|
---|
Category:Inspection Report Correspondence
MONTHYEARIR 05000361/20240032024-05-20020 May 2024 – NRC Inspection Report 050-00361/2024-003 and 050-00362/2024-003 IR 05000361/20216402016-07-17017 July 2016 San Onofre Nuclear Generating Station - NRC Security Inspection Report 05000361/216403 and 05000362/2016403, June 23, 2016 IR 05000362/20164032016-07-17017 July 2016 San Onofre Nuclear Generating Station - NRC Security Inspection Report 05000361/216403 and 05000362/2016403, June 23, 2016 IR 05000361/20105012011-01-10010 January 2011 IR 05000361-10-501 & 05000362-10-501, on 12/31/2010, San Onofre Nuclear Generating Station, Units 2 and 3, NRC Emergency Preparedness Annual Inspection Report (Cover Letter) IR 05000361/20094012010-03-26026 March 2010 NRC Physical Security Annual Inspection Report 05000361-09-401 and 05000362-09-401 IR 05000361/20094032009-04-28028 April 2009 NRC Security Inspection Report 05000361/2009403 and 05000362/2009403 IR 05000361/20085012009-03-13013 March 2009 IR 05000361-08-501, and IR 05000362-08-501, on 12/31/2008, San Onofre Nuclear Generating Station, Units 2 & 3 - NRC Emergency Preparedness Annual Inspection Report ML0811307022008-04-22022 April 2008 IR 05000361-08-010, IR 05000362-08-010, 06/09/2008, San Onofre Generating Station - Information Request for NRC Triennial Baseline Component Design Bases Inspection IR 05000361/20075012008-02-21021 February 2008 IR 05000361-07-501, and IR 05000362-07-501, on 12/31/2007, for San Onofre, Units 2 and 3, Emergency Preparedness IR 05000361/20070042007-11-0909 November 2007 IR 05000361-07-004, IR 05000362-07-004; 06/27/07 - 09/26/07; San Onofre Nuclear Generating Station, Units 2 & 3; Integrated Resident and Regional Report; Fire Protection, Maintenance Risk Assessments and Emergent Work Control, and Postmaint ML0721806022007-08-0303 August 2007 Response to Notice of Violation and NRC Inspection Report 05000361/2007404 and 05000362/2007404 - Letter Only ML0718606552007-07-13013 July 2007 Evaluation of 2006 (Cycle 14) Steam Generator Tube Inspection Report Summaries IR 05000361/20074022007-03-15015 March 2007 IR 05000361-07-402, and IR 05000362-07-402, on 10/30/2006 - 02/02/2007, for San Onofre Nuclear Generating Station, Units 2 and 3, Security - Letter Only IR 05000361/20060052007-02-0606 February 2007 IR 05000361-06-005, 05000362-06-005, on 09/24/2006 - 12/31/2006, San Onofre, Units 2 & 3; Integrated Resident and Regional Report; Refueling and Other Outage Activities, Surveillance Testing, Occupational Rad Safety, and PI&R ML0631904142006-11-0808 November 2006 Oak Ridge Institute for Science and Education (Orise); Ltr. Dated 11/08/2006; Analytical Results for Soil & Water Samples Associated with the San Onofre Nuclear Generating Station, San Clemente, California on 10/13/2006 (IR #050-00206/06-01 IR 05000361/20060132006-11-0101 November 2006 IR 05000361/2006013 and 05000362/200613; 08/21/2006 - 09/21/2006; San Onofre Nuclear Generating Station; Annual Baseline Inspection of the Identification and Resolution of Problems ML0622206552006-08-10010 August 2006 IR 05000206-06-012, on 07/17-21/2006, SONGS, Unit 1 IR 05000361/20020032002-02-11011 February 2002 IR 05000361/2002-003, IR 05000362/2002-003; on 1/07/2002-1/11/2002 Southern California Edison; San Onofre Nuclear Generating Station, Units 2 and 3; Radiation Safety Team Inspection Report IR 05000361/20010132002-01-23023 January 2002 IR 05000361/2001-013 & IR 05000362/2001-013, San Onfore, Units 3 & 3, Inspection on 11/04-12/29/2001, Related to the Effectiveness of Risk Assessment and Emergent Work Associated with an Underground Fire Main Break. No Violations Noted 2024-05-20
[Table view] Category:Letter
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 ML24191A2472024-07-0202 July 2024 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24141A0802024-05-15015 May 2024 (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 ML24094A0642024-03-27027 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Status Report 2023 ML24065A0152024-02-28028 February 2024 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation 2023 ML24044A0812024-02-14014 February 2024 LTR-24-0008: NRC Response to Paul Blanch Email Safety of Spent Nuclear Fuel at SONGS ISFSI IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) ML24037A0542024-01-30030 January 2024 (Songs), Units 2 and 3, Submittal of Annual Corporate Financial Reports ML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 And Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Services December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 – NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commissions Analysis of Southern California Edisons Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 2024-09-18
