Category:Letter type:BSEP
MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] Category:License-Operator
MONTHYEARML23065A0702023-03-0606 March 2023 Bru 2022301 2B Exam Administrative Items IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21015A0162021-01-15015 January 2021 301 1A Final RO Written Exam (2-Year Delayed Release) ML21015A0202021-01-15015 January 2021 301 1A Final SRO Written Exam (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20339A4052020-11-30030 November 2020 Operator Licensing Examination Approval 05000325/2020301 and 05000324/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2282019-04-25025 April 2019 Exam 2019-301, Exam Administrative Items (Normal Release) ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML19004A3402019-01-0303 January 2019 Operator Licensing Examination Approval 05000325/2019301 and 05000324/2019301 ML18239A4532018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2D)- Delay Release 2 Yrs ML18239A4522018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML18239A4482018-08-27027 August 2018 302 Exam Final Items (ADAMS-2B)- Delay Release 2 Yrs ML18239A4462018-08-27027 August 2018 302 Examination Draft Items (ADAMS-2A)- Delay Release 2 Yrs RA-18-0049, Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-3012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 IR 05000324/20183012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 ML18110A3212018-04-16016 April 2018 March 2018 - Brunswick NRC Generic Fundamentals Examination Results ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination IR 05000324/20173022017-12-12012 December 2017 (Retake) Operator Licensing Examination Approval 05000325/2017302 and 05000324/2017302 ML17298B1732017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Administrative Items ML17298B1312017-10-25025 October 2017 05000325/2017-301 and 05000324/2017-301 Exam Draft Items ML17298B1612017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Final Items ML17263A6222017-09-20020 September 2017 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments 05000325/2017301 and 05000324/2017301 Post Exam Comments ML17263A6012017-09-20020 September 2017 Final RO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17263A6042017-08-0808 August 2017 Final SRO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17201B5072017-07-18018 July 2017 Operator Licensing Written Examination Approval 050003252017301 and 050003242017301 ML17181A3862017-06-30030 June 2017 Exam Draft Items 2A - Delay Release ML17181A3952017-06-30030 June 2017 Exam Final Items 2B - Delay Release ML17181A4012017-06-30030 June 2017 Exam Administrative Items 2C - Delay Release ML17181A3342017-06-30030 June 2017 Brunswick 2015301 ADAMS 2D - Exam Admin Items ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17012A3042017-01-27027 January 2017 Final RO Written Exam - Delay Release 2 Yrs ML17017A3852017-01-27027 January 2017 Final SRO Written Exam - Delay Release 2 Years ML17017A3892017-01-27027 January 2017 Post-Exam Comment - Delay Release 2 Yrs ML16334A5322016-11-21021 November 2016 Operator Licensing Written Examination Approval 05000325/2016301 and 05000324/2016301 ML16007A2122016-01-0707 January 2016 Initial Exam 2015-301 Post Exam Comments BSEP 15-0105, Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments2015-12-21021 December 2015 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments BSEP 15-0018, Updated Information Regarding Operator Licensing Examinations2015-03-0505 March 2015 Updated Information Regarding Operator Licensing Examinations ML14350A1732014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative JPMs ML14350A1682014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator In-Plant JPMs ML14350A1612014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator Scenarios ML14350A1582014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative Documents ML14350A1552014-12-16016 December 2014 Initial Exam 2014-301 Draft Administrative JPMs 2023-03-06
[Table view] Category:Other HQ and Regional Correspondence
[Table view] |
Text
William R. Gideon DUKE * .* BrunswickVice Nuclear Plant President ENERY,,P.O. Boxl10429 Southport, NC 28461 910.457.3698 December 21, 2015 Serial: BSEP 15-0105 U.S. Nuclear Regulatory Commission, Region II ATTN: Regional Administrator 245 Peachtree Center Aye, NE, Suite 1200 Atlanta, GA 30303-1 257
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments
Reference:
Letter from Eugene F. Guthrie (NRC) to William R. Gideon (Duke Energy),
"Brunswick Steam Electric Plant - Notification of Licensed Operator Initial Examination 05000325/2015301 and 05000324/2015301 ," dated May 15, 2015, ADAMS Accession Number ML15138A340
Dear Regional Administrator:
In accordance with the guidance contained in Revision 10 of NUREG-1 021, "Operator Licensing Standards for Power Reactors," Section ES-402, "Administering Initial Written Examinations,"
and ES-501, "Initial Post-Examination Activities," Duke Energy Progress, Inc., is providing the NRC the specified documentation for the reactor operator and senior reactor operator written examinations, which were administered at the Brunswick Steam Electric Plant on Tuesday, December 15, 2015. The examination documentation enclosures are being provided only to Mr.
Eugene Guthrie, with his copy of this letter. Duke Energy has five post exam comments relating to the written examination included with this submittal letter as Enclosure 2.
The master examination and answer key are provided in Enclosure 6 of this letter, with annotations. All substantive comments made by the applicants following the written examination are included with Enclosure 2. Lastly, the original ES-201 -3 forms, "Examination Security Agreement," with all the pre- and post-examination signatures will be provided via email, as previously discussed with the NRC chief examiner on December 21, 2015.
