August 5, 2020
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION UNITS 2 and 3 -
SECURITY BASELINE INSPECTION REPORT 05000361/2020401 AND 05000362/2020401
Dear Mr. Bauder:
On July 8, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the San Onofre Nuclear Generating Station, Units 2 and 3 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety
Docket Nos. 05000361 and 05000362
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000361 and 05000362
License Numbers:
Report Numbers:
05000361/2020401 and 05000362/2020401
Enterprise Identifier: I-2020-401-0006
Licensee:
Southern California Edison
Facility:
San Onofre Nuclear Generating station
Location:
San Clemente, Ca
Inspection Dates:
July 6, 2020 to July 8, 2020
Inspectors:
A. Meyen, Physical Security Inspector
Approved By:
Ray L. Kellar, Chief
Plant Support Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at San Onofre Nuclear Generating station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
81200.02 - Access Control for Decommissioning Reactors
Access Control (1 Sample)
(1)
- Tier I: all requirements
- Tier II: None
- Tier III: None
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On July 8, 2020, the inspector presented the security baseline inspection results to Mr. Doug Bauder, Vice President and Chief Nuclear Officer, other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
200.02
Corrective Action
Documents
0119-96767
219-80681
0419-22148
20-75968-2
20-41769
CR
SDS-000702
Procedures
SO123-5.3.3
Search and Inspection
SO123-IV-5.1
Protected Area and Vital Area Access
SO123-IV-5.3.5
Vehicle Search and Escort
SO123-IV-6.8.4
Hardened Post Operations
SO123-XV-13
1410 Access Authorization Process for PA-VA
Self-Assessments Nuclear Oversight
Division
Security Program Audit
20