[Table view] Category:Inspection Report
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 IR 05000361/20240032024-05-20020 May 2024 – NRC Inspection Report 050-00361/2024-003 and 050-00362/2024-003 IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 IR 05000361/20220052022-11-17017 November 2022 – NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 IR 05000206/20214022022-03-24024 March 2022 Notice of Violation, NRC Inspection Report 05000206/2021402, 05000361/2021402, 05000362/2021402, and 07200041/2021401; and Investigation Report 4-2021-004- Public- Cover Letter IR 05000361/20220012022-03-14014 March 2022 NRC Inspection Report 05000361/2022-001; 05000362/2022-001 IR 05000361/20210042021-12-0303 December 2021 NRC Inspection Report 05000361/2021-004 and 05000362/2021-004 IR 05000361/20210032021-09-22022 September 2021 NRC Inspection Report 05000361/2021-003 and 05000362/2021-003 ML21200A0622021-07-20020 July 2021 Security Baseline Inspection Report 05000206/2021402, 05000361/2021402, 05000362/2021402, and 07200041/2021402 IR 05000361/20210022021-07-0606 July 2021 NRC Inspection Report 05000361/2021002 and 05000362/2021002 IR 05000361/20210012021-03-0303 March 2021 NRC Inspection Report 05000361/2021001 and 05000362/2021001 IR 05000361/20200042020-12-18018 December 2020 NRC Inspection Report 05000361/2020-004 and 05000362/2020-004 IR 05000361/20200032020-10-22022 October 2020 NRC Inspection Report 05000361/2020003 and 05000362/2020003 IR 05000206/20200072020-09-14014 September 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2020007; 05000361/2020007; 05000362/2020007; and 07200041/2020003 IR 05000361/20204012020-08-0505 August 2020 Security Baseline Inspection Report 05000361/2020401 and 05000362/2020401 IR 05000206/20200062020-08-0404 August 2020 Southern California Edison Company, San Onofre Nuclear Generating Station Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2020006; 05000361/2020006; 05000362/2020006; and 07200041/2020002 IR 05000206/20200022020-07-20020 July 2020 NRC Inspection Report 05000206/2020-002, 05000361/2020-002, and 05000362/2020-002 IR 05000206/20200052020-04-28028 April 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2020005; 05000361/2020005; 05000362/2020005; and 07200041/2020001 IR 05000361/20200012020-02-25025 February 2020 NRC Inspection Report 05000361/2020-001 and 05000362/2020-001 IR 05000206/20190042020-02-20020 February 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2019 004; 05000361/2019 007; 05000362/2019 007; and 07200054/2019-002 IR 05000361/20190062019-12-0909 December 2019 NRC Inspection Report 05000361/2019006 and 05000362/2019006 IR 05000206/20190032019-11-22022 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Inspection Report 050-00206/2019-003, 050 00361/2019-005, 050-00362/2019-005, 072 00041/2019-001 IR 05000361/20190042019-09-25025 September 2019 NRC Inspection Report 05000361/2019-004 and 05000362/2019-004 IR 05000361/20194012019-08-0505 August 2019 Physical Security Inspection Report 05000361/2019401 and 05000362/2019401 IR 05000361/20190032019-07-15015 July 2019 Southern California Edison Company; San Onofre Nuclear Generating Station - NRC Inspection Report 05000361/2019-003 and 05000362/2019-003 IR 05000206/20180062019-07-0909 July 2019 EA-18-155; Southern California Edison Company; San Onofre Nuclear Generating Station; NRC Supplemental Inspection Report 050-00206/2018-006, 050-00361/2018-006, 050-00362/2018-006, 072-00041/2018-002 IR 05000206/20190022019-05-30030 May 2019 NRC Inspection Report 05000206/2019002, 05000361/2019002, and 05000362/2019002 IR 05000361/20180052019-03-25025 March 2019 Notice of Violation and Proposed Imposition of Civil Penalty and NRC Special Inspection Report 050-00206/2018-005, 050-00361/2018-005, 050-00362/2018-005, 072-00041/2018-001 IR 05000206/20190012019-03-18018 March 2019 NRC Inspection Report 05000206/2019001, 05000361/2019001, and 05000362/2019001 IR 05000206/20180042019-02-21021 February 2019 