TS) cooldown rate is required to be maintained?

Pipe break on the _

TS cooldown rate required to be maintained.

A. HPCI Turbine Steam Supply Line in the Steam Tunnel.

is B. HPCI Turbine Steam Supply Line in the Steam Tunnel.

is not C. RHR Service Water line above the RSDP.

is D. RHR Service Water line above the RSDP.

is not Page 93 of 100

94. Which one of the following identifies the earliest point in a reactor startup that the requirement for two Control Operators in the affected unit's Main Control Room can be relaxed in accordance with 001-01.02, Shift Routines and Operating Practices.

A. As soon as rated reactor pressure is achieved B. As soon as the point of adding heat is achieved

c. As soon as the second Reactor Feed Pump is in service D. As soon as the Main Generator is synchronized to the grid Page 94 of 100
95. Unit One is in an accident condition and is executing RVCP with the following conditions:

Reactor Water Level -60 inches Reactor Pressure 800 psig Reference Leg Temperature 0 208 F Injection sources available None (reference provided)

Which one of the following identifies the required procedure(s) that is/are required to maintain adequate core cooling?

A. Below the minimum steam cooling water level Enter STCP. Do not perform Emergency Depressurization.

B. Below the minimum steam cooling water level Enter STCP and perform Emergency Depressurization.

C. Above the minimum steam cooling water level Remain in RVCP. Do not perform Emergency Depressurization.

D. Above the minimum steam cooling water level Remain in RVCP and perform Emergency Depressurization.

Page 95 of 100

96. A fire in the control building fire area requires entry into OPFP-013, General Fire Plan, and OASSD-01, Alternative Safe Shutdown Procedure Index.

The SCO has determined that alternate safe shutdown actions are required.

Which one of the following identifies the next action that is required in accordance with ASSD-01 after a manual scram of both units and also identifies what procedure(s) are performed following these actions?

A. Place MSIV control switches in close; Perform OASSD-02, Control Building, only.

B. Trip both Reactor Recirc pumps; Perform OASSD-02, Control Building, only.

C. Trip both Reactor Recirc pumps; Perform OAOP-32, Plant Shutdown From Outside the Control Room, concurrently with OASSD-02" Control Building.

D. Place MSIV control switches in close; Perform OAOP-32, Plant Shutdown From Outside the Control Room, concurrently with OASSD-02, Control Building.

Page 96 of 100

97. In accordance with OAI-147, Systematic Approach to Troubleshooting, which one of the following identifies the trouble shooting activities that must be approved by the Plant General Manager (PGM)?

A. ONLY high risk activities.

B. ONLY those high risk activities that are performed during max/safe/gen periods of operation.

c. ALL medium and high risk activities that are performed during max/safe/gen periods of operation.

D. ALL high risk activities (anytime) and ONLY those medium risk activities that are performed during max/safe/gen periods of operation.

Page 97 of 100

98. During the performance of 10P-30, Condenser Air Removal and Off-Gas Recombiner System, an error is identified in the procedure and a temporary procedure change is being performed.

Which one of the following identifies how this type of temporary change is required to be categorized and the maximum duration allowed in accordance with PRO-NGGC-0204, Procedure Review and Approval?

A. One-Time-Use-Only, not to exceed 21 days from interim approval date B. Permanent Revision to Follow, not to exceed 21 days from interim approval date C. One-Time-Use-Only, not to exceed 4 months from interim approval date D. Permanent Revision to Follow, not to exceed 4 months from interim approval date Page 98 of 100

99. A steam leak at the MSR manway exists with the following conditions:

AREA RAD TURBINE BLDG HI In alarm Turbine Rotor Wash Down Area ARM Increase from 2 mr/hr to 300 mr/hr Turbine Building CAMs Alarming Turbine Building WRGM Increasing trend Turbine Building Evacuation Has been directed (reference provided)

Which one of the following choices completes the statements below in accordance with OAOP-05.0 Radiactive Spills, High Radiation, and Airborne Activity, and OPEP-02.1, Initial Emergency Actions?

Ensure Turbine Building HVAC is operating in the mode of operation.

The highest emergency action level classification that is required for these conditions is A. Recirc Unusual Event B. Recirc Alert

c. Once through Unusual Event D. Once through Alert Page 99 of 100

100. The Unit One Salt Water Release Tank (U/1 SWRT) is nearing capacity and is scheduled to be released. The tank has been recirculated per OOP-06.4, Discharging Radioactive Liquid Effluents to the Discharge Canal.

A radioactive liquid release permit has been prepared with the following data:

Tank Level 83%

Tank Volume 30,087.5 gallons Required Recirc Time 332 minutes Recirc Start Date/Time 10/23/08, 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> Sample Valve Opened Date/Time 10/24/08, 0410 hours0.00475 days <br />0.114 hours <br />6.779101e-4 weeks <br />1.56005e-4 months <br /> Sample Taken Date/Time 10/24/08, 0420 hours0.00486 days <br />0.117 hours <br />6.944444e-4 weeks <br />1.5981e-4 months <br /> (Reference provided)

Which one of the following identifies whether or not the time requirements for recirculation and sampling of the U/1 SWRT have been met in accordance with OOP-06.4?

The requirements of OOP-06.4 for recirculation and sampling of the U/1 SWRT:

A. have been met.

The recirculation and sample times are satisfied.

B. have NOT been met.

The recirculation time was incorrectly calculated.

C. have NOT been met.

The recirculation time was calculated correctly; however, the tank was not recirculated long enough.

D. have NOT been met.

The recirculation time was calculated correctly; however, the sample valve was not open long enough before obtaining the sample.

Page 100 of .1 00

Brunswick NRC SRO Exam November 2008 Name: - - - - - - - - - - - - Date: -------

1. ABC D 26. A 8 C *D 51. ABC D 76. ABC 0
2. ABC D 27. A B C D 52. ABC D 77. ABC D
3. ABC D 28. A 8 C D 53. ABC D 78. ABC 0
4. ABC D 29. A 8 C D 54. ABC D 79. ABC 0
5. ABC D 30. A 8 C D 55. ABC D 80. ABC 0
6. ABC D 31. A 8 C D 56. ABC D 81. ABC 0
7. ABC D 32. A 8 C D 57. ABC o 82. ABC D
8. ABC D 33. A B C D 58. ABC o 83. ABC 0
9. ABC D 34. A 8 C D 59. ABC o 84. ABC 0
10. ABC D 35. A 8 C 0 60. ABC o 85. ABC 0
11. ABC D 36. A 8 C 0 61. ABC D 86. ABC 0
12. ABC D 37. A 8 C 0 62. ABC D 87. ABC D
13. ABC D 38. A B C D 63. ABC D 88. ABC D
14. ABC D 39. A 8 C D 64. ABC o 89. ABC D
15. ABC D 40. A 8 C D 65. ABC D 90. ABC D
16. ABC D 41. A B C D 66. ABC D 91. ABC D
17. ABC D 42. A 8 C D 67. ABC D 92. ABC D
18. ABC D 43. A B C D 68. ABC o 93. ABC D
19. ABC D 44. A 8 C D 69. ABC D 94. ABC D
20. ABC D 45. A 8 C D 70. ABC D 95. ABC D
21. ABC D 46. A B C D 71. ABC D 96. ABC D
22. ABC D 47. A B C D 72. ABC D 97. ABC D
23. ABC D 48. A B C D 73. ABC D 98. ABC D
24. ABC D 49. A B C D 74. ABC D 99. ABC D
25. ABC D 50. A B C D 75. ABC o 100. ABC D