U.S. Nuclear Regulatory Commission, Region II Page 2 of 3 This document contains no regulatory commitments.
Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.
William R. Gideon WRG/mkb
Enclosures:
- 1. Completed ES-403-1, "Written Examination Grading Quality Checklist"
- 2. Written Examination Performance Analysis Results (with recommended substantive changes)
- 3. Graded Written Examinations and Applicants' Answer Sheets
- 4. Applicants' Questions Asked and Answers Given During the Written Examination
- 5. Written Examination Seating Chart
- 6. Master Examination and Answer Key
U.S. Nuclear Regulatory Commission, Region II Page 3 of 3 cc (with enclosures):
U.S. Nuclear Regulatory Commission, Region II ATTN: Mr. Eugene F. Guthrie Chief, Operations Branch 2 245 Peachtree Center Aye, NE, Suite 1200 Atlanta, GA 30303-1257 cc (without enclosures):
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-000 1 U.S. Nuclear Regulatory Commission, Region II ATTN: Mr. Gerald J. McCoy Chief, Operations Branch 1 245 Peachtree Center Aye, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC
BSEP 15-0105 Enclosure 1 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 1 Completed ES-403-1, "Written Examination Gradinq Quality Checklist"
BSEP 15-0105 Enclosure 2 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 2 Written Examination Performance Analysis Results (with recommended substantive changqes)
BSEP 15-0105 Enclosure 3 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 3 Graded Written Examinations and Appjlicants' Answer Sheets
BSEP 15-0105 Enclosure 4 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 4 ADolicants' Questions Asked and Answers Given Durinq the Written Examination
BSEP 15-0105 Enclosure 5 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 5 Written Examination Seatina Chart
S
- BSEP 15-0105 Enclosure 6 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 6 Master Examination and Answer Key
William R. Gideon DUKE * .* BrunswickVice Nuclear Plant President ENERY,,P.O. Boxl10429 Southport, NC 28461 910.457.3698 December 21, 2015 Serial: BSEP 15-0105 U.S. Nuclear Regulatory Commission, Region II ATTN: Regional Administrator 245 Peachtree Center Aye, NE, Suite 1200 Atlanta, GA 30303-1 257
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments
Reference:
Letter from Eugene F. Guthrie (NRC) to William R. Gideon (Duke Energy),
"Brunswick Steam Electric Plant - Notification of Licensed Operator Initial Examination 05000325/2015301 and 05000324/2015301 ," dated May 15, 2015, ADAMS Accession Number ML15138A340
Dear Regional Administrator:
In accordance with the guidance contained in Revision 10 of NUREG-1 021, "Operator Licensing Standards for Power Reactors," Section ES-402, "Administering Initial Written Examinations,"
and ES-501, "Initial Post-Examination Activities," Duke Energy Progress, Inc., is providing the NRC the specified documentation for the reactor operator and senior reactor operator written examinations, which were administered at the Brunswick Steam Electric Plant on Tuesday, December 15, 2015. The examination documentation enclosures are being provided only to Mr.
Eugene Guthrie, with his copy of this letter. Duke Energy has five post exam comments relating to the written examination included with this submittal letter as Enclosure 2.
The master examination and answer key are provided in Enclosure 6 of this letter, with annotations. All substantive comments made by the applicants following the written examination are included with Enclosure 2. Lastly, the original ES-201 -3 forms, "Examination Security Agreement," with all the pre- and post-examination signatures will be provided via email, as previously discussed with the NRC chief examiner on December 21, 2015.
U.S. Nuclear Regulatory Commission, Region II Page 2 of 3 This document contains no regulatory commitments.
Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.
William R. Gideon WRG/mkb
Enclosures:
- 1. Completed ES-403-1, "Written Examination Grading Quality Checklist"
- 2. Written Examination Performance Analysis Results (with recommended substantive changes)
- 3. Graded Written Examinations and Applicants' Answer Sheets
- 4. Applicants' Questions Asked and Answers Given During the Written Examination
- 5. Written Examination Seating Chart
- 6. Master Examination and Answer Key
U.S. Nuclear Regulatory Commission, Region II Page 3 of 3 cc (with enclosures):
U.S. Nuclear Regulatory Commission, Region II ATTN: Mr. Eugene F. Guthrie Chief, Operations Branch 2 245 Peachtree Center Aye, NE, Suite 1200 Atlanta, GA 30303-1257 cc (without enclosures):
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-000 1 U.S. Nuclear Regulatory Commission, Region II ATTN: Mr. Gerald J. McCoy Chief, Operations Branch 1 245 Peachtree Center Aye, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC
BSEP 15-0105 Enclosure 1 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 1 Completed ES-403-1, "Written Examination Gradinq Quality Checklist"
BSEP 15-0105 Enclosure 2 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 2 Written Examination Performance Analysis Results (with recommended substantive changqes)
BSEP 15-0105 Enclosure 3 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 3 Graded Written Examinations and Appjlicants' Answer Sheets
BSEP 15-0105 Enclosure 4 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 4 ADolicants' Questions Asked and Answers Given Durinq the Written Examination
BSEP 15-0105 Enclosure 5 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 5 Written Examination Seatina Chart
S
- BSEP 15-0105 Enclosure 6 Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Enclosure 6 Master Examination and Answer Key