NRC Inspection Report 05000206/2018-004, 05000361/2018-004, and 05000362/2018-004 ML18341A1722018-12-19019 December 2018 Errata for San Onofre Nuclear Generating Station - NRC Special Inspection Report 05000206-2018-005, 05000361-2018-005, 05000362-2018-005, 07200041-2018-001 and Notice of Violation ML18332A3572018-11-28028 November 2018 EA-18-155, Southern California Edison Company; San Onofre Nuclear Generating Station - NRC Special Inspection Report 050-00206/2018-005, 050-00361/2018-005, 050-00362/2018-005, 072-00041/2018-001 and Notice of Violation IR 05000361/20180032018-11-19019 November 2018 Southern California Edison Company; San Onofre Nuclear Generating Station - NRC Inspection Report 05000361/2018-003 and 05000362/2018-003 IR 05000206/20170032018-08-24024 August 2018 NRC Inspection Report 05000206/2017-003, 05000361/2017-003, 05000362/2017-003, and 07200041/2017-001 IR 05000361/20180022018-08-10010 August 2018 NRC Inspection Report 05000361/2018002 and 05000362/2018002 IR 05000361/20184122018-07-16016 July 2018 Security Inspection Report 05000361/2018412 and 05000362/2018412 2024-08-09
[Table view] |
See also: IR 05000361/2008010
Text
UNITED STATES
NU CLE AR RE GU LATOR Y C O M M I S S I O N
R EGI ON I V
611 R YAN PLAZA D R IV E, SU ITE 400
AR LI N GTON , TEXAS 76011-4005
April 22, 2008
Richard M. Rosenblum
Senior Vice President and
Chief Nuclear Officer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
SUBJECT: SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION -
INFORMATION REQUEST FOR NRC TRIENNIAL BASELINE COMPONENT
DESIGN BASES INSPECTION (NRC INSPECTION REPORT
05000361/2008010;050000362/2008010)
Dear Mr. Rosenblum:
On June 9, 2008, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial baseline
Component Design Bases Inspection at the San Onofre Nuclear Generating Station. A team of
six inspectors plus a team leader will perform this 3-week inspection. This inspection will be
performed in accordance with revised NRC Baseline Inspection Procedure 71111.21 and
replaces the biennial Safety System Design and Performance Capability inspection.
The component design bases inspection focuses on components that have high risk and low
design margins. The components to be reviewed during this baseline inspection will mainly be
identified during an information gathering visit and during the subsequent in-office preparation
week. In addition, a number of risk significant operator actions and operating experience
issues, associated with the component samples, will also be selected for review.
The inspection will be 4-weeks onsite, including the information gathering site visit and 3-weeks
of onsite inspection. The inspection will consist of six NRC inspectors, of which five will focus
on engineering and one on operations. The current inspection schedule is as follows:
Onsite information gathering visit: Week of June 9, 2008
Onsite weeks: June 23, July 7 and July 14, 2008
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with a member of your probabilistic risk analyst staff. Additional information
and documentation needed to support the inspection will be identified. A Region IV senior
reactor analyst was requested and may accompany the inspection team during the information
gathering visit to review probabilistic risk assessment data and assist in identifying risk
significant components, which will be reviewed during the inspection.
Experience with previous baseline design inspections of similar depth and length has shown
that these inspections are extremely resource intensive, both for the NRC inspectors and the
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive
inspection, we have enclosed a request for information needed for the inspection. The request
has been divided into three groups. The first group lists information necessary for the
information gathering visit and for general preparation. This information should be available to
the regional office no later than May 12, 2008. Insofar as possible, this information should be
provided electronically to the lead inspector. Since the inspection will be concentrated on high
risk/low margin component, calculations associated with your list of high risk components
should be available for the inspectors to review during the information gathering visit to assist in
our selection of components based on available design margin.
The second group of documents requested are those items that the team will need access to
when onsite and after components are selected. The third group lists information necessary to
aid the inspection team in tracking issues identified as a result of the inspection. It is requested
that this information be provided to the lead inspector as the information is generated during the
inspection. It is important that all of these documents are up to date and completed in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection. In order to facilitate the inspection, we request that a contact
individual be assigned to each inspector to ensure information requests, questions, and
concerns are addressed in a timely manner.
The lead inspector for this inspection is Mr. Kelly Clayton. We understand that our licensing
engineer contact for this inspection is Mr. Mike McBrearty. If there are any questions about the
inspection or the requested materials, please contact the lead inspector at (817) 860-8216 or via
e-mail at kelly.clayton@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA/
Russ Bywater, Chief
Engineering Branch One
Division of Reactor Safety
Dockets: 50-361; 50-362
Licenses: NPF-10; NPF-15
Enclosure:
Component Design Basis Inspection
Document Request
cc w/enclosure:
Mr. Ross T. Ridenoure
Vice President and Site Manager
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, CA 92101
Gary L. Nolff
Assistant Director-Resources
City of Riverside
3900 Main Street
Riverside, CA 92522
Mark L. Parsons
Deputy City Attorney
City of Riverside
3900 Main Street
Riverside, CA 92522
Dr. David Spath, Chief
Division of Drinking Water and
Environmental Management
California Department of Health Services
850 Marina Parkway, Bldg P, 2nd Floor
Richmond, CA 94804
Michael J. DeMarco
San Onofre Liaison
San Diego Gas & Electric Company
8315 Century Park Ct. CP21G
San Diego, CA 92123-1548
Director, Radiological Health Branch
State Department of Health Services
P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
Mayor
City of San Clemente
100 Avenida Presidio
San Clemente, CA 92672
James D. Boyd, Commissioner
California Energy Commission
1516 Ninth Street (MS 34)
Sacramento, CA 95814
Douglas K. Porter, Esq.
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, CA 91770
A. Edward Scherer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Mr. Steve Hsu
Department of Health Services
Radiologic Health Branch
MS 7610, P.O. Box 997414
Sacramento, CA 95899-7414
Mr. James T. Reilly
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Chief, Radiological Emergency Preparedness Section
National Preparedness Directorate
Technological Hazards Division
Department of Homeland Security
1111 Broadway, Suite 1200
Oakland, CA 94607-4052
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Clyde.Osterholtz@nrc.gov)
Branch Chief, DRP/D (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP/D (Greg.Werner@nrc.gov)
Senior Project Engineer, DRP/D (Geoff.Miller@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
NRR CDBI Coordinator, (Donald.Norkin@nrc.gov)
Only inspection reports to the following:
DRS STA (Dale.Powers@nrc.gov)
J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov)
ROPreports
SO Site Secretary (Heather.Hutchinson@nrc.gov))
SUNSI Review Completed: _Yes_ ADAMS: Yes No Initials: _KDC _____
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
S:DRS\REPORTS\SO CDBI FRI ltr-KDC ML
RIV:RI:DRS/EB1 BC/EB1
KDClayton RBywater
/RA/ /RA/
04/22/08 04/22/08
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
INFORMATION REQUEST FOR SAN ONOFRE NUCLEAR GENERATING STATION
COMPONENT DESIGN BASES INSPECTION (CDBI)
Inspection Report: 05000361/2008010; 05000362/2008010
Information Gathering Dates: June 9 - 11, 2008
On-site Inspection Dates: June 23 - 27 2008, July 7 through July 18, 2008
Inspection Procedure: IP 71111.21, Component Design Bases
Inspection
Lead Inspector/Team Leader: Kelly Clayton
817-860-8216
kelly.clayton@nrc.gov
I. Information Requested Prior to the information Gathering Visit
The following information is requested by May 12, 2008, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, pleased
call the lead inspector as soon as possible. (Please provide the information
electronically in pdf files, Excel, or other searchable formats. The information should
contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.
Information in "lists" should contain enough information to be easily understood by
someone who has knowledge of pressurized water reactor technology).
1. An excel spreadsheet of equipment basic events (with definitions)
including importance measures risk achievement worth, Fusselly-Veseley
(RAW, FV) from your internal events probabilistic risk assessment (PRA),
including risk ranking of top 50 components from your site-specific PRA
sorted by (RAW). Include values for Birnbaum Importance, risk reduction
worth (RRW), and Fussell-Veseley FV (as applicable).
2. Provide a list of the top 500 cut-sets from your PRA.
3. Copies of PRA system notebooks.
4. An excel spreadsheet of PRA human action basic events or risk ranking
of operator actions from your site specific PSA sorted by RAW and FV.
Provide copies of your human reliability worksheets for these items.
5. If you have an external events or fire PSA model, provide the information
requested in items 1-3 for external events and fire.
6. Any pre-existing evaluation or list of components and associated
calculations with low design margins, (i.e., pumps closest to the design
limit for flow or pressure, diesel generator close to design required output,
heat exchangers close to rated design heat removal, etc.).
7. List of high risk maintenance rule systems/components and functions;
based on engineering or expert panel judgment.
8. A list of operating experience evaluations for the last 2 years.
9. Any pre-existing evaluation or list of components and calculations with
low design margins (i.e., pumps closest to the design limit for flow or
pressure, diesel generators close to design required output, heat
exchangers close to rated design heat removal, etc.).
10. A list of permanent and temporary modifications sorted by component
identified in Item 1.
11. List of current operator work arounds/burdens.
12. A list of the design calculations, which provide the design margin
information for components included in Item 1. (Calculations should be
available during the information gathering visit).
13. List of root cause evaluations associated with component failures or
design issues initiated/completed in the last 5 years.
14. Current management and engineering organizational charts.
15. San Onofre Nuclear Generating Station IPEEE, if available electronically.
16. Mechanical piping drawings for:
Engineered safety features
Emergency core cooling Systems
Emergency diesel generators
17 Electrical one-line drawings for:
Offsite power/switchyard supplies
Normal ac power systems
Emergency ac/dc power systems including
120Vac power, and
125Vdc/24Vdc safety class systems
18. List of any common-cause failures of components in the last 3 years.
II. Information Requested to be Available on First Day of Inspection (June 23,
2008)
1. List of condition reports (corrective action documents) associated with
each of the selected components for the last 5 years.
2. The corrective maintenance history associated with each of the selected
components for the last 2 years.
3. Copies of calculations associated with each of the selected components
(if not previously provided), excluding data files. Please review the
calculations and also provide copies of reference material (such as
drawings, engineering requests, and vendor letters).
4. Copies of operability evaluations associated with each of the selected
components and plans for restoring operability, if applicable.
5. Copies of selected operator work-around evaluations associated with
each of he selected components and plans for resolution, if applicable.
6. Copies of any open temporary modifications associated with each of the
selected components, if applicable.
7. Trend data on the selected electrical/mechanical components
performance for last 3 years (for example, pumps performance including
in-service testing, other vibration monitoring, oil sample results, etc., as
applicable).
8. A copy of any internal/external self-assessments and associated
corrective action documents generated in preparation for the inspection.
9. A copy of engineering/operations related audits completed in the last 2
years.
10. List of motor operated valves (MOVs) in the program, design margin and
risk ranking.
11. List of air operated valves (AOVs) in the valve program, design and risk
ranking.
12. Structure, system and components in the Maintenance Rule (a)(1)
category.
13. Site top 10 issues list.
14. Provide list of PRA assumptions regarding operator actions and the
associated procedures.
15. List of licensee contacts for the inspection team with pager or phone
numbers.
III. Information Requested to be provided throughout the inspection.
1. Copies of any corrective action documents generated as a result of the
teams questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/ resolution of the information requested (provide daily during the
inspection to each team member).
3. Reference materials (available electronically and as needed during all
onsite weeks):
General set of plant drawings
IPE/PRA report
Procurement documents for components selected
Plant procedures (normal, abnormal, emergency, surveillance, etc.)
Technical Specifications
Updated Final Safety Analysis Report
Vendor manuals
Inspector Contact Information:
Kelly Clayton
Senior Reactor Inspector
(817) 860-8216
kelly.clayton@nrc.gov
Mailing Address:
US NRC, Region IV
Attn: Kelly Clayton
611 Ryan Plaza Dr, Ste 400
Arlington, TX 76011